Loading...
HomeMy WebLinkAbout20180860 Ver 1_Permit Drawings_Buffer_20180605_20180619� �j����� ���, Norch Carolina Department of Transportation 5 tt �rn itivaxt�e I . .__ Highway Stormwater Program �;1' STORMWATER MANAGEMENT PLAN -_ - (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: SF-920077 TIP No.: 17BP.5.R.77 County�ies): Warren Page 1 of 1 General Project Information WBS Element: SF-920077 TIP Number: 176P.5.R.77 Project T pe: Brid e Replacement Date: 4/27/2018 NCDOT Contact: Galen Cail Contractor I Desi ner: Reid Robol, PE - Ecolo ical En ineerin Address: 1000 Birch Ridge Drive Address: 1151 SE Cary Parkway Raleigh, NC 27610 Suite 101 Ca , NC 27518 Phone: 919-707-6711 Phone: 919-557-0929 Email: cail ncdot. ov Email: rrobol ecolo icalen .com Cit ITown: Warrenton Count ies : Warren River Basin s: Tar-Pamlico CAMA Count ? No Wetlands within Project Limits? Yes Pro'ect Description Pro'ect Len th lin. miles or feet : 0.10 Surroundin Land Use: Forest, agricultural, and rural residential Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 1.4 ac. 1.2 ac. Typical Cross Section Description: 2@ 10 ft lanes, 5.42 ft shoulders 2@ 10 ft lanes, 1 ft shoulders Annual Avg Daily Traffic (vehlhr/day): Desi n/Future: 600 Year: 2025 Existin : 280 Year: 2010 General Project Narrative: State project 17BP.5.R.77 involves the replacement of the existing NCDOT Bridge #920077 on SR 1640 over Fishing Creek. Bridge #920077 consists of 2@17'-6", 4@17'-0", (Description of Minimization of Water 2@17'-3" timeber deck on timberjoist on timber caps and piles. The proposed bridge consists of 2@70', 1@25' 24" Cored Slab with 4'-0" caps. The proposed crossing is Quality Impacts) located in Zone AE of FIRM Map number 3720298000J and was studied by Limited Detail Study methods. One stormwater outfalls is proposed which will be placed at a distance to minimize disturbance to adjacent stream and nearby buffers. Rip Rad pads will be utilized to dissipate the energy. No deck drains are required for the proposed bridge. Waterbody Information Surface Water Body (1): Fishing Creek NCDWR Stream Index No.: 28-79-(9) NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters (NSW) Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Fishing Creek Buffer Rules in Effect: Tar-Pamlico Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) See Sheet 9A For Index of Sheets See Sheet 9B For Conventional Symbols CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. ����1�1L� ��� ��/'���� ��i`l� � � �lv'�1L�1�� I �!1�' ��D�!���I ��ll" 1I1�`��1��'� �� !L�� WARREI� CD U1�lTY LOCATIOIV: BRIDGE NO. 77 OVER FISHI11tG CREEK ON SR 1640 (RICHARDS0IV RD.) TYPE OF WORK: GRADING, DRAIIVAGE, PAVING, A11tD STRUCTURE BUFFER IMPACTS PERMIT -L- SR 1640 fRICHAROSON ROJ TO NC 58 POT STAl2+OOA( 5 / 11 \ I� �\ END BRIOGE -L- STA15+8625 I ' � � _�-�_ -,_�- J � �� N� �,� /; ��...� , � BUFFER DRAWING SHEET 1 OF 3 �� --- °"- �� ;� ;�� t'� "' ,����,rk�. \`4� y.�t�'�',F�t��,W� ���� +,, ;�x �� �� ��_ �Y�� ID STATE PROJECT �;;;Y y=_.�` 3PS�R.77�iC77�.� TO NC 43 ���� �� ��� ��. �€ ''�'���� � � r ,�_ � � �� � ���r i �'i e +�'+ t �� ��t �� � g� N� +� '��'"� e��_� �'i +`.:- GRAAHIC SCALES DESIGN DATA PROJECT LE11iGTH Prepared ;n tne ofJices oJ.� HyDRAULICS ENGINEER 50 25 0 50 100 LENGTH ROADWAY STATE PROJECT 176P.5.R.77 = 0.072 mi. S� E 0� b� �� T� �-�'. '�" ���� ADT — l,000 vP� ���� ECOLOGICAL �� � V= 60 MPH LENGTH STRUCTURES STATE PROJECT 17BP.5.R.77 — 0.032 mi. ���9�e�a�s� -����� ENGINEERIIVG @�� �'��� PLANS — ZOlB ST.9NDARD SPECIFICATIONS � �8 CLASS — RURAL TOTAL LENGTH STATE PROJECT 176P.5.R.77 — 0.104 mi. Y.t. LOCAL RIGHT OF WAY DATE: ANDY YOUNG. PE s�r.NazunE: � � 50 25 0 50 100 � � SUBREGIONAL TIER DECEMBER 23, 2017 rxo�scr excrhEsx �� � ROADWAY DESIGN RIGHT OF WAY ENGINEER PROFILE (HORIZONTAL) COMPLETE: MI�cHAE srBURNSE PE �°�p � ����`�� 10 5 O 10 20 � gW�� LETTING DATE: LISA GILCHRIST, EI NCUOT CONTACT P.E. PROFILE (VERTICAL) SEPTEMBER 12, 2018 srcuAz�ns: N Z 0 � � = -L- Pl Sta /0+7620 Pl Sto 16+0026 Pl Sta 17+g3.62 �= 0' S8' 48A' (LTJ �= 0' /2' 269" (RTJ p= 0' 05' 25.6' (LTl D= 0' 38' 352' D= l' 00' 00.0' D= 0' 0/' 29.0' L= 15239' L= 20.75' L= 365.97' T= 7620' T= 10.37' T= 18298' R= 8,909.33' R= 5,72958' R= 23/,85626' Se = Exist. Se = Exlst. ;' SITE 2 50' 0' 100' GRAPHIC SCALE 25' 0' 50' INSET SCALE TBM"I : —L— /'/ J/(J. //TJG - pr c+., in.ann nn DETAIL 1 DETAIL 2 TOE PROTECTION HANK STABILIZATION , �o� �o ��o��, , „o ��o�a, f\o s< 3.0'min. N�.,w�ai ° s�°Pe s o� Gru�nd � � � "`F�� w5 I��I d � d- 7.0 Ff. GEOTE%iILE 6= 2.0 F�. Geaie�i�le Type ofL'incr= CLASS B RIP RAP Type olLino�- ClASS IIRIPRAP FROM STA.12 :-00 TO STA.12�! 50 -L- RT. STA 1A+27 TO 14+80 �-I.- FROM STA.15:99 TO STA.17:50 --L- RT. STA 15+30 TO 15-60 �L � . , .� O , i. �I�►p _.i. /\ ,�/ � Vr►��1 - ♦ `�I � : �,� �► , —��.��,;�<.�:� ' ,����:— � � ` - ' %� ' �A1.111� !'�'_�'.'���.��i1i7�1G���=i'�% �� �t�'�.�'� � .i a: .d _, • . � �i ��, . �r' � ������''�. - CtGIN CONS/ HUCI lON/ —L— POT STAIlt98J8 ei 2 BEGIN STATE PROJECT 17BP5R.77 ; w`cin"ss5 io Pa�no�e —L— POT STA%Z'�'OO.00 . �� `- TOE PROTECTION EST 650 SY� GSEOiEXTILE SEE DETAIL 1 CLASS 8 RIP RAP ESf 30 TONS EST 80 SY GEOTE%TIIE O / � \\� _ .. : � � qLLOWABLE IMPACTS ZONE 7 SITE 2 \������ ALLOWABLE IMPACTS ZONE 2 MITIGABLE IMPACTS ZONE 1 � MITIGABLE IMPACTS ZONE 2 PROIECT REFERENCE NO l7BP.5.R.77 '.OADWAY DESIGN ENGINEER � � r � � \ � /� C I SHEET NO. imw,u�� s ENGINEER f �IENOiNOGI�cNL SITE 3 BUFFER DRAWING SHEET 2 OF 3 3�a � �O I g 4� 9�—� � �\ ,/6+/0.63 �_\ ���Y ���� � �� �1 �ROCK PLATING END STATE PROJE£`T'.� l � .� � � �� � Faonn sTn ,s+se.ss —L— POC STAlI+50 Qe � -� � � � � TO STA 17 - 00.00 LT � y- � � -Y� � ,y. � e���l� �1��'� �� ,� �� i �Ji� . . . 4 �,� y� �C- ,� Y- Y-'� ,� �\ ,s> e���� ���, �` ���� � � � �y � � CL455 B RIP RAP �� E5T 2 TONS EST 5 SY GEOTEXTILE K STABLIZATION DETAIL 2 150 TON$ 220 SY GEOTEXTILE �F " ,.:. . �.� ., �r.. � e�w'¢' � y� �% TOE PROTECTION �'Y' .� 'Y" Y- APER CLASDS BAIRIP RP.P �Y- '�,� Y- '�,� Y- �l & RT E5T 125TS�YNGEOTEXiILE ��� � ,y.� ��.�� �,�'/ ����������� �� F � ��� �� �f.� yr. �- ,p -�' � O�e�'1�� � J�-� ,� ���� N� 2 `������� �g`� ��� ��� /�� ,��-�� ,���� �� �� ,� �'� -�� � �,�� �� ,�� � ��� � �� �y ���.��� �� ������ ����� � � � � � � � ���� ������� � ������� � �� � �� ���� � �""��'���� �� �� �.� � �� � �� � �� � �� � � �� � � � �� ��� � � �� � S ITE 1 S ITE 3 FOR -L- PROFILE,SEE SHEET 5 FOR STRUGTUR£ PLANS,SEE SHEETS S-ITHRU 5-23 RIPARAIN BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT STATION ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. STRUCTURE SIZE / TYPE (FROM/TO) CROSSING BRIDGE IMPACT (ftZ) (ftZ) (ftZ) (ftZ) (ftZ) (ftZ) (ftZ) (ftZ) 1 2 70', 1 25' 24" CS W/ 4' CAPS 12+91/14+20 -L- RT X 0 798 798 1 2 70', 1 25' 24" CS W/ 4' CAPS 14+20/14+63 -L- X 2704 939 3643 1 2 70', 1 25' 24" CS W/ 4' CAPS 14+20/14+63 -L- X 0 645 645 2 2 70', 1 25' 24" CS W/ 4' CAPS 15+45/15+85 -L- RT X 1345 295 1640 2 2 70', 1 25' 24" CS W/ 4' CAPS 15+85/16+02 -L- RT X 0 395 395 3 2 70', 1 25' 24" CS W/ 4' CAPS 16+62/17+54 -L- LT X 1278 493 1771 TOTAL: aoa9 2274 6323 1278 1291 2569 0.0 0.0 Rev. May 2006