HomeMy WebLinkAboutNCG190089_NOD Follow-up Inspection_20180611Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
June 11, 2018
Gillikin Marine Railways, Inc.
Attn: James D. Gillikin
PO Box 533
Beaufort, NC 28516
Subject: Notice of Deficiency Follow Up Inspection
NPDES General Stormwater Permit NCG190000
Certificate of Coverage NCG190089
Gillikin Marine Railways
Carteret County
Dear Mr Gillikin:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
TOBY VINSON
Director
On June 8, 2018, staff from the Wilmington Regional Office of the Division of Energy, Mineral
and Land Resources (DEMLR), conducted a site inspection for the tract/project known as
Gillikin Marine Railways located in Carteret County, North Carolina. The site drains to the
Newport River, which is currently classified as Class SA HQW Waters in the White Oak River
Basin.
The following observations were noted during the DEMLR inspection (please see the attached
addendum for additional information about your permit):
1. A stormwater pollution prevention plan has not been developed and implemented and is a
violation of Permit Condition Part II Section A.
2. Analytical sampling has not occurred for the site and is a violation of Permit Condition
Part II Section B which requires semi-annual sampling for 7 parameters.
3. Qualitative sampling has not occurred for the site and is a violation of Permit Condition
Part II Section C which requires semi-annual observations for 9 parameters.
4. The site needs general housekeeping and implementation of best management practices
to keep potential pollution sources from entering stormwater discharges.
5. Spill prevention and response procedures need to be implemented. Petroleum products
found on site were spilled on the ground.
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Wilmington Regional Office
127 Cardinal Drive Ext, Wilmington, NC 28405
T:910-796-7215
Gillikin Marine Railways, Inc.
March 26, 2018
Page 2 of 2
Required Response
1. You were directed to respond to the Notice of Deficiency letter in writing within 30
calendar days of receipt of the Notice. Respond to this letter immediately. Your
response should be sent to this office at the letterhead address and include a schedule for
compliance with the permit. The inspection established a new deadline for compliance of
July 8; 2018.
2. Develop and implement a Stormwater Pollution Prevention Plan (SPPP). Submit copy of
the SPPP to this office for review by July 8, 2018. Include all required minimum
elements.
3. Implement the required sampling protocol as outlined in the permit.
Thank you for your attention to this matter. This office requires that the violations as described
above be properly resolved. Unresolved violations may lead to the issuance of a Notice of
Violation and/or assessments of civil penalties.
Thank you for your assistance and cooperation during this inspection. Please be advised that
violations of the 1lPDES Stormwater General Permit may be subject to a civil penalty
assessment of up to $25,000.00 per day for each violation. If you have any questions,
comments, or need assistance with understanding any aspect of your permit; please do not
hesitate to contact Daniel Sams or me at (910) 796-7215.
Sincerel
ian Lambe
Land Quality Section
Attachments: BIMS Inspection Checklist
cc:. Wetlands and Stormwater Programs
Central Files — DEMLR
WiRO Files — Land Quality
Compliance Inspection Report
Permit: NCG190089 Effective: 09/29/15 Expiration: 05/31/20 Owner: Gillikin Marine Railways
SOC: Effective: Expiration: Facility: Gillikin Marine Railways
County: Carteret PO Box 533
Region: Wilmington
Beaufort NC 28516
Contact Person: James D Gillikin Title: Phone: 252-241-2008
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 06/08/2018
Primary Inspector: Brian P Lambe
Secondary Inspector(s):
Certification:
Phone:
EntryTime: 10:OOAM Exit Time: 12:OOPM
Phone:
Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation
Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page: 1
Permit: NCG190089 Owner - Facility: Gillikin Marine Railways e
Inspection Date: 06/08/2018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up
Inspection Summary:
Met with Mr. Gillikin, owner, and Mr. Clark Calloway, consultant for Mr. Gillikin. The permit requirements were discussed
including Stormwater Pollution Prevention Plan elements, sampling protocols, and general maintenance of the facility.
The SWPPP should be prepared within 30 days. An extension may be granted with significant progress in preparation.
Documentation requirements should begin immediately. Submit a copy to this office for review.
Sampling may begin in July 2018. One railway should be selected for sampling. Please remember qualitative and analytical
sampling forms.
General maintenance is required for the yard. Clean up of debris, waste materials, and used liquid containers is neccesary.
Page: 2
I
Permit: NCG19DC89 Owner - Facility: Gillikin Marine Railways
Inspection Date: 06/08/2018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices'?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment: A SWPPP has not been prepared for the facility. Reviewed the reauirements for the SWPPP
Yes No NA NE
❑ ® ❑ ❑
❑ 0 ❑ ❑
❑ ® ❑ ❑
❑ ®❑❑
❑®❑❑
❑0 M
❑ ® ❑ ❑
with the owner.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? [] ❑ ❑
Comment: No monitoring has occured for the facility.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 110 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? El 0 ❑ ❑
Comment: No monitoring has occured for the facility.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? [] ❑ ❑
# Were all outfalls observed during the inspection? ® ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ® ❑
# Has the facility evaluated all illicit (non stormwater) discharges? El M ❑ ❑
Comment: Discussed selecting the outfalls for sampling. The property has two railways. One railway
should be selected to sample. Representative outfall status may be granted pending sampling
results.
Page: 3