Loading...
HomeMy WebLinkAbout20180630 Ver 1_More Info Received_20180618Goss, Stephanie ,From: Goss, Stephanie' .Sent: Friday, June 15, 2018 1:57 PM To: 'Eric Kulz' Subject: Crabtree Creek Interceptor Eric; Ca'n,you please provide the -following information for the above referenced project: ® The buffer -and stream impacts requested in this application need to be clearly shown and enumerated on the site plan. These impacts need to correspond to the impacts requested in the application. The labels on the site ,plan must match the impacts listed in the application. As the application and impact map currently stands; it isnot possible to match up what is listed the application with the site plan. [15A NCAC 0214.0502(g)] Thanks! Stephanie Z. Goss , Environmental Senior. Specialist Division of Water, Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 919-791-4256 E-mail'correspondence to and from this address may be subject to the North Carolina Public Records Law- and may be disclosed to third parties 1 TOE OF, 2' HORIZONTAL 1 } \ EMBANKMENT' s - RIPRAP APRON f =, II r CLASS 'B* RIPRAP 1 1 t:•- (MIN 18" THICK) S co N / GRAPH C CALE / CUT BACK BANK AT 6:1 SLOPE TO 20 / 0 0 z0 / / 40 PROVIDE SLOPING POINT BAR 1 inch = 20 Ft 1 GRADE BACK CHANNEL BANKS AT MIN 2:1 SLOPES r � 2q1- 1 Rte 00 C-9 I �^ l i Li . EXISTING GRADE 2:1 SLOPE CLASS '8' RIP ----FILTER FABRIC X=MANTPJN EXISTING CHANNEL INVERT TYPICAL CHANNEL RIPRAP PLACEMENT PROFILE CLASS NOT TO SCALE CHANNEL POINT BAR RIPRAP PLACEMENT PROFILE NOT TO SCALE IFCRABTREE CREEK I— 90 DEGREE BEND ARMORING III ;�WithersRavenet JI GREENWAY Engineers I Planners I Surveyors ... _ 115 MacKenan Drive I Cary. NC 27511) c 919.469.3340 I I'Kense 8:6-0832 I w .vdthersravenelxom