HomeMy WebLinkAbout20140129 Ver 1_Site meeting Notes_20180619Meeting Notes
Date: June 19, 2018
Type of Site: NCDMS Stream Site
Prepared By: Mac Haupt
Sponsor/Provider: NCDMS
Meeting Type: Field Site Review
NCDMS ID Number:
Project Name: Little Buffalo Creek
County: Cabarrus
USACE Action ID Number:
HUC and Basin: Yadkin - 03040105
NCDWR Project Number: 20140129
Coordinates: 35.4858 `N -80.3747 `W
Attendees:
Louis Berger- Robin Mayock, Doug Parker, Matt Holthouse,
Austin (Intern)
COE- Kim
Notes, Sketch, etc.:
Site currently in Year 4 Monitoring: From report has numerous issues:
1. Flow issues, UT 2,3, 5
2. Exotics
3. Beaver
4. Poor growth areas, will be replanting in fall of 2018, should have planted winter 2017/18
5. Cattle in easement
6. stream repairs
7. over all map needs revision, showing components
Discussed revising overall map to see different approaches better
5 yr site
Amt of planting?
Upper main stem P2- low growth typical, need to remove more of beaver dam
UT2-flow to mid reach, , trees lacking, a lot of golden rod, a lot of water, will install another gauge in the middle of the
reach, will work to find gauge at the bottom of reach
UT4-ok
Reach 4 -stream left rip area cow grazed, low growth, need some trees (larger) here
UT3- looked at bottom portion, will add a gauge in middle, herbaceous lush but trees of size lacking
UT 5- no water, moved gauge to this reach, however, likely not a creditable reach
UT6- flow, short area subsurface
New crossing fence good
Did not look at bottom of project, heat issues (me)
We did see all areas where there were current or past issues. Cattle appear to have been out for the last year or so...
They plan on replanting areas around UT2 and UT3 as well as areas stream left on Rch 4.
They will send a summary of notes from today's activities
Action Items:
Page 1
Notes, Sketch, etc.:
Page 2