Loading...
HomeMy WebLinkAbout20180850 Ver 1_Design Plans_2018061760% PLANS - PERMITTING BARNARDSVILLE, NC 28709 121 STONEY FORK ROAD STONEY FORK ENHANCEMENT TITLE SHEET 1.1 APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ MVRCD - STONEY FORK AS NOTED NOVEMBER 13, 2017 PROJECT DIRECTORYLAND OWNERCATHY GERSON121 STONEY FORK ROADBARNARDSVILLE, NC 28709COORDINATORMOUNTAIN VALLEYS RC&D, INCJESSICA HOCZ828.649.3313jessica.hocz@mountainvalleysrcd.orgENGINEERJENNINGS ENVIRONMENTALGREG JENNINGS, PHD, PE919.600.4790jenningsenv@gmail.comSHEET INDEXTITLE SHEET1.0PROPOSED STABILIZATION AND REPAIR PLAN2.0PROPOSED PLANTING PLAN3.0PROPOSED STRUCTURE DETAILS4.0MVRCD - STONEY FORK ENHANCEMENT121 STONEY FORK ROAD, BARNARDSVILLE, NC - BUNCOMBE COUNTY60% PLANS SUBMITTED FOR REVIEW ANDPERMITTING ON NOVEMBER 17, 2017GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION 0+000+501+001+502+002+48PROPOSED PLAN LEGENDEXISTING TOP OF BANKEXISTING CENTERLINEBANK GRADINGIN-CHANNEL WORKBOULDER CROSS VANEBOULDER J-HOOK VANEAPPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ MVRCD - STONEY FORK AS NOTED NOVEMBER 17, 2017 GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION1 INCH = 20 FEETFeet02040PROPOSED BOULDERJ-HOOK VANE.SEE DETAIL.EXTEND VANE ARM INTORIVER BANK MIN. 12.0 FTEXTEND VANE ARM INTORIVER BANK MIN. 12.0 FTPROPOSED BOULDERCROSS VANE. SEE DETAIL.EXISTING STRUCTUREEXISTING BRIDGE ONPRIVATE DRIVEWAYARBITRARY STATIONINGTO EXISTING BRIDGE60% PLANS - PERMITTING BARNARDSVILLE, NC 28709 121 STONEY FORK ROAD STONEY FORK ENHANCEMENT PROPOSED PLAN 2.1GRADE RIGHT BANK AT 3:1,APPLY 700 GR COIR MATTING.SEE DETAIL.REMOVE EXISTINGTRANSVERSE BAR 0+000+501+001+502+002+4860% PLANS - PERMITTING MARS HILL, NC 28754 3544 GABRIELS CREEK ROAD IVY RIVER BANK STABILIZATION PLANTING PLAN 3.1 APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ MVRCD - STONEY FORK AS NOTED NOVEMBER 17, 2017 GDJ1 INCH = 40 FEETPLANTING TECHNIQUESA.PLANTINGS, TEMPORARY AND PERMANENT SEED SHALL EXTEND 20 FT OUTSIDE LTOB AND 15 FT OUTSIDE RTOB ASSHOWN ON THE PLAN.B.INSURE THAT ROOTS, ONCE REMOVED FROM POT, ARE STRAIGHTENED AND FACE DOWNWARD.C.CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PITD.PLACE PLANTS IN PIT INSURING ROOTS ARE FACING COMPLETELY DOWNWARDE.HEEL IN SOIL AROUND PLANT AND PROCEED TO NEXT PLANTING LOCATIONF.NEWLY-PLANTED PLANTS NEED TO BE FASTENED TO THE SUBSTRATE FOR THE ESTABLISHMENT OF NEW ROOTSG.ROOTS SHALL BE SPREAD IN THEIR NORMAL POSITION. ALL BROKEN OR FRAYED ROOTS SHALL BE CUT OFF CLEANLY.H.THE DIAMETER OF THE PLANTING HOLES (PITS) FOR EACH PLANT SHOULD BE AT LEAST THREE TIMES THE DIAMETER OFTHE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION.I.SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ONUNDISTURBED SOIL.J.PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TOELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 23 FULL, WATER THOROUGHLY BEFORE PLACINGREMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL.CONTAINER STOCK / LIVE STAKESA.STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPEDSUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER.B.CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTINGOCCURS.C.CUTTINGS SHOULD BE INSTALLED THE SAME DAY THEY ARE CUT. THE STAKE SHOULD BE ORIENTED WITH THE BUDSPOINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR EASY INSERTION INTO THE GROUND.D.ABOUT FOUR-FIFTHS OF THE LENGTH OF THE STAKE SHOULD BE BELOW GROUND AND ANGLED DOWNSTREAM. AN IRONBAR CAN BE USED TO MAKE A PILOT HOLE TO PREVENT BARK FROM BEING DAMAGED DURING INSTALLATION.PLANT LOCATIONSA.NEW PLANTINGS SHALL BE LOCATED WHERE SHOWN ON PLAN EXCEPT WHERE CHANGES HAVE BEEN MADE BY THEPROJECT ENGINEER ONSITE.B.NECESSARY ADJUSTMENTS SHALL BE MADE ONLY AFTER APPROVED BY THE OWNER OR PROJECT ENGINEER.STREAMBANK AND BUFFER PLANTING SPECIFICATIONSLIVE STAKES AND CONTAINERIZED PLANTS - 8,000 FT2SCIENTIFIC NAMECOMMON NAMESIZE (CAL)SPACINGQTYLiriodendron tulipiferaTULIP POPLAR0.25" - 1.0"5 FT O.C.50Salix sericeaSILKY WILLOW0.50" - 1.0"5 FT O.C.50Platanus occidentalisSYCAMORE0.25" - 1.0"5 FT O.C.50Betula nigraRIVER BIRCH0.25" - 1.0"5 FT O.C.50Comus amomumSILKY DOGWOOD0.25" - 1.0"5 FT O.C.100PERMANENT SEEDING - 8,000 FT2SCIENTIFIC NAMECOMMON NAMETYPEAPP. RATEQTY------RIPARIAN SEED MIXSEED4 LBS / 1000 SF25 LBSElymus virginicusVIRGINIA WILD RYESEED20 %.------Agrostis perennansAUTUMN BENT GRASSSEED15 %------Pancicum virgatumSWITCHGRASSSEED15 %------Redbeckia hirtaBLACK-EYED SUSANSEED10 %------Coreopsis lanceolataLANCELEAF COREOPSISSEED10 %------Andropogon gerardiiBIG BLUESTEMSEED10 %------Juncus effususSOFT RUSHSEED10 %------Schizachyrium scopariumLITTLE BLUESTEMSEED5 %------Sorghastrum nutansINDIAN GRASSSEED5 %------TEMPORARY SEEDING, MULCHING AND SOIL PREP - 8,000 FT2SCIENTIFIC NAMECOMMON NAMETYPEAPP. RATEQUANTITYSecale CerealeMILLETSEED5 LBS / 1000 SF40 LBS------GROUND AG. LIMESTONEPELLET45 LBS / 1000 SF360 LBS------10-10-10 FERTILIZERPELLET17 LBS / 1000 SF140 LBS------WHEAT STRAW MULCHSTRAW90 LBS / 1000 SF720 LBS.60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTIONFeet04080VEGETATION PLAN LEGENDLIVE STAKES / CONTAINERIZED PLANTS PERMANENTSEED, TEMPORARY SEED AND SOIL PREP - 8,000 FT2 FLOWA'FLOW1.THE BOULDER CROSS-VANE IS A DESIGN FEATURE USED TO CONTROL GRADE IN HIGH IN GRADIENT REACHES ORAT CRITICAL JUNCTURES OF THE PROPOSED CHANNEL. THE CROSS-VANE IS ALSO USED TO PROVIDE ENERGYDISSIPATION, REDUCE NEAR BANK STRESS (NBS), AND CREATE A DIVERSITY OF AQUATIC HABITAT THROUGHSCOUR OF THE STREAM BED. THE CROSS-VANE IS COMPOSED OF A BOULDER SILL, WHICH IS A ROW OF BOULDERSSET AT AN ELEVATION PROVIDED IN THE PROPOSED PROFILE THAT SPANS PERPENDICULAR TO AND SLIGHTLYARCED ACROSS THE CHANNEL. THE BOULDER SILL EXTENDS APPROXIMATELY 1/3 OF THE CHANNEL WIDTH IN THECENTER OF THE CHANNEL. FROM THE EXTENTS OF THE SILL BOULDERS, TWO VANE ARMS EXTEND UP ANDTOWARDS THE STREAM BANK, EVENTUALLY KEYING INTO THE BANK AT AN ELEVATION HIGHER THAN THE SILLBOULDERS.2.ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL ORRECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE.3.DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER TOFIT CONDITIONS ONSITE.4.CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY.5.GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOTCLASS A AND SELECT MATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTERFABRIC.6.THERE SHALL BE NO CHANGE IN ELEVATION GREATER THAN 0.3 FT OVER THE STRUCTURE.7.BOULDERS SHALL BE 3 FT X 4 FT X 2 FT +/- 0.5 FT.8.NON-WOVEN GEOTEXTILE SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUTOF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTERBOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE.SELECT BACK FILL MATERIAL SHALL BE UPSTREAM OF THE GEOTEXTILE MATERIAL.13 BKF13 BKF13 BKFWBKFSCOURPOOLBOULDER CROSS-VANEDETAILED PLANNOT TO SCALEBOULDER CROSS-VANESECTION A - A'SCOUR POOLBELOW STEPNON-WOVENGEOTEXTILEHEADERBOULDERFOOTERBOULDERBOULDER CROSS-VANECROSS-SECTIONNOT TO SCALEPROPOSED BANKFULL WSEKEY BOULDERS INTOSTREAM BANK @ 13 TO 12 BKF STAGEKEY BOULDERS INTOSTREAM BANK MINIMUM 10.0 FT.ARM SLOPE = 1 - 3%BANKFULL WSEBOULDER CROSS-VANENOTESSELECT BACKFILLBEHIND STRUCTUREHIGH DENSITY LIVE STAKING,CONTAINERIZED PLANTSOR TRANSPLANTSEXTEND VANE ARMAND SILL INTOSTREAM BANKMIN. 12.0 FTNON-WOVENGEOTEXTILEBANKFULLPLACE FOOTER BOULDERS INTOSTREAMBED A MINIMUM OF THEBOULDER DIAMETERASELECT BACKFILLNOT TO SCALEAPPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ MVRCD - STONEY FORK AS NOTED NOVEMBER 17, 2017 GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION60% PLANS - PERMITTING BARNARDSVILLE, NC 28709 121 STONEY FORK ROAD STONEY FORK ENHANCEMENT CROSS-VANE 3.1 A'AFLOW1.THE BOULDER J-HOOK IS A DESIGN FEATURE USED TO CONTROL GRADE IN HIGH IN GRADIENT REACHES OR ATCRITICAL JUNCTURES OF THE PROPOSED CHANNEL.THIS STRUCTURE WILL ALSO ENCOURAGE POOL MAINTENANCEAND CREATE A DIVERSITY OF AQUATIC HABITAT THROUGH SCOUR OF THE RIVER BED. THE BOULDER J-HOOK ISCOMPOSED OF A BOULDER SILL, WHICH IS A ROW OF BOULDERS SET AT AN ELEVATION PROVIDED IN THEPROPOSED PROFILE THAT SPANS PERPENDICULAR TO AND SLIGHTLY ARCED ACROSS THE CHANNEL. THEBOULDER SILL EXTENDS EXTENDS FROM A BOULDER VANE ARM INTO THE OPPOSITE STREAMBANK. THE BOULDERVANE ARM EXTENDS UP AND TOWARDS THE OUTSIDE STREAM BANK, EVENTUALLY KEYING INTO THE BANK AT ANELEVATION HIGHER THAN THE SILL BOULDERS.2.ALL BOULDERS USED FOR THE PROPOSED STRUCTURE SHALL BE STRUCTURAL STONE, CUBICAL ORRECTANGULAR IN SHAPE. THE ENGINEER MUST APPROVE THE USE OF BOULDERS THAT MAY BE AVAILABLE ONSITE.3.DIMENSIONS AND SLOPES OF STRUCTURES DESCRIBED IN THE DETAIL MAY BE ADJUSTED BY DESIGN ENGINEER TOFIT CONDITIONS ONSITE.4.CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TOGETHER TIGHTLY.5.GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH NC DOTCLASS A AND SELECT MATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTERFABRIC.6.THERE SHALL BE NO CHANGE IN ELEVATION GREATER THAN 0.3 FT OVER THE STRUCTURE.7.BOULDERS SHALL BE 3 FT X 4 FT X 2 FT +/- 0.5 FT.8.NON-WOVEN GEOTEXTILE SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUTOF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTERBOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE.SELECT BACK FILL MATERIAL SHALL BE UPSTREAM OF THE GEOTEXTILE MATERIAL.9.13 BKF13 BKF13 BKFWBKFSCOURPOOLDETAILED PLANNOT TO SCALEBOULDER J-HOOK VANENOTESSELECT BACKFILLBEHIND STRUCTURENON-WOVENGEOTEXTILEBANKFULLBOULDER J-HOOK VANEEXTEND BOULDER SILL INTOSTREAMBANK MIN 12.0 FTHIGH DENSITYLIVE STAKINGHIGH DENSITY LIVE STAKING,CONTAINERIZED PLANTSOR TRANSPLANTSEXTEND VANE ARMAND SILL INTOSTREAM BANKMIN. 12.0 FTFLOWSECTION A - A'SCOUR POOLBELOW STEPNON-WOVENGEOTEXTILEHEADERBOULDERFOOTERBOULDERCROSS-SECTIONNOT TO SCALEPROPOSED BANKFULL WSEKEY BOULDERS INTOSTREAM BANK @ 13 TO 12 BKF STAGEKEY BOULDERS INTOSTREAM BANK MINIMUM 10.0 FT.ARM SLOPE = 1 - 3%BANKFULL WSEPLACE FOOTER BOULDERS INTOSTREAMBED A MINIMUM OF THEBOULDER DIAMETERSELECT BACKFILLNOT TO SCALEBOULDER J-HOOK VANEBOULDER J-HOOK VANEAPPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ MVRCD - STONEY FORK AS NOTED NOVEMBER 17, 2017 GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION60% PLANS - PERMITTING BARNARDSVILLE, NC 28709 121 STONEY FORK ROAD STONEY FORK ENHANCEMENT J-HOOK VANE 3.2 3'BANKFULL2.5' (TYP)6" MIN. HORIZONTALOVERLAP2.5'(TYP)2.5'(TYP)2'(TYP)2'(TYP)6" MIN. VERTICALOVERLAPAA'700 GRAM COIR FIBER MATTINGFROM TOE OF CHANNEL TO3 FT BEYOND BANKFULLBANKFULLCHANNEL TOE OF SLOPE700 GRAM COIRMATTING2' LONG 2" x 2" WOOD STAKESw/ 3" GALVANIZED ROOFING NAILAT THE TOP TO SECURE MATTING6" MIN. HORIZONTALOVERLAPEROSION CONTROL MATTINGDETAILED STAKING PLANNOT TO SCALEEROSION CONTROL MATTINGDETAILED PLANNOT TO SCALE1.EROSION CONTROL MATTING IS USED TO PROTECT RECENTLYCONSTRUCTED STREAM BANKS FROM EROSION. THE MATTING WILLREMAIN INTACT WHILE THE BANK AND RIPARIAN VEGETATION MATURES,PROVIDING CRITICAL BANK PROTECTION.2.BEFORE INSTALLING COIR FIBER BLANKET, RAKE SOIL LEVEL AND ADDSEED, FERTILIZER, LIME AND MULCH.3.700 GRAM COIR FIBER EROSION CONTROL MATTING SHALL BE PLACEDALONG THE LENGTH OF THE NEW CHANNEL FROM THE TOE OF SLOPEOUT TO A MINIMUM OF 3 FT BEYOND THE BANKFULL ELEVATION.4.SECURE COIR MATTING IN PLACE BY STAKING AND OVERLAPPING ATTHE SEEMS WITH A SHINGLE-TYPE METHOD SUCH THAT THEOVERLAPPING PIECE IS IN THE SAME DIRECTION AND AS THE STREAMFLOW. ADDITIONAL STAKING SHALL BE APPLIED BY THE CONTRACTORAT NO ADDITIONAL COST IF THE MATTING SEPARATES FROM THE SOILMORE THAN ONE INCH UNDER A REASONABLE PULL.700 GRAM COIR FIBER MATTINGSUPPLEMENT WOODEN STAKESWITH 12" ECO-STAKES2' LONG 2" x 2" WOOD STAKESw/ 3" GALVANIZED ROOFING NAILAT THE TOP TO SECURE MATTINGEROSION CONTROL MATTINGDETAILED CROSS-SECTION A - A'NOT TO SCALEEROSION CONTROL MATTINGNOTESKEY INTO EARTHMIN 0.5'APPROVED : CHECK : DRAWN : DESIGN : PROJECT NAME : SCALE : DATE : PROJECT # PHASE # JLP JLP, GDJ MVRCD - STONEY FORK AS NOTED NOVEMBER 17, 2017 GDJ 60% PLANS F O R PERMITTI N G N OT F O R CONSTRUCTION60% PLANS - PERMITTING BARNARDSVILLE, NC 28709 121 STONEY FORK ROAD STONEY FORK ENHANCEMENT BANK MATTING 3.2