Loading...
HomeMy WebLinkAbout20180871 Ver 1_Permit Plans_20180622in 3 See Sieet 7A For Index of 5/eets See Sl�et 1B Fo� Convenflonal Symbols �v�.F]1v�IL'e �ll' ���Il4��4llll `V.c51114.��.e1lA\'� �� U' ����1W �ll' ���lYllll V'V' t7\ ll � TRAI�SYLVA11tIA COUI�TY LOCATIOIV: BRIDGE 11Zo.137 ON SR ]107 (EAST FORK ROAD) OVER BRADLEY CREEIC TYPE OF WORK GRADIPIG, DRAl1�7AGE, PAVIIVG A1�D STRUCTURE (CULVERT) "' l�6 700% ROADWAY PLANS SUBMITTAL NO: D—010 DATE: JUNE 3, 2016 P(AHS PREPAREO 6Y: `� 'p' ^�, JJyDRAULlCS GNGINEEA GRAPHIC SCALES DESIGl�I DATA PROJECT LENGTH ���u ,szo soorx eoo�evann, sarrc 200 �`��\H �_R0�^.� O�. CXARLOTT&� NC 28203 $�,2�j�pkE55/ 9�> p ADT 2017 = 260 �oa-isz-oeto sent `; ° 50 25 0 50 700 LENGTH ROADWAY = 0.094 MILES ___ Foa rne xoarn caaouxa oerareneer✓r aF rRavsPoirrnrrox ;;4 a5iee ;'�j�� ��,w �s �awrq ���-�� LENGTH STRUCTURE = 0.006 MILES �o�: sr.+xoa,� s��r,.«c.�rroxs '� � w tl �O i F�,: INEt.O.�„t.0� uarrE�urhu. p4 9 PlANS -- ---- JENNIFER FARINO,_PE _ �"�.;�wininE;;e'� bi�im�s � TOTAL LENGTH = 0.700 MILES rn �eii c,vcrres�ax x.�ru������ —���—� P�� � �' T = 6 % RIGHT OF {VAY DATE: °�'p',p��. ROADNAY DGSIGN 50 2,5 �.0 � 0 V = 35 MPH 2O74 ,P'�;�H"i'si'i' ��:;.�'0, CsNGINGLR � � r rr � 1 SEAN KORTOVICH, EI or ¢, A� PROFIIE (HORIZONTAL) rn�ccrnasrcnen %4's�i'�'�:, 3 `"�s �°@ 10 5 0 10 20 FUNC CLASS = LET77NC DATE: !, oso9ss ,:' `;�.,;,f„' �� YdA4�$� LOCAL JOSH DEYTON PE ��'�.;^'�ER�oEi":o'` ������ sirono�s PROPIIE (VERTICAL) SUBREGIONAI TIER n�oz w.v�.�cr Note: Not to Scale *S. U.E. = Subsurface Utility Engineering BOUNDARIES AND PROPERTY.• S}a}e Line Coun}y Line Township Line City Line Reservafion Line Property Line Existing Iron Pin � Property Corner �- � Property Monument � Par<eVSequen<e Number iza Existing Fence I.ine — -�-��---�---x--x—x- Proposed Woven Wire Fence Proposed Chain Link Fence a Proposed Barbed Wire Pence 6 Exisiing Wetland Boundary ------ ----•��--- Proposed Wetland Boundory �ie Existing Endangered Animal Boundary E°� Exis}ing Endangered Plnnt Boundary E_� Known Soil Contamination: Area or Site --�- � Potential Soil Con}aminafion: Area or Si1e -- �2 --- �% BUILDINGS AND OTKER CULTURE:• Gas Pump Vent or WG Tank Cap O Sign � Well . Small Mine 5Z� Foundafion 0 Area Outline _._.__._._ ___ ................._.._ �_� Cemetery 0 Building � s�r,00i � Church � Dam HYDROLOGY.• $tream or Body of Waier Hydro, Pool or Reservoir �__ __ J Jurisdictional Stream .`.._15_—... _ Buffer Zone 1 � � ._ . Buffer Zone 2 ...— —�-- .... .. .._ .. ..... Flow Arrow -�---...—� Disappearing Sfream }—..�—��� Spring c�-'.�_-^ Wetland � Proposed Lateral, Tail, Hepd Di}ch False $ump � �"I � �I� �.��I I— �' i�l '� � � 1�1V�I IM��� i�l H H�,��l� CONVENTIONAL PLAN SHEET SYMBOLS RAILROADS.• Standard Gauge -- ����— -�-.�� RR SignalMilepost - Po�� Swiich . ul�f�J� RR Abandoned - -n- -.-- RR Dismantled ��----- RIGHT OF WfIY.• Baseline Control Point . Existing Righ} of Way Marker /� Existing Righ} of Way Line - Proposed Right af Way Line ---�-- Proposed Right of Way Line wifh -�� Iron Pin and Cap Marker Proposed RightofWay Line with . __..m . ....�__ Concrete or Granite R!W Marker—��-- �7 V Proposed Cantrol of Access Line with � Concrete C/q Marker Exisfing Conirol of Access ��-- -�,--- Proposed Control of Access -� Existing Easemen}Line ... - E__.__ Proposed Temporary Consiruction Easemeni -�� E Proposed Temporary Drpinoge Eosement —Toe— Proposed Permanen}Drainage Eqsement— --poE— Proposed Permanen} Drainage / Ufility Eosemeni—oUE— Proposed Permanent Utili}y Easemenf puE-- Proposed Temporary Utilify Easemen} TUe— Proposed Aerial Utilify Easemen} AUE— Proposed Permaneni Easemeni wiih O Iron Pin and Cap Marker � ROADS AND RELATED FE.9TURES: Existing Edge of Pavement Exisfing Curb -- -�-� ----- Proposed Slope Stakes Cui --- �--- Proposed $lope Sfakes Fill --- F---- Proposed Cur6 Ramp CR Exis}ing Me}al Guardmil ---' � - Proposed Guardrail -�-���� �T--�-LL Existing Ccable Guiderail ^ � _n._. Proposed Cable Guiderail " " ,a-� Equality Symbol - ������-- � Pwement Removal --�� -- � PEGETATION.� Single Tree �7 Single Shrub - o Hedqe ^^--.-.-^.-,,,..-^,- Woods Line �-._.� ..�^�^•,a..m„ Orchard Vineyard EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall- MINOR: Head and End Wall Pipe Culvert —��-�����-- Pootbridge -��- Drainage Box: Catch Basin, DI or JB Paved Ditch G�iter Storm Sewer Manhole $}orm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joini Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer lVG Power Cpble Hand Hole H-Frame Pole Recorded WG Power Line Designated WG Power Line (S.U.E.*) TELEPHONE: Q €) O � 0 0 ���� ��( �\ OO r=� Existing Telephone Pole + Proposed Telephone Pole -O- Telephane Manhole OO Telephone Booth O Telephone PedesTal --- Ll Telephone Cell Tower � lVG Telephone Cable Hand Hole � Recorded lVG Telephone Cable � Designaied WG Telephone Cable (S.U.E.')— ----�--- Recorded lVG Telephone Conduit �_ Designated U/G Telephone Conduit(S.U.E.*)- ----*�---- Remrded lYG Fiber Opfics Cable �-- ��° Designated WG FiberOpticsCable(S.U.E.''f ---��°--� WATER: Wa}er Manhole OO Wa}er Me}er o Wa}er Valve � Water Hydrani � Remrded lYG Water Line � Designated lYG Water Line (S.U.E.*) ----+---- Above Ground Water Line rv: N Satellite Dish CS N Pedestal ---�- c� N Tower � lL� N Cable Hand Hole J Recorded lVG N Cable --�- �• Designated l4G TV Cable (S.U.E.') -----����--- Recorded lVG Fiber Optic Cqble �° �°— Designated LVG Fiber Optic Cdble ($.U.E.`r ----���°-- GAS: Gas Valve � Gas Meter Q Recorded WG Gas Line - _ Desig�ated lL�i Gas Line (S.U.E.") ---�---- Above Ground Gas Line SANITARY SEWER: Sani}ary Sewer Manhole --- OO Sanitary Sewer Cleanaut - �+ lYG Saniiary Sewer Line --����--- ---:, Above Ground Sanitary Sewer Remrded SS Forced Main Line «,-.....-- Designated SS Forced Main Line (S.U.E.`) -----�.�---- MISCELLANEOUS: Uiility Pole � Utiliiy Pole with Bose ❑ Utiliiy Located Object � Ufiliiy Traffic Signal Box ps U}iliiy Unknown WG Line ,��.— lVG Tank; Wafer, Gas, Oil �� Underground Storage Tank, Approx. Loc. — 'o�js� P!G Tank; Water, Gas, Oil �� Geoenvironmenial 6oring � lVG Test Hole (S.U.E.*) � Abandoned According to Utilify Remrds — AqTUR End of Informafion E.O.I. - - - -- ---- -- - - - -_ _ - ---- ---- ---- - -- - - - - _ - - - - - --- - LIIAITS OF GEOTEXTILE PEINFOflCEMENT I___________________'_'... I I� �� �����^ � ���\� 95"X 6�" PIPE ApCH ______'"'_______________ I i� � � `O Q GEOTEXTILE MACHINE � K DZIlECTION (MD) � w ma � _'.' ___-----__'__7 _ I GEDTEXTILE CHOSS-MACHINE � OIPECTION (C�) �I I �..�I�\ \ 1 VARIABLE LENGTH ��I����^� ���� FRONT ELEVATION GEOTEXTILE REINFORCEMENT (TYPE 5 GEOTEXTILE) WALL REINF. WIDE�WIDTH HEIGHT LENGTH TENSILE STFENGTH H L @ ULTIIAATE (MD) (ft) (ft) llb/ft) < 4 6 2400 4 TO 6 6 3400 6 TO 0 = H 4300 B TO 10 = H 5200 GENEPAI NOTES: 1. FOFi FEINFOFCEO SANOBAG HEADWALLS, SEE SAN�BHG HEA�WALLS PROVISION. 2. FEZNFORCE� SANDBAG HEAOWALLS ARE BASED ON A TflAFFIC SURCHAHGE OF 250 LB/SF Op LE55 AND A BACK SLOPE OF 2:1(H:V) OH FLATTEq. 3. PEINFOHCED SANDBAG HEADWALlS AflE BASE� ON THE FOLLOWING IN-SITU ASSUMEO SOIL PARAMETEqS: I/NIT WEIGHT,Y = 120 LBlCF FflICTION AN�LE�� = 30 OEGFEES COHESION, c = 0 LB/SF 4. DO NOT USE flEINFOflCEO SANDBAG HEADWALLS IF ASSUTAE� SOIL PAFAMETEHS AflE NOT APPLICABLE. 5. �0 NOT USE HEINFOFCEO SANDBAG HEA�WAILS WHEN VEflY LOOSE ON SOFT SOIL OH MUCK IS BELOW SANDBAGS OF PZPES. 6. DO NOT PLACE GEOTEXTILE IlEINFONCEMENT OF SAN�BAGS UNTZL EXCAVATION �IMENSZONS ANO FOUNDATION MATEFIAI HqE APPNOVEO. �. 24" LONG N4 flEINFOflCING STEEL BAHS MAV BE SU85TITUTE� FOF 8" LONG STEEL SPIKES. ORIVE N4 BAF TNqOUGH NO MOflE THAN 5 SANOBAGS. e. DO NOT SPLICE OP OVEflLAP GEOTEXTILE HEINFOflCEMENT 50 SEAMS AFE PARALLEL TO THE HEADWAIL FACE. 9. HEAOWALL �Ih1ENSI0NS MAY BE PDJUSTED AS DIRECTED BY THE ENGINEEH. • • EACH BHG CONNECTED WITH 4 - 8" SPIKES • SANDBAG PLAN VIEW Z� 0, 3, p�� (APPft X MIN. (I) ���������� �� � )� 95" X 67" �� I )) PIPE ARCH �ia,� ________________ SLOPE V1 OP � TER � SIDE ELEVATION TOTAL AREA SAN�BAG HEADWALL = 185 S.F. GEOTEXTILE FEZNFOFCEMENT ________________________________.._._........ .. .. . ... . .._......_____________________ .._____ ....__ ____________.._______ ....._____ .........._______________..... .._____________________...... .. ......._..__________________. _.......... .......________________________.. ....________" NDTE: PIACE TEMPORARY ROCK SEDIMENi OPMS TYPE - B � AND TEMPORARY ROCK SILT CHEGKS TYPE - A AT ENVIRONMENTALLY SENSRIVE AREA OR4INAGE OUTLETS. SEE PROJECT SPECIAL PROVISIONS NOTE: UTILIZE SPECIAI STIIUNG BASIN AS SiiLLING BASIN WHERE APPtICABLE. PROPO ALUMIN DETAIL A �>�a � sw Faorn srn. n+oo .o :.n ia.3s �� �xn � N Q W � Q Z INSTALL DRIVEWAY PIPE DURING CLEARING & GRUBBING PHASE CLEARMG AND GRUBBING EROSION CONTROL FOR CONSTRUCTION SHEET 4 z 0 � CUL�VERT C�NSTRUCTIaN S�QIJE�CE �-L-- STA. 13�14 1. UTIl,IZ� SP�CiAI, STI[,�ING BASIN(Sy AS N�EDED THROUGHOUT CULVER7 CONSiRUCTION. 2. STAGE 1-- CONSTRUCT IMPERVIOUS DIKES FOR TH� D�T�UR AND INSTA�L 24 INCH TFMPORARY PIPE, DIVERTING FLOW THROl1GH 7H� TEMPORAIiY PIP�. 3. CONSTRUC7 PfZOP05EC7 D�70UR CULV�RT AND iNLEVOUTLET CHANN£l. IMPROV�MENTS. 4. REMOVE IMPERVIOUS DIKES AND TEMPORARY PIPE �Olt i'HE DETOUR. DNERT FI.OW THCtOUGH TH� �ETOUR CULVERT. 5. STAGE 2- C�NSTRUC�' IMP£RVIOUS D1KES FOR THE PROPOSED CIJLVERT AND INSTALL 24 lNCH TEMPORACtY PIP�, DIVERTING FLOW THRQUGH THE �"EMPORARY PiPE. 6. CONSTRUCT PROP�SE� CULVERT AND INLET/OUTI.ET CHANNEL IMPRQVEMENTS. 7. REMOVE IMPERVIDUS DIKES AND TEMPORARY PIPE. DlV�RT FLOW THROUGH THE PROPOS�D CULV�RT. $. COMPLETE ROADWAY. EXISTING BRIDGE PROPOSED 7'll" X 5'7" �, METAL P1PE ARCH CULVERT STAG E 1 ���r�rnVIOUS DIKE T�MPORARY DIVERS[ON PIPE (24" CMP @ � .5% M� N IMUM� ��IL�1T��7T:i� IMPERVIOUS DIKE PROP4SED 22'--1" X 6'-6" ALUMINUM BOK CULVERT STAG E 2 a �`` `, y-� \ � ae ~� 2� '"'�i�.,� . . s/�e S/' . � T�NIPORARY DIVERSION PIPE (24" CMP @ 1.5% MINIMUM) 2 IMPERVIOUS �IKE PROPOSED 7'��" X 5'7" METAL PIPE ARCH CU�VERT ��� �� �� _�-� �/ � PROPOSED ALUMINUM srec DETAIL A rn oA..a � si, raos srn. n� oo ro s.a �a+as -i- �xn NOTE: PL10E TEMPORARY ROCK SEOIMENT DAMS TYPE - B AND TEMPORARY ROCK SILi CHECKS TYPE - A AT DRAI-AGE OUiLEfS. NOTE: UTILIZE SPECIAL STItLING BASIN AS STILLING BASIN WHERE APPtICABLE. RSs�I O Q W 0 Q Z ���cii pua�.�n ��'.�'[eats) ensr ON l' " gh QuuliiY Wore� Zo, e Gxvt R=l r ro sSc�snednrPravtrlo�i. j r Spaia(Co�„tde.o��or�:. NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL REQUIRE PRIOR APPROVAL BY ENGINEER. ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS DIRECTED 8Y THE ENGINEER. I I , NOTE: PtACE TfMPORP.RY ROCK SEDIMENT �AMS TYPE - B � AND TEMPORARY ROCK SILT CHECKS ttPE - A AT ENVIRONMENTAILY SENSITIVE AREA DRAINAGE OUTLETS. SEE PROJECT SPECIAL PROVISIONS NOTE: UTILIZE SPECIAt STILIING OASIN AS STILLING BASIN WHERE APPlICAOIE. DETAIL A �,o.. � �b FaoM sra.iz+se.�3 to nn.�a+so�oei-jii� Pa 17BP14RJ22 � Ecaicrorv57.4 RS�1 CLEARING AND GRUBBING EROSION CONTROL FOR CONSTRUCTION SHEET 4 O -LDET- STA, 10+92 to -LDET- STA. 12+62.99 RT DETAIL A srec ir.�„:,�in ircH �,,..a --`- ��, vaoM sla.iz.se.�aro srn.ia.so-ioer-�i'� I 1 ' NOTE: PIACE TEMPORARY ROCK SEDIMENi DPMS TYPE - B AND TEMPOFARY ftOCK SILT CHECKS TYPE - A AT DRAINAGE OUTlETS. NOTE: UTILIZE SPECIAI STIILING BASIN AS STILIING BASIN WHERE APPLICABLE. O PROPOSED TEMPORARY 7'll' X 57' MET?L PIPE ARCH CULVERT —LDET— STA. 72+58.33 io —LDET— STA, 73+50 (LT) O N Q ❑ Q Z �nv�� ctuALr�'1'�vATenls) SIS'r N�gh �ualiry IYa er,Zore Fxra� /S+Sf A� G.Spr..:a(Ao�.:o�r !. =��otco,,,m:.��ro�,. NOTES: ANY DEVIATION FROM OPTIONS GNEN WILL REQUIRE PRIOR APPROVAL 6Y ENGINEER. ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS DIRECTED BY THE ENGINEER. a«�s:yn embw�io: eioFosaz�xo-aanaisr-sco3soecnaov + + I EL.2399.1* BENCHN�ARK #2: NAIL IN BASE OF 18" POPLAR �2e73' LT�. Q� -�-- STA. 13+-55.20 EL. 2403e13' 15'-10" LL.2398.7' n�AWN �Y : Mb�- pdTE : 07/2014 cH�cxeo BY :�__ T�p anre : U8/2D19 fIESTGN CNGINEER ��g , 08/201q 6F RECOR� : ._..nATF. . BM �1� 15"H�PE 459-00,-OD,• BM # ` CLASS S R7(' RAP (TYP.i - � PROPpSE� Sq'-0°x 22'-1"x 5`-6" ALIIMINUM BOX CLILUERT STd, i3�r]q.�0 -L- � MOMENi SLAB fTYP.F '�- f'C20f'OSE❑ Gl1ARORAIL fROAdWAY PAv zTEM _�_ & �ETATLI (TYP,I LOCATION SK�TCH 24'-7„ 7�_3•, -L-� ~� EL. 2398.7 � . ---�EL. 2398.7 W �ROF���E ALONG � GLJ�VERT � � � 27'-7„ FOR UiILT'I"Y INFORMdTION, SEE 11TILTTY PLANS AN� SPECIAL PRUVISIDNS S,_2•, EL. 2397.8 � � � EL. 2397.8 * TOTAL STRUCTURE QUAN�f�TI�5 REMOVAL OF 57RUCTURC dT STA.(3+54.00 -L- ___LIJMP SUM Cl1�VERT EXCAVATIDN AT STA.33+14.OD -L- _____LLJMF' SIJ�h ALU�fINUNi BOX CUI_YERT ____________________ ___LUMP SUM RIP r�AP, CLASS I-----------_.� -- --------------86 TONS c�or�xrr�E FaR o�nzr�nc� _________._______......_�� sa, ros. EPDXY COATECI REINFC3#�CING STE£I_ _____________2676 �BS. CLA55 AA CONCREi� ______._ _________25.f7 C.Y. CLAS5 TI iYPC I SELECT MATERIAL __________.._..16 TONS � PAYMENT F6R MOMFiJT SLAB NOTES ASSUM�D LIVE LOA�= HL-93 Oft ALiERNA7E LOAf7ING. CULVEfZ7 IS TO BE OESIGNEn FDR A MTiVIMUM FILL DEPTH OF 3.09 FT.AN❑ A MdXIMUM rLLL �EPTH OF �.97 �T. THE RESI�ENT ENGINEER SHALL CMECK TN� l.£NG7H QF CUl_VERT t3E�ORE STAKING IT 0[1T TO MAKE CERTAIN THA'f IT �VILi. PR01'ERLY TAKE CARE aF TNE FILL. FQR ALIJMINUM BOX CIJLVERT,SEE SPECIAL PRaVI5I0N5. ALL MATERIALS SHALL MEET THE REQLJIREMEN75 as= rriE NCi707 S7ANdAF2� SPECIFICA7ION5 FOR ROA05 AN� Siftl1CTL1RE5 DATE� JANllARY 2012. TNE nE7ALL5 SHOWN ARE FOR GEIVERAL LAYOLlT ONLY,THE SIJPPLI�n SHAL� PROVi�E bF5IGN5 dN� 0�7AiL5 FOR REVI�W ANp hPPROVAL THAT MEET THE REt1i1TItEMENTS OF A�151ITO LFR� BRIDGE ❑ESIGN SPECTFICAT70NS. SECTION 12, AN� ARE SEALE� BY A NORTH CAROLINA REGISTEREp PROFESSIOiJAL ENCINEER. GUARQRAIL PQS7 LOCATIDNS SHALL BE �ETERMINE� IN tHE FIELO 8Y 7HE ENGZNEER 7D ENSURE ADECIUATE CDVER FOR INSTALLATION. THE EXISTI�IC STRllCTIJRE CONSZSTING flF S 5f'AN C� 20'-6", TYMBEli �LOOR ON TZMBER JOISTS,ENO BENTS ON 7IMBE€2 CAPS AN� TIM6ER POSTS & SILLS AT VARI011S CENT�RS 51�ALL BE fi€MOVEd. 7H� EXISTING BRI�GE IS PR�SENTLY NQT PflST�D FOR LpAl7 LIMIT. 5110ULD TI�� 5iRUC7URAL IiVTEGRTTY OF TFiE BRIpGF DF.iERI0Rt1TE L]URTNG CONSTRUCTION OF THE PROPOSE� 9RI�DGE,A LOAp LIMI1� MAY flE PDSTL� AN� MAY 8E RE�LICE� AS FOL1N� N�C�SSARY p€1RING THE I.IFE OF THE PROJECT, #tEMOVAL DF THE EXISTING BRI�GE SHALL 9E PERFORMEO 50 AS NOT TO ALLG4V dEBRI5 'CD �ALL INTO THE 1YATER.THE CONTRACTOR SNALL REMOVE 7HE BRIUGE AN[7 5LlaMT7 P�ANS FOR DEMOLITION IN ACCOR�ANCE WI�fNI AFi7�CLE 402-2 OF TNE STANDAR� SPECIFICATIOtJS. �iHC S17657fiUC7Uf2E OF 7HC EXISTING BRI�GE INDICATE❑ ON TNE P�ANS x5 FROM TIiE BEST INFDRMATIDN AVATLA6LE.SINCE THZS INFURMATI01� :CS SNpYdN FQR THE CONVENIENCE OF �HE CDNTRACTOR,THE COEVTRACT4R SHALL NAVE Nd CLAIM }VHATSDEVER AGAINST THE �CPAR1't�CNT DF �RdNSPOHT0.TIpN FOR A�JY dELAYS OFi A�DiTIONAL CDST INCLIRREO BASE� ON DTFFERENCES BETWEEN THE EXISTING HRIaGE SL195TRLiCT[1RE SHOWN ON TNE PLANS AND THE ACTUAL CON�ITIONS AT THE PROJECT SITE. EXCAVATE ONE FOOT BELOV{ CULVER7 AN€� f00iTNG5 AND REPLACE 4YLTH FOUN�ATION CONDIi�ONING MA'fGf2TAL CiV ACGOR�ANCE WITH AR€ICLE 414 OF THE STAN�AR� SPECIFICATIONS. THE BOX CULVERT NEAY �E �ESTGN�€� Fp(� A FhCTORE� RESISTANCE OF 11P TQ 2.0 TSF AND [3CARING DN RCSIpUAL SflILS,CHECK FI[Lf3 CONDITIONS FOR THE REQUiRE� NOMINAL SCARING R�STSTANC� 0� q.q TSF JUST BEFORE PLACING CONCRETE. FOR EftO5I0N COiJTROL MEASLIRES, CIJtVERT �IVERSiON DETAILS ANQ PAY I'fEM. SEE EROSION CONTROL PLANS. FOR CRANE SAFETY, SEE SF'fC]:Al� PROVISIONS. FDF! Sl18MI77AL DF WORKIIVG �RA4YING5, S�E SPECIlsL PROVI51TON5. FOR FALSEkVORK AND FORMIYORK, SEE S!'�:CIAL PROVISIQNS. TIiTS BRIUGE SS LDCATL"a IN SEISMIC ZONE l. FDR OTHER �ESIGN DATA AN� NOTES,SEE 5HEEi 5N. THIS 57FiUCTIJftE SHAI_L. BF f�ESrGNE� IN ACCOR�AiVCE V'fITH TFiE AASFfTO LRF� BRT�GE DESZGN 5PECIFSCATTDN5. THIS STRUCTURE HAS �EEN �ESIGNE� TN �CCORDANCE IYITH "HFC l8-EVALUATING SCQIJR AT BRI�GES." THE CONTI�AC'iDR WTLL BE REQUIRE� TO CONSTRUCi,MAINTAIN AN� AFiFRWAR05 REMOVE A TEMPORARY STRUCTURE AT SThTIDN 12+55.00 -L6ET- FOR 115E �LIRING CONSif7liCiiON OF' THE PROPOSED STRUCTIJRE. FOR CONSTRUCTIO€�i, NAINTENANCF AND REMOVAL OF" TIiE TEMPORARY STRUCTURE,SEE €HE SPECIAL PEiDUISIDN5. NA1'IV[ MATEf�TAL CDNST57S OF" MATERIAL TNAT IS EXCAVATFp FROM iFfE STREANE BE� AT 7HE PROJECT SITE �llRIt�JG CULVERT CONSTRUCTI6N, NATTV� MA'f�.{2IAt_ LS SUBJECT TO APPROWAL BY iHE ENGZNECR ANp MAY BE Sl1BJ�CT TO PERMTT CUN�I'fIDNS. AT 'fli�: CpNTHliCToR'S OaTIaN HE MAY SlJ6MIT, TO THE ENGINEER FOR APPROVAL, �[SLGN AN� DE'iAIL �RAWINGS FOR A CAST- IN-PLACE FiEINFORCED CONCRETE WING 44ALL. FOR PLACEMENT OF NATLIRAL SiREAhA BE� MATERIAL, SEE SPECIAL PROV I5iDN5. ���� a 1� e� tl��� ror� cu�v�r�r �acK����, sc� s��crn� PROJECT N0. 1 PR°vISI°"5, �RANSYLVAN�A COLINTY STATION: �3+14000 -L � GRApE DATA GRA�E POTNT LLF.V.[il STA, 13Tk4.DD -L- = 2407,52 B�[� �LEV. = 2397.5 ROAD4YAY SLOPES - VARIES I-IYDRAULIC nA fA L]�SIGN UISCHARGE = 550 CFS FREQUENCY OF �ESIGN FLOOd = 25 YRS p[SSGN NIGH 4YATER ELEVATION - .7.403.4 �RAINAGE AREA - 1.52 50. MI. E3ASE �ISCHARGE i0100S = 800 CFS E3ASE HIGH WhTER ELEVA'CiON = 2405.29 OVER7�P�'ING FL.OQD �ATA OVERTDPPING �ISCHARGE - 930 CFS �RE�UENCY OF OVCR7DPPING FLDDD = ]00 YRS+ OVERTOPPING FL�OCJ F[FVAiiON = 2406.8 .o0.tH�CARp��,� �•�`, ��a�,,�',�. �„�sd�4R- t �: ' 9`'r�;Gft34W�`�'�� ��q�0 ,� FO�.�,.. gO�„`�9 ��"���NIFzDiG RSs�I�' RS9H fu�hile�ts�fngineeis�Plannars,l�c. ew r tr x�.a, swiexsn � SRaIOIgM1.kG �i615 9596]64S06FR% 919-0ES96l� m.w..::�anxom � srnr� oF HorsrN cnaoGz+aa OEPAftTMENT OF TRANSPORTATION HALETCH SINGLE 22'-1" X 6'-6" ALLJMINL�M BOX CIJLVERT FOR BRZDGE OVER BRAC}LEY Cf�EEK ON SR 1107 BETWEEN SR 11Q5 AND US 276 REVISIONS �HEET N0. 6Y: tlRT�; NO gy: oa�E: I C-1 3 INVEftT CJ INLET EL. 2397.81 MOMENT S�AB (TYP.I SEE SHEET 3 OF 3 FOR TYPICAL SECTION iHROUGH MOMENT SLA� '�' 0_012 SLOPE INVERT [J � CULVERT EL. 2397.5' CULVERT SECTION NORMAL TO ROADWAY ROA�WAY FILL SLOPE VARIES ITYP.) WING SLOPf FOR 2:1 FILL (TYP.) INVERT [J OUTLET EL. 2397.16 PLAN MOMENT SLAB NOT SHOWN FOR CLARII'Y S7 / BY SUPPLIER CAP N�f �L� CULVERT I HEA�WALL INTEGRAL SILL �FUILY ITYP.1 o W[LDEDI � TO ARCH FULI AI INVERT � �,_�. 8,_Q„ 7,_Q., 22,_1„ END ELEVATION (�OOKING �OWNSTftEAM) \ O PLATE TOE WALI. PLAN OF FLOOR SILL LAYOUT � BACKFILL WITH NATIVE BC� MATERIAL TO SILL HEIGHT PROJECT No. 17BPo14aRo122 TRANSYLVANIA COUNTY STATION: 13+1q,00 -�- o��s�s�E�.�.�o F,PF�=d,�«„�,e,a�a,soE<A<os � PL�A�N pOF GU��ARDRAIL^ pPOST � S P o M NSION TO BE ONOFIRMED BY Th� EN I EEft A Y O UIELD. y B SECTION A—A SHIM If NECESSARY ( MAXIM�M UF �q" ) READEO STEEL FERRULE - SERTS TO FIT 1"PJ BOLT SECTION B—B 3-"4B1 ^5 SI Cil 6"CTS. - 2..�., �,_7„ �,_Z„ � FERRULES SHALI 6E MADE fROM STEEL MEETING THE REOUIREMLNTS OF AASHTO M169,GRADE 12L14 AN� SHALL HAVE A MINIMUM LENGTH OF THREA�S OF 2��z". ANCHOR 90LT5, N�TS, ANO WASHERS SHA�� 8E 1" 0 AND MEET T41E REOUIR[MENTS OF ASTM A325. BOLTS, Nt1T5, ANO WASHERS ShIALL BE GALVANIZE�. PAYMENT FOR CUAR�RAI�,POSTS,ADHLSIVFLY ANCHORE� ANCHOR �OLTS ANO POST BASE P�A1'ES IS INC�U�E� IN ROA�WAY PAY ITEMS. THE GUAR�RAIL POSTS SHALL NOT BE ATTACHED UNTIL THE MOMENT SLAB HAS ATTAINE� AN AGE OF THREE CIINING �AYS OR A MINIMUM COMPRESSIVE STRENGTH UF 2000 PSI. IN A�DTION, NO FILL MATERIAL, ASPHALT. OR CONSTRl1CTI0N GQUIPMENT IS A�LOWED ON THE MOMENT SLA� PRIOR TO SATISFYING THE MINIMUM CONCRETE Cl1RING AND STRENGTH REQIIIREMENTS. ALL REINFORCZNG STEEL IN 'fHE MOMENT SLAB SHA�L BE EPDXY COATE�. THE CONTRACT PRICE FOR "CLA55 AA CONCRETE" ANO "EPDXY COATE� REINfORCING STEEL" WILL 6E FULL COMPENSATION FOR SUBMITTALS,LABOR,TOOLS,E�UIPMENT,MOMENT SLAB MATERIALS,EXCAVATING,6ACKFILLING,HAULING AND REMOVING EXCAVATED MATERIALS,AN� Sl1PPLYSNG ANY INCIDENTALS NECESSARY TO CONSTftl1CT THE CONCRETE MOMENT SLAB. fOR GUARDRAIL ANCHORAGE DETAILS,SEE STAN�ARD URAWING 062.03 SHEET 7 OF 7. PLACE CONCRETE SLAB ON 6"MINIMUM (3"MINIMUM ABOVE TOP OF CULVERTS)OF COMPACTE� CLASS II TYPE 1 SELECT MATERIAL. FOR CLA55 II TYPE 1 SELECT MATERIAL.SEE SPECIAL PftOVISI0N5. r�rar.ra - "5 GI �4 G2 z,•CL. ca 1,_O.,CTS. (a 1,_0„CTS. � 1ENT SLA6 qpPROVE� WIRE BAf2 � SUPPORTS ca 3'-0"CTS. 9-"46I TOP & 80TTOM (J 1'-fl"MAX CTS. 66-°5 SI (J 6"CTS. Gl CJ 1'-0"CTS, ITOP). 33-64 G2 (J 1'-0"CTS. (BOT SPLICE LE ITYP.1 MOMENT SLAB PLAN TYPICAL SECTION THROUGH MOMENT SLAB LOOKING 11P5TATI0N, LEFT SIDE SIIOWN. RIGHT SI�E SIMILAR. PROJECT No. 17BPe14aRo122 TRANSYLVANIA COUNTY STATION: 13+14,00 -L-