HomeMy WebLinkAboutNCG030620_ROS APPROVAL LETTER (2018)_20180619Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
Linamar
Attn: Thomas Grein
2169 Hendersonville Road
Arden, NC 28704
June 19, 2018
Subject: NPDES Stormwater Permit
Permit No. NCG030620
Representative Outfall Status Request
Linamar
Buncombe County
Dear Mr. Grein:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
WILLIAM E. VINSON, JR.
Interim Director
The Asheville Regional Office staff have reviewed your request dated December 4, 2017, for a
determination that stormwater discharge outfall (SDO) 001 be granted representative outfall status for
stormwater outfalls 002, 003 and 004. Based on the information and maps provided and a site inspection
on April 26, 2018, we are approving this request. In accordance with 40 CFR §122.21(g)(7), you are
authorized to sample outfall number 001 as a representative outfall. This approval is effective with the
next sampling event. We also want to remind you that the permit still requires Qualitative Monitoring be
performed at all SDOs, regardless of representative status.
Please remember that any actions you initiate in response to benchmark exceedances as directed in the
tiered response provisions of your permit must address all drainage areas represented by 001, where
appropriate.
Please append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit to document that
representative outfall status has been approved. If changes in drainage areas, structures, processes,
storage practices, or other activities occur that significantly alter the basis of this approval, representative
outfall status may no longer be valid. You should either resume sampling at all SDOs, or reapply to this
office for representative outfall status based on updated information. If you have any questions or
comments concerning this letter, please contact Shawna Riddle or me at 828-296-4500.
Sincerely,
—1` Stanley E. Aik PEGA
Regional Engineer
Land Quality Section
Enclosure: Inspection Report
ec: Betliany.Georgoulias a,ncdenr.gov, Environmental Engineer
Nicole.Grein(c,,,Linamar.com, EHS Specialist, Linamar
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
2090 US 70 Highway I Swannanoa, NC 28778-8211
828 296 4500 T
Compliance Inspection Report
Permit: NCG030620 Effective: 11/16/17 Expiration: 10/31/18 Owner : Linamar North Carolina Inc
SOC: Effective: Expiration: Facility: Linamar North Carolina Inc
County: Buncombe 2169 Hendersonville Rd
Region: Asheville
Arden NC 28704
Contact Person: Thomas Grein Title: Phone: 828-200-4287
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
On-site representative
Related Permits:
Inspection Date: 04/26/2018
Primary Inspector: Shawna Riddle
Secondary Inspector(s):
Certification:
Nicole Grein
Entry Time: 09:30AM Exit Time: 11:30AM
Phone:
828-348-5343 ext 473,
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: Compliant F� Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
Page: 1
Permit: NCG030620 Owner - Facility: Linamar North Carolina Inc
Inspection Date: 04/26/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Met with Nicole Grein for the inspection. Inspection was to determine representative outfall status for the NCG030620 permit.
The SPPP is current and monitoring is being conducetd as required. Representative outfall status will be approved for this
site. You are authorized to sample Outfall 001 as a representative outfall for outfalls 002, 003, and 004. This approval is
effective with the next sampling event.
Page: 2
Permit: NCGO30620 Owner - Facility: Linamar North Carolina Inc
Inspection Date: 04/26/2018 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0 ❑ 111:1
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
E ❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0 ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0 ❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0 ❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
0 ❑ ❑ ❑
# Does the Plan include a BMP summary?
N ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0 ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
E ❑ ❑ ❑
# Does the facility provide and document Employee Training?
0 ❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ ❑ ❑
Comment
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? E ❑ ❑ ❑
Comment:
Analytical Monitorinq Yes No NA NE
Has the facility conducted its Analytical monitoring? E 1:11:1 ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑
Comment:
Page: 3