Loading...
HomeMy WebLinkAbout20110089 Ver 5_Comment Responses_20180524CONSUS GROUP - STATE SWM COMMENTS COMMENT RESPONSE Please include delineation of the stormwater BMP maintenance access (min 10' required and extend to the Stormwater BMP maintenance easement has been added. nearest public right-of-way) and easements in the See sheet C4.0. engineering drawings Plan sheet C-4.4 is mistakenly labeled as C-4.3, please Sheet label has been updated. amend Plan sheets C-4.3 & C-4.4 show emergency spillways but there is no detailed drawings provided, please include Emergency spillway details have been added to sheets C4.3 additional design drawings for these emergency spillways as and C4.4 they are required Inlet to the north sand filter basin is not shown on the plans, please add this or explain how stormwater will enter the Storm drainage has been added at north sand filter. sediment basin Inlet erosion protection at the sediment basins for both sand Riprap aprons shown in plans filter units are not shown on the plans Please include riprap design calculations to ensure that non- erosive flows are provided at the BMP outfalls (use peak flow Riprap apron calculations provided in stormwater report from 10 -yr storm event). In addition, detailed drawings of (end of report) riprap design should be shown on the plans.