Loading...
HomeMy WebLinkAbout20180875 Ver 1_Mitigation Acceptance Letter_20180622PAT MCCRORY GOVERNOR STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATTON June 23, 2015 Ms. Beth Harmon, NCDOT Coordinatar Division of Mitigation Services 1625 Mail Service Center Raleigh, NC 27699-1625 ANTHONY J. TATA SECRETARY Subject: Request Acceptance Letter for Compensatory Mitigation Credits Replace Bridge No. 220 on SR 1351 (Matlock Creek Road) over Matlock Creek Macon County WBS Element: 17BP.14.R.111 Dear Ms. Harmon: The North Carolina Department of Transportation (NCDOT) is proposing to replace the subject bridge. This proposal entails replacing the existing timber bridge with a 16'2" W x 5' 1" H x 45.5' L aluminum box culvert with headwalls on existing location in Matlock Creek (DWR Class: C). Impacts to Waters of the United States In order to replace the existing bridge structure, it will be necessary to impact waters of the United States in the Little Tennessee River Basin (HUC 06010202). Specifically, NCDOT is requesting compensatory mitigation for impacts to 461inear feet of cold water stream at a 2:1 ratio. If you have any questions or need additional information, please contact me at (828) 586- 2141. Your early review and consideration will be greatly appreciated. 5����.� � Mark S. Davis Division 14 Environmental Supervisor cc: Mr. Josh Deyton, PE, Division 14 Bridge Management Engineer, NCDOT ---------- — --- — ----- -- --- ---_ �'�. Fourteenth Division Office � � ITelephone: (828) 586-2141 253 Webster Road, Sylva, NortU Carolina 28779 Fax: (828) 586-4043'� ��� ��� North Carolina Department of Environment and Natural Resources Pai McCrory Division of Mitigation Services Governor June 24,2015 Mr. Mark S. Davis NCDOT Division 14 Enviroiunen[al Supervisor North Carolina Dzpartmen[ of Transportafion 253 WebsterRoad Sylva, North Carolina 28779 Dear Mr. Davis: Subject Mitigation Acceptance Letter: Donald R. van der Vaart Secretary ��' ��� ��� JUN 2 4 2015 �'V1�7��� �� Division 14 Project, Replace Sridge 220 0� SR 1351 (Matlock Creek Road) over Matlock Creek, Maco� Counly; WBS Element 17BP.f4.R.111 The purpose of this letter is to no[ify you that tlie Division of Mitigatioo Services (DMS) will provide the compensatory stream nutigation for the su6ject project. Based on the i�fomiation received on June 23, 2015, the impacts are located in CU 060] 0202 of the Little Te�messee River Uasin iu the Southem Mountauis (SM) Eco- Regiou, and are as follows: Little Tennessee Stream Wetlands Buffer (Sq. FtJ 06010202 Non- Coastal SM Cold Cool 6Vann Riparian Zone 1 Zone 2 Ftiparian Marsh Impacts 46.0 0 0 0 0 0 0 0 (Feedncres) Tlils impact and associated mitigation need were under projected by the NCDOT' in the 2015 unpact dala. DMS wili conuuit to implement suCficient compensatory stream mitigatiou credi�s to offset lhe impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Sec[ion F.3.c.iii of [he In-Lieu Fee Instrument dated July 28, 201 D. If the ahove refere�ced impact a�noui�ts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required fi�om DMS. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707- 8420. Sincerely, �� I\� James . Stanfill Asset � nagement Supervisor Ms. Lori Beckwith, USACE - Asheville Regulatory Field Office Mr. Josh Deytoq P.E., NCDOT - Division 14 Bridge Maintenance �ngineer Ms. Linda Pilzpatrick, NCDOT - PDEA File: SR 1351 -Bridge 220-Division l4 1652 tifail Service Center, Raleigh, Notlh Carolina 276994G52 Phone:919-707�97fi 1lnlernet:http:l/podal.ncdenr.org/web/eep An Equal Op�itunily \hffirmalive Ac�ion Employer—MaOe in pan by recyclM paper