HomeMy WebLinkAboutWQ0040094_Application_20180621Frn
iiiki
COVER LETTER
RECEIVEDINCDENRIDWR
JUN 2 0 2018
WQROS
Date: 06/19/2018 MOORESVILLE REGIONAL OFFICE
To: NCDEQ — Attention: Ori Tuvia
From: BGE — Kory Hedrick / Eric Hampton
Reference: Monroe High School Addition
Itein No.
Number of Copies
Description
1.
2
Fast Track Application (Form: FTA 04-16)
2.
2
Flow Tracking/Acceptance Form (Form: FTSE 04-16)
3.
2
8.5'x1 I" Color USGS Topographic Map
4.
2
Street Level Map
5.
2
Site Map / Utility Plan
6.
1
Application Fee — Check ($480.00)
The sewer line of interest to be relocated will not be serving additional students, only existing
students at Monroe High School. Therefore, there is no addition flow due to the relocation of this
sewer line. Please see the attached Utility Plan for the relocation of this sewer line.
BGE
Kory Hedrick(980)500-8931
Khedrick@bgeinc.com
Serving. Leading. Solving.-
121
olving-121 West Trade Street, Suite 1030 • Charlotte, North Carolina 28202 • 980-220-2322
State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Dlvlslon of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: �v'C -I (to be completed by SWR)
All items must be completed or the application will be returned
1. APPLICANT INFORMATION:
I. Applicant's name: Union County Public Schools (company, municipality, HOA, utility, etc.)
2. ApplicLnt tyt L: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ❑ Municipal
® Other
R ECEI VEDINCD ENR/DW fR
3. Signature authority's name: David Burnett per 15A NCAC 02T .0106(b)
Title: Director of Facilities UCPS
JUN 2 U ?07$
4. Applicant's mailing address: 400 N Church Street
WOROS
City: Monroe State: NC Zip: 28112-
MOORESVILLE REGIONAL OFFICE
5. Applicant's contact information:
Phone number: (704) 296-9898 Email Address: david.Vope@ucps.kl2.uc.us
II. PROJECT INFORMATION:
I. Project name: Monroe High School Addition
2. Application/Project status: ® Proposed (New Permit) ❑ Existing PermiVProject
If a modification, provide the existing permit number: W000_ and issued date:
If new constt action but part of a master plan, provide the existing permit number: W000
3. County where project is .located: Union County
4, Approximate Coordinates (Decimal Degrees): Latitude: 34.972°Longitude: -80.526°
5. Parcel ID (if applicable): 09194029
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
I. Professional Engineer: Eric Hampton License Number: 034426
Finn: BGE
Mailing address: 121 W Trade Street, Suite 1030
City: Charlotte Stater NC Zip: 28202 -
Phone number: (980) 220-2322 Email Address: ehampton@bgeire.com
IV. WASTEWATsR'rREATMENT FACILITY (WWTF) INFORMATION:
I. Facility Name: City of Monroe W WTP Permit Number: NCO024333
Owner Name: City of Monroe
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: _ inch
System Wide Collection System Permit Number(s) (if applicable): WQCS_
Owner Name(s):
FORM: FTA 04-16 Page I of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No NN/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement ( FORM: DEV I been attached?
❑ Yes ❑No NN/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No NN/A
4. Origin of wastewater: (check all that apply):
❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
-� ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
® School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: %Domestic/Commercial 100 % Commercial
Industrial (See 15A NCAC 02T.01 03(20))
"Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Has a flow reduction been approved under 15A NCAC 02T.01 14(f)? ❑ Yes N No
Y If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.01140
Daily Design Flow ""
No. of Units
Flow
School with cafeteria, gym and showers
15 gal/student
0
0 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Totat
0 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(I ) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east ofthe Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G . 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
S. Wastewater generated by project: 0 GPD (per 15A NCAC 02T.0 1 14)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T o03O5 & AIDC (Gravity Sewers):
I. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8" 133' PVC
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
I. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - '
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational points) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B):
Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(I)(C):
Y It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
Y
If tile portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-I6 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(8 & (s) ® Yes [—]No
> 15A NCAC 02T.0305(f) contains minimum separations that shall be orovided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS -1 waters of Class I or
Class 11 impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS -1 or WS -V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.03051f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
> If noncompliance with 02T.0305(f) or (e). see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A
> See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high-priority?"
Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streantbanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
I. Does the submitted system comply with I SA NCAC 02T, die Minimum_Design Criteria for the Permittingof f Pump, Stations
and force Mains (latest yergitnnj, and the (iraVlly Sewer Minimum Desien_Crileriu th�tp�t ycrSiyni as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required Prior to submittal or the FaslTrack Armllcation null supporting documents
2. Professional Engin • 's Certification:
that this application for
—�Oussional1Engineer's name from Application Item III,!.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the bestof my knowledge. 1 further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast=crack Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes 143-215.6A and 143.215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties tip to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date;
3. Applicant's
Certification per ISA NCAC /N,B}Ot;(b):
I • j___/_ �1. I(L vvR p F me it i 1)tS attest that this application for
(Signature Authority's name & title from Application Item 1.3.) oe f
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, thisapplication package will be returned to me as
incomplete.
NOTE - In accordance with General Statutes 143.215.6A and 143-215.611, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Stgnahme. _ _ Date: el� -I )- Z01 2)
FORNI. FTA 04.16 Page 5 of i
State of North Carolina
%t Department of Environmental Quality
Division of Water Resources
Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Union County Public Schools
Project Name for which flow is being requested: Monroe High School Addition
More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: City of Monroe WWTP
b. WWTP Facility Permit #: NCO024333
All flows are in MGD
c. WWTP facility's permitted flow 10.4
d. Estimated obligated flow not yet tributary to the WWTP .54
e. WWTP facility's actual avg. flow 6.11
f. Total flow for this specific request 0.00
g. Total actual and obligated flows to the facility 6.65
It. Percent of permitted flow used 63.9%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Average Daily Approx. Not Yet Total Current
Station Firm Flow** Current Avg. Tributary Flow Plus
(Name or Capacity, * (Firm / pl), Daily Flow, Daily Flow, Obligated Available
Number) MOD MGD MGD MOD Flow Capacity***
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pt) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Page 1 of 6
ISPIXIINUI
III. Certification Statement:
I Russell Colbath certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
Page 2 of 6
l
Date
FTSF 04-16
3 �;s
f
A
+Y
r5
_ _
3
" a
f
x � �
0 1..
O
H
E
�I
h,
g
GlA f
I
V
Q
N
O
F MONROE HIGH SCHOOL
mBUILDING EXPANSION
BROWN 6 GAY ENGINfERb.INC.
SITE TOPO MAP
1
y
`i.
1
�
,
m
s
t
�I
AKS
i
�
1
L y I
A r� 7i
t"
I
r
r I
I
l
, fy�
1
• t �
1j 4 Y
1
a