Loading...
HomeMy WebLinkAboutNCG190089_NOD Follow-up Inspection_20180611Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY June 11, 2018 Gillikin Marine Railways, Inc. Attn: James D. Gillikin PO Box 533 Beaufort, NC 28516 Subject: Notice of Deficiency Follow Up Inspection NPDES General Stormwater Permit NCG190000 Certificate of Coverage NCG190089 Gillikin Marine Railways Carteret County Dear Mr Gillikin: ROY COOPER Governor MICHAEL S. REGAN Secretary TOBY VINSON Director On June 8, 2018, staff from the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a site inspection for the tract/project known as Gillikin Marine Railways located in Carteret County, North Carolina. The site drains to the Newport River, which is currently classified as Class SA HQW Waters in the White Oak River Basin. The following observations were noted during the DEMLR inspection (please see the attached addendum for additional information about your permit): 1. A stormwater pollution prevention plan has not been developed and implemented and is a violation of Permit Condition Part II Section A. 2. Analytical sampling has not occurred for the site and is a violation of Permit Condition Part II Section B which requires semi-annual sampling for 7 parameters. 3. Qualitative sampling has not occurred for the site and is a violation of Permit Condition Part II Section C which requires semi-annual observations for 9 parameters. 4. The site needs general housekeeping and implementation of best management practices to keep potential pollution sources from entering stormwater discharges. 5. Spill prevention and response procedures need to be implemented. Petroleum products found on site were spilled on the ground. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 127 Cardinal Drive Ext, Wilmington, NC 28405 T:910-796-7215 Gillikin Marine Railways, Inc. March 26, 2018 Page 2 of 2 Required Response 1. You were directed to respond to the Notice of Deficiency letter in writing within 30 calendar days of receipt of the Notice. Respond to this letter immediately. Your response should be sent to this office at the letterhead address and include a schedule for compliance with the permit. The inspection established a new deadline for compliance of July 8; 2018. 2. Develop and implement a Stormwater Pollution Prevention Plan (SPPP). Submit copy of the SPPP to this office for review by July 8, 2018. Include all required minimum elements. 3. Implement the required sampling protocol as outlined in the permit. Thank you for your attention to this matter. This office requires that the violations as described above be properly resolved. Unresolved violations may lead to the issuance of a Notice of Violation and/or assessments of civil penalties. Thank you for your assistance and cooperation during this inspection. Please be advised that violations of the 1lPDES Stormwater General Permit may be subject to a civil penalty assessment of up to $25,000.00 per day for each violation. If you have any questions, comments, or need assistance with understanding any aspect of your permit; please do not hesitate to contact Daniel Sams or me at (910) 796-7215. Sincerel ian Lambe Land Quality Section Attachments: BIMS Inspection Checklist cc:. Wetlands and Stormwater Programs Central Files — DEMLR WiRO Files — Land Quality Compliance Inspection Report Permit: NCG190089 Effective: 09/29/15 Expiration: 05/31/20 Owner: Gillikin Marine Railways SOC: Effective: Expiration: Facility: Gillikin Marine Railways County: Carteret PO Box 533 Region: Wilmington Beaufort NC 28516 Contact Person: James D Gillikin Title: Phone: 252-241-2008 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/08/2018 Primary Inspector: Brian P Lambe Secondary Inspector(s): Certification: Phone: EntryTime: 10:OOAM Exit Time: 12:OOPM Phone: Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG190089 Owner - Facility: Gillikin Marine Railways e Inspection Date: 06/08/2018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: Met with Mr. Gillikin, owner, and Mr. Clark Calloway, consultant for Mr. Gillikin. The permit requirements were discussed including Stormwater Pollution Prevention Plan elements, sampling protocols, and general maintenance of the facility. The SWPPP should be prepared within 30 days. An extension may be granted with significant progress in preparation. Documentation requirements should begin immediately. Submit a copy to this office for review. Sampling may begin in July 2018. One railway should be selected for sampling. Please remember qualitative and analytical sampling forms. General maintenance is required for the yard. Clean up of debris, waste materials, and used liquid containers is neccesary. Page: 2 I Permit: NCG19DC89 Owner - Facility: Gillikin Marine Railways Inspection Date: 06/08/2018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices'? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: A SWPPP has not been prepared for the facility. Reviewed the reauirements for the SWPPP Yes No NA NE ❑ ® ❑ ❑ ❑ 0 ❑ ❑ ❑ ® ❑ ❑ ❑ ®❑❑ ❑®❑❑ ❑0 M ❑ ® ❑ ❑ with the owner. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? [] ❑ ❑ Comment: No monitoring has occured for the facility. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 110 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? El 0 ❑ ❑ Comment: No monitoring has occured for the facility. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? [] ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? El M ❑ ❑ Comment: Discussed selecting the outfalls for sampling. The property has two railways. One railway should be selected to sample. Representative outfall status may be granted pending sampling results. Page: 3