Loading...
HomeMy WebLinkAbout20180849 Ver 1_401 Application_20180615Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/15/2018 10:46:55 AM (Start Event) Accept by Montalvo, Sheri A 6/20/2018 10:02:42 AM (Non DOT Initial Review) The task was assigned to Montalvo, Sheri A. The due date is: June 20, 2018 5:00 PM 6/15/2018 10:48 AM DWR Division of water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq.nc.govMaterResources/0/edocl6247041PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Wake Is this project a public transportation project?* f Yes f• No This is any publicly funded by nunicipal,state or federal funds road, rail, airport transportation project. 1a. Type (s) of approval sought from the Corps:* V Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* IJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 12 - Utility Lines Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Number Other: List all MN nunbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply V 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non -404 Jurisdictional General Permit IJ Riparian Buffer Authorization F- Individual Permit * 1d. Is this notification solely for the record because written approval is not required? For the record onlyfor DWR 401 Certification: r Yes G No For the record only for Corps Permit: r Yes r No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? ff so, attach the acceptance letter from n itigation bank or in -lieu fee program f Yes r No 1f. Is the project located in anyof NC's twenty coastal counties?* O Yes r No 1h. Is the project located in a designated trout watershed?* f Yes r No Link to trout information: http://wvvw.saw.usace.army.mil/Missions/Regulatory-Permit-ProgranVAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Eric Kulz 1b. Primary Contact Email:* Eric. Kulz@townofcary.org 1c. Primary Contact Phone:* (XXX)XXX-XXXX (919)462-3931 1d. Who is applying for the permit? r Owner V Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: 200 Cornerstone LLC 2b. Deed book and page no.: 17031/2430 2c. Responsible party: (for Corporations) Eric Kulz (Town of Cary Easement) 2d. Address Street Address 2509 Victoria Park Lane Address Line 2 City State / Province/ Fbgion Raleigh NC Fbstal / Zip (ode Country 27614-6858 2e. Telephone Number: (XXX)XXX-)D= (919)462-3931 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* eric.kulz@tomofcary.org 2a. Name(s) on recorded deed: Don Hammett Daycare, LLC c/o Knowledge Learning Corp 2b. Deed book and page no.: 10221/1897 2c. Responsible party: (for Corporations) Eric Kulz (Town of Cary Easement) 2d. Address Street Address Attn: Tax Dep Address Line 2 PO Box 6760 City State / Province / Pegion Portland OR Postal / Zip Code Country 97228-6760 2e. Telephone Number: (xxx)xxx-xxxx (919)462-3931 2f. Fax Number: (XXX)xxx-xxxx 2g. Email Address:* eric.kulz@townofcary.org 2a. Name(s) on recorded deed: The Buswell, LP 2b. Deed book and page no.: 14685/1198 2c. Responsible party: (for Corporations) Eric Kulz (Town of Cary Easement) 2d. Address Street Address 1919 Napoli Drive Address Line 2 City State/ Province/ Fbgion Apex NC Fbstal / Zip Code Country 27502-9662 2e. Telephone Number: (xxx)xxx-xxxx (919)462-3931 2f. Fax Number: (XXX)XXX-)O= 2g. Email Address:* eric.kulz@townofcary.org 3. Applicant Information (if different from owner) 3a. Applicant is: r Agent F Other Town of Cary - Work in TOC sanitary sewer easement. IF other please specify. 3b. Name: Eric Kulz 3c. Business Name: (if applicable) Town of Cary 3d. Address Street Address P.O. Box 8005 Address Line 2 City Cary Postal / Zip Code 27512-8005 3e. Telephone Number: (919)462-3931 (xXX)xxx-xxxx 3f. Fax Number: (xxx)xxx-xxxx 3g. Email Address:* eric.kulz@townofcary.org State / Province/ Region NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Quarrystone Sanitary Sewer Repair/Stabilization 1b. Subdivision name: (if appropriate) Cornerstone 1c. Nearest municipality/ town:* Cary 1d. Driving directions* If it is a new project and can not easily be found in a GPS napping system Pease provide directions. From Downtown Cary travel west on West Chatham St to traffic circle. Continue west on Old Apex Rd to High House Rd. Turn right on High House Rd and travel west to Davis Dr. Turn left on Davis Dr and take first right onto Cornerstone Dr. Turn left on Quarrystone Cir to cul-de- sac. Site is on right behind businesses. 2. Project Identification 2a. Property Identification Number: (tax PN or parcel ID) 0206711, 0270789, and 0378102 2b. Property size: (in acres) 4.34, 1.86, and 1.04 acres 2c. Project Address Street Address 200 Cornerstone Dr, 250 Cornerstone Dr, and 151 Quarrystone Cir Address Line 2 City State/ Province/ Region Cary NC Postal / Zip Code Country 27502 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.786976 -78.848984 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Turkey Creek 3b. Water Resources Classification of nearest receiving water:* QNSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Neuse River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Project area is within a sanitary sewer easement behind commercial properties within a commercial business park. Properties to the south consist of single-family residences 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) (]ick the upload button or drag and drop files here to attach document Figure 2 - USGS.pdf 162.62KB File type must be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Gick the upload button or drag and drop files here to attach document Figure 3 - NRCS.pdf 237.96KB File type must be pdf 4d. List the total estimated acreage of all existing wetlands on the property: Unknown 4e. List the total estimated linear feet of all existing streams on the property: (intermittent and perennial) 500 LF 4f. Explain the purpose of the proposed project:* Emergency repair of ruptured sewer line partially within the bed of a stream, relocation of a portion of the stream into a relict channel, and stabilization of remaining stream bank within sewer easement.. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: The project involves removal of approx 260 LF of PVC sewer line, and replacement with ductile iron pipe. The project also involved diverting flowfrom 85 LF of eAsting relict channel into a relic channel, moving the flowaway from the sewer line. The old channel was filled, and the remaining eAsting channel banks wer reshaped and stabilized. Equipment included trackhoes and dump trucks. 4h. Please upload project drawings for the proposed project. Qick the upload button or drag and drop files here to attach docurrent Figure 1 - Aerial Photo.pdf 292.85KB Quarrystone-pre construction. pdf 461.78KB Qu arrystone- Post Construction. pdf 507.64KB Quarrystone Impacts Map.pdf 789.91 KB File type mist be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes G No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Unknown r N/A Corps AID Number: Exanple: SAW -2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5dl. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurrent File type mast be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? r Yes r No r Unknown 7. Future Project Plans 7a. Is this a phased project? * f Yes C No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary Ia. Where are the impacts associated with your project? (check all that apply): F Wetlands V Streams -tributaries fJ Buffers F- Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * 3e. Stream 3f. Type of 3g. Stream 3h. Impact sgfe type* Type* Jurisdiction* width* length* No 2,100 S1 Relocation of P Fill Turkey Creek Perennial Both 10 85 8 flow/channel fill F2rnanent(P)or Perennial (F9P)or Average (linear feet) 5 Nbp label (e.g. Foad Grossing Tenporary (T) internittent (INT) (feet) 0 1) S2 Streambank T Stabilization Turkey Creek Perennial Both 10 160 1 stabilization F2rnanent (F) or Perennial (FHS or Average (linear feet) Nbp label (e.g. Road Grossing Tenporary (T) internittent (INT) (feet) 6 1) n ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 85 3i. Total temporary stream impacts: 160 3i. Total stream and tributary impacts: 245 3j. Comments: A total of 85 linear feet of stream channel was filled for the purpose of relocating the stream flow into a relic channel and away from the sewer line. The length of the "restored" channel is 120 LF. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply. V Neuse r Tar -Pamlico F- Catawba F Randleman r- Goose Creek r- Jordan Lake F Other 6b. Impact Type * 6c. Per or 6d. Stream name * 6e. Buffer mitigation 6f. Zone 1 6g. Zone 2 Temp* required?* impact* impact* Allowable P Turkey Creek No 2,100 225 Location and Exempt, Allowable, allowable w/ F2rrranent (Fj or (square feet) (square feet) mtigation Tenporary (T) 6h. Total buffer impacts: ................. Zone 1 Zone 2 Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Permanent impacts: 2,100.00 225.00 Zone 1 Zone 2 Total buffer impacts: 2,100.00 225.00 6i. Comments: Impacts associated with streambank stabilization to protect sewer line. Impacts shown on previously uploaded figure. Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Qick the upload button or drag and drop files here to attach docurnxA File mist be FDF E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The project involves repair of an existing sewer line, realignment of a portion of the stream into a relict channel to move away from the sewer line, and stabilization of the remaining stream within the easement. Impacts from realignment are temporary and due to differences in length of existing and relict channel. Riprap was limited to areas where the stream could erode and affect the sewer line in the future. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Use of silt fence and tree protection fence. Pump -around was used during repair and realignment. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes F No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Surface contours will be restored to pre -project elevations. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * f Yes C No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* f Yes r No To look up low density requirement click here 15A NCAC 02H.1003(2). 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state - approved local government stormwater program?* r Yes r No Fant: projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally-irrplerrented stormwater programs through use of comrunity in -lieu programs should answer no to this question. 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters. r Stormwater Management f Antidegradation Plan Calculations 3b. Stormwater Management Plan: If submitting a SMP for review and approval, it shall complywith the high-density development requirements set forth in 15ANCAC 02H .1003. Include all appropriate stormwater control measure supplemental forms and associated items. Click the upload button or drag and drop files here to attach docurrent Stormwater.pdf 6.73KB FILE TYPE MUST BE FDF 3c. Antidegradation Calculations: If submitting calculations to document the project will not cause degradation of downstream surface waters, the documentation shall include a detailed analysis of the hydrological impacts from stormwater runoff when considering the volume and velocity of stormwater runoff from the project built upon area and the size and existing condition of the receiving waterbody(ies). Click the upload button or drag and drop files here to attach document RLE TYPE NUSTBEPDF G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments:* 15A NCAC 01 C .0407 states that standard maintenance/repair activities do not require filing of environmental documents. (3) specifies ebsting utilities. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 2b. Is this an after -the -fact permit application?* r Yes r No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Emergency repair to replace a ruptured sewer line. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* f Yes r No 3b. If you answered "no," provide a short narrative description. Replacing and ebsting sewer line with a new line of the same diameter/capacity. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* f Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* C Yes r No 5d. Is another Federal agency involved?* f Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? f Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? f Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?' f Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP website (5/4/18) and USFWS iPac website (5/4/18). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Project area is not located within the 20 coastal counties 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC Historic Protection Office HPOWEB Service (accessed 5/4/18). No elements on or near the project site. 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach document File mist be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes 6 No 8c. What source(s) did you use to make the floodplain determination?* Map No. 3720076400K Firm Panel: 0764. date: 5/2/06. Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach document Quarrystone Permit Photos.pdf 1.22MB File rrust be FDF or IQv7 Signature PF By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Eric W. Kulz Signatures -g 651-11 %rte • C�- Date Submitted: 6/15/2018 Initial Review Is this project a public transportation project?* (? f Yes C No Change only ff needed. Has this project met the requirements for acceptance in to the review process?* r Yes f No BIMS # Assigned * 20180849 Version#* Reviewing Office* Raleigh Regional Office - (919) 791-4200 Select Project Reviewer* Stephanie Goss:eads\szgoss Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification What amout is owed?* f $240.00 r $570.00