Loading...
HomeMy WebLinkAbout20180814 Ver 1_401 Application_20180618ROBERTSON MILLPOND PHASE 2 VICINITY MAP SCALE: 1'' =800' PERMIT REVIEW SET PROJECT #: 17002 SHEET INDEX COV COVER MAP RECORDED MAP L100 EXISTING CONDITIONS & DEMOLITION PLAN L200 LAYOUT & MATERIALS PLAN L201 LAYOUT & MATERIAL DETAILS L300 GRADING PLAN L400 PLANTING PLAN L401 PLANTING NOTES & DETAILS C100 EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE C200 EROSION CONTROL PLAN C300 EROSION CONTROL DETAILS C400 EROSION CONTROL DETAILS S101 DOCK FRAMING PLAN S201 STRUCTURAL DETAILS SITE DATA SUMMARY PROJECT NAME ROBERTSON MILLPOND PHASE 2 EXISTING STREET ADDRESS 6307 ROBERTSON POND RD EXISTING LOT AREA 81.71 ACRES EXISTING USE PARK AREA OF PUBLIC RIGHT-OF-WAY DEDICATION 0 SF LOT AREA 81.71 ACRES CURRENT ZONING R40 OVERLAY DISTRICT(S) RCOD-1 PARCEL NUMBER 1775345450 REAL ID NUMBER 0023200 DEED BOOK/ DEED PAGE 015790 / 02591 EXISTING GROSS BUILDING AREA VACANT STRUCTURE - 727 SF UTILITY STRUCTURE - 392 SF EXISTING BUILDING USE VACANT - UNMANNED BUILDING & UTILITY STRUCTURE PROPOSED GROSS BUILDING AREA N/A PROPOSED BUILDING USE N/A DISTURBED AREA 1.55 AC EXISTING IMPERVIOUS AREA 47,000 SF (1.3%) PROPOSED IMPERVIOUS AREA 61,860 SF (1.7%) NET CHANGE IN IMPERVIOUS AREA 14,860 SF CONTACT INFORMATION PROPERTY OWNER / CLIENT WAKE COUNTY FACILITIES, DESIGN, AND CONSTRUCTION PO BOX 550 RALEIGH, NC 27602 CONTACT: ERIC STAEHLE PHONE: 919.856.6369 EMAIL: ERIC.STAEHLE@WAKEGOV.COM LANDSCAPE ARCHITECT SITE COLLABORATIVE, INC. 727 W. HARGETT STREET, SUITE 101 RALEIGH, NC 27603 CONTACT: GRAHAM H. SMITH PHONE: 919.805.3586 EMAIL: GRAHAM@SITECOLLABORATIVE.COM CIVIL ENGINEER WARD CONSULTING ENGINEERS 4805 GREEN ROAD, SUITE 100 RALEIGH, NORTH CAROLINA 27616 CONTACT: BECKY WARD PHONE: 919-870-0526 EMAIL: BWARD@WCE-CORP.COM NOTES: STRUCTURAL ENGINEER LYSAGHT & ASSOCIATES 120 ST MARYS STREET RALEIGH, NORTH CAROLINA 27603 CONTACT: CHUCK LYSAGHT, PE PHONE: 919-833-0495 EMAIL: CHUCK@LYSAGHTASSOCIATES.COM 1. Final zoning and site improvement inspection shall be required to verify site plan compliance before a Certificate of Compliance is issued by Wake County Building Inspections. 2. Deteriorated or dead screening shall be repaired or replaced within six months 3. No permanent construction can occur within buffer yards 4. Septic tanks and septic drain lines are prohibited in required buffer yards. Storm water retention and detention facilities, storage tanks for any purpose, utility substations, and buildings housing utility substations and buildings housing utility commodities or equipment are also prohibited in required buffer yards. COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET SHEET TITLE: COVER SHEET NUMBER: COV BKBM2013PGO1239 STORM WATER MANAGEMENT CERTIFICATION x I CERTIFY THAT THE PLAT SHOWN HEREON COMPLIES WITH ARFICLE 9, STORM WATER MiANAGEMFE UNIFIED DEVELOPMENT ORDINANCE AND MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING IN DEEDS OFFICE 19 -f -1 h0 DATEiFORM WATER MAd1AtEM ENGI R %1D svk A00 VICINITY MAP (NTS) pQ O Z NOW OR FORMERLY WILLIAM EARL STEVENS SUE R STEVENS DB 3224 PG 734 LOT 4 8041 1983 PG 1300 NOW OR FORMERLY WIL1_IAM EARL STEVENS Z� s SUE R STEWNS y D8 3224 PG 734 LOT 4{Q HOU 1983 PG 1300 ► LR .� NOW OR FORMERLY CRESCENT STATE BANK 09 138.30 PG 690 HOW 2002 PG 105 STATE NF BOOK 7688 PAGE 220 OP DDSTING IRON PIPE WAKE COUNTY. NORTH CAROLINA OOM MON ° OW RROPMR G COUNTY OF S6&JA�lft NOW OR FORMERLY NOTES: CB CATCH BASIN I CERTIFY THAT I AIA (WEARf THE OWNERS) OF THE PROPERTY SIN, ELMS QPE & , LLc EDWARD 50' FROM ALL PUBLIC ARIGHT--OF—WAY c � I CERTIFY THAT THE FOLLOWING PERSON(S) PERSONALLY APPEARED BEFORE WE THIS DAY, EACH SHOWN AND DESCRIBED HIM, WHICH I5 IN THE SUBDSION IVI JURISDICTION OF THE COUNTY OF WAKE AND THAT 1 (WE) HERESY NOW OR FORMERLY `. APPLY COUNTYWIDE. RESIDENTIAL LAN DISTURBANCE'S OF ]1 ACRE AND NON— ACKNOWLEDGING TO M£ THAT HE OR SHE VOLUNTARILY SIG E HG W E PURPOSE + THEREIN D IN THE CAPACf CATED ADOPT THIS PLAT WITH MY (OUR) FREE CONSENT. ► FOR JAMES W. GRIFFIN JR. TRACT AS sHOa+a T I S SH WN - l rI ; r" � OF THE WAKE COUNTY DATE: 2d THE REGISTER DFa ` t OWNER: L �� ' ■�?� ' ' + r �f DEBORAH S. GRIFFIN DOM BOOK 7454 PAGE 341 DOES NOT CALL FOR PROPEI; to Ga TO HIGH WATER M W rn � REFERENCES TRACT 1 BOM 1997 PG 710 BOOK OF MAPS 1960 PAGE 245 100' 300' 700' OWNER-. Q e yd L3 3`�r, PRINTED AM . N NOFTARY PUBIJC �t�,�i�a��ar�•s, wy�'R....�s �y. DATE:_ I,_ JJQ .. ._ 1� OP A o - My aamrnimion expire ��� a �'.��-'� ` , , ''�. y�. T TT � 23 is AA 00 0M �}23 CERTIFICATION OF REVIEW BY WAKE COUNTY^� Z STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES ''� a f,'Y Z Z> CERTIFICATION GRANTED IN CONJUNCTION WITH ISSUANCE CSG ,' - " . +i' ,.• W:n� LJ W 1 N /' r' -QC- WAKE COUNTY IMPROVEMENTS PERMIT(S) ON LOT(S) I, JOHN Y. PHELPS JR., PROFESSIONAL LAND SURVEYOR �� CERTIFY THAT THIS MAP WAS DRAWN UNDER fM1Y A&PF Y�, Fi�il IMPROVEMENT I'ERMIFT !S FOR A SPECIFIC USE AND SITING. ANY CHANGE IN _J r•�� *q 7 ' 55f1—I INTENDED USE AND/OR SITING OR ANY SFTE ALTERATIONS MAY VOID THE MS rer� � / � �I o DEED DESCRIPTION RECORDED IN DEED BOOK — IMPROVE MENT PERMIT (S). CIEFIFlGITION IS ONLY FOR LDT(S) WITH THE FOLLOWING c� ' % xZ v PAGE _ THAT THE RATIO OF PRECISION AS 3� � % 1 I C3rnrn CALCULATES 15 1:_�Q�❑OO THAT THE BOUNDARIES TRACT NO. t PERMrr NO, 1 I ��� NOW OR FORMERLY x e ' TRACT NO. 2 PERMIT N0. JAMES W. GRIFFIN JR. AND a}P� 1 �T NOT SURVEYED ARE SHOWN AS BROKEN LINE=S PLaTTEp FROM r �[ DEBORAH S. GRIFFIN s J, INFORMATION FOUND IN BOOK AS SHOWt#AGE___ �1 _ _ _ �fii(] BOOK 11298 PAGE 2719 THAT THIS MAP WA EPARED iN AC DANCE WITH WAKE ou RQNWENTAL sET nc1' Hors 19so Pc 969 : 4 mm�tl G. S. 47-- A N ITN ND AND SEAL THIS AUTHORIZED REPRESENTATIVE MAP CALLS FOR PRESENT HIGH f �` CERTIFICATION GRANTED FOR EXISTING STRUCTURE WITH RESPECWATER T TO BE PROPERTY LINE L�---�' Q _ __ CIP TO RECOMBINATION OF PROPERTY LINES ON LOTS � �� )a3 Y.; -,•P. �" EGISTFtATION NO. L-1329 ANY CHANGE IN USE OR ANY SITE ALTETiA71oN MAY RESULT IN SUSPENSION OR "-)f ' PERMITS CERTEFI REVOCATION OF APPUCA�TIOONNf� ? I o o r C" I;EaSFrTy' At � � � �� DATE WAKE Coup IRONkEN'rAL SEROICE AM SEA[- AUTHORIZED REPRESENTATIVE AT CP -rte NOTE: m L-1319 NOW OR FORMERLY G & F PROPERTIES. LLC _ BOOKE513399DPJ. GEHRKF_ ACE 672 II• MANAGER '�� N tT.= = THE BOUNDARY OF THE: HORTON '.tBOOK 1378 PAGE 35 1. sub '{\{� ��` DEED TRACT 12 p� � � � 1 '7HFNPROPERTY WFTH SAID CREEK. NOT TRACT 10 _ _ BOM 1860 PG 245 0 �- THE HIGH WATER MARK NEW TRACT 70.42 AC. + 3.756 AC -74.18 A COWL � �� y � �r�r �, NOW OR FORMERLY PEARL P HORTON AND BOBBY��r aP�II k F. RTOE BO1350 � FENCED IN _�� LOT 4 NOW OR FORMERLY THIS PORTION, 163,623.01 S. CELL TOWER EIP i EDWARD J. GEHRKE 3.756 ACRES. OF TRACT 11 F ��=- k i LIP- r W A 1946 FARM76 "' ♦ MARYNELL GEHRKE THE C.W. ROBERTSON E. AT AS - - \ 80M 1946 PG 76 BOOK 4276 PAGE 764 • RECORDER X BOOK OF 1980PAGE 245 M rr 1 t�� ,p'I 1 t BOM 1998 PG 764 - 0 NOW/ ORTCf ADDED TO TRACT �3 3�1 ° G R F PROP£RMES LLC I 1 A' W qZ`3 I.' + � �,��. 1621,95' ' % ` ; I � ; Ll N 1�•ra0 r 5144 �� PR LINE i` 1 `� f /,� WON I o Int r ti /• CO m BARN Kb'' �-,- . i 1+1 } ,��rf_ oP) W1 41 4J L�a6.87` • MAW _lr NOW OR FORMERLY x CHARLES R COATES �{ p ae 2414!1 PG ass ^L ift c - s NOW OR FORMERLY TAMMY BROWN WMRIS 08 149x9 PG 1182 TRACT 11 (LAKE ROBERTSON) 3,559,081.45 S.F. +,-- BOM 1960 PC 245 51.705 ACRES i I r�'► 1,161 S.F. EXISTING IMPERVIOUS AREA �$,4' WAKE COUNTY, NC 115 ALLOWABLE IMPERVIOUS AREA 533,862 S.F. I %� LAURA M RIDDICK I` REGISTER OF DEEDS PRESENTED & RECORDED ON - tdL 09? 16/2613 AT 10:62:49 BOOK:BM2013 PAGE:01239 I / I MAPPOW . _ i EIP w ETP `� _ J L► s 2Sg' v� ti 3 * * 1 � ti N I E'OINEAIL, y = ` EP _ �S 2 ,_�� ItlT EIP 727 S.F. LAI a■ _ \ •� %4 A1'el• ,S � .�-- � £ �3g.47' LAT ZD 0A�E �Y 3 /�EILUTIM°,�_� '- \ �" 5 i �" +''M11w i�'�' SEE MAP ENTITLED ° 1 11'_ .% �, I EIP $ SEE 2M�AP EISTM-E D ROBERT G. FLETCHER do 302 S.F. LA. . ROBERT G. FLETCHER & SARA J. FLETCHER 42 S.F. IA � .. \ Z SARA J. FLETCHER BOM 1998 M 972 L-212. �� �\ �� at BOW 1996 PG 872 HIGH WATER MARK OF ROBERTSON R�W616' \ Vt HIGH WATER MARK OF ROBERTSON POND IS CALLED FDR PROPERTY LINE ma� v, 1 EIP Come m mw r 11 CJI HIGH WATER MARK OF ROBERTSON UP �� ■ EIP POND IS CALLED FOR PROPERTY LINE HEARING AND DISTA}�fCCES SHOWIN ARE S 1�•gt/;3' E'!'' ALONG REFERENCE LITTLE Av SAM H 5HUGAITT ANO LEGEND r NANCY R SHUGART BOOK 7688 PAGE 220 OP DDSTING IRON PIPE t + OOM MON ° OW RROPMR G TRACT 3 NOW OR FORMERLY NOTES: CB CATCH BASIN ro F `�r.� ELMS QPE & , LLc EDWARD 50' FROM ALL PUBLIC ARIGHT--OF—WAY / C/O J. GEHRKE. If, MANAGER DOM 8139 PAGE 672DEED {RCeERT50N KIND) THE NEUSE RULES APPLY COUNTYWIDE. RESIDENTIAL LAN DISTURBANCE'S OF ]1 ACRE AND NON— TRACT SUBMITTAL OF A STORMWATER PLAN FOR THE COMPLIANCE WITH APPLICABLE - l rI A PORTION OF2 OF THE SUBDIVISION. IMPERVfOUS SURFACE LIMIT WILL BE NOW OR FORMERLY x CHARLES R COATES �{ p ae 2414!1 PG ass ^L ift c - s NOW OR FORMERLY TAMMY BROWN WMRIS 08 149x9 PG 1182 TRACT 11 (LAKE ROBERTSON) 3,559,081.45 S.F. +,-- BOM 1960 PC 245 51.705 ACRES i I r�'► 1,161 S.F. EXISTING IMPERVIOUS AREA �$,4' WAKE COUNTY, NC 115 ALLOWABLE IMPERVIOUS AREA 533,862 S.F. I %� LAURA M RIDDICK I` REGISTER OF DEEDS PRESENTED & RECORDED ON - tdL 09? 16/2613 AT 10:62:49 BOOK:BM2013 PAGE:01239 I / I MAPPOW . _ i EIP w ETP `� _ J L► s 2Sg' v� ti 3 * * 1 � ti N I E'OINEAIL, y = ` EP _ �S 2 ,_�� ItlT EIP 727 S.F. LAI a■ _ \ •� %4 A1'el• ,S � .�-- � £ �3g.47' LAT ZD 0A�E �Y 3 /�EILUTIM°,�_� '- \ �" 5 i �" +''M11w i�'�' SEE MAP ENTITLED ° 1 11'_ .% �, I EIP $ SEE 2M�AP EISTM-E D ROBERT G. FLETCHER do 302 S.F. LA. . ROBERT G. FLETCHER & SARA J. FLETCHER 42 S.F. IA � .. \ Z SARA J. FLETCHER BOM 1998 M 972 L-212. �� �\ �� at BOW 1996 PG 872 HIGH WATER MARK OF ROBERTSON R�W616' \ Vt HIGH WATER MARK OF ROBERTSON POND IS CALLED FDR PROPERTY LINE ma� v, 1 EIP Come m mw r 11 CJI HIGH WATER MARK OF ROBERTSON UP �� ■ EIP POND IS CALLED FOR PROPERTY LINE HEARING AND DISTA}�fCCES SHOWIN ARE S 1�•gt/;3' E'!'' ALONG REFERENCE LITTLE Av SAM H 5HUGAITT ANO LEGEND r NANCY R SHUGART BOOK 7688 PAGE 220 OP DDSTING IRON PIPE t + f ° POND IS CALLED FOR PROPERTY UNE PK PARKER KAL.ON NAIL C CENTER EINE NOW OR FORMERLY NOTES: CB CATCH BASIN TREE AND VEGETATION PROTECTION ZONE NOW OR FORMERLY x CHARLES R COATES �{ p ae 2414!1 PG ass ^L ift c - s NOW OR FORMERLY TAMMY BROWN WMRIS 08 149x9 PG 1182 TRACT 11 (LAKE ROBERTSON) 3,559,081.45 S.F. +,-- BOM 1960 PC 245 51.705 ACRES i I r�'► 1,161 S.F. EXISTING IMPERVIOUS AREA �$,4' WAKE COUNTY, NC 115 ALLOWABLE IMPERVIOUS AREA 533,862 S.F. I %� LAURA M RIDDICK I` REGISTER OF DEEDS PRESENTED & RECORDED ON - tdL 09? 16/2613 AT 10:62:49 BOOK:BM2013 PAGE:01239 I / I MAPPOW . _ i EIP w ETP `� _ J L► s 2Sg' v� ti 3 * * 1 � ti N I E'OINEAIL, y = ` EP _ �S 2 ,_�� ItlT EIP 727 S.F. LAI a■ _ \ •� %4 A1'el• ,S � .�-- � £ �3g.47' LAT ZD 0A�E �Y 3 /�EILUTIM°,�_� '- \ �" 5 i �" +''M11w i�'�' SEE MAP ENTITLED ° 1 11'_ .% �, I EIP $ SEE 2M�AP EISTM-E D ROBERT G. FLETCHER do 302 S.F. LA. . ROBERT G. FLETCHER & SARA J. FLETCHER 42 S.F. IA � .. \ Z SARA J. FLETCHER BOM 1998 M 972 L-212. �� �\ �� at BOW 1996 PG 872 HIGH WATER MARK OF ROBERTSON R�W616' \ Vt HIGH WATER MARK OF ROBERTSON POND IS CALLED FDR PROPERTY LINE ma� v, 1 EIP Come m mw r 11 CJI HIGH WATER MARK OF ROBERTSON UP �� ■ EIP POND IS CALLED FOR PROPERTY LINE HEARING AND DISTA}�fCCES SHOWIN ARE S 1�•gt/;3' E'!'' ALONG REFERENCE LITTLE Av SAM H 5HUGAITT ANO LEGEND r NANCY R SHUGART BOOK 7688 PAGE 220 OP DDSTING IRON PIPE MH MANHOLE NEP NEW IRON PIPE HIGH WATER MARK OF ROBERTSON MON MONUMENT PP POWER POLE R/W RIGHT OF WAY POND IS CALLED FOR PROPERTY UNE PK PARKER KAL.ON NAIL C CENTER EINE NOW OR FORMERLY NOTES: CB CATCH BASIN TREE AND VEGETATION PROTECTION ZONE 50' FROM ALL PUBLIC ARIGHT--OF—WAY 25' FROM ALL OTHER PROPERTY LINES ADDITIONAL STATE STORMWATER MANAGEMENT REGULATIONS, THE NEUSE RULES APPLY COUNTYWIDE. RESIDENTIAL LAN DISTURBANCE'S OF ]1 ACRE AND NON— RESIDENTIAL LAND DISTURBANCES OF 7112 ACRE REQUIRE SUBMITTAL OF A STORMWATER PLAN FOR THE COMPLIANCE WITH APPLICABLE STANDARDS TO WAKE CO. IMPERVIOUS SURFACE COVERAGE SHALL NOT EXCEED 15% OF THE SUBDIVISION. IMPERVfOUS SURFACE LIMIT WILL BE STRICTLY ENFORCED INTO PERPETUITY AREA CALCULATED USING COORDINATE METHOD REFERENCES DEED BOOK 290 PAGE 446 BOOK OF MAPS 1960 PAGE 245 100' 300' 700' 900' 1000' i s asr+ir 44 POND IS CALLED FOR PROPERTY UNE CURRENT ZONING R-30 AND R-40 y N.C. ORIO 000W COWROL POINT E I s s ••4 ' w �. i m P WITH A RCOD-1 OVERLAY 15-74:01 O6-25•W,S" y 011 ; i I > _, ® I f REVISED 05/14/13 ADDED 3.756 AC. TO TRACT 10 _D X1.77' P t [ POINT INSET WAKE COUNTY PIN NO. 1775 33 8906 E1P `� SEE INS1 �` i g L� _J SCALE EIP i� LOT 2A LOT 2B SEE UAP ENTIT-M SEE MAP ENTrTUD ROBERT G. FLETCHER k ROBERT G. FLETCHER k SARA J. FLETCHER SARA J. FLETCHER BOM 1895 PG 572 BOW 1996 PG 972 HIGH WATER MARK OF ROBERTSON HIGH WATER MARK OF ROBERTSON POND IS GALLED FOR PROPERTY LINE POND IS CALLED FOR PROPERTY LINE RECORDED IN BOOK OF MAPS"! S-PAOEIS31" _. WAKE COUNTY COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET D� I.•I:IgMMIIINM RECORDED MAP SHEET NUMBER: RMATA'Aal'r' O" CYPRESS 24" OA 4" OAK 4" CYPRESS / / 32" CYPRESS a 0" CYPR SSS/ / k�l \ \ / \ � / 44„ GUS \ ` ,,\ \ � \ 1 29 OAK i / l9" GUA \ \ \ \ \ I \ 0" OAK 31 " YPRESS I a „ \\) I \ I 61 " CYPRESS I \ \ �_ 9" OAK I \ /b" GUM I \ T 25 CYPRESS I 1 \ co 34„ I a0� I / IoO�II 4 28" CYPRESS I sF 36" OAK 0 32 GUA B1 TP O^ ` \ \ „ C YPRESS I Al O �dOl I �. Al 736 W \� o / 20.:::: A2 00 /24» GI 1 OD \ \ 32 C YPRES I d 26 :::.:. Pt S. TSN O :.: .... \ d 7" GUM �07 :. CYPRESS\� J \ , o \ 1 \ I I p0> I o�////� / :i:>::::::1'P}? SS / 00 4' UN J ' 37" GUM B1 0 / / 20 J AK 1 O o I �21 K t LAR \I / ::..::::::::: ✓I ��/ / 295 • l l .YP1:ES 32" GI 1 ^ \\ / YP ES o 1 / Op ��"�' �� L w 2" PINE X00 J GU� :... � �� ..... 24 / ^ _ ' k$ 0" PIN 22" CYP%jj - /TREELINE�\� O ?X /OA 21 dl _ / 5 ' 0" L / WAKENCOUNTY \ O� ...'.'..'.'�':?` / D�15449. PG. 2570 B.M. 2013, PG. 1239 5 _ /" - ' _ - P.I.N.: 1775345450 OPER E BY 0TH RS 6 A4 SPIL WAY 1 / _-J X x \ , �4 24 RESt \ O l 0 2RES I n_ / v � I '�/ II�ITS OF \� " 2 C1 / ASBCJIL� C� / foo SURVEY 8„ OAK I m x 00 ,' A3 / 0 / ay LOW CT Z /:.� TOR WATER I cV ,yp AS BUILT SURVEY LIMITS _ I " G EX. CONTROL POINT #3 o X 21 " GUM ,� �P�O REBAR W/CAP C3 I "" 83) NC 53I0(09.D57OFtUS I I E: 2,174,469.517FtUS p x " 7 " E l l EL.: 302.19(NAVD88) O� 20 CY ESS .....:'::':: a .. ... .O / / FBNK I I Z / FLOATI G ::::::FIXED / V�' D CK CO:::: DOCK / ~ o ROBERTSONS o _2 0 IP 4 „ �, E� Al IP �RAP .�C{ A2 1\ „ POND ...... OP\ YAiv�D o 2 OAK GANGWAY ' - HYDR B1L.�0 q EXISTING WATERLINE SHIED SING v .....'F / \ \ 22" PI E w ' / ' r EXISTING N/F / J 21 „�N Q M SHED WAKE COUNTY \ D.B. 15449, PG. 2570 TBM-SITE BENCHMARK 0::;::`::?;"` XISTIN B1 CONCRETE PI B.M. P I.N2017753454509 IN EL.=293P02W(NAV 88) 0ER POLE0 ; STUTCITY ; B2 ° SIDEWALK.. ; y};::• �, I / 0 ° \ CHANNEL DR N CONCRETE o (10-1 I 1 :: :: .;' CURB & O / / / ONE . CONCRETE I GUTTER I 0 WALKWAY O( EXISTING O ':.:: 19 / - C2 O6Fib POWER LINE EXISTING (OVERHEAD , (OVERHEAD O01 O 1 A3 No ,/ / o N ( CONCRETE (bVERHEAD) F DERGR N CURB ERLINE / GRAVEL 290 \ rn E ECTRI ❑ + + o PARKING AREA Al ` - EXISTING `� '� N 11ETERS + Al / � x,30 l MILL DAM E A B2 FOUNDATION �'C %. /�� B2 � NG r II + \ TE C3 I I°� WELL I HOUSE / I 1 F8 NCE I I \ C?6 O I CONCRETE \ O O - - - - - - r r X �O®O CURB \ O `- BOULDER: , l \\ \ \ \ 1 l I C4 O GkJAV L E 0 - O Opp,, BOULDIL \ ♦ JEXISTINGI298 \ TREELINE ' \ / I , < \\\ I \ I N / R ♦ ♦ ,�F GST \ \ BUILDNG - - - - i , X285 �=I' I ♦ -296_ - . -- - - -- -- \ I \ WOOD FENCE I - I �tP O ,1 \INV. P $»RCP 2&Z-71 �-- �- _ EDGE OF PAVEMENT - - - INV.= 287.20 EDGE OF PAVEMENT CONCRETE EDGE OF PAVEMENT DRIVEWAY ROBERTSON POND ROAD (SR APRON HW H (60' PUBLIC RW) 2324) RAW_ EDGE OF PAVEMENT _ �EX. CONTROL POINT #2 REBAR WCAP _ NC GRID�AD 83) _ N: 752,714.1 OFtUS PP _ E: 2,174,349.57FtUS _ EL.: 293.50(NAVD88) - - - COUNTY /OF WAKE MCKIM & CREED, INC. D.B. 15449, PG. 2570 CONTROL PT. # 2 B.M. 2013, PG. 1239 P.I.N.: 1775420635 REBAR/CAP ZONED R-30 WITH A RCOD-1 OVERLAY NC GRID(NAD 83) N 752,714. 10' 2� JASPER ME MOSLEY SHIRLEY J. MOSLEY D.B. 2136, PG. 560 B.M. 2013, PG. 1239 P.I.N.: 1775426928 EXISTING FENCE DEMOLITION NOTES 1. THE CONTRACTOR SHALL NOTIFY THE N.C. ONE CALL CENTER AT 811 OR 1-800-632-4949 PRIOR TO STARTING WORK. 2. THE CONTRACTOR SHALL NOTIFY THE LOCAL GOVERNING PUBLIC UTILITIES DEPARTMENT PRIOR TO STARTING WORK. 3. ALL DEMOLITION, AND ANY SUBSEQUENT CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS SET FORTH AND APPROVED BY THE LOCAL GOVERNING MUNICIPALITY OR THE STATE. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS. 4. THE CONTRACTOR SHALL NOT MAKE ANY LANE CLOSURES OR CHANGES TO THE EXISTING TRAVEL PATTERNS ON ANY PUBLIC STREET WITHOUT PRIOR APPROVAL FROM THE LOCAL GOVERNING MUNICIPALITY TRANSPORTATION DEPARTMENT AND/OR STATE TRANSPORTATION DEPARTMENT. 5. LANE CLOSURE, TRAFFIC CONTROL PLAN, OR PEDESTRIAN CONTROL PLAN TO BE COORDINATED WITH APPROPRIATE STAFF OF THE LOCAL GOVERNING MUNICIPALITY AND/OR STATE DEPARTMENT OF TRANSPORTATION PRIOR TO ANY CONSTRUCTION IN PUBLIC RIGHT-OF-WAY. 6. THE CONTRACTOR IS RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL REQUIREMENTS REGARDING REMOVAL AND DISPOSAL OF MATERIALS AND DEBRIS. 7. CONTRACTOR SHALL REFER TO CIVIL SHEETS FOR SANITARY SEWER AND WATER REMOVALS AND RELOCATIONS. 8. RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER(S). 9. WHERE UTILITIES (TO BE REMOVED) IMPACT THE FOOTPRINT OF THE NEW BUILDING, CONTRACTOR SHALL EXCAVATE AND REMOVE AN ADDITIONAL 2 FEET OF SOILS TO EITHER SIDE OF PIPE, AND 1 FOOT BELOW TO REMOVE UNSUITABLE SOILS, IF UNSUITABLE SOILS EXIST. 10. CLEANOUTS LOCATED IN AREAS OF DEMOLITION OR SUBSEQUENT CONSTRUCTION THAT ARE TO REMAIN, SHALL BE PROTECTED FROM DAMAGE AND RAISED TO FLUSH WITH NEW GRADE. 11. ELECTRICAL OR GAS UTILITY SERVICES TO BE REMOVED SHALL BE REMOVED AND RELOCATED (AS INDICATED) BY THE UTILITY PROVIDER. CONTRACTOR SHALL SCHEDULE AND COORDINATE THIS WORK WITH THE APPROPRIATE SERVICE PROVIDER. ALL SERVICES SHOULD BE RE -INSTALLED PRIOR TO THE INSTALLATION OF PAVEMENT, SIDEWALKS, CURB AND GUTTER, OR OTHER PERMANENT FEATURES. 12. REMOVE EXISTING CONCRETE (WHERE REQUESTED) TO FIRST COLD JOINT OR SAWCUT JOINT TO OBTAIN A CLEAN EDGE FOR NEW CONSTRUCTION. SAWCUT EXISTING ASPHALT DRIVE AT LIMITS OF NEW CURBING TO OBTAIN A CLEAN EDGE. 13. CONTRACTOR SHALL RETAIN AND STOCKPILE CONCRETE WHEELSTOPS WHICH ARE IN USEABLE CONDITION FOR RE -INSTALLATION AT THE END OF THE PROJECT. 14. CONTRACTOR SHALL RESTORE THE LAYDOWN AND STAGING AREA TO ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. 15. CLEAN SOILS SHALL BE UTILIZED FOR BACKFILL. COMPACTION OF THESE SOILS PERFORMED IN ACCORDANCE WITH SPECIFICATIONS, GEOTECHNICAL REPORT, AND SITE PLAN. 16. ALL FENCING TO BE REMOVED SHALL BE REMOVED AT NEXT NEAREST POLE. 17. ALL GRAVEL TO BE REMOVED (SURFACE OR SUBSURFACE) SHALL BE STOCKPILED AND REUSED ON SITE WHERE POSSIBLE. 18. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE REMOVED COMPLETELY, INCLUDING ALL SUBGRADE MATERIALS DIRECTLY ASSOCIATED WITH ITEMS TO BE REMOVED. 19. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE DISPOSED OF LEGALLY OFFSITE UNLESS OTHERWISE NOTED ON THIS PLAN. 20. ALL TREES TO BE REMOVED SHALL BE GROUND DOWN TO A MINIMUM DEPTH OF 121, BELOW PROPOSED FINISH GRADE. 21. ALL TREE PROTECTION FENCING SHALL REMAIN IN PLACE DURING DEMOLITION AND CONSTRUCTION. TP SF x LOD O I DEMOLITION LEGEND KEY DESCRIPTION Al TREE PROTECTION FENCE - SEE DETAIL ON SHEET L201 A2 TREE PROTECTION I SILT FENCE - SEE CIVIL SHEETS A3 TREE TO BE RELOCATED, SEE PLANTING PLAN A4 TREE TO BE COMPLETELY REMOVED B1 LIMITS OF DISTURBANCE B2 LIMITS OF CONSTRUCTION AND CONSTRUCTION FENCE C1 RIP RAP TO BE REMOVED AND RELOCATED - SEE CIVIL SHEETS C2 CONCRETE PAVING AND BASE TO BE REMOVED COMPLETELY C3 CHAINLINK FENCE AND GATE TO BE REMOVED COMPLETELY C4 HISTORIC CONCRETE FOOTER TO BE PROTECTED IN PLACE NOTE: THIS SURVEY DATA IS A COMPILATION OF THE AS -BUILT CONSTRUCTION OF PHASE I PERFORMED BY TURNER LAND SURVEYING OCTOBER 2015 AND THE EXISTING CONDITIONS OF PHASE II SURVEY PERFORMED BY MCKIM & CREED IN MARCH 2017. N SCALE: 1 " = 30' 0 15 30 60 b COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 co,�_WC/froo o%y x osC-505 g x (4<ABORP����` ''�rlllllllll�\\ `��11 rrrr • X'- • 1365 �y r.H 1,,011•�• REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. W U N � W Cf) �U Q z = O a. W Q z � °' O O Q J U O _J O I� � O z�� 0 O Cf) U) W 0 -0 O O WU� W O co(D co co PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET L,T 06.08.2018 SHEET TIT EXISTING CONDITIONS & DEMOLITION PLAN SHEET NUMBER: Ll 00 FENCE TO MATCH EXISTING — RAILING ON-SITE FROM PHASE 1 IN COLOR AND STYLE - SEE L201 291— a a Cio a 4 O a SF S,c SF V09 X00 / V/ %I V I M I L TV 11 9 \J 1 L/ \ I I `1 1\1 V I L 1 11 L/ \ I\\/ "IV 1"1 Y I SCALE: 1 " = 10'-0" SEE ENLARGEMENT 1 ON — SHEET L200 FOR MORE DETAIL R/W --� R/W KEYNOTE LEGEND OVERLOOK FENCE, TO MATCH EXISTING ON-SITE IN 3/L201 DETAIL / KEY DESCRIPTION SHEET 1 A PLANTING BED - SEE PLANTING SHEETS 4B 1 B TURF - SEE PLANTING SHEETS 5A EXHIBIT SIGNS MOUNTED ON RAILING OR POSTS, BY COMPACTED EARTH WITH BERMUDA SOD 1 C 6A BOARDWALK. SEE STRUCTURAL FOR MORE DETAILS. FLUSH - SEE PLANTING SHEETS 7A 2A 4" THICK CONCRETE PAVING 1 /L201 2B 6" THICK CONCRETE PAVING 1 /L201 ACCESSIBLE HANDRAILS (GALVANIZED ALUMINUM), 3A SEE STRUCTURAL FOR MORE DETAILS EXISTING WATERLINE N/F WAKE COUNTY D.B. 15449, PG. 2570 B.M. 2013, PG. 1239 P.I.N.: 1775345450 3B OVERLOOK FENCE, TO MATCH EXISTING ON-SITE IN 3/L201 STYLE AND COLOR 4A 8' LONG BUILT IN WOODEN BENCH, BY OWNER 4B 4' LONG BUILT IN WOODEN BENCH, BY OWNER 5A EXHIBIT SIGNS MOUNTED ON RAILING OR POSTS, BY OWNER 6A BOARDWALK. SEE STRUCTURAL FOR MORE DETAILS. 7A 8" x 8" TREATED LUMBER SEE SHEET S101 FOR MORE DETAIL REGARDING DOCK LAYOUT AND DIMENSIONING I I I I I I00 4A oo� 6A (TYP) O p0 p I I 3A <O 4A I Q 00 4A ;00 I3A 00 3A a . � y Z IY O ROBLK I Z:)vIN , -- % (60' PUBLIC R/W) nod —� NF JASPER L E MOSLEY SHIRLEY J. MOSLEY D.B. 2136, PG. 560 B.M. 2013, PG. 1239 P.I.N.: 1775426928 GENERAL SITE NOTES 1. ALL PAVEMENTS TO SLOPE POSITIVELY AWAY FROM ALL BUILDINGS. PONDING OF WATER IS PROHIBITED. 2. PROVIDE CONSTRUCTION JOINTS IN CONCRETE WALKWAYS AS SHOWN IN PLANS. IF NOT SHOWN ON PLANS - MAX SPACING @ 10' 3. THROUGHOUT PROJECT SITE, ALL DIMENSIONS TO BE FIELD VERIFIED. NOTIFY THE LANDSCAPE ARCHITECT OF ANY DISCREPANCY. ALL DIMENSIONS ARE TO OUTSIDE FACE OF BUILDING, TO CENTERLINE, CENTER TO CENTER ON STRIPES, AND/OR FACE OF CURB, UNLESS OTHERWISE NOTED. 4. BUILDING AND PUBLIC ROADWAY STAKE OUT SHALL BE PERFORMED BY A REGISTERED LAND SURVEYOR. 5. GUARDRAILS MUST BE INSTALLED ON THE OPEN SIDES OF ELEVATED WALKING SURFACES THAT EXCEED 30 INCHES IN HEIGHT. ALL GUARDRAILS MUST BE A MINIMUM HEIGHT OF 42 INCHES ABOVE THE LEADING EDGE OF THE TREAD OR WALKING SURFACE. GUARDRAILS SHALL HAVE BALUSTERS SUCH THAT A 4 INCH DIAMETER SPHERE CANNOT PASS THROUGH ANY OPENING UP TO A HEIGHT OF 34 INCHES. FROM 34 INCHES TO 42 INCHES ABOVE THE WALKING SURFACE, A 8 INCH DIAMETER SPHERE SHALL NOT PASS. 6. THE CONTRACTOR, AT ALL TIMES, MUST KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY THE CONTRACTOR, THE CONTRACTOR'S EMPLOYEES OR THE CONTRACTOR'S SUBCONTRACTOR. ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE ON A DAILY BASIS. 7. IF DEPARTURES FROM THE DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITH THE EXPRESS WRITTEN PERMISSION OF THE OWNER. 8. LANDSCAPE ARCHITECT AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 9. EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE, ARE BASED ON A FIELD DATA PROVIDED TO LANDSCAPE ARCHITECT. THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES, UNDERGROUND LINES, AND STRUCTURES AS NECESSARY TO AVOID DAMAGING OR DESTROYING EXISTING SERVICES. 10. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE, AND MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE ON THIS PROJECT. THE RELOCATION OF ANY UTILITY SERVICES REQUIRED TO COMPLETE ANY PORTION OF THESE CONSTRUCTION PLANS. 11. CONTRACTOR SHALL MAINTAIN AN "AS BUILT" SET OF DRAWINGS TO RECORD ANY FIELD CHANGES, ALONG WITH ANY PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE OWNER AT THE END OF THE PROJECT. 12. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH PERMITS AS ISSUED, AND ANY AND ALL APPLICABLE STATE, COUNTY AND LOCAL CODES. 13. EXISTING IMPROVEMENTS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED OR RESTORED TO THEIR ORIGINAL CONDITION, AND TO THE SATISFACTION OF THE OWNER OF THE IMPROVEMENTS. 14. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, AND/OR ANY OTHER REQUIREMENTS WHICH MUST BE MET UNDER CONTRACT. 15. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDINGS AND BUILDING DIMENSIONS. 16. CONTRACTOR SHALL COORDINATE CONSTRUCTION OF ALL UNDERGROUND UTILITIES FOR THIS PROJECT WITH THE OWNER'S REPRESENTATIVE PER ALL APPLICABLE REGULATIONS. 17. CONTRACTOR SHALL COORDINATE WITH OTHER CONTRACTOR'S ON SITE AND UTILITY PROVIDERS DURING CONSTRUCTION TO ENSURE SMOOTH TRANSITION BETWEEN DISCIPLINES. 18. ALL DEMOLITION, AND ANY SUBSEQUENT CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS SET FORTH AND APPROVED BY WAKE COUNTY. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS. ALL TREE PROTECTION FENCING SHALL REMAIN IN PLACE DURING CONSTRUCTION. 19. TRAFFIC CONTROLS FOR ANY UTILITY WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE PERFORMED IN COMPLIANCE WITH STANDARDS OF THE NORTH CAROLINA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). NOTE: THIS SURVEY DATA IS A COMPILATION OF THE AS -BUILT CONSTRUCTION OF PHASE I PERFORMED BY TURNER LAND SURVEYING OCTOBER 2015 AND THE EXISTING CONDITIONS OF PHASE II SURVEY PERFORMED BY MCKIM & CREED IN MARCH 2017. SCALE: 1 " = 30' N r�� 0 15 30 60 T E COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 \\\1111111111���'/ �Oo �GE ARCIdlF��,�2y X °C-5050 X , too - ZV 4o ''''11111111`\\ C" X 1 fi5 _ ��,9y�•••••........ : H,�t���`'��� REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. W U N W� C/) �U z = O W Q C W z O O 4' n U O _J U) O C 0 a- 0 U) >.1 C/) _�_J 4 -JW 0 -0 O O WU� M � Q o PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET DATE: 06.08.2018 SHEET TITLE: LAYOUT & MATERIALS PLAN SHEET NUMBER: L200 3,500 PSI CONCRETE W/ MEDIUM BROOM FINISH PERPENDICULAR TO MAIN TRAFFIC FLOW - THICKNESS PER TABLE BELOW #4 REBAR - REINFORCEMENT PER TABLE BELOW - ABC -THICKNESS PER TABLE a BELOW � I-1111 II I-1111 II I ii COMPACTED SUBGRADE - 95% S.P.D. r iIMiII:L_11 I PAVEMENT TYPE ABC REINFORCEMENT CONCRETE Sidewalks across Drive Lanes 4" #4 @ 12" o.c, b.w. 6" Pedestrian Sidewalks 4" None 4" NOTES: 1. CONTRACTOR TO CONTACT LANDSCAPE ARCHITECT TO REVIEW FORMS PRIOR TO POURING. 2. SEE PLANS FOR JOINT LOCATIONS. CONCRETE PAVING SCALE: 1 " = V-0" Varies (6' min) -RL111 ; hii_—ii SIDE VIEW FRONT VIEW 8" f2" 32" I I I°I I I I°I I I I I I I I 2" MIN G 1 .�40"�' 4" 3" TREE PROTECTION AREA 18" 4" 3" DO NOT ENTER 4" WARNING SIGN DETAIL pSteel Post 0 Woven Wire Fabric. Always required pOrange, UV resistant high -tensile strength poly barricade fabric 0 Warning Sign p6" min. cover over skirt pAnchor skirt as directed by engineer 0 Min. 10 gauge line wires pMin. 12 2 gauge intermediate wires 9 Grade NOTES: WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. O SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. TREE PROTECTION FENCING SCALE: NTS 2" X 6" PRESSURE TREATED COMPOSITE LUMBER TOP RAIL, ROUNDED EDGES TO $" RADIUS. SECURE USING HARDWARE PER MANUFACTURER. 2"X4" PRESSURE TREATED '%' 94° LUMBER TO SECURE WIRE MESH GALVANIZED WELDED WIRE MESH, — SECURE USING GALVANIZED SCREWS AND WASHERS TO POSTS 4"X4" PRESSURE TREATED POSTS WITH CONCRETE FOOTER SLOPE TOP OF FOOTER FOR POSITIVE DRAINAGE FINISHED GRADE I I°I I I I°I I I I°I I I I I I I I G GI G\/AT1r)K1 OVERLOOK FENCE SCALE: NTS DUCT CC(`TVIAI 1:5'OTE c, 11 COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 \\,,11111 fill" CAROB �Oo �G�E ARCIdlF��,�2y �; x °C-5050 X , �0- o�' V o 11 ob �o �<o<ABpN-\ REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET DATE: 06.08.2018 SHEET TITLE: LAYOUT & MATERIA DETAILS SHEET NUMBER: L201 N/F WAKE COUNTY D.B. 15449, PG. 2570 B.M. 2013, PG. 1239 P.I.N.: 1775345450 0 = 290 NO - - 1 —286 �_-- I -1' V 0 I I GO-1SOOT \ r UP01 J \ a s \ i� \ III ° / TOP DECK 290.50 \ TOP DECK 290.50 I / / O° (707 TOP DECK 290.50 (301 SF 01 I O O as \ O° g , 291— O QO FG 292.00 �O� � ' ems, � �.- Baa O LP 292.50 �� `. ; � 295 00 O, ° °°: -n 11 ,i o Op °� �� °O zs6 O _� �►' z9 / < z ' Op 29 F dl, ° L PG. 2570 TOP DECK 290.50 09 ° 2013, PG. 1239 I.N.: 1/75345450___----_29 L TOP DECK 290.50 / QQ '07 /3 0 \� 2 / 04300 o m X TOP DECK 290.50 �/ AS BUILT SURVEY LIMITS FG 292 00 O / o / I A ��� �� W °° W. --- ° HP 303.5 i ( R o EXISTING WATERLINE Ci OJ UT / STRU o J $/ HW — -> _ — — "_ _ ROBERTSON POND ROAD (SR 2324 Riw ROB R/ _ _ _ _ _ - 60' PUBLIC R/w) �- - — — — — PP N/F COUNTY OF WAKE D.B. 15449, PG. 2570 B.M. 2013, PG. 1239 P.I.N.: 1775420635 ZONED R-30 WITH A RCOD-1 OVERLAY NF JASPER L E MOSLEY SHIRLEY J. MOSLEY D.B. 2136, PG. 560 B.M. 2013, PG. 1239 P.I.N.: 1775426928 GRADING NOTES 1. ORIGINAL EXISTING CONDITIONS SHOWN AS'EXISTING' IN THIS PLAN SET HAS BEEN COMPILED FROM SURVEY DATA PROVIDED BY WAKE (MAPS. CONTRACTOR TO FIELD VERIFY ALL INFORMATION AND REPORT ANY DISCREPANCIES. 2. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 3. ALL PAVEMENTS TO SLOPE POSITIVELY AWAY FROM ALL BUILDINGS. PONDING OF WATER IS PROHIBITED. 4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF EROSION CONTROL METHODS DURING CONSTRUCTION, AND THE OWNER IS RESPONSIBLE FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER CONSTRUCTION IS COMPLETE, IF ANY PERMANENT METHODS ARE REQUIRED. 5. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET FORTH IN THE CITY OF RALEIGH EROSION AND SEDIMENT CONTROL MANUAL. 6. CONTRACTOR TO SEE CIVIL SHEETS FOR SEDIMENT AND EROSION CONTROL NOTES, SEQUENCE, GUIDANCE, AND DETAILS. GRADING LEGEND KEY DESCRIPTION FG FINISH GRADE MG MEET EXISTING GRADE HP HIGH POINT HPS HIGH POINT OF SWALE LP LOW POINT BWH BOTTOM OF WALL (HIGH SIDE) BWL BOTTOM OF WALL (LOW SIDE) TW TOP OF WALL X% SLOPE DIRECTION - POINTS DOWNWARD ' ACCESSIBLE ROUTE (EXISTING) 00 --op ACCESSIBLE ROUTE (PROPOSED) NOTE: THIS SURVEY DATA IS A COMPILATION OF THE AS -BUILT CONSTRUCTION OF PHASE I PERFORMED BY TURNER LAND SURVEYING OCTOBER 2015 AND THE EXISTING CONDITIONS OF PHASE II SURVEY PERFORMED BY MCKIM & CREED IN MARCH 2017. SCALE: 1 " = 30' N 0 15 30 60 1 b04 T E COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 �\\\\NCARO'/" �O�G�E ARG•NIFcT/�iy X °C-5050 Xo , oV* -�aoo 00-0-00.0 41, BOP N-\ 00000 C It, XN Ro 1365 �'• _ REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET DATE: 06.08.2018 SHEET TITLE: GRADING PLAN SHEET NUMBER: L300 PLANTING LEGEND SYMB OL TOTAL QTY SCIENTIFIC NAME COMMON NAME INSTALL SIZE INSTALL STYLE NOTES TREES AAR 5 Amelanchier arborea American Serviceberry Existing Existing Existing trees relocated TDI 1 Taxodium distichum Bald Cypress 2" CAL. B/B Existing tree replanted due to grading SHRUBS CAL 17 Clethra alnifolia 'Ruby Spires' Summersweet 18"HT./SPR. Container Full, Dense GRASSES PVI 60 Panicum virgatum "Shenandoah" Switch Grass 16"HT./SPR. Container TURF/REVEGETATION LAWN Festuca arundinacea Tall Fescue Seed Contractor shall repair all areas damaged by construction NOTE: 1. SOME PLANTS ARE TO BE REMOVED AND RELOCATED ON SITE. SEE PLANTING PLAN FOR LOCATION AND LEGEND FOR IDENTIFICATION. 2. ADDITIONAL PLANT NOTES AND DETAILS CAN BE FOUND ON SHEET L401 . 290 — N/F WAKE COUNTY D.B. 15449, PG. 2570 B.M. 2013, PG. 1239 P.I.N.: 1775345450 30" CYPRESS 24" OA4" OAK 4" CYPRESS �'V2" CYPRESS a0" CYPRESS 0 29" OAK �4" GUN Ie2,9" GUN' �I n" nA� \ i 31 " CYPRESS �7n„ ni /AAA I \ 31 " CYPRESS I I GUM 25" CYPRESS 00•� O�- 28" CYPRESS I 34" sF °>� 32„ GUI O^ "��b01 l p RE -VEGETATE ANY DISTURBED ` " CYPRESS / O SLOPES BACK TO ORIGINAL `„ V T, CONDITION AND PER CIVIL SHEETS ;'Q 2O OYPRESS/ 00 O 5 gyp) ' v d 26'iCYPRESS TWIN 00 Q07 -0 2 721 " CYPRESS 0 "I 00 /CYPRF,SS p0 020 021 "J T \\\ O 0i/ Opp _ O n / 99500 29 AR <O O \ p0 0 / O, O 7'� YPRESS 293 32 C / „ 0 " 20CYPRESS 01 / 00 �� � � 0 24 0, ..,.6 2 PIN O 2s -' G U " O O r / �S .� a �Z'22" CYP ° ns 21 29 F O dl \ ` 30 L 29`' OUNITY O 49, PG. 2570 2013, PG. 1239 00 OX OO / r - - _ 9 I.N.: 1775345450 29 O �' ;� 00 0 • - X93 � I —19 p tX—, O � ti91 1 00 1 v EXISTING TREEn / RELOCATED o O I M EXISTING TREE REPLANTED Oj a X DUE TO GRA ` AS BUILT SURVEY LIMITS °o x RE -VEGETATE ANY DISTURBED I SLOPES BACK TO ORIGINAL TRIPLE -SHREDDED HARDWOOD MULCH, TYP. CONDITION AND PER CIVIL SHEETS y ~�' ALL LANDSCAPE BEDS AND MULCH RINGS I X s � � 4" V -SHAPED SPADED BED EDGE, TYP. ALL Q x LANDSCAPE BEDS AND MULCH RINGS 0 20" CY ESS / N a O w r O a � � O v ES / \ 00 =� - - �0'0 X303 O _ 2 OAK EXISTING WATERLINE / ,'^ t�o z 302 z , O � OD o � ~�~ • �o • r'11� \o ° - � o 21 PIN o 0 ~� Z/ PINS i a1` 00 EXISTING TREES RELOCATED, TY F (4) 661 11 00 °, SF 00 / y � X \0" O O/ i O_WM2 �1 1 TRIPLE -SHREDDED HARDWOOD MULCH, TYP. ALL LANDSCAPE BEDS AND MULCH RINGS 4" V -SHAPED SPADED BED EDGE, TYP. ALL LANDSCAPE BEDS AND MULCH RINGS 0 �T.TiM _o-300 ' I\ /--------- ------ —285— 74 ��� EXISTING - /0� �_ , _ _ _ _ _ - - - 1 � ter✓ , — — `� O - - `290 `. - • ' NF JASPER L E MOSLEY SHIRLEY J. MOSLEY D.B. 2136, PG. 560 B.M. 2013, PG. 1239 P.I.N.: 1775426928 HW - -> _ - - " ROBERTSON POND ROAD (SR 2324 Riw R/_ _ _ _ ROB 60' PUBLIC R/w) — — PP N/F COUNTY OF WAKE D.B. 15449, PG. 2570 B.M. 2013, PG. 1239 P.I.N.: 1775420635 ZONED R-30 WITH A RCOD-1 OVERLAY NOTE: THIS SURVEY DATA IS A COMPILATION OF THE AS -BUILT CONSTRUCTION OF PHASE I PERFORMED BY TURNER LAND SURVEYING OCTOBER 2015 AND THE EXISTING CONDITIONS OF PHASE II SURVEY PERFORMED BY MCKIM & CREED IN MARCH 2017. SCALE: 1 " = 30' N 0 15 30 60 1 b04 'OTE COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 1,1 \�N CAROB �Oo _GE ARCId7%�,�2y X 2TC-5050 X , off` XN ;� 1 fi5 _ r lri�fili��t�t��`,`` REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. W 0 N Q W� C/) �U CZ z =O Q z 0 O 4' n U 0 _J LJ— U) 0 Cr 0 a- 0 U/ >1 v ) 4i 0-0 O O WU� W W Q O PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET DATE: 06.08.2018 SHEET TITLE: PLANTING PLAN SHEET NUMBER: L400 0 O _o-300 ' I\ /--------- ------ —285— 74 ��� EXISTING - /0� �_ , _ _ _ _ _ - - - 1 � ter✓ , — — `� O - - `290 `. - • ' NF JASPER L E MOSLEY SHIRLEY J. MOSLEY D.B. 2136, PG. 560 B.M. 2013, PG. 1239 P.I.N.: 1775426928 HW - -> _ - - " ROBERTSON POND ROAD (SR 2324 Riw R/_ _ _ _ ROB 60' PUBLIC R/w) — — PP N/F COUNTY OF WAKE D.B. 15449, PG. 2570 B.M. 2013, PG. 1239 P.I.N.: 1775420635 ZONED R-30 WITH A RCOD-1 OVERLAY NOTE: THIS SURVEY DATA IS A COMPILATION OF THE AS -BUILT CONSTRUCTION OF PHASE I PERFORMED BY TURNER LAND SURVEYING OCTOBER 2015 AND THE EXISTING CONDITIONS OF PHASE II SURVEY PERFORMED BY MCKIM & CREED IN MARCH 2017. SCALE: 1 " = 30' N 0 15 30 60 1 b04 'OTE COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 1,1 \�N CAROB �Oo _GE ARCId7%�,�2y X 2TC-5050 X , off` XN ;� 1 fi5 _ r lri�fili��t�t��`,`` REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. W 0 N Q W� C/) �U CZ z =O Q z 0 O 4' n U 0 _J LJ— U) 0 Cr 0 a- 0 U/ >1 v ) 4i 0-0 O O WU� W W Q O PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET DATE: 06.08.2018 SHEET TITLE: PLANTING PLAN SHEET NUMBER: L400 PLANTING NOTES 1. ROUGH GRADING TO BE COMPLETED PRIOR TO THE START OF PLANT INSTALLATION. SUBSTANTIAL COMPLETION SIGN -OFF BY LANDSCAPE ARCHITECT CONTRACTOR TO ENSURE NO CHANNELIZED FLOWS AROUND THE SITE. 2. CONTRACTOR RESPONSIBLE FOR LOCATING ALL UTILITIES AND UNDERGROUND IMPEDIMENTS PRIOR TO BEGINNING PLANTING. 3. ALL WEEDS, NON-NATIVE INVASIVE SPECIES, AND EXOTIC SPECIES LOCATED WITHIN THE PROJECT CONTRACTOR LIMITS SHALL BE ELIMINATED PRIOR TO PLANTING BED CREATION, PLANTING, AND SEEDING/SODDING OPERATIONS. 4. PLANTING SHOULD OCCUR IMMEDIATELY AFTER CONSTRUCTION TO STABILIZE AREAS OF BARE SOIL. 5. IT SHALL BE NOTED THAT ALL SECTIONS OF THE SITE THAT ARE SLOPED 3:1 OR HIGHER WILL BE COVERED WITH EROSION CONTROL STABILIZATION COIR FABRIC (WITH 1" SQUARE OPENINGS) PRIOR TO PLANTING TO ENSURE IMMEDIATE STABILIZATION. LANDSCAPE CONTRACTOR SHALL CUT FABRIC AT EACH PLANT LOCATION AND PLACE PLANTS ACCORDING TO PLAN. ALL FABRIC SHALL BE RE -STAKED PER ENGINEERS ORIGINAL DRAWINGS IMMEDIATELY AFTER PLANTING. 6. PLANTS ARE TO BE PURCHASED BY SCIENTIFIC NAMES. THEY SHALL BE REPRESENTATIVE OF THEIR SPECIES, MEET ALL NOTED CONDITIONS OF SPECIFICATIONS, AND SHALL BE IN VIGOROUS GROWING CONDITION MEETING ANSI STANDARD Z60. 7. LANDSCAPE ARCHITECT OR OWNER MAINTAINS RIGHT TO REJECT ANY PLANT DUE TO AESTHETICS OR STRUCTURAL DEFICIENCY AT ANYTIME. 8. CONTRACTOR RESPONSIBLE FOR FURNISHING AND INSTALLING ALL PLANTS SHOWN ON PLANS IN LOCATIONS SHOWN. QUANTITIES GIVEN ON THE PLANT LEGEND ARE FOR CONTRACTOR'S CONVENIENCE ONLY. IF DISCREPANCIES OCCUR, THE PLANS SHALL OVERRULE THE PLANT LEGEND. CONTRACTOR SHALL LOCATE ALL PLANTS AWAY FROM KNOWN PERMANENT FIXTURES. IF CONFLICT ARISES WITH PLAN, CONTRACTOR SHALL NOTIFY PROJECT MANAGER OR DESIGNEE PRIOR TO PROCEEDING. 9. ALL PLANT MATERIAL SHALL CONFORM TO OR EXCEED THE AMERICAN STANDARD FOR NURSERY STOCK (LATEST EDITION) AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 10. ALL PLANT MATERIAL SHALL BE FREE OF ALL PESTS, DISEASES, AND CANKERS, IN HEALTHY CONDITION, AND FREE OF MECHANICAL DAMAGE AT THE TIME OF PLANTING. 11. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE A HEALTHY AND VIABLE PLANT AND THE PLANT SHALL BE REJECTED IF DEEMED UNHEALTHY OR UNFIT AT ANY TIME DURING THE CONTRACT OR WARRANTY DURATION. 12. IF ANY PLANT/MATERIAL SUBSTITUTIONS ARE REQUESTED BY CONTRACTOR, THEN NOTICE SHALL BE GIVEN TO PROJECT MANAGER OR DESIGNEE AT MINIMUM SEVENTY-TWO (72) HOURS (NOT INCLUDING WEEKENDS) PRIOR TO DESIRED ORDERING DATE/TIME. WHEN SUBSTITUTIONS ARE REQUESTED BY CONTRACTOR, SUGGESTED ACCEPTABLE REPLACEMENTS SHALL ALSO BE PRESENTED AT TIME FOR FULL AND COMPLETE REVIEW BY LANDSCAPE ARCHITECT OR OWNER. 13. BALLED AND BURLAPPED PLANTS/TREES TO BE PLANTED PRIOR TO CONTAINER OR BEDDING PLANTS. 14. BALLED AND BURLAPPED MATERIAL SHALL COMPLY WITH THE FOLLOWING GUIDELINES: 14.1. TREES DESIGNATED B&B SHALL BE PROPERLY DUG WITH FIRM, NATURAL BALLS OF SOIL RETAINING AS MANY FIBROUS ROOTS AS POSSIBLE, IN SIZES AND SHAPES AS SPECIFIED IN THE AMERICAN STANDARD FOR NURSERY STOCK ANSI Z60.1. 14.2. ROOT BALLS SHALL BE FIRMLY WRAPPED WITH NONSYNTHETIC, ROTTABLE BURLAP AND SECURED WITH NAILS AND HEAVY, NONSYNTHETIC TWINE. 14.3. ROOT COLLAR SHALL BE APPARENT AT SURFACE OF BALL, OR THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING EXCESS SOIL FROM THE TOP OF THE ROOTBALL. 14.4. REMOVE ALL BURLAP, LACING, AND WIRE BASKET FROM AT LEAST THE TOP 1/2 OF THE ROOTBALL AND DISCARD FROM PLANTING HOLE. 14.5. DO NOT MANEUVER BY TRUNK. HANDLE BY ROOT BALL ONLY. 15. CONTAINERIZED PLANTS SHALL COMPLY WITH THE FOLLOWING GUIDELINES: 15.1. MATERIAL SHALL HAVE FIRM, NATURAL BALLS OF SOIL RETAINING AS MANY FIBROUS ROOTS AS POSSIBLE, IN SIZES AND SHAPES AS SPECIFIED IN THE AMERICAN STANDARD FOR NURSERY STOCK ANSI Z60.1 15.2. ROOT COLLAR SHALL BE APPARENT AT SURFACE OF BALL, OR THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING EXCESS SOIL FROM THE TOP OF THE ROOTBALL. 15.3. REMOVE CONTAINER PRIOR TO PLANTING. 16. TREES TO BE STAKED WILL BE DESIGNATED BY THE LANDSCAPE ARCHITECT. TREE STAKING FOR CANOPY AND LARGE EVERGREEN TREES SHALL NOT EXCEED 90 DAYS. 17. PLANT BED PREPARATION: ALL PLANT BEDS ARE TO RECEIVE A MINIMUM OF 4" OF APPROVED TOPSOIL TILLED IN TO A DEPTH OF 8" TO ENSURE INTEGRATION WITH EXISTING SOIL. APPROVED TOPSOIL IS TO BE PREFERABLY FROM ON-SITE STOCKPILE FROM STRIPPING OPERATIONS - SEE EROSION AND SEDIMENT CONTROL PLANS. IF ON-SITE TOPSOIL IS NOT AVAILABLE, CONTRACTOR SHALL PROVIDE TO SITE ACCORDINGLY. 18. ALL MULCH TO BE CERTIFIED TO BE FREE OF WEEDS, NON-NATIVE INVASIVE SPECIES AND THEIR LARVAE. MULCH SAMPLE SUBMITTAL SHALL BE PROVIDED TO LANDSCAPE ARCHITECT BEFORE SITE DELIVERY. 19. SEED/SODDED BED PREPARATION: ALL AREAS TO BE SEEDED/SODDED ARE TO RECEIVE A MINIMUM OF 2" OF APPROVED TOPSOIL SEEDING/SODDING NOTES FILLED INTO ALL DEBRIS, ROCKS, ETC. LARGER THAN .5" ARE TO BE REMOVED PRIOR TO SEEDING/SODDING OR PLANTING. A DEPTH OF 4" TO ENSURE INTEGRATION WITH EXISTING SOIL. APPROVED TOPSOIL IS TO BE PREFERABLY FROM ON-SITE STOCKPILE FROM STRIPPING OPERATIONS - SEE EROSION AND SEDIMENT CONTROL PLANS. IF ON-SITE TOPSOIL IS NOT AVAILABLE, CONTRACTOR SHALL PROVIDE TO SITE ACCORDINGLY. SEEDING/SODDING NOTES 1. ROUGH GRADING TO BE COMPLETED PRIOR TO THE START OF PLANT INSTALLATION. SUBSTANTIAL COMPLETION SIGN -OFF BY LANDSCAPE ARCHITECT CONTRACTOR TO ENSURE NO CHANNELIZED FLOWS AROUND THE SITE. 2. ALL SEEDED/SODDED AREAS SHALL BE FINISHED GRADE AT THE THICKNESS OF THE SOD. 3. NO SEEDED/SODDED AREAS SHALL BE SODDED UNTIL ALL OTHER CONSTRUCTION ACTIVITIES, INCLUDING PLANTING AND MULCHING HAVE OCCURRED AND LANDSCAPE ARCHITECT HAVE REVIEWED THE FINAL GRADING. 4. SOD AREAS WILL BE ACCEPTED WHEN IN COMPLIANCE WITH ALL THE FOLLOWING CONDITIONS: 4.1. ROOTS ARE THOROUGHLY KNIT TO THE SOIL 4.2. ABSENCE OF VISIBLE JOINTS 4.3. ALL AREAS SHOW A UNIFORM STAND OF SPECIFIED GRASS IN HEALTHY CONDITION 4.4. AT LEAST 30 DAYS HAVE ELAPSED SINCE THE COMPLETION OF WORK UNDER THIS SECTION. 5. QUALITY GUARANTEE: 5.1. SOD SHALL BE UNIFORM IN COLOR, LEAF TEXTURE, LEAF AND ROOD DENSITY, AND FREE FROM WEED, DISEASES, AND OTHER VISIBLE IMPERFECTIONS AT TIME OF FINAL ACCEPTANCE. GUARANTEE DOES NOT COVER DAMAGE AS A RESULT OF FERTILIZERS, PESTICIDES, OR OTHER APPLICATIONS NOT SUPERVISED BY THE CONTRACTOR OR AS A RESULT OF ACTS OF GOD OR VANDALISM. 5.2. SEED SHALL BE UNIFORM IN COLOR, LEAF TEXTURE, LEAF AND ROOD DENSITY, AND FREE FROM WEED, DISEASES, AND OTHER VISIBLE IMPERFECTIONS AT TIME OF FINAL ACCEPTANCE. GUARANTEE DOES NOT COVER DAMAGE AS A RESULT OF FERTILIZERS, PESTICIDES, OR OTHER APPLICATIONS NOT SUPERVISED BY THE CONTRACTOR OR AS A RESULT OF ACTS OF GOD OR VANDALISM. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT THE SEED/SOD IS PROPERLY IRRIGATED DURING THE GROW -IN PERIOD AND SHALL BE RESPONSIBLE IF THE SOD SUFFERS IRREPARABLE HARM. 7. SEED/SOD IS SUBJECT TO INSPECTION AND ACCEPTANCE. LANDSCAPE ARCHITECT AND/OR CLIENT RESERVES THE RIGHT TO REJECT AT ANY TIME OR PLACE PRIOR TO ACCEPTANCE, ANY WORK AND SOD WHICH IN THE LANDSCAPE ARCHITECTS OPINION FAILS TO MEET THESE SPECIFICATIONS REQUIREMENTS. 8. SOD STANDARDS: 8.1. GENERAL: HEALTHY, THICK TURF HAVING UNDERGONE A PROGRAM OF REGULAR FERTILIZATION, MOWING AND WEED CONTROL; FREE OF OBJECTABLE WEEDS; UNIFORM IN GREEN COLOR, LEAF TEXTURE AND DENSITY; HEALTHY, VIGOROUS ROOT SYSTEM; INSPECTED AND FOUND FREE OF DISEASE, NEMATODES, PEST AND PEST LARVAE BY THE ENTOMOLOGIST OF THE STATE DEPARTMENT OF AGRICULTURE. 8.2. EACH PIECE OF SOD: SANDY -LOAM SOIL BASE THAT WILL NOT BREAK, CRUMBLE OR TEAR DURING SOD INSTALLATION. 8.3. THICKNESS: MINIMUM 3/4" THICK, EXCLUDING THE TOP GROWTH THATCH. 8.4. THATCH: NOT TO EXCEED 1/2" UNCOMPRESSED. 8.5. SIZE: CUT IN STRIPS 18" WIDE NO MORE THAN 24 HOURS PRIOR TO DELIVERY. 9. SOD DELIVERY, STORAGE AND HANDLING GUIDELINES ARE AS FOLLOWS: 9.1. SOD SHALL BE DELIVERED ON PALLETS PROPERLY LOADED ON VEHICLES AND WITH ROOT SYSTEM PROTECTED FROM EXPOSURE TO SUN, WIND, AND HEAT IN ACCORDANCE WITH STANDARD PRACTICE AND LABELED WITH BOTANICAL AND COMMON NAME OF EACH GRASS SPECIES IN ACCORDANCE WITH FEDERAL SEED ACT. SOD THAT HAS BEEN DAMAGED BY POOR HANDLING OR IMPROPER STORAGE IS SUBJECT TO REJECTION BY THE LANDSCAPE ARCHITECT OR OWNER. 9.1.1. PROTECT FROM DEHYDRATION, CONTAMINATION, FREEZING AND HEATING AT ALL TIMES. KEEP STORED SOD MOIST AND UNDER SHADE OR COVERED WITH MOISTENED BURLAP. 9.1.2. DO NOT DROP SOD ROLLS FROM CARTS, TRUCKS OR PALLETS. 9.1.3. DO NOT DELIVER MORE SOD THAN CAN BE INSTALLED WITHIN 36 HOURS. 9.1.4. DO NOT STACK SOD MORE THAN 2 FEET DEEP. DO NOT CUT LEADER SPECIFIED TREE STRAP 2 GAUGE GALV. WIRE WITH '' DIAMETER WHITE PVC ON ENTIRE LENGTH OF EACH WIRE SPECIFIED POSTS - ALIGN NW/SE, 2 PER TREE - SET MIN. 18" INTO UNDISTURBED SUBGRADE WRAP ENTIRE SURFACE OF TRUNK UP TO SECOND BRANCH W/ SPECIFIED WRAPPING SECURED @ TOP AND BOTTOM & AT 2 FT INTERVALS PLANT TREE W/ TOP OF ROOTBALL 2"4" - ABOVE FINAL GRADE 3" DEEP MULCH RING, MIN. 48" O, PULL - MULCH BACK 2"-3" FROM TRUNK 4" HT. WATER SAUCER IN NON -TURF AREAS. SPADED BED EDGE AT TREE RINGS TYP SPECIFIED BACKFILL MIXTURE AS PER SPECIFICATIONS AFTER TREE IS SET, REMOVE ALL TWINE & WIRE FROM TOP AND SIDES OF ROOTBALL. PULL BURLAP BACK 3 (MIN.) SET ROOTBALL ON UNDISTURBED SUBGRADE - DO NOT OVER - EXCAVATE. i SET SHRUB 1" HIGHER THAN SURROUNDING GRADE PAVEMENT. AS rn SHOWN ON PLANS \/�X DIAM/EfER OF ROOTBALL, MIN. \ /\ TREE PLANTING AS SPECIFIED IN LEGEND SCALE: 1/4'' = 1'-0" AMEND PLANTING AREA PER SPECIFICATIONS 3" DEPTH MULCH AS SPECIFIED. DO NOT BURY PLANTS WITH MULCH REMOVE PLASTIC POTS PRIOR TO PLANTING PERENNIAL GROUNDCOVERS SCALE: 1 " = V-0" a� - I SUBGRADE I I SPACING ROWS + + ,A 11 -F-+ + + Z-6" PRUNE ALL DAMAGED OR DEAD WOOD IMMEDIATELY PRIOR TO PLANTING - SPECIFIED MULCH 3" DEEP 1- =111 III I III- 2x DIAMETER DIAMETER OF ROOTBALL, MIN. SHRUB PLANTING + + + + + + + + + + + + + + + + + + + FILL WITH SPECIFIED SOIL MIX ROOTBALL. SCORE SIDES OF ROOTBOUND PLANTS ONLY SCALE: 3/4'' = 1'-0" PLANT SPACING CHART SPACING 'D" ROW 'A" PLANTS/s.f. 6" ox. 5.20" o. c. 4.69 8" ox. 6.93" o. c. 2.60 90"o.c. 8.66" o. c. 9.66 92"o. c. 90.40" ox. 9.00 95" o. c. 93.00" ox. 0.73 98"o.c. 95.60" o. c. 0.59 24 " o. c. 20.80" o. c. 0.29 TRIANGULAR SPACING FOR GROUNDCOVERS SCALE: NTS COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 CAROB 02 o. x,5r\-505g x :tV o �0<<ABORP��� ''I"i llllllO `��11 rrrr 9 • 1365 ' X REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. N U N � Q W Cf) Q (Do =�z a. p O�� 4-1 J O Jry 75 Cf) � 0 zLn Opo U) U) � o-0 wU mry 0 � co o PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET DST 1• Ii 1 S SHEET TITLE: PLANTING NOTES & DETAILS SHEET NUMBER: L401 EROSION CONTROL NOTES: 1. THE CONTRACTOR SHALL EXERCISE PRECAUTIONS THROUGHOUT THE CONSTRUCTION SEQUENCE TO PREVENT EROSION AND OFF-SITE SEDIMENT. EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE PROJECT PLANS, WAKE COUNTY GUIDELINES, AND AS DIRECTED BY THE DESIGNER. ALL SEDIMENTATION AND EROSION CONTROLS ARE TO BE BUILT TO WAKE COUNTY AND NCDENR STANDARDS. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES DURING CONSTRUCTION. THE MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL BE CHECKED FOR MAINTENANCE ISSUES AFTER EVERY RAINFALL AT A MINIMUM. 3. ALL DISTURBED AREAS TO BE SEEDED TO SPECIFICATIONS UNLESS OTHERWISE NOTED ON THE PLANS. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. ALL DISTURBED AREAS THAT ARE NOT OTHERWISE STABILIZED SHALL BE TOP SOILED AND SEEDED, TEMPORARILY OR PERMANENTLY, IN ACCORDANCE WITH THE WAKE COUNTY STANDARDS. PERMANENT SEEDING AND GRASS ESTABLISHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. 4. THE CONTRACTOR SHALL PROVIDE GROUND COVER AS SOON AS POSSIBLE BUT IN ANY EVENT WITHIN 14 DAYS ON DISTURBED FLAT AREAS AND 7 DAYS ON ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL. SEE GROUND STABILIZATION CHART. 5. ALL DISTURBED AREAS TO BE PERMANENTLY GRASSED SHALL BE SEEDED WITH PERMANENT SEED MIX. 6. THIS SITE IS LOCATED WITHIN THE NEUSE WATERSHED. THE RECEIVING WATERCOURSE IS BUFFALO CREEK, A CLASS A STREAM. 7. THE CONTRACTOR SHALL KEEP ALL SURROUNDING PUBLIC ROADWAYS, PARKING AREAS, AND DRAINAGE SYSTEMS FREE FROM DIRT, MUD, AND CONSTRUCTION DEBRIS AT ALL TIMES. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACES, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE SURFACES BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER EXCESS SEDIMENT IS REMOVED. 8. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THE PLANS BUT NECESSARY TO CONTROL EXCESS SEDIMENT, IF DETERMINED TO BE NECESSARY BY THE ENGINEER. 9. PROVIDE SILT FENCE OUTLETS AS NEEDED. ADDITIONAL OUTLETS WILL HELP TO DISSIPATE THE RUNOFF AND HELP PREVENT SCOURING ALONG THE SILT FENCES. WATTLE INLET PROTECTION FOR SILT FENCES OUTLETS IS A RECOMMENDED MEASURE TO REDUCE OUTLET MAINTENANCE. ADDITIONALLY, COMPOST SOCK OUTLETS ARE AN ACCEPTABLE OPTION INSTEAD OF GRAVEL. 10. SILT FENCE AROUND STOCKPILES - SILT FENCE SHALL ENCOMPASS, WITH THE EXCEPTION OF THE INGRESS/EGRESS AREA, THE ENTIRE STAGING, STOCKPILE, AND/OR SPOIL AREA TO PREVENT ANY SEDIMENT FROM LEAVING THE LIMITS OF DISTURBANCE. 11. PROTECT STREAM CROSSINGS - ADEQUATE TEMPORARY SEDIMENT CONTROLS SHALL BE PROVIDED AT THE END OF EACH WORK DAY AT ALL STREAM CROSSINGS UNTIL ADEQUATE PERMANENT GROUND COVER IS PROVIDED. 12. MINIMIZE BUFFER DISTURBANCE - THE PROJECT MUST MINIMIZE THE DURATION AND EXTENT OF DISTURBANCE WITHIN THE STREAM BUFFER ZONE. STAGING AREAS AND STOCKPILES MUST BE LOCATED OUTSIDE OF THE BUFFER ZONE WHENEVER POSSIBLE. WORK WITHIN THE BUFFER ZONE SHOULD BE SEQUENCED TO MINIMIZE THE LENGTH OF TIME THAT DISTURBED AREAS ARE EXPOSED. ALL MATERIALS SHOULD BE ON HAND BEFORE WORK IS COMMENCED. STREAM BANK STABILIZATION, WHICH INCLUDES THE AREA FROM THE EDGE OF WATER TO THE TOP OF BANK, SHOULD BE PHASED SO THAT EACH DAY'S WORK IS COMPLETED AND ADEQUATELY STABILIZED AT THE END OF EACH WORK DAY. 13. CONCRETE DUST/WASTE/WASTEWATER MUST NOT BE RELEASED TO THE STORM DRAIN OR OFF-SITE. ALL SEDIMENT MUST BE CLEANED OFF THE ROADWAY BY DRY SWEEPING METHODS ONLY. WATER MUST NOT BE USED TO WASH SEDIMENT OFF OF ROADS, DRIVEWAYS, OR PARKING LOTS. 14. THE FOLLOWING MUST BE KEPT ON SITE UNTIL THE E&SC PLAN HAS BEEN CLOSED OUT BY THE DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES: PREVIOUS 30 DAYS OF SELF INSPECTION RECORDS, RAIN GAUGE, APPROVAL CERTIFICATE/LETTER, APPROVED PLAN, AND NPDES PERMIT. THESE ITEMS SHOULD BE LOCATED NEAR THE MAIN CONSTRUCTION ENTRANCE. COORDINATE WITH THE INSPECTOR IF AN ALTERNATIVE LOCATION IS PREFERRED. ADDITIONAL INFORMATION AND A LINK TO THE NCGO1 COMBINED SELF-MONITORING FORM CAN BE FOUND AT: HTTPS://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL-LAND-RESOURCES/ENERGY-MINERAL -LAN D- PERMITS /STORMWATER- PERMITS /CONSTRUCTION -SW. 15. ANY EVENT WHERE VISIBLE SEDIMENT LEAVES THE LIMITS OF DISTURBANCE OR WHERE POLLUTANTS ARE DISCHARGED TO WATERS OF THE STATE SHALL BE REPORTED TO APPROPRIATE OFFICES OF NCDWR AND NCDEMLR WITHIN 24 HOURS OF FIRST KNOWLEDGE OF THE OCCURRENCE, NCDWR SHALL BE CONSULTED REGARDING APPROPRIATE CLEAN-UP TECHNIQUES FOR ANY LOSS OF POLLUTANTS TO WATERS OF THE STATE OR PROTECTED BUFFER AREAS. 16. ALL STOCKPILES, DEBRIS PILES, HAZARDOUS/TOXIC WASTE, FUEL TANKS AND CONCRETE WASHOUT AREAS SHOULD BE NO LESS THAN 50' AWAY FROM ALL INLETS AND WATER BODIES (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE). 17. SILT FENCE SHOULD BE INSTALLED ON ALL DOWNSLOPE PORTIONS OF THE DISTURBED AREA. SILT FENCES SHOULD NOT BE INSTALLED ON THE HIGH SIDE OF THE DISTURBANCE AREA (TREE PROTECTION FENCINGS IS AN ACCEPTABLE ALTERNATIVE IF DESIRED). SILT FENCE OUTLETS SHOULD BE INSTALLED AT ALL LOW SPOTS AND ANYWHERE WATER IS POOLING. SILT FENCE AND OUTLET LOCATIONS MAY VARY FROM THE APPROVED PLANS PER SITE CONDITIONS. IF THERE ARE QUESTIONS OR CONCERNS REGARDING SILT FENCE PLACEMENT, CONTACT THE DEMLR INSPECTOR FOR ASSISTANCE. 18. COMPOST SOCK MAY BE SUBSTITUTED FOR SILT FENCE OUTLET GRAVEL, SLOPE BREAKS, CHECK DAMS, AND INLET PROTECTION. THE COMPOST SOCK MUST BE INSTALLED PER MANUFACTURER SPECIFICATIONS. THE MUST BE SIZED TO PREVENT OVERTOPPING. FOR SILT FENCE OUTLETS, THE INSTALLED HEIGHT CAN BE NO LESS THAN 16 INCHES. WATTLES, COIR LOGS, FILTER LOGS, ETC. ARE NOT ACCEPTABLE FOR THESE USES. 19. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTION MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 48.0131. THE SELF -INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM HTTP://PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919)791-4200. 20. THE PERSON RESPONSIBLE FOR MAINTENANCE: ERIC STAEHLE, WAKE COUNTY FACILITIES DESIGN AND CONSTRUCTION (919) 856-6369. GROUND STABILIZATION CHART SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS DIKES, SWALES, 7 DAYS NONE DITCHES, AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES LOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER ARES WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. CONSTRUCTION SEQUENCE GENERAL SITE PREPARATION 1. THE CONTRACTOR IS REQUIRED TO PERFORM AN INITIAL INSPECTION OF THE SITE AND TO TAKE PHOTOGRAPHS AND VIDEO OF THE PROPOSED CONSTRUCTION, STAGING, AND STOCKPILE AREAS BEFORE DISTURBING THE SITE IN ACCORDANCE WITH THE GENERAL CONDITIONS. APPROVAL TO INSTALL EROSION AND SEDIMENT CONTROL SHALL NOT BE GRANTED UNTIL THE CONTRACTOR HAS PROVIDED TO THE WAKE COUNTY AND RECEIVED WRITTEN APPROVAL OF THE CONTENT FROM WAKE COUNTY. 2. PERFORM ALL UTILITY IDENTIFICATION AND MARKING/FLAGGING AS NECESSARY. 3. COORDINATE WITH UTILITY COMPANIES TO RELOCATE OR PROTECT UTILITIES. 4. STAKE CONSTRUCTION LIMITS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 5. INSTALL A PLAN BOX AT A VISIBLE LOCATION WITHIN THE SITE TO KEEP A COPY OF THE APPROVED EROSION CONTROL PLANS, NPDES REPORTS, ETC. POST THE EROSION CONTROL PERMIT IN A VISIBLE LOCATION ON THE PLAN BOX. 6. INSTALL SEDIMENT/EROSION CONTROL FENCING, TREE PROTECTION FENCING, AND CONSTRUCTION ENTRANCE AND MOBILIZE CONSTRUCTION EQUIPMENT TO THE PROJECT SITE. 7. CONSTRUCT EXISTING DETENTION BASIN TO THE DIMENSIONS SHOWN ON THE CONSTRUCTION PLANS AND CONVERT TO DETENTION BASIN FOR THE DURATION OF THE PHASE II CONSTRUCTION. THE SKIMMER SHALL BE CONNECTED TO THE CLEANOUT BELOW THE EXISTING FRENCH DRAIN AND THE DRAIN PLUGGED ABOVE THE CONNECTION. THE CONTRACTOR SHALL PROTECT THE DRAIN FROM SILTATION BY COVERING WITH AN IMPERMEABLE LAYER. SEED AND MAT THE SIDES OF THE EXPANDED BASIN AND THE DIVERSION SWALE. 8. INSTALL ALL OTHER EROSION CONTROL MEASURES NECESSARY AS SHOWN ON THE EROSION CONTROL PLAN. 9. THE CONTRACTOR SHALL EXERCISE EVERY REASONABLE PRECAUTION THROUGHOUT THE CONSTRUCTION OF THE PROJECT TO PREVENT EROSION AND OFF-SITE SEDIMENTATION. WHEN THE MEASURES ARE COMPLETE CALL FOR AN INSPECTION BY THE ENGINEER. EMAIL ADDRESS FOR ENGINEER IS BWARDOWCE-CORP.COM. 10. IDENTIFY STAGING AND STOCKPILE AREAS AS SHOWN ON PLANS. ALL EXCAVATED MATERIAL SHALL BE STOCKPILED WITHIN STAGING AREAS OR THE LIMITS OF DISTURBANCE FOR LATER USE AS FILL MATERIAL OR DISPOSAL. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING APPROPRIATE STABILIZATION MEASURES AROUND THE STOCKPILE AREA(S) TO PREVENT EROSION AND SEDIMENTATION. ANY STOCKPILE MUST BE STABILIZED IF INACTIVE FOR MORE THAN 7 CALENDAR DAYS. STOCKPILES SHALL NOT BE LOCATED WITHIN 50 FEET OF ANY DRAINAGE STRUCTURE OR WATERCOURSE. PARK IMPROVEMENTS 11. PERFORM CLEARING OPERATIONS AS REQUIRED FOR IMPROVEMENTS. 12. INSTALL CONCRETE TRUCK WASH OUT AREA. 13. INSTALL TURBIDITY CURTAIN AND CONCRETE ABUTMENTS FOR BOARDWALK. 14. INSTALL HELICAL PILINGS AND BOARDWALK OVER ROBERTSON'S POND. 15. PERFORM GRADING OPERATIONS FOR WALKWAY EXTENSION TO THE MILL HOUSE. 16. INSTALL PROPOSED BOAT LAUNCH. 17. INSTALL CONCRETE WALKWAY FROM SHELTER TO MILL AREA AND PAD. 18. PERFORM FINE GRADING OF ADJACENT GROUND, SEED AND MULCH DISTURBED LAWN AREA. 19. GRADE WALKWAY NORTH OF PARKING LOT AND INSTALL CONCRETE WALK AS SHOWN ON THE CONSTRUCTION PLANS. 20. PERFORM FINE GRADING ADJACENT TO THE WALKWAY AREAS, SEED, AND MULCH. GENERAL SITE COMPLETION 21. COMPLETE SITE SEEDING AND PLANTING AS DESCRIBED IN THE CONSTRUCTION PLANS AND SPECIFICATIONS. DEWATER AND REMOVE SEDIMENT FROM THE BASIN. BAFFLES SHALL BE REMOVED FOR MATTING REPAIRS OR PLACEMENT AND THEN REINSTALLED UNTIL THE SITE IS STABILIZED. 22. REPAIR AREAS USED FOR CONSTRUCTION ACCESS, CONSTRUCTION ACTIVITIES AND STOCKPILE LOCATIONS. 23. SEED AND MULCH STAGING AREAS, STOCKPILE AREAS, ALL HAUL/ACCESS AREAS AND ANY REMAINING NON -VEGETATED AREAS. 24. COMPLETE SITE CLEANUP AND STABILIZATION AS CALLED FOR ON THE PLANS AND SPECIFICATIONS. 25. EROSION CONTROL DEVICES SHALL BE REMOVED FROM THEIR RESPECTIVE LOCATIONS ONLY WHEN THE THE ADJACENT GROUND HAS BEEN ESTABLISHED. 26. OBTAIN FINAL APPROVALS FROM WAKE COUNTY. 27. COMPLETE AS -BUILT SURVEY. 28. DEMOBILIZE 29. WHEN VEGETATION IS ESTABLISHED CONTACT NCDENR LAND QUALITY INSPECTOR FOR FINAL INSPECTION COMPLIANCE. 30. UPON RECEIPT OF THE CERTIFICATE OF COMPLIANCE THE CONTRACTOR SHALL REMOVE ALL TEMPORARY MEASURES. REMOVE BAFFLES AND SKIMMER FROM SEDIMENT BASIN(S). ). SEED AND MAT PERMANENT BOTTOM AS NEEDED TO PROVIDE FOR A PERMANENT STAND OF VEGETATION. STABILIZATION OF AND CERTIFICATE OF EROSION CONTROL DRY DETENTION BASIN Know what's below. Callbefore you dig. glul_� COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, INC 27603 1919.805.3586 WARD CONSULTING ENGINEERS, P.C. FM UCBNSE N0: C-2819 1805 Green Rd, Suite 10 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com NCBELS Firm No. C-2619 CAF?pC� I3344 Z J� REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET SHEET TITLE: EROSION CONTROL NOTES AND CONSTRUCTION SEQUENCE 6HEL:1 NUMBEK. C100 Swale ID Slope (ft/ft) Bottom Width Minimum Depth Minimum Top Side Slopes (A) 10 Year Peak 10 Year Velocity Shear Stress Channel Liner (B) (ft) (D) (ft) Width (ft) (ft/ft) Flow (cfs) (fps) (Ib/sf) Swale 1 0.03 3 0.5 3 3 4.4 3.44 0.47 CurlexType I i 4_0 i 6" CYPRESS ♦ ' 23" CYPRES / 24" OAK ♦ ' a QD�4' OAK 0" CYPRESS � / ♦ ♦ �a4" CYPRESS NOTES: 00 2" CYPREAS / 00 TOP WIDTH VARIES / / / 50' � �' \ 1. CHANNEL SHALL BE LINED WITH EROSION CONTROL MATTING a o" CYPRESS \ / / R�P� \ � I \ WITH DEPTH SPECIFIED IN CHART. -�' / /eUF lqN \ \ I N F\ \ N 24" GUM �R \ I WAK� COUNTY \\ \ 31" CYPRESS , / a I D.B. 15449 PG. \257�Q D / / / s" GUM �� \ B. M� 2013,\ P\G. 1R,39\ r, 2s� OAK 1 A / I � SILT FENCE / / P.I. I.. 17753454ai \ �� C400 OUTLETa7 N 2 SILT FENCE \ �� oaK \ `9 \ B 1 EROSION CONTROL1 I / C400 ; d�0" GUM C300 N 1 MATTING (SEE NOTES) \ N o a 1" CYPRESS I I N \ \ \ \ �s" OAK 7-6AY STABILIZATION \ 111 I 1 � / i 30" GUM 1 , N SWALE DETAIL L \ \ \ \ I � I / II a 25" CYPRESS 34" CYPRESS I\ \ \ / 00 �� „ 36" OAK TWIN rt� A8"' "a CYPV2ESS 36" OAR- a 32" GUM "CYPRESS ° Q / �0" CYPRESS "CYPRESS 1110 �. \ / � O / 26" CYPR 9S TWIN �s 24" GUM /IQ 2 SILT FENCE PROVIDE SEDIMENT a a %� \ a / C400 OUTLET COLLECTIAN ZONE I „ CYPRESS (_ r (� \ Ogg N°j / a 7" GUM �Q \ EXCA\4ATE TO 291 11 ti ( 26" CYPRESS � . \� \ / 24" CId 9 \ \ EXISTING RIPRAP SPILLWAY CiNTQUF �� I , - `- ��� i - , , !/ E / a \ \ I REMOVE RIPRAP, REESTABLISH SPILLWAY o I 4 / / 37" GUMI ELEVATION AT 293.7 FT., SEED, STRAW, AND j y O / OBJ �91�� ♦♦ /�Q 293 / o y 20" oA�\ MAT WITH C-700 EROSION CONTROL MATTING I p0 °° - �/ . ;�- / 2 POPLAR \ 7 -DAY STABILIZATION - ,. .4 ♦ / 294 - - V, OAK\ /UNUSED RIPRAP TO BE REMOVED FROM SITE \ \ Q i ., l ) \ / 24:' GUM. •y s 32" GUM 295— (!) / . / PROPOSED ° /����� ':--FINE SWALE 1 a 7 TURBIDITY CURTAIN TYP. o \ o / ^� 27 CYPRESSr - 36" POPLAR I 1(3.0%/ !LOPE) / • %_c 26" GUM D22" PINE \296. O / a - / o ♦ dL dl °off 7l2�C�PRESS 2 OAK / / � '•- �" PINE O' . \ O �/ /2g / °DO 4 6 SKIMMER SEDIMENT BASIN SEE CONTOURS / 2r/CyP S, / 29 97 1 " OAK I C300 C400 FOR BASIN LAYOUT. DIMENSIONS VARY�� 29 / �� BOTTOM ELEVATION _292.00 FT. \ °/ - - -3 R 29g SPILLWAY WEIR ELEVATION =293.70 FT. WEIR LENGTH =50 FT. \° / , - ° �� - - �- /•. • ��' ^ `� ay SILT 2 SURFACE AREA AT ELEV 294 FT. =4800 SF. / °� 21" YPR�S� / O % •. ' ti� �� - o FENCE C400 CY SS 299 x —X I PROTECT EXISTING / y x FRENCH DRAIN WITH �YP ss / c,,y� ti� �� �� /`1,� r`L°' EXISTING I PLASTIC SHEETING DURING -, (/ p0 / o p / ti �ti/ TREE LIN I , ❑❑B❑❑❑S❑NS CONSTRUCTION / /� ii�� �; j 300 or \ x FE CHAIN LINK [][IND/ �� / / � �Dp28" OAK 21" UM 3 SILT FENCE / /� ' ��� ✓ °- - a C400 OUTLET %/ / II / / 301 ✓2b'�YPRES'O ' t °• /� / / / / y/ / V MO / l x I x 4 2.0" FAIRCLOTH SKIMMER YPRE i" CYi// 24" CYPR ESS- a2, C400 1.25 ORIFICE SIZE CONNECT TO EXISTING _ // - ' / ,�/ / / / / / / / // A o o M X xEX. CONTROL POINT 3 FRENCH DRAIN CLEANOUT " CYll / REBAR W CAP PIPE TEMPORARY PLUG PROTECT -- - leo A ry `� l / /�� // / / / I / STOCKPILE o o NC GRID NAD 83) DRAIN ABOVE CLEANOUT 1EXISTING o / / //`� / I N: 753,009.57MUS SIDEWALK / / / E: 2, 174, 469.517FtUS - I� /� / / / / o 0 0 REMOVE AND REPLACE / EL.: 302.19(NAVD88) BOULDERS AS NEEDED BO - DER / / / / /�y/// / / / �p PROPERTY LINE FOR ACCESS �.o'/// (\ \ BY OTHERS N F 2 SILT FENCE f _ i TRIP / � O� \ PROPOSES ,5 �'��- 22" OAK / / / RAP O \ � „� ° 24" OAK EXISTING WAKE COUNTY C400 FLOATING / \ �" \ BAFFLES- C40 - o SHED D.B. 15449, PG. 2570 DOCK /F� / O� / \ , i� ? - - _ _ 300 0� X30 02 \ \I B.M. 2013, PG. 1239 GANGWAY / /// / / ( --A - .•� •22 PINE P.I.N.: 1775345450 / L^ / \ / SW LE / 21" PINE EXISTING 3 SILT FENCE JHOOK / ' �� ((� y / \ SHED C400 WITH OUTLET DUCK I /. ./� y / / / 27" PINE TBM-SITE eoxOj,� . EXISTING BENCHMARK IN / f - SHELTER ' /� j.CONCRETE / POWER POLE I - /' - / ' . ;SIDEWALK � CHANNEL / ASF � " TEMPORARY GRAVEL 1 /° I 1 MILL-� %// \ DRAIN CONCRET(# �— _Wil CONSTRUCTION C400 EL.=293.02 (NAVD88) j / % ❑ STONE, 9 �/ CONCRETE CURB &I I ENTRANCE WALKWAY GUTTER UNDERGROUNDEXISTING 0 POWER LINE 00 / ❑❑ I `� ❑L_ 11OT ❑uuOb N I (OVERHEAD)_ / ❑❑�� \ BRIDGE `�' CONCRETE \ -_ �Y C� ❑❑❑—/yam j G' I/�\ I CURB ?96- D D 11 �♦ EXISTING DAM �� �� WATERLINE / GRAVEL I EXISTING i N� ' �" I / o ��r / PARKING AREA \ 300 MILL DAM S \. • / `� y ♦ EXISTING MILL ti9 ELECT IC FOUNDATION �� F ,. ♦♦ I BOv�'dER�� EXISTING MEQ RS / �CONCRETE TRUCK 2 // / WASHOUT AREA C300 g N�♦ dD WELL HORSE / 0 2" GRAMT-EVVALL\ � ♦ � \ O p � \\ ` o i °O \ �\ \ / / o o BOULDERS -MILL HOUSE1 1 y! p GAVEL 00� I- - RE AJNS / I X29 IVH \ CONC�ETE� - \ UtDtRS --300- - --_ ���_ \ \ I✓I/ // l� % \ \ \ CURB \ \ - \ - - - - -- _�_ 2 SILT FENC ,\ \ EXISTIf� \ EXISTING \ - _ _ _ 298--- LINE EXISTING FENCE - \ \ GATE \ BUILDING COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1 919.805.3586 WARD CONSULTING ENGINEERS, P.C. FIRM LICENSE N0: C-2819 [8057Green Rd, Suite 10 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com NCBELS Firm No. C-2619 CARO,�y'--, WEi 13344Cs '• f LY NNE.•`• GENERAL NOTES: 1. EROSION CONTROL MATTING SHALL BE AMERICAN EXCELSIOR COMPANY CURLEX 1 OR APPROVED EQUAL. 2. EROSION CONTROL MAT SHALL BE PLACED ON PERMANENT DRY DETENTION BASIN TO PROMOTE REUSE OF DOCUMENT ESTABLISHMENT OF VEGETATION. This document is the property of 3. THE DRY DETENTION BASIN SHALL FUNCTION AS A TEMPORARY SEDIMENT BASIN DURING SITE GRADING Site Collaborative Inc. The ideas AND CONSTRUCTION. THE 1 -FOOT SEDIMENT COLLECTION ZONE SHALL BE EXCAVATED FROM THE EXISTING and design incorporated on this DRY DETENTION BASIN. THE CONTRACTOR SHALL AVOID EXCAVATING AROUND THE EXISTING FRENCH DRAIN. document is an instrument of professional service and shall not PROTECT THE FRENCH DRAIN FROM SEDIMENT WITH PLASTIC SHEETING AND PROVIDE TEMPORARY PLUG. be used for any other project 3.1.WHILE OPERATING AS A SEDIMENT BASIN, BAFFLES SHALL BE INSTALLED IN ACCORDANCE WITH NCDEQ without written authorization of AND WAKE COUNTY REQUIREMENTS. Site Collaborative Inc. 3.2.DEWATERING OF THE SEDIMENT BASIN SHALL OCCUR THROUGH A 1.25" FAIRCLOTH SKIMMER ATTACHED TO THE EXISTING FRENCH DRAIN CLEANOUT. Q) 3.3.ONCE ENOUGH SEDIMENT HAS COLLECTED TO FILL THE 1 -FOOT SEDIMENT COLLECTION ZONE, THE BASIN SHALL BE DEWATERED USING PUMPS IN ORDER TO FACILITATE REMOVAL OF EXCESS SEDIMENT. WATER U PUMPED OUT OF THE BASIN SHALL BE DISCHARGED INTO A SEDIMENT BAG BEFORE BEING ALLOWED TO (� DISCHARGE AS DIFFUSE FLOW INTO THE RIPARIAN BUFFER. 3.4.ONCE GRADING OPERATIONS AND CONSTRUCTION IS COMPLETED, THE SEDIMENT TRAP SHALL BE RESTORED TO OPERATE AS THE DRY DETENTION POND. THE 1 -FOOT SEDIMENT COLLECTION ZONE SHALL C/) BE BACKFILLED TO 292.0 FT. WITH ONSITE SOILS. ALL BAFFLES SHALL BE REMOVED. 4. CONTRACTOR SHALL MINIMIZE IMPACTS OF DISTURBANCE TO THE SHORELINE. v,' ^ � U Q z = 0 Q z 0� O �--' CZ U O DISTURBED AREA=1.55 ACRES 0 � LEGEND 0 O�%) EXISTING SURVEYED CONTOURS `'' 4-1 �--' PROPOSED CONTOURS WETLANDS 0 — — — RIPARIAN BUFFER' ` 0 EXISTING FENCELJJ v N /F ------------::::::--------------- EXISTING STORM PIPE JASPER LEE MOSLEY PROPOSED STORM PIPE In (a) SHIRLEY J. MOSLEY D.B. 2136, PG. 560 ❑❑D LIMITS OF DISTURBANCE Q 0 B.M. 2013, PG. 1239 P.I.N.: 1775426928 si= SILT FENCE ❑❑ TREE PROTECTION FENCE — - - — PROPOSED STORM SWALE PROPOSED BAFFLES PROJECT NUMBER: TURBIDITY CURTAIN 17002 CONSTRUCTION ENTRANCE PROJECT PHASE: CONCRETE TRUCK WASH PIT PERMIT SET I ) SF O�� \ \ - — STAGING OR STOCKPILE AREA DAT -' - — _ \ _ _DAN 06.08.20 18 `( f= _ _ _ - - -�P 7 \ - 294-- -- - - EXISTING WOOD FENCE I - —RAP °18 RCP- - 287.71 — (' EDGE OF ' INV. _ PEDGE iT , . 287.20 (,nNC RFTF PAVET MEN 0- _ I APRON MmoBdC ow[] �u 0 bi w - - - EX. CONTROL POINT #2- J v - - - � - - _ REBAR W CAP - - -1 El oI SUPPLEMENT EXISTING - - -NC GRID(NAD 83) - - - - - - 30 15 - 30 60 RIPRAP THIS LOCATION N: 752,714.1OFtUS a E: 2,174,349.57FtUS LSI WITH REMOVED m SPILLWAY RIPRAP EL.: 293.50(NAVD88) SCALE: 1 "=30' CURLEX EROSION CONTROL MATTING ® SILT FENCE OUTLET CONSTRUCTION ACCESS ROUTE RIPARIAN BUFFER Know what's below. Callbefore you dig. SHEET TITLE: EROSION CONTROL PLAN SHEET NUMBER: C200 LONGITUDINAL ANCHOR TRENCH J: U STAKE AT 3'-5" INTERVALS 9- P � YAYA TERMINAL SLOPE AND CHANNEL ANCHOR CHECK SLOT AT 25' INTERVALS • (MIN) ISOMETRIC VIEW WOODEN STAKES NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED AT 25' INTERVALS. 2. ALL MATTING TO BE SECURED WITH WOODEN STAKES ACCORDING TO THE SPECIFICATIONS AT 5' P 611 INTERVALS. 3. FABRIC OVERLAP WHEN 2 ROWS °�°• OF MATERIAL ARE USED SHALL BE PLACED WITH THE UPPER ROW OF MATERIAL PLACED OVER THE LOWER ROW OF MATERIAL. 6„ 4. TRENCH MATTING AT TOP AND INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT BOTTOM OF MAT AS SHOWN IN D ETAI L 5. OVERLAP FABRIC IN DIRECTION OF FLOW WITH MATTING UPSTREAM ON TOP OF DOWNSTREAM MAT. 6. MATTING WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS. 1 TYPICAL EROSION CONTROL MATTING INSTALLATION SCALE: NOT TO SCALE CONCRETE FWASHOUT SIGN BERM L- BERM CONCRETE WASHOUT AREA PLAN 12" TYPICAL WIDTH COMPACTED BERM AROUND 4:1 THE PERIMETER .2% SLOPE UNDISTURBED OR COMPACTED SOIL QVQ AAIAI SECTION A CONCRETE WASHOUT AREA NOTES: 1. SEE CONSTRUCTION PLANS VIEW FOR CONCRETE WASH OUT AREA (CWA) LOCATION. 2. DO NOT LOCATE AN UNLINED CWA WITHIN 400' OF ANY NATURAL DRAINAGE CONVEYANCE OR WATER BODY. DO NOT LOCATE WITHIN 1000' OF ANY WELLS OR DRINKING WATER SOURCES. IF SITE CONSTRAINTS MAKE THIS INFEASIBLE, OR IF HIGHLY PERMEABLE SOILS EXIST ON SITE, THE CWA MUST BE INSTALLED WITH AN IMPERMEABLE LINER (16 MIL MIN. THICKNESS) OR SURFACE STORAGE ALTERNATIVES USING PREFABRICATED CONCRETE WASHOUT DEVICES OR A LINE ABOVE GROUND STORAGE SHOULD BE USED. 3. THE CWA SHALL BE INSTALLED PRIOR TO CONCRETE PLACEMENT ON SITE. 4. CWA SHALL INCLUDE A FLAT SUBSURFACE PIT THAT IS AT LEAST 8' BY 8'. SLOPES LEADING OUT OF THE SUBSURFACE PIT SHALL BE 3:1 OR FLATTER. THE PIT SHALL BE AT LEAST 3' DEEP. 5. BERM SURROUNDING SIDES AND BACK OF THE CWA SHALL HAVE MINIMUM HEIGHT OF 1' 6. VEHICLE TRACKING PAD SHALL BE SLOPED 2% TOWARDS THE CWA 7. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE CWA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CWA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 8. USE EXCAVATED MATERIAL FOR PERIMETER BERM CONSTRUCTION. CWA MAINTENANCE NOTES 1. THE CWA SHALL BE REPAIRED, CLEANED, OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE. CONCRETE MATERIALS, ACCUMULATED IN PIT, SHALL BE REMOVED ONCE THE MATERIALS HAVE REACHED A DEPTH OF 2'. 2. CONCRETE WASHOUT WATER, WASTED PIECES OF CONCRETE, AND ALL OTHER DEBRIS IN THE SUBSURFACE PIT SHALL BE TRANSPORTED FROM THE JOB SITE IN A WATER -TIGHT CONTAINER AND DISPOSED OF PROPERLY. 3. THE CWA SHALL REMAIN IN PLACE UNTIL ALL CONCRETE FOR THE PROJECT IS PLACED. 4. WHEN THE CWA IS REMOVED, COVER THE DISTURBED AREA WITH TOP SOIL, SEED AND MULCH, OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE LOCAL JURISDICTION. 2 STANDARD CONCRETE TRUCK CLEAN OUT PIT SCALE- NOT TO SCALE •� - " - -_ p at, Spillway Data --2917A_ . . . . . . . �'-� �! ♦_♦ ♦ `,.` - - 29 / - - - - EXISTING RIP- RAP�9� I -292-- _ II _ - ' tr '-� ' _ ' QBE' REMOVED " = ' TIEv p•' / oo �-- � ---_-- 292 _ Fm raw on ~�on on M ,.� �0��� _ .,v' • d • �`'so p ' TOP OF MENT=294.80 FT- - - - - P►LLWAY=29 29 _ _ �' ♦ �. -I ;�, • �� p. • . . MBANK T \. r p- • • , d 00 \\E 29.E----- 294 00 0�° d I f/ �29��71 9 5, d \ \ //\ - L EXISTING FRENCH DRAIN - - \ -� d ° ° d d \ (PROTECT DURING CONSTRU&ION) \ DRY DETENTION BASIN \ \ \ d � \ d ,� v d � � � � � - � VOLUME 4200 CU.f\f. TO ELEVATION 293.70 FT. PROVIDE EROSION CONTROL MATTJNG ON BOTTOM OF DRY _ �d d \ \ BASIN, ,AFTER CONVERTED FROM \ i 29� - `- d \ \ // SKIMMER SEDIMENT BASIN �Q0 �. (1 J d DRY DETENTION BASIN DETAIL 4 SCALE: 1 "=20' Table 6.10a Temporary Seeding Specifications for Winter and Early Spring Seeding mixture Species Rate (Ib/acre) Rye (grain) 120 Seeding dates Mountains >2500ft 15 -Feb to 15 -May <2500 ft 1 -Feb to 1 -May Piedmont 1 -Jan to 1 -May Coastal Plain 1 -Dec to 15 -Apr Soil amendments Follow recommendations of soil tests or apply 2ton/acre ground agricultural limestone and 750lb/acrea 10-10-10 fertilizer Mulch Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10b Temporary Seeding Specifications for Summer Seeding mixture Species Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 501b/acre. Seeding dates Mountains 15 -May to 15 -Aug Piedmont 1 -May to 15 -Aug Coastal Plain 15 -Apr to 15 -Aug Soil amendments Follow recommendations of soil tests or apply 2ton/acre ground agricultural limestone and 750lb/acrea 10-10-10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchorstraw by tacking with asphalt, netting ora mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10cTemporary Seeding Specifications for Fall Seeding mixture Species Rate (Ib/acre) Rye (grain) 120 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50lb/acre. Seeding dates Mountains 15 -Aug to 15 -Dec Coastal Plain and 15 -Aug to 30 -Dec Piedmont Soil amendments Follow recommendations of soil tests orapply 2 ton/acre ground agricultural limestone and 750lb/acrea 10-10-10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50lb/acre Kobe (Piedmont and Coastal Plain) late February or early March. ❑ermanent seeding see specifications. Ilse this table if not otherwise specified. permanent Seeding Mixture Seed Mixtures ❑lanting Elates Blend of ❑❑❑ =31 Call fescue and C❑- mixture of two or more turf[type tall fescues 2❑❑E2❑❑ Ibs[Acre ❑r Blend of three or more turf type tall fescues 2❑❑E2El❑ Ibs[acre Seeding Dates Best ossible [lug. 211 []Sept. 1 ❑ lug. 2❑ F-I❑ct. 211 Feb 1 []March 31 Che above vegetation are those which do well under local conditions❑Dther seeding rate combinations are possible. Seeding mix shall be approved by the ❑ngineer before seeding of the pro ect starts. 3 TEMPORARY SEEDING SPECIFICATIONS SCALE- NOT TO SCALE Peak Flow Velocity Shear Storm Event (cfs) (fps) Stress (Ib/sf) 10 -year 1.97 0.71 0.03 100 -year 5.4 1.07 0.06 EXTEND DRY BAS I N CONSTRUCTI 1. REMOVE THE EXISTING RIP RAP FROM THE SPILLWAY. FILL TO SPILLWAY ELEVATION, SEED, STRAW, AND MAT THE SPILLWAY WITH C-700 EROSION CONTROL MATTING. 2. GRADE TO EXTEND THE DRY DETENTION BASIN TO PROVIDE AN ADDITIONAL 600 CU.F.T FOR A TOTAL OF 4800 CU.FT. 3. PROVIDE EROSION CONTROL MATTING ON GRADED SLOPES. MAT THE BOTTOM OF THE BASIN AFTER CONVERTING FROM THE SKIMMER SEDIMENT BASIN. 294.80 FT. _ 50' SPI TOP OF 1 EXISTING 293.70 FT. SPIL \A WEST BERM -------------- y EXISTING RIP RAP TO BE REMOVED (SEE NOTE 1) WAY LENGTH _ 296.00 FT. TOP OF PROPOSED BERM EAST y� y .4 -4-4 i 4 �: W J DRY DETENTION BASIN OUTLET DETAIL DRY DETENTION BASIN MODIFICATION DETAIL (FINAL DESIGN) SCALE: NOT TO SCALE Know what's below. Callbefore you dig. dQ� COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 WARD CONSULTING ENGINEERS, P.C. F= UCEM N0: C-2819 1805 Green Rd, Suite 10 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com NCBELS Firm No. C-2619 13344 REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. U N � WC/) C/ -) E QU 0- z = O Q O� O 4' n J U 0 J W G � Cf) O z1*1� C6 � oa_ O Cf) >� 4-1 O O LU W � O (a O Q0 PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET 1. 1:�Igg SHEET TITLE: EROSION CONTROL DETAILS SHEET NUMBER: C300 EXISTING ROADWAY AKE COUNTY NORTH CAROLIN EFFECTIVE: 01/31/08 100' MIN. BUT SUFFICIENT TO KEEP SEDIMENT ON SITE 2"-3" STONE TO BE USED SURGE STONE OR RAILROAD BALLAST) PLAN VIEW NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUDIS NOT REMOVED BY THE VEHICLE 25' OR WIDTH OF TRAVELING OVER THESTONE, THEN THE TIRES OF PROPOSED STREET, THE VEHICLES MUST BE WASHED BEFORE WHICHEVER IS ENTERING THE PUBLIC ROAD. GREATER. 3. MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING CONSTRUCTION SITE. ENTRANCE WILL REQUIRE PERIODIC REMOVAL OF SEDIMENT -LADEN STONE AND REPLACEMENT WITH FRESH STONE. 35' MIN. 15' MIN. NEW CONSTRUCT EXISTING ROADWAY_"" 12" MIN. 6" MIN. -FABRIC UNDER STONE CROSS SECTION STANDARD CONSTRUCTION ENTRANCE STANDARD CONSTRUCTION ENTRANCE 1 SCALE: NOT TO SCALE ESSIBLE THROUGH DOOR OAT iAN SHOWN. FOR THIS PROJECT: USE 2" SKIMMER WITH 1.25" ORIFICE couNKE NORTH CAROLINA STANDARD SKIMMER DETAIL EFFECTIVE: 01/31/08 STANDARD SKIMMER DETAIL 4 SCALE: NOT TO SCALE TOP FLOTATION TURBIDITY CURTAIN 7 SCALE: NOT TO SCALE NOTES: CONTRACTOR TO SUBMIT SHOP DRAWING FOR APPROVAL PRIOR TO INSTALLATION. I . MAXIMUM ' - MINIMUM 10 GAUGE LINE WIRES NOTE: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE. AKE COUNTY NORTH CAROLIN EFFECTIVE: 01/31/08 SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROI TOP i FRONT VIEW STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC 3'-0' z_ FILL SLOPE 26 CN MINIMUM 12-1/2 GAUGE INTERMEDIATE WIRES '- GRADE GRADE 6" MINIMUM COVER OVER 2�_ SKIRT ANCHOR SKIRT AS DIRECTED BY ENGINEER SKIRT SHALL BE ANCHORED 8" VERTICALLY AND 4" HORIZONTALLY SIDE VIEW STANDARD TEMPORARY SILT FENCE TOP OF SILT FE MUST BE AT LES ABOVE THE TOP THE WASHED ST STEEL FENCE PO'. WIRE FENCE HARDWARE CLOTH FILTER OF #57 WASHED STONE AKE COUNTY NORTH CAROLINA EFFECTIVE: 01/31/08 FENCE ARE CLOTH STANDARD TEMPORARY SILT FENCE STANDARD SILT FENCE OUTLET 2 SCALE: NOT TO SCALE SCALE: NOT TO SCALE PLAN VIEW FENCE AND FABRIC BURIED IN TRENCH 6"X6" TRENCH, BACKFILLED AND COMPACTED NOTES: 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY, WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. E 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE 5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES. 4. BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET. 5. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL SUPPORT ROPE TO WIRE TO SUPPORT POST PREVENT 24" INTRO BOTTOM STAKE TO SAGGING OR SIDE SUPPORT WIRE STEEL POST SECTION VIEW AT OPENING AKE COUNTY NORTH CAROLIN EFFECTIVE: 01/31/08 STANDARD BAFFLES DETAIL STANDARD BAFFLES DETAIL 5 SCALE: NOT TO SCALE COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE CROSS SECTION 3' FILTER FABRIC ON GROUND BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH SECTION VIEW co�KE NORTH CAROLINA EFFECTIVE: 01/31/08 FENCE, u FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH STEEL FENCE POST SET MAX 2' APART MIN. 18" INTO SOLID GROUND NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. STANDARD SILT FENCE OUTLET DEWATERING ONE DISSIPATER PAD RIP RAP PLAN VIEW EMERGENCY INLET SHALL BE CROSS CMP OUTLET PIPE SPILLWAY PROTECTED (AS NEEDED) SECTION FROM EROSION WITH RIPRAP, TARP, MATTING NOTES: OR EQUIVALENT. 1. BASIN SHOULD BE CLEANED OUT WHEN CAPACITY REACHES AN ELEVATION REPRESENTING THAT THE BASIN IS HALF -FULL. 2. THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO AVAILABLE SUPPLY. IF MULTIPLE TARPS ARE TO BE USED, THEN TARPS SHALL BE OVERLAPPED AT LEAST 12". THE UPSTREAM 12" TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP SHALL BE 50 MIL. HEAVY DUTY SILVER TARPAULINS OR EQUIVALENT FOR U.V. RESISTANCE. 3. PROVIDE A MINIMUM OF THREE POROUS BAFFLES TO EVENLY DISTRIBUTE FLOW ACROSS THE BASIN, REDUCING TURBULENCE. 4. BAFFLE MATERIAL MUST BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR A SILT FENCE. 5. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST BAY, SO THIS SHOULD BE READILY AVAILABLE FOR MAINTENANCE. 6. DURING THE CONSTRUCTION PHASE OF THE PROJECT, PERMANENT STORMWATER RISER SHALL ONLY DEWATER FROM THE TOP OF PIPE. 7. POND SHALL NOT BE CONVERTED FOR STORMWATER USE UNTIL APPROVED BY ENVIRONMENTAL ENGINEER. STANDARD SKIMMER BASIN 6 SCALE: NOT TO SCALE STANDARD SKIMMER BASIN Know what's below. Callbefore you dig. bihm g 10 Eg [E Ll COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, INC 27603 1919.805.3586 WARD CONSULTING —ENGINEERS, P.C. 1►lRll UCEM NO: C—MIGI 1805 Green Rd, Suite 10 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com NCBELS Firm No. C-2619 GARp��.,,w r " 'SkRL 13344&-," REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. W U N � W� U) �U z = O W Q zC W O� 0 4' a. rR J U O J W 0 O zL 0 a - v / vJ � O 0-0 LU m 0 PROJECT NUMBER: 17002 PROJECT PHASE PERMIT SET DATE: 06.08.2018 SHEET TITLE: EROSION CONTROL DETAILS SHEET NUMBER: C400 18" MIN TOP OF DAM TARP PROTECTION DITCH AND BURY TARP 10' MIN EDGE (MIN. 1211) WEIR LENGTH SECTION THRU WEIR TOP OF BERM 1' MIN FREEBOARD INFLOW STRUCTURE / BAFFLES (STD) SKIMMER EMERGENCY SPILLWAY � f \ — ELEVATION DEWATERING ONE DISSIPATER PAD RIP RAP PLAN VIEW EMERGENCY INLET SHALL BE CROSS CMP OUTLET PIPE SPILLWAY PROTECTED (AS NEEDED) SECTION FROM EROSION WITH RIPRAP, TARP, MATTING NOTES: OR EQUIVALENT. 1. BASIN SHOULD BE CLEANED OUT WHEN CAPACITY REACHES AN ELEVATION REPRESENTING THAT THE BASIN IS HALF -FULL. 2. THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO AVAILABLE SUPPLY. IF MULTIPLE TARPS ARE TO BE USED, THEN TARPS SHALL BE OVERLAPPED AT LEAST 12". THE UPSTREAM 12" TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP SHALL BE 50 MIL. HEAVY DUTY SILVER TARPAULINS OR EQUIVALENT FOR U.V. RESISTANCE. 3. PROVIDE A MINIMUM OF THREE POROUS BAFFLES TO EVENLY DISTRIBUTE FLOW ACROSS THE BASIN, REDUCING TURBULENCE. 4. BAFFLE MATERIAL MUST BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR A SILT FENCE. 5. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST BAY, SO THIS SHOULD BE READILY AVAILABLE FOR MAINTENANCE. 6. DURING THE CONSTRUCTION PHASE OF THE PROJECT, PERMANENT STORMWATER RISER SHALL ONLY DEWATER FROM THE TOP OF PIPE. 7. POND SHALL NOT BE CONVERTED FOR STORMWATER USE UNTIL APPROVED BY ENVIRONMENTAL ENGINEER. STANDARD SKIMMER BASIN 6 SCALE: NOT TO SCALE STANDARD SKIMMER BASIN Know what's below. Callbefore you dig. bihm g 10 Eg [E Ll COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, INC 27603 1919.805.3586 WARD CONSULTING —ENGINEERS, P.C. 1►lRll UCEM NO: C—MIGI 1805 Green Rd, Suite 10 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com NCBELS Firm No. C-2619 GARp��.,,w r " 'SkRL 13344&-," REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. W U N � W� U) �U z = O W Q zC W O� 0 4' a. rR J U O J W 0 O zL 0 a - v / vJ � O 0-0 LU m 0 PROJECT NUMBER: 17002 PROJECT PHASE PERMIT SET DATE: 06.08.2018 SHEET TITLE: EROSION CONTROL DETAILS SHEET NUMBER: C400 DocuSign Envelope ID: EC2806EB-9DAE-451E-A15F-546F3B6414EE i----------------------------------------------------- I. THE DOCK 15 FIXED. THE DOCK STRUCTURE 15 PIERS. THE HELICAL PIER ANCHORS ARE 5H01^ TH15 PLAN FOR CLARITY. HELICAL PIER 51ZE5 BASED ON SUPPLIERS SHOP DRAWINGS. 5EE E 2 1/4" DIAMETER VERTICAL HELICAL PIER ANC VERTICAL PIER5 SHALL BE RATED FOR 12 KIF 2 1/4" LATERAL (ANGLED) HELICAL PIER ANCHt ANGLED PIER5 5HALL RE315T 4 KIP LATERAL 2. 5EE DRAWING L-200 FOR ALL 51TE INFORMAT ELEVATIONS AND RELATED 51TEWORK. ALL 51' DRAWING 15 FOR REFERENCE ONLY. 3. SEE 01/5201 FOR &14112E FIXED DOCK SECTIO FOR 12' WIDE DOCK DETAILS. OE516N DATA: DOCK DEAD LOAD = 20 P5 DOCK LIVE LOAD = 100 P� 3A51C WIND SPEED (3 SECOND OUST) = 100 Mf TOP DECK ELEVATIOb = 290.5' TOP DECK ELEVATION = 290.5' FI XEO GOOK I=IAMI NO FLAN .3/.32" SCALE L---------------L-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------' E TALL — I " CONCRETE AVINC — EE L200 ---------------------------- WO T 9 MULAM(OMATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 L4SflGHT© 120 Stndory'sst-et Raleigh, NC 27603 flSSOCIRTES 9,9.833.0495 Lysag htAssociates.com s }ruc to rol engincc rs Firm 14o.0-0621 CA PE046123 BL 6/8/2018 REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. N w Co Q a) U L.L � Q (1) 0 C () Z o Z 0 0 J � � J U O a) ry Z ry _0 OU) C: U) se I_ co 0- 0- C: 0 ry >1 U) LL1 o 0 0 �o Co PROJECT NUMBER: LA 11533 PROJECT PHASE: PERMIT SET DATE: 06,0$,2018 SHEET TITLE: DOCK FRAMING PLAN SHEET NUMBER: S101 DocuSign Envelope ID: EC2806EB-9DAE-451 E-A15F-546F3B6414EE m--------------T------------------------------------------------------------------ 1 1 1 1 1 V & DOCK SECTION NOTES.- 1. OTES:1. ALL LUMBER IS TO BE PRESERVATIVE TREATED. 2. ALL HANGERS AND FASTENERS SHALL BE STAINLESS STEEL. 3. HELICAL PIER ANCHORS AND ACCESSORIES SHALL BE GALVANIZED. 4. RAIL MESH IS TO BE GALVANIZED. 5. SEE SITE PLAN FOR EXTENT AND LOCATION OF RAILING. 6. MAXIMUM GIRDER SPACING (JOIST SPAN) SHALL BE 121-0". PT I X6 I NTERMEDI ATE RAIL (T 7'PI GAL) CONTINUOUS CHAMFERED PT 4X4 POST ON PT 2X4 BLOCKING FOR DRAINAGE GAP. T ZPT (2)2X10 JOISTS a 2' O.G. ATTACH TO GIRDERS W.55 51 MP5ON HANGERS, USE CONGEALED FLANGE HANGERS AT ENDS. 2 1/4" 12 KIP VERTICAL HELICAL PIER ANCHOR 2'—O" COMPOSITE LUMBER MARINE GRADE 2XbX8 DECKING (COLOR BEIGE). ATTACH USING 5.5 SCREWS COUNTERSUNK PER MANUFACTURERS SPE6IFIGATION5. T (4)PT 2X10 GIRDER PT2XIO BLOCKING B/W JOISTS AT GIRDER MID -SPAN 2 1/4" 12 KIP VERTICAL HELICAL PIER ANCHOR I 2 1/4" 4 KIP LATERAL 7LOAD ANGLED HELICAL PIER ANCHOR. THE DIRECTION OF THE 1'-0" PIERS ALTERNATES PER PLAN. FIXED DOCK - 8' W10E SECTION I" SCALE 8" THICK CONCRETE RETAINING WALL 4" CONCRETE WALKWAY - SEE SITE PLANS COMPOSITE DECKING PT 2X10 LEDGER. ATTACH TO CONCRETE ABUTMENT Al 5/8" a EPDXY BOL T5 (W/ 6 " EMBEDMENT) • EVERY 16" O.G. STAGGERED. ATTACH JOISTS TO LEDGER - #4 18" O.G. EACH WAY WITH SIMPSON HANGERS. PT (2) 2X10 — , 2" •� JO/5T3 • N-B,41RS Q a 2" FROM FACE OF WALL TO CENTERLINE OF REI NFORGI NG. V-5AR5 INSTALL RIP -RAP AT • #4 DIAGONAL CORNER BARS BASE OF WALL TO ��� • AT SAME SPACING AS V -BARS PREVENT 5GOURI NG > o o a FRENCH OO DRAIN c>_6) a (DESIGNED CQ • BY OTHERS) X a dJ v III III - Q O a � 1 U a • m <1 a a a � Lb 10" 8" 1'-6" W B A O CONCRETE RETAININCs WALL AT DOCK NO SCALE PT 2X6 COMPOSITE LUMBER TOP RAIL (TYP.) PT 2X4 TO SECURE WIRE MESH GALVANIZED WIRE MESH - SEE SITE PLAN FOR LOCATION OF MESH PT4X4 POSTS ATTACHED TO J01 STS W/ (2) GALVANIZED 5/8" THROUGH BOLTS 77 (TYPICAL). GALVANIZED HELICAL PIER ATTACHMENT BRACKETS BY MANUFAGTUER. ATTACH W/ GALVANIZED 5/8" THROUGH -BOLTS (TYP.) -IN �0 ir1 CONTINUOUS CHAMBERED PT 4X4 POST ON PT 2X4 BLOCKING FOR DRAINAGE GAP. REINFORCED CONCRETE RETAININCs WALL SCHEDULE MK# H A B W T V -BARS H -BARS X -BARS Lb GRW4 4'-0" 3'-O" 1'-6" 5" 1 12" #4 (9 18" #4,9 12" #6 (P 18" (5) #4 CONCRETE RE7,41NIN(S WALL NOTES 1. USE GLASS "A" SOIL FOR BACKFILL BEHIND WALL TO MINIMIZE LATERAL PRESSURE. GLASS "A" IS GLEAN SAND OR GRAVEL, FREE OF FINES THAT MIGHT OBSTRUCT FREE DRAINAGE. BACKFILL MUST BE APPROVED BY THE GEOTECHNICAL ENGINEER. 2. STRUCTURAL DATA: Pic = 3,000 PSI FOR FOOTINGS, Pic = 4,000 PSI FOR WALLS, GRADE 60 REBARS, 3,000 PSF ALLOWABLE SOIL BEARING PRESSURE, 30 PGF EQUIVALENT FLUID PRESSURE. 3. THIS DESIGN IS BASED UPON LEVEL BACKFILL AND NO ADDITIONAL SURCHARGE LOAD. CONTACT THE STRUCTURAL ENGINEER FOR A REDESIGN OF THE WALL AND FOOTING IF THERE WILL BE A SLOPING BACKFILL OR SURCHARGE LOAD. 4. REINFORCING BARS MUST BE ACCURATELY PLACED AT THE LOCATIONS SHOWN AT THE DETAILS TO ENSURE THAT THE COMPLETED CONSTRUCTION WILL REFLECT THE STRUCTURAL DESIGN. 5. PROVIDE WEAKENED PLANE CONTRACTION JOINTS AT INTERVALS OF ABOUT 25 FEET AND KEYED EXPANSION JOINTS AT EVERY FOURTH CONTRACTION JOINT. GUT ALTERNATE LONGITUDINAL BARS EXACTLY OPPOSITE WEAKENED PLANE JOINTS. 6. CONCRETE FOOTINGS SHALL BE ON FIRM UNDISTURBED EARTH (OR ENGINEERED FILL) AND SHALL BE PLACED BELOW THE FROST LINE. 7. REFER TO ARCHITECTURAL AND SITE PLANS AND/OR SPECIFICATIONS FOR WATER- PROOFING REQUIREMENTS AND ORA I NAGE REOUI REMENTS. 8. THE MAXIMUM SIZE AGGREGATE FOR WALLS IS 3/4". q. DO NOT BACKFILL BEHIND WALL UNTIL THE CONCRETE HAS CURED. 10. IF THE "V -BARS" ARE SPL I GED, USE A GLASS B SPL I GE WITH A LAP THAT /3 1.3 * Ld. II. THIS DESIGN HAS 5HRINKAGE AND TEMPERATURE BARS ON THE EXPOSED FACE - #4'5 a IB" O.G. EACH WAY AT 2" FROM THE EXPOSED FACE FOR THE FULL HEIGHT OF THE WALL. IF TYPICAL SHRINKAGE CRACKING IS ACCEPTABLE ON THE EXPOSED FACE, THEN THIS STEEL CAN BE DELETED. 12. USE THE SITE PLAN TO DETERMINE THE BOTTOM OF WALL AND TOP OF WALL ELEVATIONS. THE MAXIMUM HEIGHT FOR THIS DESIGN IS 4'-0". LPT (2)2X10 JOISTS Q 2'0.r-. ATTACH TO GIRDERS W/ SS SIMP5ON HANGERS, USE CONGEALED FLANGE HANGERS AT ENDS. 2 1/4" 12 KIP VERTICAL HELICAL PIER ANCHOR 2'-0" T & DOCK SECTION NOTES: I. ALL LUMBER IS TO BE PRESERVATIVE TREATED. 2. ALL HANGERS AND FASTENERS SHALL BE STAINLESS STEEL. 3. HELICAL PIER ANCHORS AND ACCESSORIES SHALL BE GALVANIZED. 4. RAIL MESH IS TO BE GALVANIZED. 5. SEE SITE PLAN FOR EXTENT AND LOCATION OF RAILING. 6. MAXIMUM GIRDER 5PACING (JOIST SPAN SHALL BE 12'-0" COMPOSITE LUMBER MARINE GRADE 2X6X8 DECKING (COLOR BEIGE). ATTACH USING 5.5 SCREWS COUNTERSUNK PER MANUFACTURERS SPECIFICATIONS. FT2XI2 BLOCKING B/W ` (4)PT 2X12 GIRDER JOISTS AT GIRDER MID -SPAN 2 1/4" 4 KIP LATERAL LOAD ANGLED HELICAL PIER ANCHOR. THE DIRECTION OF THE PIERS ALTERNATES PER PLAN. 12'-0" FIXED DOCK - 6'00E SECTION I" SCALE PT I X6 I NTERMEDI ATE RAIL (TYPICAL) 2 1/4" 12 KIP_ VERTICAL HELICAL PIER ANCHOR •I• 1r-0" PT 2X6 COMPOSITE LUMBER TOP RAIL (TYPJ PT 2X4 TO SECURE WIRE MESH ,LY GALVANIZED WIRE MESH - SEE SITE PLAN FOR LOCATION OF MESH PT4X4 POSTS ATTACHED TO J01 STS W/ (2) GALVANIZED 5/8" THROUGH BOLTS 77 (TYPI GAL). GALVANIZED HELICAL PIER ATTACHMENT BRACKETS BY MANUFAGTUER. ATTACH W/ GALVANIZED 5/8" THROUGH -BOLTS (TYP.) ---------------------------- O TE GOLLAMMATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 ®L4S06HT© ,2o s1 Marys 7605 Raleigh, ry 27605 ASSOCIRTES 919.833.0495 Lysag htAssociatee.ccm s fruc to ral enpinccrs Firm No.0-06'21 ®���i�i PE046123 4 f31� N��L\ SL I 6/8/2018 REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. N UJ U) r W^, U C� Cly C) C U Z Q_ O 7 0_0 _ C: WCo 0W O ^I U O N ry Z _0 O^^O U) LZ co �\ O �--+ U� L_ LL1 O � U O � O W Co O 010 PROJECT NUMBER: LA 11533 PROJECT PHASE: PERMIT SET DATE: 06.08.2018 SHEET TITLE: STRUCTURAL DETAILS SHEET NUMBER: S20 a`'oF wArE�Q� Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: NX Yes ❑ No For the record only for Corps Permit: ❑X Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. N Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Robertson Millpond Preserve Phase II 2b. County: Wake County 2c. Nearest municipality / town: Wendell, NC 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Wake County 3b. Deed Book and Page No. DB 015790 PG 02591 3c. Responsible Party (for LLC if applicable): Contact Mark Forestieri Wake County Facilities Design & Construction Director 3d. Street address: Wake County Office Building 336 Fayetteville Street 3e. City, state, zip: Raleigh, North Carolina 27601 3f. Telephone no.: 919-856-6356 3g. Fax no.: 919-856-6355 3h. Email address: mforestieri@wakegov.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Becky L. Ward, P.E. 5b. Business name (if applicable): Ward Consulting Engineers, P.C. 5c. Street address: 4805 Green Road, Suite 100 5d. City, state, zip: Raleigh, North Carolina 27616-2848 5e. Telephone no.: 919-870-0526 5f. Fax no.: 919-870-5359 5g. Email address: bward@wce-corp.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1775345450 1 b. Site coordinates (in decimal degrees): Latitude: 35.817426 Longitude: -78.411867 1 c. Property size: 81.71 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Buffalo Creek 2b. Water Quality Classification of nearest receiving water: C; NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Please see supplemental data word document attached to this form for description. 3b. List the total estimated acreage of all existing wetlands on the property: 0.11 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 4,600 3d. Explain the purpose of the proposed project: Please see supplemental data word document attached to this form for the explanation. 3e. Describe the overall project in detail, including the type of equipment to be used: Please see supplemental data word document attached to this form for the explanation. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases in the past? ❑X Yes ❑ No ❑ Unknown Comments: See email concurring with delineation as is in Appendix g pp 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): sandy smith Agency/Consultant Company: Axiom Environmental Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Wetland Determinations were included in Phase I of the project. The Phase II project is adjacent to these same wetlands identified in Phase I. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No 0 Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑X Yes ❑ No 6b. If yes, explain. This is Phase II of the park. The park most likely will have future improvements in the future in other areas of the property to meet park user needs and as funding becomes available. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: N/A no wetland impacts 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one S2 - Choose one S3 - Choose one - S4 - Choose one - S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 3i. Comments: N/A No stream impacts Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑X Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 P Walk, dock,and abutments Buffalo Creek & Robertson's Pond No 502 1,979 B2 P Boat Launch Buffalo Creek & Robertson's Pond No 346 B3 P Mill Concrete pad Buffalo Creek & Robertson's Pond No 480 B4 T Construction Access Buffalo Creek & Robertson's Pond No 3,708 6,448 B5 P Permitted Phase I Walkway Buffalo Creek & Robertson's Pond No 80 176 B6 Yes/No 6h. Total Buffer Impacts: 5,116 8,603 6i. Comments: B1: permanent concrete nature Walks and two boardwalk abutments. B2: boat launch 133: mill concrete pad 134: Construction access to install improvements with adjacent areas re -vegetated; 135: Permitted Phase I permanent Impacts Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The configuration of the nature trail and boardwalk was optimized to meander around trees to require minimal tree removal. Grading for the trails will be minimal and completed only as necessary for ADA compliance. Trails are planned in zone two with perpendicular access points through zone 1. Pilings will be installed for the boardwalk construction over the wetlands and pond. Robertson's Mill Pond park is a nature preserve and therefore construction will be conscientious of preserving existing vegetation and minimal impacts to the buffers along the pond. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. A boardwalk is being used which will be constructed above the wetlands and open water. Construction equipment will be limited to a narrow corridor for this installation and will operate from equipment on a floating platform or the boardwalk deck. Pilings will be driven as construction of the boardwalk progresses. The removal of existing vegetation will be minimized during construction as preserving the natural amenities of the site is a priority for the park. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑X Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. The only flow from the site will be from the dry pond that has been designed. The water will be contained Yes No and infiltrated into the ground for the 1 year 24 hour storm event. A installed french drain aids in the de- ❑X ❑ watering of the pond. Based on the soils the predicted time to fully infiltrate is 24-48 hours. Larger storm events will be bypassed over the top of a grassed weir. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0.65% 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: A stormwater impact analysis was completed for the project and has been submitted for approval to Wake County. Both peak flow and nitrogen export were investigated in the report. A copy of the stormwater impact analysis has been included with this PCN submittal and is included on the CD attached to this submittal. A copy of the stormwater approval can be supplied after upon receipt as requested by the State. 2e. Who will be responsible for the review of the Stormwater Management Plan? Wake County Environmental Services 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Wake County ❑X Phase II ❑X NSW 3b. Which of the following locally-implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, E] Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? El Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. There will be no permanent rest room facilities located on the project site. A port-a-john has been installed at the park for visitor's use. The existing building on site is be closed to the public and only used for unmanned storage by the park staff. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑X Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Axiom Environmental, Inc prepared a letter addressing federally protected species assessment and results in a letter for phase I of the project, included in Appendix C of the PCN submittal document. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? There will be very minor impacts to the edge of the shore line and therefore critical habitat of this 81 acre site that is mostly impounded by water is not anticipated. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑X Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The North Carolina State Historic Preservation Office web site Http://www.hpo.ncdcr.gov was investigated. The Dam is listed as HPO Site ID: WA 1954. Wake County has been working with local and state groups to preserve the dam and mill building remnants. See Appendix C. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: A No-Rise study was obtained in the floodplain of Buffaloe Creek through HEC-RAS modeling of the proposed boardwalk and floating dock impacts. This study has been submitted to Wake County Environmental Services for review and approval. The project is located in the floodplain of Buffalo Creek and outside of the floodway of Buffaloe Creek and therefore comply's with FEMA's requirements. 8c. What source(s) did you use to make the floodplain determination? North Carolina floodplain mapping program website was utilized to download models and mapping information for the study. Mark Forestieri Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 Pre -Construction Notification (PCN) Form Supplemental Data Robertson Millpond Preserve Phase II, Wake County North Carolina 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The Robertson Millpond Preserve is a nature preserve park located at 6333 Robertson Pond Road in Wendell, NC. The park lies on an 81.71 acre parcel consisting of open water, forest, farmland, and managed open space. The existing site amenities were constructed in 2015 and include a floating dock, a kayak and canoe route, a covered picnic table, and a gravel parking lot. 3b. List the total estimated acreage of all existing wetlands on the property: The entire 81.71 acre property was not investigated for wetlands. The park improvements will be made to only a small portion of the site approximately 3.4 Acres in the south eastern corner of the property was investigated. Within this 3.4 acre boundary wetlands were determined at the edge of the existing pond open water which totaled 0.11 acres. Wetland data and forms were submitted in the phase I PCN application. Appendix B includes a letter received from the US Army Corps of Engineers Wilmington District stating that the placement of pilings in jurisdictional wetland to facilitate the construction of a raised boardwalk which would be use to access a dock does not require authorization by the US COE. The work for the proposed dock structure will be constructed on pilings and therefore will not require a COE permit. A copy of this PCN has been sent to the COE for their records only. 3d. Explain the purpose of the proposed project: The proposed improvements are to expand visitor amenities to the park. Phase II improvements will add a paved ADA compliant walking trail that will meander through the existing woods, a fixed boardwalk over the water providing better access to Robertson's pond, and a walkway to the existing mill site foundation for preservation and interpretive learning of the old mill history. The open water experience will give park visitors that are not able to explore the pond water course with a boat access to the open water and unique Bald Cypress trees that are the most western known location in North Carolina. The existing dry detention basin will be expanded required by Wake County will be enlarged to increase the volume capacity for the additional impervious area, however this expansion will be outside of all buffer areas. The park will be open primarily for weekend use, however this may be expanded due to the popularity of the park. 3e. Describe the overall project in detail, including the type of equipment to be used: The walkways have been designed to fall within zone 2 of the buffers and are needed to provide connectivity from the existing park features to the proposed amenities. The walkway from the existing floating dock access to the proposed boardwalk hugs the edge of the existing detention basin to minimize vegetation removal. Two crossings of Zone 1 of the buffers will be required to provide an entrance and exit points for the boardwalk feature in the pond. Two concrete abutments are proposed at either end of the boardwalk. These abutments will be constructed outside of the existing wetlands. The area around the abutments will have as minimal disturbance as possible to preserve the existing Ward Consulting Engineers, PC Robertson Millpond Preserve Phase 11 vegetation. The boardwalk decking structure will be set on pilings over the wetlands and the pond. The construction of the boardwalk will be from a floating platform and the dock sections sequentially as they are constructed over the water. Helical screw pilings will be installed. The Helical pilings have advantages of smaller equipment for installation versus a traditional pile driver, improved loading capacity, and better anchoring with existing soils and root mass. The proposed walkways will be constructed of concrete materials to provide ADA accessibility for park visitors. The proposed concrete pad adjacent to the mill site will be constructed over the dimensions of the mill building that once occupied the site. Wake County Facility's and Management has worked with an Archaeological Firm to locate the building foundations. Archaeological exploration of the area additionally has been performed by this firm. The area for this walkway and pad exists currently as a maintained grassy area. The walkway to the north of the parking lot will provide a connection for visitors from the existing parking lot to experience a trail through an existing wooded section of the park with connections to the proposed open water boardwalk. This trail forms a looped connection from and back to the parking lot. The trail through the woods has been designed to meander through the woods around existing trees to minimize disturbance to existing vegetation. A boat launch is proposed to be constructed above the mean water line of the pond adjacent to the existing beach area. This boat launch will be a timber step down structure filled with stone that will allow for easier boat launching within a stable confined area of the existing shore. A boat livery company provides kayaks and canoes for rental to park visitors on the weekends. The proposed launch is not located in any existing wetlands. It is anticipated that earth moving equipment will be used for the project including but not limited to excavators, loaders, and dump trucks. Staging of equipment will be on the existing open lawn area just north of the parking lot. 2 Ward Consulting Engineers, PC Robertson Millpond Preserve Phase 11 Appendix A Photo Log & Maps Photo Log Project Location Soils USGS Quadrangle Watershed Buffer Impacts Photo Log — Robertson Millpond Phase II Photo 1: View from existing floating dock ramp toward the proposed boardwalk area. Photo 2: View from existing floating dock toward the existing canoe launch area. Photo 3: View from the existing floating dock toward the proposed boardwalk area. Photo 4: Boardwalk area. Photo 5: Existing gravel parking area Photo 6: Existing detention basin. 1 Robertsons Pond j, East M ke High School Source Wakegov.comgisCi7naps Not to Scale son- 1r 4� s � L = sm ❑❑B❑❑❑S❑NS MI❑❑ ❑❑ND ❑❑❑S❑❑❑❑ ❑❑❑mC❑ ❑❑C❑❑1❑N M❑❑ W❑❑❑ C❑ ❑N❑❑, N❑ ❑❑❑ C❑❑❑ ❑IN❑ D7777F7NO 11 2010 t�w.,w F� 1 WARD CONSULTING ENGINEERS, PC 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX 919 870-5359 1 o Com, Va n g2 ApA B pC2 ya ApB d Cn o Cn �...• Ja61r j Wy y ;' O� _ DuBAj*•�` 1 Me 2 APB2 DuB l ApB Gc Cn 0 ApD Me Wy AgB2 //¢ ■ DuC Me Dub y D / Wy ' APC2 'Doct_:., Dub — — APB' v� :" C Ap82 RQ c. ,Wo M C VVy D APB2 Ag ,, Me APC Ch w 1 �r' ApB ApB2 Me Me - - - + v ApB2 • ■ ,� _ PR= CT f. Cn i APC ��. . DuB ApC2 --- G n V Wy/ VaC2 DuC DuB \ Wo VaB2 J2r c / ApC2 ._ . % DuC � o APB2 ApB cDuC C� VaBZ DuB o ApC2 VaB ` ° c I VVo / n VVyC QG _ P ApB _ DuC 5. ¢ V 4 DuB f Cn , A ApC V DuB � ApB2, iuul� ApB2 � Q_ APC DuB Me All, Wy -' ApC2 V� APB2 - LEGEND DuC P'� ApC2 -Appling Sandy Loam, 6-10% Slopes Me V APC2�' -� ApB2 - Appling Sandy Loam, 2-6% Slopes / Wy - Warsham Sandy LoamL—. ap62 Me - Mantachie Soil % v�y Me Wo - Wehadkee and Bibb Soil . ❑❑B❑❑❑S❑NS MILL] ❑❑ND ❑❑S❑❑❑❑ S❑1❑S M❑❑ W❑❑❑ C ❑N❑❑, N❑ ❑❑❑ C❑❑—i ❑IN❑ DOOOOmND [} 2010 Source: Wake County Soil Survey 1970 WARD CONSULTING ENGINEERS, PC Not to Scale 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX 919 870-5359 1c xcvisva— �,- E o � ,� o ��� eoeFinnH � (/ � � - cw ore 3 �� � % � �- � .� _ ��• �o N 10 PROJECT AREA LATITUDE: 35.817426 o HF° LONGITUDE: 78.4118 7 x = Pa 1' e �0 1 - Pebbleb ok t:' ; o 60 Maplewood ' l ' crossrone, NC) / 1 A All x J' u r= ensu °orc \ C¢ O P° L s�>+ KNI6HTDALE / ��,\ +� t j - _ °ate –I e I Ea le Rock J F _ ra�coHwooF oa , Carrington Woods 0 IL r e _ y Tun)Z k �lcJnn( ft iE EftftEJp° of maiCw Ill � .� F HFa05°N 0 90 N t U °P pp0 / [ROSS Cur PC oCOF a� �t� am�F fwE W o\ ova7 �r7s 1 N m9ago3 2000 1000 2000 4000 SCALE: 1 "=2000' ❑❑B❑❑❑S❑NS MI❑❑ ❑❑ND ❑❑S❑❑❑❑ ❑❑❑D M❑❑ W❑❑❑ C❑ ❑N❑❑, N❑ ❑❑❑ C❑❑❑ ❑IN❑ D7777F7NO q 2010 Source ❑usgs.gov[Maps ScaIe❑1"❑2❑❑❑❑ WARD CONSULTING ENGINEERS, PC 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX M9� 870-5359 ♦ I- Ii ♦ I n � 'II III 00 a 20 � '00 00 00 00 III \ / B R f �00 ZO 00 2 00 /\--- 30' BUFFER ZONE 1 - J WETLfJDS \ \ \ \ ONE1 PROPOSED ABUTMENT, DOCK l o I /Oa / I ooAWALKWAY PERMANENT IMPACTS=261 S.F. °ou PROPOSED BOARDWALKO O / O \ \ TO BE SET ON DRIVEN ' \ PILES DESIGNED TO BE \ I / I `�\� 4000o _• -. / ( \ I °OI , / / a o \ INSTALLED BETWEEN TREE CLUSTERS / \ \ \ I °00 I /. /. �❑ / 00 / i \ \ I I p� r \ I 0c) ao I '\ �v / / \ 4 ❑❑ i ��� / 293- / N N � '_ _ I i��I 000/ �-294- \ \ \ %v/ l / / 295 �W ° 0 0\ 0 00 b��`� / - r oo O, ALKWAY PERMANENT B 'I I IMPACTS ZONE 2=264 S.F. N / DOD�00O I 0 40p/ I / 299— \ ✓ Xx—X I ROBERTSONS POND 3 \� x -300-------- — EXISTING WALKWAY AND �/� / FLOATING DOCK PHASE I /'/ / I / / i / / — — _ I I / �b PERMANENT IMPACT / L -301— x ZONE 1=80 S.F. �� ✓/ /- / / / I / / / I ZONE 2=160 S.F. i - I �' 1 1 EXISTING / WALKWAY PERMANENT IMPACTS o - - -/ - /� DETENTION SIN / / B1 X X � � - - � - - � ° ' � �'� ZONE 2=1095 S.F. --, EXISTING PHASE 1 WALKWAY B / / / / %�' �/ B5 PERMANENT IMPACTS=80 S.F. j O/ 1 ABUTMENT, DOCK B _ Q I /AND LKWAY PfMANEN S/=2/411 s . ocz EXISTING ` I ( L ��0� \ \ � — \ O WATER EDGE�_ • / / I \ \ _77_ \ \ — = 3 1 \ � _ p a EXISTING PHASE I ❑ X30 � BEACH AREA TO REMAIN / ZONE 1 BOAT LAUNCH B2 PERMANENT IMPACTS=346 S.F. ...,° \ ( I w B ZONE 1 PROPOSED CONCRETE PAD . ' // II // (b/ . . EXISTING PAD PRIOR _ — ♦ OVER OLD MILL FOUNDATION -480 S.F. / 1 // nTO PARK ACQUISITION ❑❑❑ , ❑LL, _ 000 ♦ i I `�q❑ ❑ ❑ ❑ I \ — _ �Y C� ,� - ❑❑❑ ❑❑ I /�� EXISTING ❑❑— ❑❑❑— ❑❑ PARKING LOT C� ❑❑ O 9/'�29s;� / 40 00 —300 —'� —1�� EXISTINI I I �y°� EXISTING PHASE 1 WALKWAY B G DAM �j O / PERMANENT IMPACTS=176 S.F. III o WAL AY PERMANEOT IMPACTS B 0 0 _ ZONE 2-788 S.F. I o --—(\ \ � 00 1 I \ \ O lo -I B4 _-300--_ r--- l l I / 41 \1D \ ---- i9 LLJI I � — —�` \\ �� \294— 1 ❑OB[iSL-iN ❑OND _ � � �D � ❑ 2324 ❑ � — — — � — _ — _ I �❑m❑BLOC ❑W❑ � WARD CONSULTING ENGINEERS, P.C. FIRM LICENSE N0: C-2619 1805 Green Rd, Suite 100 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward@wce—corp.com NCBELS Firm No. C-2619 SEAL: U Z LEGEND PERMIT — — — — —WATERS EDGE — RIPARIAN BUFFER DATE: 6-5-2018 BUFFER ZONE 1 I M PACT AREA BUFFER ZONE 2 I M PACT AREA WETLANDS DRAWN BY: JSV EXISTING CONTOURS CHECKED BY: BLW -301 PROPOSED CONTOURS BUFFER APPROXIMATE TREE LINE IMPACTS MAP SURVEYED TREE LINE PHASE II SCALE: NOT TO SCALE — — — — — 30 15 30 60 77 SCALE: 1 "=30' ►1:121a!`►[sa C 2 0 0 Appendix B Analysis & Correspondence Department of the Army no Authorization Required Stormwater Impact Analysis (Submitted as a separate document with the State PCN package) SAW -2014-02316 U.S. ARMY CORPS OF ENGINEERS COPY WILMINGTON DISTRICT Action ID. SAW -2014-02316 County: Wake NO DEPARTMENT OF THE ARMY AUTHORIZATION REQUIRED Property Owner: Mark Forestieri Wake County Facilities Design & Construction Address: Wake CoynL Office Building 336 Fayetteville Street RaleiLyh, North Carolina 27601 Telephone Number: 919-856-6356 Size and Location of Property waterbod road name/number, town etc.: The project area is located on the northeast corner of the intersection of Buffalo Creek and Robertson Pond Road in Wendell, Wake County, North Carolina. Description of Activity: The placement of Pilinas in 'urisdictional wetlands to facilitate the construction of a raised boardwalk which would be used to access a dock. Your work as proposed does not require Department of the Army authorization for the following reason(s): - There are no jurisdictional waters or wetlands within the boundaries of the property. _ The proposed project does not impact jurisdictional waters or wetlands. X The proposed project does not require a permit by Department of the Army regulation. Specify: Placement of pilings in waters of the United States that does not have or would not have the effect of a discharge of fill material shall not require a section 404 permit. Placement of ilin s for linear ro'ects such as bridges, elevated walkways, and powerline structuresgenerally does not have the effect of a discharge of fill material. 323.3(c). This Department of the Army determination does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. For any activity within the twenty coastal counties, before beginning work, you must contact the N.C. Division of Coastal Management in Washington, North Carolina, at (252) 956-6481 to discuss any required State authorization. Any changes in the above described work must be coordinated with the Corps of Engineers prior to commencement. If you have any questions regarding the Corps of Engineers regulatory program, please contact David Shaeffer at telephone number 919-554-4884 X31 or David.L.Shaeffer@usace.army.mil. Regulatory Project Manager Signature —L�—" Date: 5/5/2015 SAW -201.4-02316 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://reizulatoa.usacesurvey.com/ SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORM, ETC., MUST BE ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnished: BeEky Ward Ward ConsulfinLy Engineers, P.C. 4805 Green Rd. Ralei h NC 27616 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2014-02316 County: Wake U.S.G.S. Quad: NC-KNIGHTDALE NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Wake County Facilities Design & Construction Mark Forestieri Address: Wake County Office Building 336 Fayetteville Street Raleigh, North, 27601 Telephone Number: 919-856-6356 Size (acres) Unknown Nearest Waterway Buffalo Creek USGS HUC 03020201 Nearest Town Wendell River Basin Neuse Coordinates Latitude: 35.8174 Longitude: -78.4118 Location description: The project area is located on the northeast corner of the intersection of Buffalo Creek and Robertson Pond Road in Wendell Wake County, North Carolina. Indicate Which of the Following Apply.- A. pply:A. Preliminary Determination X Based on preliminary information, there may be waters of the U.S. including wetlands on the above described project area . We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. B. Approved Determination _ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are waters of the U.S. including wetlands on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (C WA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the waters of the U.S. including wetlands on your project area delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. Page 1 of 2 There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311), if you have any questions regarding this determination and/or the Corps regulatory program, please contact David Shaeffer at 919-554-4884 X31 or David.L.Shaeffer(&usace.army.mil. C. Basis For Determination: Based on the delineation report submitted by the applicant, the site exhibits criteria for waters of the U.S. as defined in 33 CFR 328.3 the 1987 Wetland Delineation Manual and the Regional Supplement to the 1987 Manual: Eastern Mountains and Piedmont v2.0. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Date: 5/5/2015 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at htt ://re ulato ,usacesurve .coin/. - - - - - - - - - - - - - - - - - ..... .......... ........ ..... Applicant: Mark Forestieri File Number: SAW-2014-02316 Date: 5/5/2015 Wake County Facilities Design & Construction Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT (Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I -The following identifies your rights and options regarding an admin 'trative appeal of the above decision. Additional information may found at http://www.usace.army.inil/Missions/Civi Works/Re ulator Pro amandPermits:as x or Co s re ulations at 33,CFR Part331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section I1 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION I1- REQUEST FOR APPEAL; or OBJECTIONS TO AN INI�IAL PR .FFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR UESTIONS OR INFORMATION: j If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Attn: Mr. Jason Steele, Administrative Appeal Review Officer David Shaeffer, 3331 Heritage Trade Drive, Suite 105, CESAD-PDO Wake Forest, North Carolina 27587 U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room lOMIS Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, David Shaeffer, For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 ATTACHMENT PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): 5/5/2015 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Wake County Facilities Design & Construction, Mark Forestieri Address: Wake County Office Building 336 Fayetteville Street Raleigh, North, 27601 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: SAW -2014-02316 (Wake County Facilities Design and Construction, Robertson Mill Pond, PIN#1775345450 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Robertson's Millpond Preserve, Robertson Pond Road (SR 2324), Wake County, NC. The land area included in this determination is shown in red on Figure 2 dated September 2014 titled Jurisdictional areas included in the administrative record. State: North Carolina County/parish/borough: Rowan County Center coordinates of site (latllong in degree decimal format): Lat. 35.8174260, Long. -78.411867°. Name of nearest waterbody: Buffalo Creek, Robertsons Pond Identify (estimate) amount of waters in the review area: Nan -wetland waters: 0 linear feet: --width (ft) Cowardin Class: -- Stream Flow: -- Wetlands: 0.24 acre. Cowardin Class: PSS1A, PSS1A Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: 0 Non -Tidal: 0 E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ® Office (Desk) Determination. Date: 5/5/2015 ❑ Field Determination. Date(s): 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. 2 Estimated Site Cowardin amount of Class of number Latitude Longitude Class aquatic resource aquatic resource in review area 1. Wetland non -Section 10 WA 35.817765 -78.412033 PFO1A 0.21 acre wetland 2. Wetland 35.817005 -78.412717 PFO1A 0.03 acre non -section 10 WB wetland Appendix C Site Data Wake County Historic Designation Letter Axiom Environmental NCNHP Letter Axiom Environmental Federally Protected Species Assessment WAKE Parks, Recreation, COUNTY and Open Space March 25, 2015 Becky L. Ward, P.E. Ward Consulting Engineers, P.C. 4805 Green Road, Suite 100 Raleigh, North Carolina 27616-2848 Ms. Ward: TEL 919 856 6170 FAX 919 856 6181 Wake County Office Building 10`h Floor 337 S. Salisbury Street PO Box 550, Suite 1000 Raleigh, NC 27602 http://www.wakegov.com/parks/Pages/default.aspx This letter is in response to your request for information regarding any historic designation of Robertson's Mill Pond in Wake County North Carolina. Wake County purchased Robertson's Mill Pond in September of 2013, in conjunction with the County's Open Space Program, due to the property's natural and cultural attributes. The property is noted in North Carolina Natural Heritage Program's An Inventory of Significant Natural Areas in Wake County, North Carolina for its "abundance of the locally rare baldcypress (Taxodium distichum), more similar to Coastal Plain habitats than Piedmont North Carolina. In addition to this unique habitat, the property also contains the dam and remains of Robertson's Mill, a gristmill constructed in the 1820s. Working with the local non-profit Capital Area Preservation, Inc. (CAP), the dam and mill remains were designated as a Wake County Landmark by the County Board of Commissioners on October 6, 2014. Wake County plans to open the property to public access in 2015 as the Robertson's Mill Pond Preserve, showcasing both the natural and cultural aspects of the property while providing recreational opportunities such as fishing, kayaking and canoeing. If you have any further questions, please don't hesitate to call. Sincerely; Christopher Snow Director, Wake County Parks, Recreation and Open Space -77 zJf { AN ' $' s '� .�-� ". 'r•� ate. 1-7 r. Pt► rS WAKE COUNTY Natural and Cultural Resources November 15, 2016 Sandy Smith Axiom Environmental, Inc. 6317 Bayswater Trail Raleigh, NC 27612 RE: Robertson's Millpond; 14-014 Dear Sandy Smith: PAT 34cCRORY Gownxw SUSAN KLUTTZ NCNHDE-2503 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. A query of the NCNHP database indicates that there are records for rare species, important natural communities, natural areas, or conservation/managed areas within the proposed project boundary. These results are presented in the attached 'Documented Occurrences' tables and map. The attached `Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists and is included for reference. Tables of natural areas and conservation/managed area within a one -mile radius of the project area, if any, are also included in this report. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. Also please note that the NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve (DNP), Registered Heritage Area (RHA), Clean Water Management Trust Fund (CWMTF) easement, or an occurrence of a Federally -listed species is documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Suzanne Mason at suzanne.mason(c�r�ncdcr.gov or 919.707.8637. Sincerely, NC Natural Heritage Program -->^TVothing Compares MAEDfNor1hC3MIftM I Depm9maentofNasaland CulftmalR.es=ea 109 East Janes Street I Ealeigb SIC 2701 919407-730D Managed Areas Documented Within Project Area Managed Area Name Owner Owner Type Wake County Open Space Wake County: multiple local government Local Government Robertson Millpond/Buffalo Creek Floodplain RHA Wake County Local Government Robertson Millpond Preserve Wake County Local Government NOTE: If the proposed project intersects with a conservation/managed area, please contact the landowner directly for additional information. If the project intersects with a Dedicated Nature Preserve (DNP), Registered Natural Heritage Area (RHA), or Federally -listed species, NCNHP staff may provide additional correspondence regarding the project. Definitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.org/content/help. Data query generated on November 15, 2016; source: NCNHP, Q3 October 2016. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 2 of 4 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Intersecting the Project Area Robertson's Millpond Project No. 14-014 November 15, 2016 NCNHDE-2503 Element Occurrences Documented Within Pro'ect Area Taxonomic EO ID Scientific Name Common Name Last Element Accuracy Federal State Global State Group Observation Occurrence Status Status Rank Rank Date Rank Natural 2018 Coastal Plain --- 2014-09-18 B 2 -High --- --- G4G5 S4 Community Semipermanent Impoundment (Cypress - Gum Subtype) Natural 14727 Coastal Plain Small --- 2015-04-27 C 2 -High --- --- G4? S4 Community Stream Swamp Natural Areas Documented Within Project Area Site Na Representational Rating Collective Rating Robertson Mill Pond and Buffalo Creek Floodplain 5 -General 5 -General Managed Areas Documented Within Project Area Managed Area Name Owner Owner Type Wake County Open Space Wake County: multiple local government Local Government Robertson Millpond/Buffalo Creek Floodplain RHA Wake County Local Government Robertson Millpond Preserve Wake County Local Government NOTE: If the proposed project intersects with a conservation/managed area, please contact the landowner directly for additional information. If the project intersects with a Dedicated Nature Preserve (DNP), Registered Natural Heritage Area (RHA), or Federally -listed species, NCNHP staff may provide additional correspondence regarding the project. Definitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.org/content/help. Data query generated on November 15, 2016; source: NCNHP, Q3 October 2016. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 2 of 4 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One -mile Radius of the Project Area Robertson's Millpond Project No. 14-014 November 15, 2016 NCNHDE-2503 Element Occurrences Documented Within a One -mile Radius of the Pro'ect Area Taxonomic EO ID Scientific Name �ommon Name Element Group Observation Occurrence Date Rank Amphibian 8523 Hemidactylium scutatum Four -toed Salamander 1980s E Dragonfly or 32043 Coryphaeschna ingens Regal Darner 2004 -Pre Damselfly Freshwater Fish 15880 Lampetra aepyptera Least Brook Lamprey 1968-09-21 Natural 2018 Coastal Plain --- 2014-09-18 Community Semipermanent Impoundment (Cypress - Gum Subtype) Natural 14727 Coastal Plain Small --- 2015-04-27 Community Stream Swamp Reptile 35562 Ophisaurus attenuatus Slender Glass Lizard 1955-10-25 Natural Areas Documented Within a One -mile Radius of the Project Area Site Name Representational Rating Robertson Mill Pond and Buffalo Creek Floodplain 5 -General Managed Areas Documented Within a One -mile Radius of the Project Area Managed Area Name Owner Triangle Land Conservancy Easement Triangle Land Conservancy Wake County Open Space Wake County: multiple local government Wake County Open Space Easement Wake County: multiple local government Robertson Millpond/Buffalo Creek Floodplain RHA Wake County Robertson Millpond Preserve Wake County H? H B C H Accuracy Federal Status 4 -Low --- 5-Very Low 3 -Medium 2 -High 2 -High 5 -Very Low Collective Rating 5 -General Owner Type Private Local Government Local Government Local Government Local Government State Global State Status Rank Rank Special Concern Significantly Rare Threatened Significantly Rare G5 S3 G5 S2? G5 S2 G4G5 S4 G4? S4 G5 S2 Definitions and an explanation of status designations and codes can be found at https:Hncnhde.natureserve.org/content/help. Data query generated on November 15, 2016; source: NCNHP, Q3 October 2016. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 3 of 4 NCNHDE-2503: Robertson's Millpond a15 F grin Rd Sh nley Di r a Ras n �a ria a� Go P,nd November 15, 2016 Project Boundary Buffered Project Boundary E] NHP Natural Area (NHNA) G1� Managed Area (MAREA) O4 o C� 'odd Rd in Oa � NaJ P d0° 0 Dailrld9eyc NCNHDE-2503: Robertson's Millpond a15 F grin Rd Sh nley Di r a Ras n �a ria a� Go P,nd November 15, 2016 Project Boundary Buffered Project Boundary E] NHP Natural Area (NHNA) E] Managed Area (MAREA) Page 4 of 4 a91e Rnn Ry 1:25,360 0 0.2 0.4 0.8 mi 0 0.325 0.65 1.3 km Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, Mapmylndia, © OpenStreetMap contributors, and the GIS User Community Axiom Environmental, Inc. 218 Snow Avenue, Raleigh, North Carolina 27603 919 270-9306 Axiom Environmental, Inc. October 27, 2014 Mr. Graham Smith DHM Design 218 Snow Avenue Raleigh, NC 27603 Re: Federally Protected Species Assessment Results 14-014 Robertson's Mill Pond Preserve, Wake County Dear Mr. Smith, Axiom Environmental, Inc. (Axiom) is pleased to provide you with this summary letter of the results of an environmental investigation on a site planned for Robertson's Mill Pond Preserve in Fuquay-Varina, NC (see Figure 1). Specifically, Axiom conducted a federally protected species survey on an approximately 3.6 -acre portion of this tract bounded by Robertson Pond Road to the south and a mill pond on Buffalo Creek to the west (hereafter referred to as the Site; Figure 2). The survey was conducted by two Axiom biologists, Sandy Smith and Scott Davis, on September 19 and October 16, 2014. Site Description The Site is in the Piedmont physiographic region of the state in eastern Wake County. The Site is relatively level, was formerly a residential yard, and currently is regularly maintained as a grass lawn. The Site is bounded by riverine swamp forest and open water of the mill pond to the west and upland mixed pine - hardwood forest to the north and east. The portions of riverine swamp forest and Buffalo Creek located within and adjacent to the Site have been identified by the N.C. Natural Heritage Program (NCNHP) as a unique example of a Coastal Plain small stream swamp occurring within the Piedmont. The riverine swamp forest is characterized by a canopy of bald cypress (Taxodium distichum), American sycamore (Platanus occidentalis), and red maple (Acer rubrum); a shrub layer of Virginia -willow (Itea virginica), ti -ti (Cyrilla racem flora), and common elderberry (Sambucus canadensis); and sometimes dense vines including common greenbrier (Smilax rotundifolia) and Japanese honeysuckle (Lonicera japonica). The upland mixed forest is characterized by a canopy of loblolly pine (Pinus taeda) and red maple; an understory of red maple and sweetgum (Liquidambar styraciflua); and vines including common greenbrier, Japanese honeysuckle, trumpet vine (Campsis radicans), and poison ivy (Toxicodendron radicans). The U.S. Fish and Wildlife Service (USFWS) has identified three species listed as Threatened (T) or Endangered (E) with ranges that extend into Wake County: dwarf wedgemussel (E, Alasmidonta heterodon), red -cockaded woodpecker (E, Picoides borealis), and Michaux's sumac (E, Rhus michauxii). In addition, the USFWS lists one species protected by the Bald and Golden Eagle Protection Act (BGPA), bald eagle (Haliaeetus leucocephalus), and one species proposed (P) for listing as Threatened or Endangered, northern long-eared bat (Myotis septentrionalis). • Habitat for dwarf wedgemussel consists of slow, well -oxygenated creeks and rivers with sand, gravel, or firm silt bottoms. Suitable habitat for dwarf wedgemussel does not occur within the Site; therefore, the proposed project will have No Effect on dwarf wedgemussel. Habitat for red -cockaded woodpecker typically occupies open, mature stands of southern pines, particularly longleaf pine (Pinus palustris), for foraging and nesting/roosting habitat. The red- Axiom Environmental, Inc. Mr. Graham Smith October 27, 2014 Page 2 cockaded woodpecker excavates cavities for nesting and roosting in living pine trees, aged 60 years or older, and which are contiguous with pine stands at least 30 years of age to provide foraging habitat. Suitable habitat for red -cockaded woodpecker does not occur within the Site; therefore, the proposed project will have No Effect on red -cockaded woodpecker. Habitat for Michaux's sumac consists of rocky, open, upland woods on acidic or circumneutral, well - drained sands or sandy loam soils, particularly where disturbance (such as mowing, grazing, clearing, or periodic fire) maintains an open habitat. Suitable habitat for Michaux's sumac occurs within open areas of the Site. Systematic surveys performed within areas of suitable habitat within the Site identified no individuals of this species; therefore, the proposed project will have No Effect on Michaux's sumac. • Habitat for bald eagle primarily consists of mature forest in proximity to large bodies of open water for foraging. Large, dominant trees are utilized for nesting sites, typically within 1.0 mile of open water. The open waters of the mill pond provide limited foraging habitat for bald eagle, and dominant canopy trees in the vicinity provide suitable nesting habitat. The proposed project May Affect, but is Unlikely to Adversely Affect this species. A USFWS proposal for listing the northern long-eared bat as an Endangered species was published in the Federal Register in October 2013. The listing will become effective on or before April 2015. Summer roosting habitat for northern long-eared bat is underneath bark, in cavities, or in crevices of both live and dead trees, and winter roosting (hibernation) habitat consists of caves and mines. Foraging habitat consists of forested hillsides and ridges. Suitable summer roosting habitat in the form of large trees with crevices and/or peeling bark and moderate foraging habitat occur along to the perimeter of the Site. Subsequent to April 2015, a moratorium on cutting trees is likely to be required from May through July. If any necessary tree cutting is concluded prior to April 2015, the proposed project will have No Effect on this species. If tree cutting is planned later than April 2015, the proposed moratorium must be observed and the project May Affect, but is Unlikely to Adversely Affect this species. Please let us know if you have any questions concerning our findings. We appreciate the opportunity to provide you with these services. Yours truly, AXIOM ENVIRONMENTAL, INC. Alexander P. (Sandy) Smith Senior Project Manager Attachment Robertson Millpond Preserve Phase II Stormwater Impact Analysis June 4, 2018 For: Wake County Facilities Design & Construction Wake County Office Building PO Box 550 Raleigh, North Carolina 27602 Prepared by: Chris Rogers Checked by: Becky L. Ward, P.E. 1.`,,,,, i i i i I,,,,,' .eN CARQ<� YrEN�G�INEERS RD.OFES81QN4`.9 LTING - 13344 ��C•.Fj�GINE� �P� Ward Consulting Engineers, P.C. ��"Of 4)'.CYNN� 4805 Green Road, Suite 100 Raleigh, North Carolina 27616-2848 Phone: (919) 870-0526 Fax: (919) 870-5359 Robertson Millpond Preserve Phase II Stormwater Impact Analysis Table of Contents 1.0 Background.......................................................................................................................... 4 2.0 Hydrologic Analysis............................................................................................................ 4 2.1 Existing Conditions — Pre Phase I.................................................................................... 4 2.2 Post Phase I Conditions................................................................................................... 5 2.3 Proposed Conditions........................................................................................................ 6 2.4 Existing and Proposed Peak Flow Comparison Summary ............................................... 6 2.5 Proposed Swale................................................................................................................ 7 2.6 Nutrient Loading Impact Analysis................................................................................... 7 3.0 Buffer Impacts..................................................................................................................... 8 4.0 Open Water Impacts............................................................................................................ 8 5.0 Wetland Impacts.................................................................................................................. 8 6.0 FEMA Impacts..................................................................................................................... 8 7.0 Conclusion........................................................................................................................... 8 Tables Table 1: Existing Conditons- Pre Phase I Peak Flows Table 2: Post Phase I Peak Flows Table 3: Proposed Conditions — Post Phase II Peak Flows Table 4: Peak Flow Comparison Table 5: Detention Basin Peak Stage & Outflow Summary Phase II Appendices Appendix A: Photo Log & Maps (Location, Soils, Quadrangle and Overall Watershed) Appendix B: Hydrology Data • Design Discharge Summary • NOAA Atlas 14 Precipitation Data • Existing Conditions — Pre Phase I o Drainage Area Map o Rational Runoff Coefficient o Rational Design Discharge • Post Phase I Conditions o Drainage Area Map o Rational Runoff Coefficient o Rational Design Discharge • Proposed Conditions — Post Phase II o Drainage Area Map o Rational Runoff Coefficient o Rational Design Discharge Appendix C: Hydraulics Data • Dry Detention Basin Ks&b Calculations • Dry Detention Basin Chainsaw Routing o Existing Dry Detention Basin Routing 1 -yr, 10 -yr, 100 -yr o Expanded Dry Detention Basin Routing 1 -yr, 10 -yr, 100 -yr • Proposed Swale Calculations Ward Consulting Engineers, P.0 2 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis Appendix D: Nutrient Loading Calculations • Wake County Stormwater Hybrid Tool V2.2 o Site Data o Drainage Area Data (DA -1, DA -2, DA -3, DA -4, and DA -5) o Site Summary o DA -1 BMP Calculations o BMP Summary Appendix E: • Soils Report • USACE No Authorization Required Letter Ward Consulting Engineers, P.0 3 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis Robertson's Millpond Preserve Phase II Stormwater Impact Analysis 1.0 Background The Robertson Millpond Preserve is a nature preserve park located at 6333 Robertson Pond Road in Wendell, NC. The park lies on an 81.71 acre parcel consisting of open water, forest, farmland, and managed open space. The existing site amenities were constructed in 2015 and include a floating dock, a kayak and canoe route, a covered picnic table, and a gravel parking lot. A dry detention basin was constructed as a part of the Phase I improvements (Wake County Project Number 54155) to comply with Wake County requirements. The proposed Phase II improvements include the installation of concrete nature trails that will meander through the wooded area north of the parking lot and a concrete path to view the remains of the historic mill adjacent to the dam. A fixed wooden boardwalk path is proposed to be constructed on pilings to provide pedestrian access over the open water of Robertson's Pond. Robertson's Pond consists of a portion of Buffalo Creek that has been impounded above an existing dam just north of Robertson Pond Road. 2.0 Hydrologic Analysis The Rational Method was used to determine the peak flow for existing pre Phase I, post Phase -I, and proposed Phase II conditions. The rainfall intensity for a 5 -minute time of concentration was assumed for the small drainage areas. The rainfall intensity values were obtained from the NOAA Precipitation Frequency Data Server. The composite rational runoff coefficients were estimated using the land uses identified on the site. The 3.26 -acre project area delineated for this study receives drainage from onsite areas only. A dry detention basin was constructed in 2015 for peak flow mitigation. The project area and improvements, excluding the existing floating dock and proposed fixed boardwalk, are above the normal water pool elevation of Robertson's Pond and the FEMA 100 -year floodplain of Buffalo Creek and are therefore not affected by stormwater flows from this portion of the watershed. 2.1 Existing Conditions — Pre Phase I The existing conditions for this analysis involve only the unimproved park prior to the initial construction of phase I, in order to verify that the dry detention basin continues to meet the design objective of mitigating any increases to the 1 -year peak flow for the site. Four drainage areas have been delineated on the site. Drainage Area 1 (DA -1) drains west from the ridge to the area identified for the dry detention basin. Drainage Area 2 (DA -2) drains south to the roadside ditch. Drainage Area 3 (DA -3) lies just downstream of the dry detention basin area and discharges as sheet flow along the bank of Robertson's Pond. Drainage Area 4 (DA -4) drains north and west from the ridge and discharges as sheet flow along the bank of Robertson's Pond. The Existing Conditions — Pre Phase I Drainage Area Map is included in Appendix B. The peak flows for the Existing Conditions — Pre Phase I are shown in Table 1. Ward Consulting Engineers, P.0 4 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis Table 1- Existing Conditions - Pre Phase I Peak Flows Drainage Composite Area "A" 1 -year Peak 10 -year 100 -year Drainage Rational Area "A" 1 -year Peak Peak Flow Peak Flow Area Rational (ac) Flow (cfs) Peak Flow Peak Flow «C„ (cfs) (cfs) DA -1 0.15 0.49 0.34 0.51 0.65 DA -2 0.16 1.33 1.07 1.59 2.05 DA -3 0.17 0.45 0.39 0.58 0.74 DA -4 0.18 0.99 0.83 1.23 1.58 TOTAL 0.17 3.26 2.63 3.91 5.02 2.2 Post Phase I Conditions The construction of Phase I improvements involved grading that redirected runoff. While the total drainage area remained unchanged, each drainage area was adjusted to reflect the new topography. • DA -1: The parking lot and area north of the parking lot up to the ridge, 1.09 acres, discharges west to the existing dry detention basin constructed during Phase I. • DA -2: The area to the south of the parking lot, 0.52 acre, discharges south to the roadway ditch on Robertson Pond Road. • DA -3: The west side of the site downstream of the dry detention basin, 0.61 acre, discharges as sheet flow along the bank of Robertson's Pond. • DA -4: The area north of the ridge, 1.03 acres, discharges west as sheet flow into Robertson's Pond. The site is comprised of managed open space, wooded area, and existing impervious surfaces that include the parking lot, covered picnic area, concrete sidewalk, and existing structure. The remainder of the project property, 78.66 acres that will not be disturbed with this project, is identified as DA -5 for this study. The Existing Conditions - Post Phase I Drainage Area Map is included in Appendix B. The existing conditions peak flow is shown in Table 2. Table 2 - Post Phase I Peak Flows Ward Consulting Engineers, P.0 5 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis Composite 10 -year 100 -year Drainage Area "A" 1 -year Peak Area Rational (ac) Flow (cfs) Peak Flow Peak Flow «C„ (cfs) (cfs) DA -1 0.45 1.09 2.39 3.55 4.56 DA -2 0.30 0.52 0.78 1.16 1.49 DA -3 0.19 0.61 0.58 0.87 1.12 DA -4 0.17 1.03 0.88 1.3 1.67 TOTAL 0.29 3.26 4.63 6.88 8.84 (Before SCM) TOTAL (After SCM) 0.29 3.26 2.24 5.57 8.84 Ward Consulting Engineers, P.0 5 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis 2.3 Proposed Conditions Phase II The proposed development of the project site for phase II, includes impervious areas for a concrete nature trail north of the parking lot and a concrete path to connect to the existing remains of the mill adjacent to the existing dam. A swale will be constructed north of the ridge to direct flow to the existing dry detention basin. The dry detention basin will be extended to increase the available volume. The site will be minimally graded for the improvements and the delineation of Drainage Areas 1 and 4 will shift. The area for post DA -1 increased from 1.09 acres to 1.45 acres and the area for post DA -4 decreased from 1.03 acres to 0.42 acre. The Proposed Conditions - Post Phase II Drainage Area Map is included in Appendix B. The proposed conditions peak flow is shown in Table 3. Table 3 - Proposed Conditions - Post Phase II Peak Flows 2.4 Existing and Proposed Peak Flow Comparison Summary The existing and proposed conditions peak flows were analyzed and compared to show that the dry detention basin continues to function as designed and comply with the 1 -year peak flow mitigation requirements. The total peak flows for the Existing, Phase I, and Phase II improvements are compared in Table 4. Table 4 - Peak Flow Comparison Composite Proposed 10 -year 100 -year Drainage Area "A" 1 -year Peak Conditions - Post Area Rational (ac) Flow (cfs) Peak Flow Peak Flow "C" 1 -year 2.63 (cfs) (cfs) DA -1 0.40 1.45 2.87 4.27 5.39 DA -2 0.30 0.52 0.78 1.16 1.49 DA -3 0.29 0.86 1.22 1.81 2.33 DA -4 0.27 0.42 0.54 0.8 1.02 TOTAL 0.34 3.26 5.41 8.04 10.32 (Before SCM) TOTAL (After SCM) 0.34 3.26 2.54 5.74 10.32 2.4 Existing and Proposed Peak Flow Comparison Summary The existing and proposed conditions peak flows were analyzed and compared to show that the dry detention basin continues to function as designed and comply with the 1 -year peak flow mitigation requirements. The total peak flows for the Existing, Phase I, and Phase II improvements are compared in Table 4. Table 4 - Peak Flow Comparison The detention basin is located to the north and downstream of the existing parking lot. The drainage area to the basin is 1.45 acres and generates a 1 -year peak discharge of 2.87 cfs. The remaining drainage areas sheet flow into Robertson's Mill Pond. The bottom elevation of the pond was set at 292.0 ft. and the 1 -yr 24 -hr storm elevation was set at 293.7. The water that is detained in the pond will infiltrate into the soil. The infiltration rate is predicted to be 0.5-1.0 inches per hour based on the onsite soils obtained in the soils report included in Appendix F. A French drain was installed post construction of Phase I with approval from Wake County Ward Consulting Engineers, P.0 6 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis Existing Proposed Post Phase I Storm Event Conditions - Pre Conditions - Post Conditions Phase I Phase II 1 -year 2.63 2.24 2.54 10 -year 3.91 5.57 5.74 100 -year 5.02 8.84 10.23 The detention basin is located to the north and downstream of the existing parking lot. The drainage area to the basin is 1.45 acres and generates a 1 -year peak discharge of 2.87 cfs. The remaining drainage areas sheet flow into Robertson's Mill Pond. The bottom elevation of the pond was set at 292.0 ft. and the 1 -yr 24 -hr storm elevation was set at 293.7. The water that is detained in the pond will infiltrate into the soil. The infiltration rate is predicted to be 0.5-1.0 inches per hour based on the onsite soils obtained in the soils report included in Appendix F. A French drain was installed post construction of Phase I with approval from Wake County Ward Consulting Engineers, P.0 6 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis Environmental Services to improve the basin drainage. Larger storm events are designed to discharge as diffuse flow over a 50 -foot long grassed weir. The existing rip rap on the weir will be removed, the elevation brought to 293.7, and the surface stabilized with grassy sod which is sufficient to handle the expected velocities of 1.07 feet per second and shear stress of 0.06 pounds per square feet. During construction, the detention basin will serve as a sediment basin. A portion of the bottom of the sediment basin is proposed to be excavated to 291.0 ft. in order to allow for sediment collection. A skimmer device will dewater the sediment basin during construction. The spillway for the sediment basin is set at 293.7 ft. Once construction is complete, the basin will be restored to proposed conditions, the skimmer will be removed. This excavated area will be at the north east end where the basin volume is being extended. The detention basin was routed with Dr. Malcom's Chain Saw routing program due to the small size of the drainage basin and for continuity with the proposed existing basin design. Based on the proposed contours Ks and b relationships were established for the proposed detention basin shape and size. This information was then entered into the chain saw routing spreadsheet and the basin sized through an iterative analysis. The proposed detention basin routing analysis for the 1 year, 10 year, and 100 year storm events are included in Appendix D. A summary of the dry detention basin modeling analysis results area shown in Table 5. Table 5 — Detention Basin Peak Staize and Outflow Summary Phase II Storm Return Period Peak Stage (ft) Peak Outflow (cfs) 1 year 292.83 0.0 10 year 293.76 1.97 100 year 293.81 5.39 2.5 Proposed Swale A is proposed along the north side of the ridge to direct flow to the expanded dry detention basin. The swale will be lined with curlex matting during construction which is sufficient to withstand the expected velocity of 2.43 feet per second and shear stress of 0.27 feet per second for permanent stabilization. The calculations for the swale are included in Appendix C. 2.6 Nutrient Loading Impact Analysis The project site lies in the Neuse River watershed. The rules indicate that only Total Nitrogen is controlled for this watershed. The nutrient loading for the site was calculated using the Wake County Stormwater Hybrid Tool Version 2.2 provided via download by NCDEQ. Based on the Tool, the Existing Conditions — Pre Phase I Total Nitrogen loading rate was calculated to be 1.15 lb/ac/year and the Proposed Conditions — Post Phase II (before Dry Detention Basin) Total Nitrogen loading rate was calculated as 1.68 lb/ac/year. The detention basin treats the Total Nitrogen down to 1.44 lb/ac/year. These rates are lower than the target 3.6 lb/ac/year for the Neuse River watershed. The Tool is included in Appendix D. Ward Consulting Engineers, P.0 7 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis 3.0 Buffer Impacts The riparian buffers for Robertson's Pond are located on the west side of the project. There are both permanent and temporary buffer impacts in both Zones 1 and 2. Temporary impacts involve grading and re -vegetation. Permanent impacts include the concrete walkway. The concrete walkway is minimized to access points for the existing picnic shelter and the proposed floating dock. Table 2.0 quantifies the temporary and permanent impacts for both buffer zones. A Pre - construction Notification will be sent to the North Carolina Division of Water Resources for Buffer Authorization. The buffer impacts are anticipated to be allowable. 4.0 Open Water Impacts The impacts to Robertson's Pond remains limited to the existing floating dock. The proposed fixed boardwalk will be constructed above the normal water surface elevation. Pilings will be used to support the fixed boardwalk. No fill or loss of open water will result from the proposed project and therefore the dock is anticipated to be allowable. 5.0 Wetland Impacts Wetlands have been delineated on the site along the water's edge. No new impacts are proposed to the wetlands. Pilings do not represent impacts and will be used to support the fixed boardwalk. A letter from the USA COE regarding the similar piling conditions and no Department of the Army required Authorization is included in Appendix E. 6.0 FEMA Impacts The fixed boardwalk will be coded into the HEC -RAS model and submitted to Wake County for a no -rise approval. It is anticipated that the boardwalk will not cause a rise in the 100 -year floodplain. The proposed boardwalk is located outside of the FEMA floodway for Buffalo Creek an therefore will provide no -impacts. 7.0 Conclusion The Hydrologic and Hydraulic analysis shows that the expansion to the existing dry detention basin will mitigate the peak flow increase for the 1 -year 24-hour storm. The nitrogen loading for the project property is below the target rate of 3.6 lb/ac/yr and therefore a water quality Stormwater Control Measure (SCM) is not required for the site. A PCN will be submitted for Buffer Authorization only for the project. A flood study will be submitted to Wake County to quantify the no -rise impacts of the floating dock for the project. Ward Consulting Engineers, P.0 8 Robertson Millpond Preserve Phase I June 4, 2018 Stormwater Impact Analysis Appendix A Photo Log and Maps Photo Log Project Location NRCS Soils Overall Watershed USGS Quadrangle Photo Log — Robertson Millpond Phase II Photo 1: View from existing floating dock ramp toward the proposed boardwalk area. Photo 2: View from existing floating dock toward the existing canoe launch area. Photo 3: View from the existing floating dock toward the proposed boardwalk area. Photo 4: Boardwalk area. Photo 5: Existing gravel parking area Photo 6: Existing detention basin. 1 Robertsons Pond j, East M ke High School Source Wakegov.comgisCi7naps Not to Scale son- 1r 4� s � L = sm ❑❑B❑❑❑S❑NS MI❑❑ ❑❑ND ❑❑❑S❑❑❑❑ ❑❑❑mC❑ ❑❑C❑❑1❑N M❑❑ W❑❑❑ C❑ ❑N❑❑, N❑ ❑❑❑ C❑❑❑ ❑IN❑ D7777F7NO 11 2010 t�w.,w F� 1 WARD CONSULTING ENGINEERS, PC 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX 919 870-5359 1 o Com, Va n g2 ApA B pC2 ya ApB d Cn o Cn �...• Ja61r j Wy y ;' O� _ DuBAj*•�` 1 Me 2 APB2 DuB l ApB Gc Cn 0 ApD Me Wy AgB2 //¢ ■ DuC Me Dub y D / Wy ' APC2 'Doct_:., Dub — — APB' v� :" C Ap82 RQ c. ,Wo M C VVy D APB2 Ag ,, Me APC Ch w 1 �r' ApB ApB2 Me Me - - - + v ApB2 • ■ ,� _ PR= CT f. Cn i APC ��. . DuB ApC2 --- G n V Wy/ VaC2 DuC DuB \ Wo VaB2 J2r c / ApC2 ._ . % DuC � o APB2 ApB cDuC C� VaBZ DuB o ApC2 VaB ` ° c I VVo / n VVyC QG _ P ApB _ DuC 5. ¢ V 4 DuB f Cn , A ApC V DuB � ApB2, iuul� ApB2 � Q_ APC DuB Me All, Wy -' ApC2 V� APB2 - LEGEND DuC P'� ApC2 -Appling Sandy Loam, 6-10% Slopes Me V APC2�' -� ApB2 - Appling Sandy Loam, 2-6% Slopes / Wy - Warsham Sandy LoamL—. ap62 Me - Mantachie Soil % v�y Me Wo - Wehadkee and Bibb Soil . ❑❑B❑❑❑S❑NS MILL] ❑❑ND ❑❑S❑❑❑❑ S❑1❑S M❑❑ W❑❑❑ C ❑N❑❑, N❑ ❑❑❑ C❑❑—i ❑IN❑ DOOOOmND [} 2010 Source: Wake County Soil Survey 1970 WARD CONSULTING ENGINEERS, PC Not to Scale 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX 919 870-5359 1c xcvisva— �,- E o � ,� o ��� eoeFinnH � (/ � � - cw ore 3 �� � % � �- � .� _ ��• �o N 10 PROJECT AREA LATITUDE: 35.817426 o HF° LONGITUDE: 78.4118 7 x = Pa 1' e �0 1 - Pebbleb ok t:' ; o 60 Maplewood ' l ' crossrone, NC) / 1 A All x J' u r= ensu °orc \ C¢ O P° L s�>+ KNI6HTDALE / ��,\ +� t j - _ °ate –I e I Ea le Rock J F _ ra�coHwooF oa , Carrington Woods 0 IL r e _ y Tun)Z k �lcJnn( ft iE EftftEJp° of maiCw Ill � .� F HFa05°N 0 90 N t U °P pp0 / [ROSS Cur PC oCOF a� �t� am�F fwE W o\ ova7 �r7s 1 N m9ago3 2000 1000 2000 4000 SCALE: 1 "=2000' ❑❑B❑❑❑S❑NS MI❑❑ ❑❑ND ❑❑S❑❑❑❑ ❑❑❑D M❑❑ W❑❑❑ C❑ ❑N❑❑, N❑ ❑❑❑ C❑❑❑ ❑IN❑ D7777F7NO q 2010 Source ❑usgs.gov[Maps ScaIe❑1"❑2❑❑❑❑ WARD CONSULTING ENGINEERS, PC 4805 Green Road, Suite 100 919 870-0526 Raleigh, NC 27616 FAX M9� 870-5359 Appendix B Hydrology Data Design Discharge Summary NOAA Atlas 14 Precipitation Data Existing Conditions Pre -Phase I • Drainage Area Map • Rational Runoff Coefficient • Rational Design Discharge Existing Conditions Post -Phase I • Drainage Area Map • Rational Runoff Coefficient • Rational Design Discharge Proposed Conditions Post -Phase II • Drainage Area Map • Rational Runoff Coefficient • Rational Design Discharge 6/19/2017 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 ' Location name: Wendell, North Carolina, USA* Latitude: 35.8180, Longitude: -78.4124° VOr Elevation: 290.17 ft** source: ESRI Maps m ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 ���������� 10 25 50 100 200 500 1000 4.87 5.64 6.43 7.24 8.05 8.71 9.30 9.82 10.4 11.0 5 -min (4.45-5.34) 1 (5.17-6.17) 1 (5.89-7.02) 11 (6.62-7.90) 1 (7.33-8.77) 1 (7.90-9.49) 1 (8.38-10.1) 1 (8.80-10.7) 1 (9.25-11.4) 1 (9.65-12.0) 3.89 4.51 5.15 5.79 6.41 6.94 7.39 7.78 8.24 8.63 10 -min (3.55-4.26) (4.13-4.94) 1(4.72-5.62)11(5.29-6.32) (5.84-7.00) (6.28-7.56) 1(6.65-8.05)11(6.97-8.49) ( 7.31-8.99) ( 7.60-9.44) 3.24 3.78 4.34 4.88 F 5.85 6.22 6.55 6.91 7.22 15 -min (2.96-3.55) 2.22----]F-2.-61--]F-3.-08--IF-3-4--]F-4.-01--]F.54.41 1 (3.47-4.14) 1 (3.98-4.74) 11 (4.46-5.33) (4.94 5.91) (5.30-6.38) 1 (5.60-6.78) 4.77 (5.86-7.14) (6.14-7.54) (6.36-7.90) 5.10 5.50 5.84 30 -min (2.03-2.43) 1 (2.39-2.86) 1 (2.83-3.37) (3.23-3.86) 1 (3.65-4.38) 1 (3.99-4.80) 1 (4.29-5.19) 2.99 3.28 (4.56-5.56) (4.88-6.00) (5.15-6.40) 1.38 1.64 1.98 2.30 2.67 3.57 3.94 4.27 60 -min (1.27-1.52) 1 (1.50-1.79) 1 (1.81-2.16) (2.11-2.51) (2.43 2.91) (2.71-3.26) (2.96-3.58) (3.20-3.90) (3.50-4.31) (3.76-4.67) 0.810 0.963 1.18 1.39 1.64 1.86 2.07 2.29 2.58 2.84 2 -hr 1(0.735-0.896)1(0.878-1.06) 1 (1.07-1.29) 11 (1.26-1.52) 1 (1.47-1.79) 1 (1.67-2.03) (1.84-2.27) (2.03-2.51) (2.26-2.83) (2.47-3.12) 0.571 0.680 0.832 0.989 1.18 1.35 1.52 1.70 1.94 2.17 3 -hr 1(0.519-0.634)1(0.620-0.751)1(0.758-0.919)11(0.896-1.09)1 (1.06 1.30) 0.712 1 (1.21-1.48) 1 (1.35-1.67) 1 (1.50-1.87) 1 (1.70-2.13) 1 (1.87-2.38) 0.343 0.409 0.501 0.595 0.820 0.927 1.04 1.20 1.34 6 -hr (0.313-0.380) (0.374-0.450) (0.457-0.551) (0.542-0.654) (0.644-0.780) (0.736-0.896) (0.825-1.01) (0.918-1.14) ( 1.04-1.31) ( 1.15-1.47) 0.201 0.239 0.294 0.352 0.424 0.491 0.559 0.633 0.735 0.831 12 -hr (0.184-0.222) (0.219-0.263) (0.269-0.323) (0.321-0.386) (0.384-0.464) (0.441-0.535) (0.497-0.609) (0.556-0.688) (0.635-0.799) (0.707-0.904) 0.120 0.145 0.183 0.214 0.256 0.291 0.327 0.365 0.419 0.462 24 -hr (0.111-0.129) (0.134-0.157) (0.170-0.198) (0.197-0.231) (0.236-0.277) 0.145 (0.267-0.314) (0.298-0.354) (0.332-0.395) (0.377-0.454) (0.414-0.502) 0.069 0.083 0.105 0.122 0.164 0.184 0.205 0.234 0.257 2 -day (0.064-0.075) (0.077-0.090) 1(0.097-0.113)11(0.113-0.131) (0.134-0.157) (0.151-0.177) (0.168-0.199) (0.186-0.221) (0.211-0.253) (0.230-0.279) 0.049 0.059 0.074 0.085 0.101 0.114 0.128 0.142 0.162 0.178 3 -day (0.046-0.053) (0.055-0.063) (0.068-0.079) (0.079-0.092) (0.094-0.109) (0.105-0.123) (0.117-0.138) (0.129-0.153) (0.146-0.175) (0.160-0.192) 0.039 0.047 0.058 0.067 0.079 0.089 0.100 0.111 0.126 0.138 4 -day (0.036-0.042) (0.043-0.050) (0.054-0.062) (0.062-0.072) (0.074-0.085) (0.083-0.096) (0.092-0.107) (0.101-0.119) (0.114-0.136) (0.125-0.149) 0.026 0.038 0.043 0.051 0.070 0.079 F 0.087 0.031 0.057 0.064 7 -day 1(0.024-0.028)1(0.029-0.033)1(0.035-0.040)11(0.040-0. 46) (0.047-0.055) 0.030 0.034 F 0.039 (0.053-0.061) (0.059-0.068) (0.064-0.075) (0.072-0.085) (0.079-0.093) 0.059 0.064 0.021 0.025 0.044 0.048 0.053 10 -day (0.019-0.022) (0.023-0.026) (0.028-0.032) (0.031-0.036) (0.037-0.042) 0.019 F 0.022 0.025 (0.040-0.046) (0.044-0.051) (0.049-0.056) (0.054-0.063) (0.058-0.068) 0.037 7F 0.040 0.014 0.016 0.028 0.030 0.033 20 -day (0.013-0.015) (0.015-0.017) (0.018-0.021) (0.020-0.023) (0.024-0.027) 0.016 0.018 0.020 (0.026-0.030) 0.022 (0.028-0.032) (0.031-0.035) (0.034-0.039) (0.036-0.043) 0.028 0.030 0.011 0.013 0.024 0.025 30 -day (0.011-0.012) (0.013-0.014) (0.015-0.017) (0.016-0.019) (0.019-0.021) 0.013 0.014 0.016 7 (0.020-0.023) F 0.017 (0.022-0.025) (0.024-0.027) (0.026-0.030) (0.027-0.032) 0.022 0.023 0.010 0.011 0.019 0.020 45 -day (0.009-0.010) (0.011-0.012) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.024) 0.009 0.010 0.012 0.013 0.014 0.015 1 0.016 0.019 0.020 F 0.017 60 -day (0.0 08-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.014-0.016) ( 0.015-0.017) (0. 0.018-0.021016-0.018) (0.017-0.020) ( ) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https:Hhdsc. nws. noaa.gov/hdsc/pfds/pfds_pri ntpage.htm I?I at=35.8180&I on=-78.4124&data=intensity&units=engl i sh&seri es= pds 1/4 STORMWATER SUMMARY Project: ROBERTSON MILLPOND PRESERVE PHASE II Location: WAKE COUNTY, NC Date: 4/4/2018 Prepared By: C. ROGERS NUTRIENT SUMMARY - TOTAL NITROGEN (TN) PEAK FLOW SUMMARY 1.15 POST PHASE 11 (W/O SCM) TN (Ib/ac/yr): DRAINAGE AREA STORM EVENT EXISTING PRE- PHASE I PEAK FLOW (CFS) POST PHASE I PEAK FLOW (CFS) POST PHASE II PEAK FLOW (CFS) CHANGE IN PEAK FLOW (POST PHASE II -PRE PHASE 1) (CFS) DA -1 1 0.34 0 0 -0.34 DA -1 10 0.51 2.24 1.97 1.46 DA -1 100 0.65 4.56 5.39 4.74 DA -2 1 1.07 0.78 0.78 -0.29 DA -2 10 1.59 1.16 1.16 -0.43 DA -2 100 2.05 1.49 1.49 -0.56 DA -3 1 0.39 0.58 1.22 0.83 DA -3 10 0.58 0.87 1.81 1.23 DA -3 100 0.74 1.12 2.33 1.59 DA -4 1 0.83 0.88 0.54 -0.29 DA -4 10 1.23 1.3 0.8 -0.43 DA -4 100 1.58 1.67 1.02 -0.56 TOTAL 1 2.63 2.24 2.54 -0.09 TOTAL 10 3.91 5.57 5.74 1.83 TOTAL 100 5.02 8.84 10.23 5.21 NUTRIENT SUMMARY - TOTAL NITROGEN (TN) EXISTING PRE PHASE I TN (Ib/ac/yr): 1.15 POST PHASE 11 (W/O SCM) TN (Ib/ac/yr): 1.68 POST PHASE II (W/ SCM) TN (Ib/ac/yr): 1.58 TARGETTN (Ib/ac/yr): 3.6 MEETS TARGET RATE: YES / � \ �I /) � J lily\ l // / /• / �I /� / / / // A\ �\ — WARD CONSULTING ENGINEERS,P 4806 cissa Rd. suite 100 NC 27610 rhos. 919) 990-0680 Fu (919) 870-6969 b..,a..os—corp em ol LIJ ____Lu / WIM \ 3------ �� O Z E 0<0— W Z j / I � � oQ O — DA - Z W Lu / / / / �V I m Q cr ter,( W x 00 000_ \ �� / / 1 N I ♦ `moo \SOL DRAINAGE AREAS 000, / ♦moi \� �L� �� `---- — I I I PRE PHASE 1 DA -1 = 0.49 AC ♦ ! \\ \ \ 1\ \ ` —,DA \ \ PRE PHASE 1 DA -2 = 1.33 AC --— — I \ \ PRE PHASE 1 DA -3 = 0.45 AC PRE PHASE 1 DA -4 = 0.99 AC / / QM* 6-6-2016 �I 1 \-7 — \�/l��l LEGEND \III\7 = ��.—� PRE PHASE I DRAINAGE AREA CHEMCR \ s' PFE PHASE _sem —�750 25 50 loo MANAGE ate► IAP / /" - ' �� / — — ROBERTSONS POND/P�pAD SMIL. 1._50. ❑❑❑❑1 "❑1111❑ s�rM6 Sc Project WEIGHTED RATIONAL RUNOFF COEFFICIENT CALCULATIONS ROBERTSON MILLPOND PHASE II Location: WAKE COUNTY, NC Existing or Pror EXISTING (PRE PHASE 1) Date: 4/2/2018 Prepared By: C. Rogers Rational C Land Use Area Breakdown Ward Consulting Engineers, P.C. 1 of 1 Managed Woods Impervious Total Drainage Total Drainage Total Drainage Pervious Area Location C C*DA Area (SF) Area (ac) Area (sq mi) Rational C 0.15 0.2 0.95 DA -1 21210 0.49 0.000761 0.49 0.00 0.00 0.15 0.07 DA -2 57960 1.33 0.002079 1.31 0.00 0.02 0.16 0.22 DA -3 19710 0.45 0.000707 0.44 0.00 0.01 0.17 0.08 DA -4 42920 0.99 0.001540 0.49 0.50 0.00 0.18 0.17 Total 141800 3.26 0.005086 2.73 0.50 0.03 0.17 0.54 Ward Consulting Engineers, P.C. 1 of 1 Project: Location: Existing or Proposed: Date: Prepared By: 1 -YEAR STORM DRAINAGE DESIGN DISCHARGE CALCULATIONS ROBERTSON MILLPOND PHASE II WAKE COUNTY, NC EXISTING (PRE PHASE 1) 4/2/2018 C. Rogers Rational Equation Q= CIA A= Drainage Area (Acres) C= Composite Rational Runoff Coefficient Tc= Time of Concentration (Min) 10 -YEAR Pipe Time of Concentration (Min) Design Design Incremental Incremental Total Intensity Intensity Location Pipe Area (sf) Length L Design Pipe Area (sf) Length L C*A Discharge Time Flow Time C*A C*A Design (in/hr) (ft)Inlet Time Qd cfs DA -1 (ft) Inlet Time Flow Time 5 5 Qd (cfs) 0.51 DA -2 0.22 0.22 Time 7.24 1.59 DA -1 0.07 0.07 5 5 5 5 4.87 0.34 DA -2 0.22 0.22 7.24 5 5 4.87 1.07 DA -3 0.08 0.08 3.91 5 5 4.87 0.39 DA -4 0.17 0.17 5 5 4.87 0.83 TOTAL 0.54 0.54 5 5 4.87 2.63 10 -YEAR 100 -YEAR Pipe Time of Concentration (Min) Design Incremental Total Intensity Location Pipe Area (sf) Length L Design Discharge C*A C*A Time Flow Time (in/hr) (ft)Inlet Time Qd cfs DA -1 0.07 0.07 5 5 7.24 0.51 DA -2 0.22 0.22 5 5 7.24 1.59 DA -3 0.08 0.08 5 5 7.24 0.58 DA -4 0.17 0.17 5 5 7.24 1.23 TOTAL 0.54 0.54 5 5 7.24 3.91 100 -YEAR Ward Consulting Engineers, P.C. 1 of 1 Pipe Time of Concentration (Min) Design Incremental Total Intensity Location Pipe Area (sf) Length L Design Discharge C*A C*A Inlet Time Flow Time (in/hr) ft Time Qd cfs DA -1 0.07 0.07 5 5 9.3 0.65 DA -2 0.22 0.22 5 5 9.3 2.05 DA -3 0.08 0.08 5 5 9.3 0.74 DA -4 0.17 0.17 5 5 9.3 1.58 TOTAL 0.54 0.54 5 5 9.3 5.02 Ward Consulting Engineers, P.C. 1 of 1 \ I I ( / // .• / / / �`t / / — -294 v /\ I � \ \ \ / �� � .•�.�� /� i X295- \ \ \\\ f/���'�/rye � � %,•/ / / '/'•'� 1'x/1,A/ 74� CY / � /// •/ 1 /�� r / / / �--moi .. Y/ 40P\ \ I I 1 1 1 _300 , x It /j// 1111I -,"- dl// / /�//// / l / I l l ♦ _ _ /' f I 41## / / l 7 �I x DA -1 / LSA -341, ow ����� WARD _— CONSULTING ENGINEERS,P = 0 as 0-0 4805 Green Rd. Suite 300 RC 87638 Phone 939) 870-05W lPu (939) 879-6569 hwerds!woe-corp-em Lu 0- Q z_ W Q J W Lu a- � Lu Q Q U o w = z Q a_ z O a J � z Ocoz ::) C/) Q O � a_ U m�� OO IM a - DA -2 - _ _ _ _ - LEGEND " / / �1� \ \ \ �\ \ \- _ - - - _ - - - - - - POST PHASE I DRAINAGE AREA — — — —nem ROBERTSONS POND ROAD POST PFIAW 1 50 25 7 50 100 DRAKAM AFEA MAP BCMF 1.-50. SC Ll ❑❑ ❑1 "❑1111❑ sir 1a DRAINAGE AREAS POST PHASE I DA -1 = 1.09 AC POST PHASE I DA -2 = 0.52 AC POST PHASE I DA -3 = 0.61 AC POST PHASE I DA -4 = 1.03 AC BRIE: 6-5-2018 DA -2 - _ _ _ _ - LEGEND " / / �1� \ \ \ �\ \ \- _ - - - _ - - - - - - POST PHASE I DRAINAGE AREA — — — —nem ROBERTSONS POND ROAD POST PFIAW 1 50 25 7 50 100 DRAKAM AFEA MAP BCMF 1.-50. SC Ll ❑❑ ❑1 "❑1111❑ sir 1a Project WEIGHTED RATIONAL RUNOFF COEFFICIENT CALCULATIONS ROBERTSON MILLPOND PHASE II Location: WAKE COUNTY, NC Existing or Pror EXISTING (POST PHASE 1) Date: 4/2/2018 Prepared By: C. Rogers Rational C Land Use Area Breakdown Ward Consulting Engineers, P.C. 1 of 1 Managed Woods Impervious Total Drainage Total Drainage Total Drainage Pervious Area Location C C*DA Area (SF) Area (ac) Area (sq mi) Rational C 0.15 0.2 0.95 DA -1 47580 1.09 0.001707 0.68 0.00 0.41 0.45 0.49 DA -2 22820 0.52 0.000819 0.42 0.00 0.10 0.30 0.16 DA -3 26610 0.61 0.000955 0.58 0.00 0.03 0.19 0.12 DA -4 44790 1.03 0.001607 0.53 0.50 0.00 0.17 0.18 Total 141800 3.26 0.005086 2.21 0.50 0.54 0.29 0.94 Ward Consulting Engineers, P.C. 1 of 1 Project: Location: Existing or Proposed: Date: Prepared By: 1 -YEAR STORM DRAINAGE DESIGN DISCHARGE CALCULATIONS ROBERTSON MILLPOND PHASE II WAKE COUNTY, NC EXISTING (POST PHASE 1) 4/2/2018 C. Rogers Rational Equation Q= CIA A= Drainage Area (Acres) C= Composite Rational Runoff Coefficient Tc= Time of Concentration (Min) 10 -YEAR Pipe Time of Concentration (Min) Design Design Incremental Incremental Total Intensity Intensity Location Pipe Area (sf) Length L Design Pipe Area (sf) Length L C*A Discharge Time Flow Time C*A C*A Design (in/hr) (ft)Inlet Time Qd cfs DA -1 (ft) Inlet Time Flow Time 5 5 Qd (cfs) 3.55 DA -2 0.16 0.16 Time 7.24 1.16 DA -1 0.49 0.49 5 5 5 5 4.87 2.39 DA -2 0.16 0.16 7.24 5 5 4.87 0.78 DA -3 0.12 0.12 6.81 5 5 4.87 0.58 DA -4 0.18 0.18 5 5 4.87 0.88 TOTAL 0.95 0.95 5 5 4.87 4.63 10 -YEAR 100 -YEAR Pipe Time of Concentration (Min) Design Incremental Total Intensity Location Pipe Area (sf) Length L Design Discharge C*A C*A Time Flow Time (in/hr) (ft)Inlet Time Qd cfs DA -1 0.49 0.49 5 5 7.24 3.55 DA -2 0.16 0.16 5 5 7.24 1.16 DA -3 0.12 0.12 5 5 7.24 0.87 DA -4 0.18 0.18 5 5 7.24 1.30 TOTAL 0.94 0.94 5 5 7.24 6.81 100 -YEAR Ward Consulting Engineers, P.C. 1 of 1 Pipe Time of Concentration (Min) Design Incremental Total Intensity Location Pipe Area (sf) Length L Design Discharge C*A C*A Inlet Time Flow Time (in/hr) ft Time Qd cfs DA -1 0.49 0.49 5 5 9.3 4.56 DA -2 0.16 0.16 5 5 9.3 1.49 DA -3 0.12 0.12 5 5 9.3 1.12 DA -4 0.18 0.18 5 5 9.3 1.67 TOTAL 0.94 0.94 5 5 9.3 8.74 Ward Consulting Engineers, P.C. 1 of 1 1 1 --- OF- / \ \ \ I N N / ,-�� : ♦ 293-/ DA -4 � I \ I I l-- ' • 92 /� r .294 \ `�\ \ \ // 0 �. .•/ �• ` �% '• �% r' -295- \ems 4/0 DA -1 V J Y/// T. \ Imom son Ljo __- _ I \ \ \♦sm / NMI ROBERTSONS POND ROAD \ WARD CONSULTING ENGINEERS, P.CIs . M0 3&64W 1805 Green Rd. Suite 300 RC 87638 Phone 939) 870-46s6 =1Fe: (939) 870-6569 19woe-corp em LEGEND mom mom mom mom mom EIIN POST PHASE II DRAINAGE AREA 50 25 ❑ 50 100 — -z_- SC❑❑❑❑1"n7 QAIL 6-5-2018 PM PFIAW 1 DRANAM AREA MAP CALF: 1"-50• 1EEr ND. DRAINAGE AREAS > a Q PHASE II DA -1 = z WJ WL POST PHASE II DA -2 = 0.52 U) w POST PHASE II DA -3 = O AC POST PHASE II DA -4 = 0.42 AC a Q w CU z (D = 0 zEr Q O J z J o w O ci5 ::) C/) O = Ir w m c/) Q cr 0 LEGEND mom mom mom mom mom EIIN POST PHASE II DRAINAGE AREA 50 25 ❑ 50 100 — -z_- SC❑❑❑❑1"n7 QAIL 6-5-2018 PM PFIAW 1 DRANAM AREA MAP CALF: 1"-50• 1EEr ND. DRAINAGE AREAS POST PHASE II DA -1 = 1.45 AC WL POST PHASE II DA -2 = 0.52 AC POST PHASE II DA -3 = 0.86 AC POST PHASE II DA -4 = 0.42 AC LEGEND mom mom mom mom mom EIIN POST PHASE II DRAINAGE AREA 50 25 ❑ 50 100 — -z_- SC❑❑❑❑1"n7 QAIL 6-5-2018 PM PFIAW 1 DRANAM AREA MAP CALF: 1"-50• 1EEr ND. Project WEIGHTED RATIONAL RUNOFF COEFFICIENT CALCULATIONS ROBERTSON MILLPOND PHASE II Location: WAKE COUNTY, NC Existing or Pror PROPOSED (POST PHASE II) Date: 4/2/2018 Prepared By: C. Rogers Rational C Land Use Area Breakdown Ward Consulting Engineers, P.C. 1 of 1 Managed Woods Impervious Total Drainage Total Drainage Total Drainage Pervious Area Location C C*DA Area (SF) Area (ac) Area (sq mi) Rational C 0.15 0.2 0.95 DA -1 63140 1.45 0.002265 0.70 0.31 0.44 0.40 0.59 DA -2 22820 0.52 0.000819 0.42 0.00 0.10 0.30 0.16 DA -3 37480 0.86 0.001344 0.33 0.40 0.13 0.29 0.25 DA -4 18360 0.42 0.000659 0.00 0.38 0.04 0.27 0.11 Total 141800 3.26 0.005086 1.45 1.09 0.71 0.34 1.11 Ward Consulting Engineers, P.C. 1 of 1 Project: Location: Existing or Proposed: Date: Prepared By: 1 -YEAR STORM DRAINAGE DESIGN DISCHARGE CALCULATIONS ROBERTSON MILLPOND PHASE II WAKE COUNTY, NC PROPOSED (POST PHASE ll) 4/2/2018 C. Rogers Rational Equation Q= CIA A= Drainage Area (Acres) C= Composite Rational Runoff Coefficient Tc= Time of Concentration (Min) 10 -YEAR Pipe Time of Concentration (Min) Design Design Incremental Incremental Total Intensity Intensity Location Pipe Area (sf) Length L Design Pipe Area (sf) Length L C*A Discharge Time Flow Time C*A C*A Design (in/hr) (ft)Inlet Time Qd cfs DA -1 (ft) Inlet Time Flow Time 5 5 Qd (cfs) 4.27 DA -2 0.16 0.16 Time 7.24 1.16 DA -1 0.59 0.59 1 5 5 5 5 4.87 2.87 DA -2 0.16 0.16 7.24 5 5 4.87 0.78 DA -3 0.25 0.25 8.04 5 5 4.87 1.22 DA -4 0.11 0.11 5 5 4.87 0.54 TOTAL 1.11 1.11 5 5 4.87 5.41 10 -YEAR 100 -YEAR Pipe Time of Concentration (Min) Design Incremental Total Intensity Location Pipe Area (sf) Length L Design Discharge C*A C*A Time Flow Time (in/hr) (ft)Inlet Time Qd cfs DA -1 0.59 0.59 5 5 7.24 4.27 DA -2 0.16 0.16 5 5 7.24 1.16 DA -3 1 0.25 1 0.25 1 5 5 7.24 1 1.81 DA -4 0.11 0.11 5 5 7.24 0.80 TOTAL 1.11 1.11 5 5 7.24 8.04 100 -YEAR Ward Consulting Engineers, P.C. 1 of 1 Pipe Time of Concentration (Min) Design Incremental Total Intensity Location Pipe Area (sf) Length L Design Discharge C*A C*A Inlet Time Flow Time (in/hr) ft Time Qd cfs DA -1 0.59 0.59 5 5 9.3 5.49 DA -2 0.16 0.16 5 5 9.3 1.49 DA -3 0.25 0.25 5 5 9.3 2.33 DA -4 0.11 0.11 5 5 9.3 1.02 TOTAL 1.11 1.11 5 5 9.3 10.32 Ward Consulting Engineers, P.C. 1 of 1 Appendix C Hydraulic Data Dry Detention Basin Spillway Calculations Dry Detention Basin Ks&b Calculations Dry Detention Basin Chainsaw Routing 1 -yr, 10 -yr, 100 -yr o Existing o Expanded Swale Calculations (� L,p,�iZ,TSiC�N %N 1 V E. R1l�b FAA �t - 15 lam, T.7'l�� !� T �: 7`�'f 1 `W ��u 1 rii - �; iZ V�5 sE3 ►� � f I � W A� �7 -y Uuv ; O . Q V� (CrzA,54) Ak C, QNcz SL tzN = o. C3I Fri r- r �\S 6 0 P( Av, e QIP � 5 -3 Q CF s SI -Q4 L*N Cv',,rh- - 7Z 6�u t-rs FI-Lws, FLPW M'Aar 'Y't�I 1AYiDaia kvkC, XAouS = 0.lso F -T Q� IF (Fs� �� . r o C -v I b 1. anO,PS. 35500 KS&B 11-7-2014.xls Page 1 Pond Analysis Ks & B relationships Project: ROBERTSON MILLPOND PRESERVE PHASE II Location: WAKE COUNTY Date 3/26/2018 Prepared By: C. ROGERS S Z Z est Contour Incremental Accumulated Estimated Contour Area Volume Volume Stage Stage Based on Z= 2 & 3 [sq ft [cu ft] [cu ft] IN IN 0 1440 0 0 0 0 Calculated Ks=> 0.5 2300 935 935 0.5 0.54 2275 1 3060 1340 2275 1 1.00 1.5 4000 1765 4040 1.5 1.48 Calculated b => 21 4800 2200 6240 21 2.00 1.46 Page 1 PROJECT: I ROBERTSON'S POND - EXISTING POST PHASE I - DRY DETENTION BASIN Reservoir Routing - Microsoft Excel By: CDR Date: 3/16/2018 Storm Data Selected Return Periods Ralei h/Durham Description Item ID This Run 1 10 100 Return Period R 1 3 5.13 7.85 24 hr. Precip P 3 108 196 311 g 108 18 25 35 h 18 Sta e-Dischar a Item ID Units Sta e - Stora a Riser / Barrel St /stor parameter 1 Ks 1921 Number N n/a St /stor parameter b 1.47 Riser Diameter Dr inches Initial stage, ft Zo 292 Riser weir coeff. Cwr n/a Initial water level, ft Zn 292 Riser orifice coeff Cdr n/a Riser crest Zcr ft. H dro ra h Data Barrel Diameter Db inches Time Inc. min dT 1 Barrel orifice co Cdb n/a Peak Discharge, cfs Qp 2.39 Barrel invert elev Binv ft Time to Peak, min Tp 10 Culvert No. 1 Inlet control Number N n/a Watershed Data Item ID Units Culvert Diameter D inches Discharge coeff. Cd n/a Area A Ac 1.09 Pipe Inv. Elev Inv ft. Basin Elev. H Ft 2 Culvert No. 2 Fonlet control H d. Length L Ft 340 Number N n/a Rational comp "C" Cc n/a 0.45 Culvert Diameter D inches SCS Curve No. CN n/a 75 Discharge coeff. Cd n/a Pipe Inv. Elev Inv ft. 1000/CN-10 S n/a 5.31 Weir No. 1 broad crested P -0.2S ^2/ P+0.8S Ro, Q* in. 0.52 Length L ft. 50 L^3/H ^.385/128 Tc min. 5.0 Crest elevation Zcr ft. 293.7 / h+Tc I in/hr 4.9 Weir Coeff Cw n/a 3 Q =CcIA Qp cfs 2.39 Weir No. 2 broad crested T=Ro*A/1.39 Qp Tp min 10.3 Length L ft. Volume Ro*A cu ft 2049.8 Crest elevation Zcr ft. Weir Coeff. Cw n/a ROUTING TABLE Computed Results: sq. ft ac. ft Normal surface area 0.00 0.00 Peak stage 293.05 H dro ra h Vol. 0.05 Max surface area 2886.33 0.07 Peak outflow 0.00 Time t Inflow Storage Stage Outflow Riser Weir Riser Barrel Weir no. 1 Units : Min. cfs cf. Ft. cfs cfs Orfice ,cfs cfs cfs 0 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 1 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 2 0 3.31 292.01 0.00 0.00 0.00 0.00 0.00 3 0 16.27 292.04 0.00 0.00 0.001 0.00 0.00 4 1 44.29 292.08 0.00 0.00 0.00 0.00 0.00 5 1 91.41 292.13 0.00 0.00 0.00 0.00 0.00 6 2 159.91 292.18 0.00 0.00 0.00 0.00 0.00 7 2 250.08 292.25 0.00 0.00 0.00 0.00 0.00 8 2 360.21 292.32 0.00 0.00 0.00 0.00 0.00 9 2 486.73 292.39 0.00 0.00 0.00 0.00 0.00 10 2 624.57 292.47 0.00 0.00 0.00 0.00 0.00 11 2 767.62 292.54 0.00 0.00 0.00 0.00 0.00 12 2 909.26 292.60 0.00 0.00 0.00 0.00 0.00 13 2 1043.03 292.66 0.00 0.00 0.00 0.00 0.00 14 2 1163.38 292.71 0.00 0.00 0.00 0.00 0.00 15 2 1269.45 292.75 0.00 0.00 0.00 0.00 0.00 16 1 1362.93 292.79 0.00 0.00 0.00 0.00 0.00 17 1 1445.32 292.82 0.00 0.00 0.00 0.00 0.00 181 11 1517.93 292.851 0.00 0.001 0.001 0.00 0.00 Page 1 PROJECT: I ROBERTSON'S POND - EXISTING POST PHASE I - DRY DETENTION BASIN Reservoir Routing - Microsoft Excel By: CDR Date: 3/16/2018 Storm Data Selected Return Periods Ralei h/Durham Description Item ID This Run 1 10 100 Return Period R 10 3 5.13 7.85 24 hr. Precip P 5.13 108 196 311 g 196 18 25 35 h 25 Sta e-Dischar a Item ID Units Sta e - Stora a Riser / Barrel St /stor parameter 1 Ks 1921 Number N n/a St /stor parameter b 1.47 Riser Diameter Dr inches Initial stage, ft Zo 292 Riser weir coeff. Cwr n/a Initial water level, ft Zn 292 Riser orifice coeff Cdr n/a Riser crest Zcr ft. H dro ra h Data Barrel Diameter Db inches Time Inc. min dT 1 Barrel orifice co Cdb n/a Peak Discharge, cfs Qp 3.55 Barrel invert elev Binv ft Time to Peak, min Tp 24 Culvert No. 1 Inlet control Number N n/a Watershed Data Item ID Units Culvert Diameter D inches Discharge coeff. Cd n/a Area A Ac 1.09 Pipe Inv. Elev Inv ft. Basin Elev. H Ft 2 Culvert No. 2 Fonlet control H d. Length L Ft 340 Number N n/a Rational comp "C" Cc n/a 0.45 Culvert Diameter D inches SCS Curve No. CN n/a 75 Discharge coeff. Cd n/a Pipe Inv. Elev Inv ft. 1000/CN-10 S n/a 5.31 Weir No. 1 broad crested P -0.2S ^2/ P+0.8S Ro, Q* in. 1.76 Length L ft. 50 L^3/H ^.385/128 Tc min. 5.0 Crest elevation Zcr ft. 293.7 / h+Tc I in/hr 7.2 Weir Coeff Cw n/a 3 Q =CcIA Qp cfs 3.55 Weir No. 2 broad crested T=Ro*A/1.39 Qp Tp min 23.6 Length L ft. Volume Ro*A cu ft 6981.0 Crest elevation Zcr ft. Weir Coeff. Cw n/a ROUTING TABLE Computed Results: sq. ft ac. ft Normal surface area 0.00 0.00 Peak stage 293.76 H dro ra h Vol. 0.16 Max surface area 3683.84 0.08 Peak outflow 2.24 Time t Inflow Storage Stage Outflow Riser Weir Riser Barrel Weir no. 1 Units : Min. cfs cf. Ft. cfs cfs Orfice ,cfs cfs cfs 0 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 1 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 2 0 0.94 292.01 0.00 0.00 0.00 0.00 0.00 3 0 4.71 292.02 0.00 0.00 0.001 0.00 0.00 4 0 13.11 292.03 0.00 0.00 0.00 0.00 0.00 5 0 27.90 292.06 0.00 0.00 0.00 0.00 0.00 6 1 50.69 292.08 0.00 0.00 0.00 0.00 0.00 7 1 82.98 292.12 0.00 0.00 0.00 0.00 0.00 8 1 126.08 292.16 0.00 0.00 0.00 0.00 0.00 9 1 181.12 292.20 0.00 0.00 0.00 0.00 0.00 10 1 249.00 292.25 0.00 0.00 0.00 0.00 0.00 11 2 330.43 292.30 0.00 0.00 0.00 0.00 0.00 12 2 425.83 292.36 0.00 0.00 0.00 0.00 0.00 13 2 535.41 292.42 0.00 0.00 0.00 0.00 0.00 14 2 659.12 292.48 0.00 0.00 0.00 0.00 0.00 15 3 796.65 292.55 0.00 0.00 0.00 0.00 0.00 16 3 947.45 292.62 0.00 0.00 0.00 0.00 0.00 17 3 1110.73 292.69 0.00 0.00 0.00 0.00 0.00 181 31 1285.49 292.761 0.00 0.001 0.001 0.00 0.00 Page 8 PROJECT: I ROBERTSON'S POND - EXISTING POST PHASE I - DRY DETENTION BASIN Reservoir Routing - Microsoft Excel By: CDR Date: 3/16/2018 Storm Data Selected Return Periods Ralei h/Durham Description Item ID This Run 1 10 100 Return Period R 100 3 5.13 7.85 24 hr. Precip P 7.85 108 196 311 g 311 18 25 35 h 35 Sta e-Dischar a Item ID Units Sta e - Stora a Riser / Barrel St /stor parameter 1 Ks 1921 Number N n/a St /stor parameter b 1.47 Riser Diameter Dr inches Initial stage, ft Zo 292 Riser weir coeff. Cwr n/a Initial water level, ft Zn 292 Riser orifice coeff Cdr n/a Riser crest Zcr ft. H dro ra h Data Barrel Diameter Db inches Time Inc. min dT 1 Barrel orifice co Cdb n/a Peak Discharge, cfs Qp 4.56 Barrel invert elev Binv ft Time to Peak, min Tp 40 Culvert No. 1 Inlet control Number N n/a Watershed Data Item ID Units Culvert Diameter D inches Discharge coeff. Cd n/a Area A Ac 1.09 Pipe Inv. Elev Inv ft. Basin Elev. H Ft 2 Culvert No. 2 Fonlet control H d. Length L Ft 340 Number N n/a Rational comp "C" Cc n/a 0.45 Culvert Diameter D inches SCS Curve No. CN n/a 75 Discharge coeff. Cd n/a Pipe Inv. Elev Inv ft. 1000/CN-10 S n/a 5.31 Weir No. 1 broad crested P -0.2S ^2/ P+0.8S Ro, Q* in. 3.81 Length L ft. 50 L^3/H ^.385/128 Tc min. 5.0 Crest elevation Zcr ft. 293.7 / h+Tc I in/hr 9.3 Weir Coeff Cw n/a 3 Q =CcIA Qp cfs 4.56 Weir No. 2 broad crested T=Ro*A/1.39 Qp Tp min 39.6 Length L ft. Volume Ro*A cu ft 15068.1 Crest elevation Zcr ft. Weir Coeff. Cw n/a ROUTING TABLE Computed Results: sq. ft ac. ft Normal surface area 0.00 0.00 Peak stage 293.80 H dro ra h Vol. 0.35 Max surface area 3719.89 0.09 Peak outflow 4.56 Time t Inflow Storage Stage Outflow Riser Weir Riser Barrel Weir no. 1 Units : Min. cfs cf. Ft. cfs cfs Orfice ,cfs cfs cfs 0 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 1 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 2 0 0.43 292.00 0.00 0.00 0.00 0.00 0.00 3 0 2.15 292.01 0.00 0.00 0.001 0.00 0.00 4 0 6.00 292.02 0.00 0.00 0.00 0.00 0.00 5 0 12.84 292.03 0.00 0.00 0.00 0.00 0.00 6 0 23.46 292.05 0.00 0.00 0.00 0.00 0.00 7 0 38.67 292.07 0.00 0.00 0.00 0.00 0.00 8 0 59.22 292.09 0.00 0.00 0.00 0.00 0.00 9 1 85.86 292.12 0.00 0.00 0.00 0.00 0.00 10 1 119.28 292.15 0.00 0.00 0.00 0.00 0.00 11 1 160.12 292.18 0.00 0.00 0.00 0.00 0.00 12 1 208.99 292.22 0.00 0.00 0.00 0.00 0.00 13 1 266.44 292.26 0.00 0.00 0.00 0.00 0.00 14 1 332.97 292.30 0.00 0.00 0.00 0.00 0.00 15 1 409.02 292.35 0.00 0.00 0.00 0.00 0.00 16 2 494.99 292.40 0.00 0.00 0.00 0.00 0.00 17 2 591.17 292.45 0.00 0.00 0.00 0.00 0.00 181 21 697.84 292.501 0.00 0.001 0.001 0.00 0.00 Page 15 PROJECT: I ROBERTSON MILLPOND PRESERVE PHASE II - DRY DETENTION BASIN Reservoir Routing - Microsoft Excel By: CDR Date: 3/16/2018 Storm Data Selected Return Periods Ralei h/Durham Description Item ID This Run 1 10 100 Return Period R 1 3 5.13 7.85 24 hr. Precip P 3 108 196 311 g 108 18 25 35 h 18 Sta e-Dischar a Item ID Units Sta e - Stora a Riser / Barrel St /stor parameter 1 Ks 2275 Number N n/a St /stor parameter b 1.46 Riser Diameter Dr inches Initial stage, ft Zo 292 Riser weir coeff. Cwr n/a Initial water level, ft Zn 292 Riser orifice coeff Cdr n/a Riser crest Zcr ft. H dro ra h Data Barrel Diameter Db inches Time Inc. min dT 1 Barrel orifice co Cdb n/a Peak Discharge, cfs Qp F 2.82 Barrel invert elev Binv ft Time to Peak, min Tp 7 Culvert No. 1 Inlet control Number N n/a Watershed Data Item ID Units Culvert Diameter D inches Discharge coeff. Cd n/a Area A Ac 1.45 Pipe Inv. Elev Inv ft. Basin Elev. H Ft 2 Culvert No. 2 Fonlet control H d. Length L Ft 340 Number N n/a Rational comp "C" Cc n/a 0.4 Culvert Diameter D inches SCS Curve No. CN n/a 71 Discharge coeff. Cd n/a Pipe Inv. Elev Inv ft. 1000/CN-10 S n/a 6.71 Weir No. 1 broad crested P -0.2S ^2/ P+0.8S Ro, Q* in. 0.33 Length L ft. 50 L^3/H ^.385/128 Tc min. 5.0 Crest elevation Zcr ft. 293.7 / h+Tc I in/hr 4.9 Weir Coeff Cw n/a 3 Q =CcIA Qp cfs 2.82 Weir No. 2 broad crested T=Ro*A/1.39 Qp Tp min 7.3 Length L ft. Volume Ro*A cu ft 1729.7 Crest elevation Zcr ft. Weir Coeff. Cw n/a ROUTING TABLE Computed Results: sq. ft ac. ft Normal surface area 0.00 0.00 Peak stage 292.83 H dro ra h Vol. 0.04 Max surface area 3050.16 0.07 Peak outflow 0.00 Time t Inflow Storage Stage Outflow Riser Weir Riser Barrel Weir no. 1 Units : Min. cfs cf. Ft. cfs cfs Orfice ,cfs cfs cfs 0 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 1 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 2 0 7.64 292.02 0.00 0.00 0.00 0.00 0.00 3 1 36.82 292.06 0.00 0.00 0.00 0.00 0.00 4 2 97.55 292.12 0.00 0.00 0.00 0.00 0.00 5 2 194.18 292.19 0.00 0.00 0.00 0.00 0.00 6 3 324.54 292.26 0.00 0.00 0.00 0.00 0.00 7 3 480.42 292.34 0.00 0.00 0.00 0.00 0.00 8 3 648.99 292.42 0.00 0.00 0.00 0.00 0.00 9 2 815.13 292.50 0.00 0.00 0.00 0.00 0.00 10 2 964.17 292.56 0.00 0.00 0.00 0.00 0.00 11 2 1089.39 292.60 0.00 0.00 0.00 0.00 0.00 12 1 1194.28 292.64 0.00 0.00 0.00 0.00 0.00 13 1 1282.16 292.68 0.00 0.00 0.00 0.00 0.00 14 1 1355.78 292.70 0.00 0.00 0.00 0.00 0.00 15 1 1417.45 292.72 0.00 0.00 0.00 0.00 0.00 16 1 1469.11 292.74 0.00 0.00 0.00 0.00 0.00 17 1 1512.39 292.76 0.00 0.00 0.00 0.00 0.00 181 11 1548.65 292.771 0.00 0.001 0.001 0.00 0.00 Page 1 PROJECT: I ROBERTSON MILLPOND PRESERVE PHASE II - DRY DETENTION BASIN Reservoir Routing - Microsoft Excel By: CDR Date: 3/16/2018 Storm Data Selected Return Periods Ralei h/Durham Description Item ID This Run 1 10 100 Return Period R 10 3 5.13 7.85 24 hr. Precip P 5.13 108 196 311 g 196 18 25 35 h 25 Sta e-Dischar a Item ID Units Sta e - Stora a Riser / Barrel St /stor parameter 1 Ks 2275 Number N n/a St /stor parameter b 1.46 Riser Diameter Dr inches Initial stage, ft Zo 292 Riser weir coeff. Cwr n/a Initial water level, ft Zn 292 Riser orifice coeff Cdr n/a Riser crest Zcr ft. H dro ra h Data Barrel Diameter Db inches Time Inc. min dT 1 Barrel orifice co Cdb n/a Peak Discharge, cfs Qp F 4.20 Barrel invert elev Binv ft Time to Peak, min Tp 21 Culvert No. 1 Inlet control Number N n/a Watershed Data Item ID Units Culvert Diameter D inches Discharge coeff. Cd n/a Area A Ac 1.45 Pipe Inv. Elev Inv ft. Basin Elev. H Ft 2 Culvert No. 2 Fonlet control H d. Length L Ft 340 Number N n/a Rational comp "C" Cc n/a 0.4 Culvert Diameter D inches SCS Curve No. CN n/a 71 Discharge coeff. Cd n/a Pipe Inv. Elev Inv ft. 1000/CN-10 S n/a 6.71 Weir No. 1 broad crested P -0.2S ^2/ P+0.8S Ro, Q* in. 1.37 Length L ft. 50 L^3/H ^.385/128 Tc min. 5.0 Crest elevation Zcr ft. 293.7 / h+Tc I in/hr 7.2 Weir Coeff Cw n/a 3 Q =CcIA Qp cfs 4.20 Weir No. 2 broad crested T=Ro*A/1.39 Qp Tp min 20.5 Length L ft. Volume Ro*A cu ft 7195.5 Crest elevation Zcr ft. Weir Coeff. Cw n/a ROUTING TABLE Computed Results: sq. ft ac. ft Normal surface area 0.00 0.00 Peak stage 293.76 H dro ra h Vol. 0.17 Max surface area 4302.99 0.10 Peak outflow 1.97 Time t Inflow Storage Stage Outflow Riser Weir Riser Barrel Weir no. 1 Units : Min. cfs cf. Ft. cfs cfs Orfice ,cfs cfs cfs 0 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 1 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 2 0 1.47 292.01 0.00 0.00 0.00 0.00 0.00 3 0 7.31 292.02 0.00 0.00 0.001 0.00 0.00 4 0 20.34 292.04 0.00 0.00 0.00 0.00 0.00 5 1 43.17 292.07 0.00 0.00 0.00 0.00 0.00 6 1 78.23 292.10 0.00 0.00 0.00 0.00 0.00 7 1 127.63 292.14 0.00 0.00 0.00 0.00 0.00 8 1 193.16 292.18 0.00 0.00 0.00 0.00 0.00 9 2 276.23 292.24 0.00 0.00 0.00 0.00 0.00 10 2 377.84 292.29 0.00 0.00 0.00 0.00 0.00 11 2 498.56 292.35 0.00 0.00 0.00 0.00 0.00 12 3 638.51 292.42 0.00 0.00 0.00 0.00 0.00 13 3 797.36 292.49 0.00 0.00 0.00 0.00 0.00 14 3 974.36 292.56 0.00 0.00 0.00 0.00 0.00 15 3 1168.30 292.63 0.00 0.00 0.00 0.00 0.00 16 4 1377.60 292.71 0.00 0.00 0.00 0.00 0.00 17 4 1600.33 292.79 0.00 0.00 0.00 0.00 0.00 181 41 1834.21 292.861 0.00 0.001 0.001 0.00 0.00 Page 8 PROJECT: I ROBERTSON MILLPOND PRESERVE PHASE II - DRY DETENTION BASIN Reservoir Routing - Microsoft Excel By: CDR Date: 3/16/2018 Storm Data Selected Return Periods Ralei h/Durham Description Item ID This Run 1 10 100 Return Period R 100 3 5.13 7.85 24 hr. Precip P 7.85 108 196 311 g 311 18 25 35 h 35 Sta e-Dischar a Item ID Units Sta e - Stora a Riser / Barrel St /stor parameter 1 Ks 2275 Number N n/a St /stor parameter b 1.46 Riser Diameter Dr inches Initial stage, ft Zo 292 Riser weir coeff. Cwr n/a Initial water level, ft Zn 292 Riser orifice coeff Cdr n/a Riser crest Zcr ft. H dro ra h Data Barrel Diameter Db inches Time Inc. min dT 1 Barrel orifice co Cdb n/a Peak Discharge, cfs Qp F 5.39 Barrel invert elev Binv ft Time to Peak, min Tp 37 Culvert No. 1 Inlet control Number N n/a Watershed Data Item ID Units Culvert Diameter D inches Discharge coeff. Cd n/a Area A Ac 1.45 Pipe Inv. Elev Inv ft. Basin Elev. H Ft 2 Culvert No. 2 Fonlet control H d. Length L Ft 340 Number N n/a Rational comp "C" Cc n/a 0.4 Culvert Diameter D inches SCS Curve No. CN n/a 71 Discharge coeff. Cd n/a Pipe Inv. Elev Inv ft. 1000/CN-10 S n/a 6.71 Weir No. 1 broad crested P -0.2S ^2/ P+0.8S Ro, Q* in. 3.20 Length L ft. 50 L^3/H ^.385/128 Tc min. 5.0 Crest elevation Zcr ft. 293.7 / h+Tc I in/hr 9.3 Weir Coeff Cw n/a 3 Q =CcIA Qp cfs 5.39 Weir No. 2 broad crested T=Ro*A/1.39 Qp Tp min 37.5 Length L ft. Volume Ro*A cu ft 16867.6 Crest elevation Zcr ft. Weir Coeff. Cw n/a ROUTING TABLE Computed Results: sq. ft ac. ft Normal surface area 0.00 0.00 Peak stage 293.81 H dro ra h Vol. 0.39 Max surface area 4362.62 0.10 Peak outflow 5.39 Time t Inflow Storage Stage Outflow Riser Weir Riser Barrel Weir no. 1 Units : Min. cfs cf. Ft. cfs cfs Orfice ,cfs cfs cfs 0 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 1 0 0.00 292.00 0.00 0.00 0.00 0.00 0.00 2 0 0.57 292.00 0.00 0.00 0.00 0.00 0.00 3 0 2.83 292.01 0.00 0.00 0.001 0.00 0.00 4 0 7.92 292.02 0.00 0.00 0.00 0.00 0.00 5 0 16.92 292.03 0.00 0.00 0.00 0.00 0.00 6 0 30.92 292.05 0.00 0.00 0.00 0.00 0.00 7 0 50.94 292.07 0.00 0.00 0.00 0.00 0.00 8 1 77.98 292.10 0.00 0.00 0.00 0.00 0.00 9 1 112.99 292.13 0.00 0.00 0.00 0.00 0.00 10 1 156.86 292.16 0.00 0.00 0.00 0.00 0.00 11 1 210.41 292.20 0.00 0.00 0.00 0.00 0.00 12 1 274.41 292.23 0.00 0.00 0.00 0.00 0.00 13 1 349.54 292.28 0.00 0.00 0.00 0.00 0.00 14 2 436.41 292.32 0.00 0.00 0.00 0.00 0.00 15 2 535.55 292.37 0.00 0.00 0.00 0.00 0.00 16 2 647.39 292.42 0.00 0.00 0.00 0.00 0.00 17 2 772.28 292.48 0.00 0.00 0.00 0.00 0.00 181 31 910.49 292.531 0.00 0.001 0.001 0.00 0.00 Page 15 SWALE CALCULATIONS Project: ROBERTSON POND PH II Location: WAKE COUNTY Date: 3/16/2018 Prepared By: CDR RIGHT DESIGN LEFT SIDE HYDRAULIC SHEAR SIDE BOTTOM CHANNEL MANNING'S n NORMAL VELOCITY CHANNEL SWALE DISCHARGE SLOPE RADIUS 'Rh' STRESS 'r' SLOPE WIDTH (ft) SLOPE (ft/ft) VALUE DEPTH (ft) 'V10' (fps) LINING 'Q10' (cfs) (ft/ft) (Ib/SF) (ft/ft)(ft) 1 4.42 3 3 10 0.027 0.03 0.17 2.43 0.16 0.27 Curlex Matting LONGITUDINAL ANCHOR TRENCH J: U STAKE AT 3'-5" INTERVALS 9- P � YAYA TERMINAL SLOPE AND CHANNEL ANCHOR CHECK SLOT AT 25' INTERVALS • (MIN) ISOMETRIC VIEW WOODEN STAKES NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED AT 25' INTERVALS. 2. ALL MATTING TO BE SECURED WITH WOODEN STAKES ACCORDING TO THE SPECIFICATIONS AT 5' P 611 INTERVALS. 3. FABRIC OVERLAP WHEN 2 ROWS °�°• OF MATERIAL ARE USED SHALL BE PLACED WITH THE UPPER ROW OF MATERIAL PLACED OVER THE LOWER ROW OF MATERIAL. 6„ 4. TRENCH MATTING AT TOP AND INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT BOTTOM OF MAT AS SHOWN IN D ETAI L 5. OVERLAP FABRIC IN DIRECTION OF FLOW WITH MATTING UPSTREAM ON TOP OF DOWNSTREAM MAT. 6. MATTING WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS. 1 TYPICAL EROSION CONTROL MATTING INSTALLATION SCALE: NOT TO SCALE CONCRETE FWASHOUT SIGN BERM L- BERM CONCRETE WASHOUT AREA PLAN 12" TYPICAL WIDTH COMPACTED BERM AROUND 4:1 THE PERIMETER .2% SLOPE UNDISTURBED OR COMPACTED SOIL QVQ AAIAI SECTION A CONCRETE WASHOUT AREA NOTES: 1. SEE CONSTRUCTION PLANS VIEW FOR CONCRETE WASH OUT AREA (CWA) LOCATION. 2. DO NOT LOCATE AN UNLINED CWA WITHIN 400' OF ANY NATURAL DRAINAGE CONVEYANCE OR WATER BODY. DO NOT LOCATE WITHIN 1000' OF ANY WELLS OR DRINKING WATER SOURCES. IF SITE CONSTRAINTS MAKE THIS INFEASIBLE, OR IF HIGHLY PERMEABLE SOILS EXIST ON SITE, THE CWA MUST BE INSTALLED WITH AN IMPERMEABLE LINER (16 MIL MIN. THICKNESS) OR SURFACE STORAGE ALTERNATIVES USING PREFABRICATED CONCRETE WASHOUT DEVICES OR A LINE ABOVE GROUND STORAGE SHOULD BE USED. 3. THE CWA SHALL BE INSTALLED PRIOR TO CONCRETE PLACEMENT ON SITE. 4. CWA SHALL INCLUDE A FLAT SUBSURFACE PIT THAT IS AT LEAST 8' BY 8'. SLOPES LEADING OUT OF THE SUBSURFACE PIT SHALL BE 3:1 OR FLATTER. THE PIT SHALL BE AT LEAST 3' DEEP. 5. BERM SURROUNDING SIDES AND BACK OF THE CWA SHALL HAVE MINIMUM HEIGHT OF 1' 6. VEHICLE TRACKING PAD SHALL BE SLOPED 2% TOWARDS THE CWA 7. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE CWA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CWA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 8. USE EXCAVATED MATERIAL FOR PERIMETER BERM CONSTRUCTION. CWA MAINTENANCE NOTES 1. THE CWA SHALL BE REPAIRED, CLEANED, OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE. CONCRETE MATERIALS, ACCUMULATED IN PIT, SHALL BE REMOVED ONCE THE MATERIALS HAVE REACHED A DEPTH OF 2'. 2. CONCRETE WASHOUT WATER, WASTED PIECES OF CONCRETE, AND ALL OTHER DEBRIS IN THE SUBSURFACE PIT SHALL BE TRANSPORTED FROM THE JOB SITE IN A WATER -TIGHT CONTAINER AND DISPOSED OF PROPERLY. 3. THE CWA SHALL REMAIN IN PLACE UNTIL ALL CONCRETE FOR THE PROJECT IS PLACED. 4. WHEN THE CWA IS REMOVED, COVER THE DISTURBED AREA WITH TOP SOIL, SEED AND MULCH, OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE LOCAL JURISDICTION. 2 STANDARD CONCRETE TRUCK CLEAN OUT PIT SCALE- NOT TO SCALE •� - " - -_ p at, Spillway Data --2917A_ . . . . . . . �'-� �! ♦_♦ ♦ `,.` - - 29 / - - - - EXISTING RIP- RAP�9� I -292-- II _ - ' _ '-� ' _ ' QBE' REMOVED " = ' •:�., ------ ----- (S�N©TEr1.-♦ p•' / oo �-- � ---_-- 292 --'-� . , � _ �`'''• ;p d o /e,.ti� _= 293--- �Q�---��� p- -- \ I raw on rte, OO ����� •��� \ \ o: /, O ♦�`� ; . ♦� �so�i�� ' °• iT�P OF _29480 _ - - - PIL�wgY_2 J���� \ � � . p. • . - - . ° , 0 EMBANKMENT - 9 � � � - • \: c.9 • 00• s p• , • , r d e ° 0/ 9 - 294 d / �\ i A • �, �. 00 19 _\A- -295 - �9 d / \ - L EXISTING FRENCH DRAIN -� d ° ° d d \ (PROTECT DURING / CONSTRU&ION) \ DRY DETENTION BASIN \ \ \ d � \ d ,� v d � � � � � / - � VOLUME 4200 CU.f\f. TO ELEVATION 293.70 FT. PROVIDE EROSION CONTROL MATTJNG ON BOTTOM OF DRY _ �d d \ \ BASIN, ,AFTER CONVERTED FROM \ i 29� - `- \ \ // SKIMMER SEDIMENT BASIN �Q0do �. !•1 J \ d \ \ N) d d Oo \ \ c) I \ \ \ DRY DETENTION BASIN DETAIL 4 SCALE: 1 "=20' Table 6.10a Temporary Seeding Specifications for Winter and Early Spring Seeding mixture Species Rate (Ib/acre) Rye (grain) 120 Seeding dates Mountains >2500ft 15 -Feb to 15 -May <2500 ft 1 -Feb to 1 -May Piedmont 1 -Jan to 1 -May Coastal Plain 1 -Dec to 15 -Apr Soil amendments Follow recommendations of soil tests or apply 2ton/acre ground agricultural limestone and 750lb/acrea 10-10-10 fertilizer Mulch Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10b Temporary Seeding Specifications for Summer Seeding mixture Species Rate (Ib/acre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 501b/acre. Seeding dates Mountains 15 -May to 15 -Aug Piedmont 1 -May to 15 -Aug Coastal Plain 15 -Apr to 15 -Aug Soil amendments Follow recommendations of soil tests or apply 2ton/acre ground agricultural limestone and 750lb/acrea 10-10-10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchorstraw by tacking with asphalt, netting ora mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10cTemporary Seeding Specifications for Fall Seeding mixture Species Rate (Ib/acre) Rye (grain) 120 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50lb/acre. Seeding dates Mountains 15 -Aug to 15 -Dec Coastal Plain and 15 -Aug to 30 -Dec Piedmont Soil amendments Follow recommendations of soil tests orapply 2 ton/acre ground agricultural limestone and 750lb/acrea 10-10-10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50lb/acre Kobe (Piedmont and Coastal Plain) late February or early March. ❑ermanent seeding see specifications. Ilse this table if not otherwise specified. permanent Seeding Mixture Seed Mixtures ❑lanting Elates Blend of ❑❑❑ =31 Call fescue and C❑- mixture of two or more turf[type tall fescues 2❑❑E2❑❑ Ibs[Acre ❑r Blend of three or more turf type tall fescues 2❑❑E21111Ibs[acre Seeding Dates Best ossible [lug. 211 []Sept. 1 ❑ lug. 2❑ F-I❑ct. 211 Feb 1 []March 31 Che above vegetation are those which do well under local conditions❑Dther seeding rate combinations are possible. Seeding mix shall be approved by the ❑ngineer before seeding of the pro ect starts. 3 TEMPORARY SEEDING SPECIFICATIONS SCALE- NOT TO SCALE Peak Flow Velocity Shear Storm Event (cfs) (fps) Stress (Ib/sf) 10 -year 1.97 0.71 0.03 100 -year 5.4 1.07 0.06 EXTEND DRY BAS I N CONSTRUCTI 1. REMOVE THE EXISTING RIP RAP FROM THE SPILLWAY. FILL TO SPILLWAY ELEVATION, SEED, STRAW, AND MAT THE SPILLWAY WITH C-700 EROSION CONTROL MATTING. 2. GRADE TO EXTEND THE DRY DETENTION BASIN TO PROVIDE AN ADDITIONAL 600 CU.F.T FOR A TOTAL OF 4800 CU.FT. 3. PROVIDE EROSION CONTROL MATTING ON GRADED SLOPES. MAT THE BOTTOM OF THE BASIN AFTER CONVERTING FROM THE SKIMMER SEDIMENT BASIN. 294.80 FT. _ 50' SPI TOP OF 1 EXISTING 293.70 FT. SPIL \A WEST BERM -------------- y EXISTING RIP RAP TO BE REMOVED (SEE NOTE 1) WAY LENGTH _ 296.00 FT. TOP OF PROPOSED BERM EAST y� y .4 -4-4 i 4 �: W J DRY DETENTION BASIN OUTLET DETAIL DRY DETENTION BASIN MODIFICATION DETAIL (FINAL DESIGN) SCALE: NOT TO SCALE Know what's below. Callbefore you dig. • COLLABORATIVE LANDSCAPE ARCHITECTURE 727 W. Hargett Street, Ste. 101 Raleigh, NC 27603 1919.805.3586 WARD CONSULTING C!17�:ENGINEERS, P.C. >RF= UCEM N0: C-2819 4805 Green Rd, Suite 10 Raleigh, NC 27616 Phone (919) 870-0526 Fax (919) 870-5359 bward®wce-corp.com NCBELS Firm No. C-2619 ♦,4;oF SA p�fy.9 AL 1334410 -d- 0611 yt� !VGI1\1EE Q♦ � CYNN��,�`�• REUSE OF DOCUMENT This document is the property of Site Collaborative Inc. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of Site Collaborative Inc. U N � WC/) Cf) E QU 0- z = O Q O� O 4' n J U 0 J W G � Cf) O z1�1� oa_ O Cf) Cf) 4-1 W O O LU W � O (a O CO PROJECT NUMBER: 17002 PROJECT PHASE: PERMIT SET 1. 1:�Igg SHEET TITLE: EROSION CONTROL DETAILS SHEET NUMBER: C300 Appendix D Nutrient Loading Calculations Wake County Stormwater Hybrid Tool V2.2 Site Data Drainage Area Data Site Summary DA -1 BMP Calculations BMP Summary Wake County SW Hyrbid Tool Version 2.2 Wake County Stormwater Hybrid Tool Directions For additional submittal and design guidance, please see Wake County's SW Manual The Wake County Stormwater Hybrid Tool is required for all stormwater submittals in Wake County jurisdiction. Engineer will input all data requested that is highlighted in blue. Engineer may follow provided links to view calculations used in this tool. Calculations for peak flow, runoff, time of concentration, etc. are for individual drainage areas. Engineer should complete a worksheet for each drainage area within a project area. TOOL DIRECTIONS Page 1 Complete all inputs on the SITE DATA worksheet. SITE DATA worksheet should be submitted with preliminary plan submittals and modified and submitted for construction plan submittals. 1 Residential Stormwater Details should be completed for all residential submittal. Stormwater Narrative should describe the site conditions in pre- and post -development conditions including a description of site improvements and proposed stormwater BMPs. Complete DA worksheets. Most of the site data is inputted by the engineer on the DA worksheets. A Links/Comments column provides details regarding individual inputs. Engineers may also enter comments in this column as needed. 2 DA Worksheets will calculate pre and post runoff, time of concentration, peak flow, and volume of runoff per drainage area. Inputs on these sheets will also be used to calculate the site composite curve numbers for pre and post development, Target Curve Number (TCN), and nitrogen and phosphorus loading calculations. Offsite values should be included when there is offsite drainage onto the site to ensure that the peak flow is an accurate value. Otherwise, peak flow represents only the site peak flow. Offsite drainage is not used in Target Curve Number or nutrient loading calculations. SITE SUMMARY worksheet summarizes the pre and post runoff, Tc, and peak flow per drainage area based on inputs from DA worksheets. This worksheet denotes the volume required for management per drainage area based on high density requirements. TCN and composite curve numbers for pre and post development are also calculated and summarized. If the TCN is exceeded, this worksheet will calculate total volume to be managed for the entire site based on TCN requirements. Nitrogen and Phosphorus Loading: Nitrogen and Phosphorus Loading Rates for the site are calculated based on the land use acreages imputed on DA worksheets. This 3 worksheet calculates the total amount of nitrogen and phosphorus for pre and post development. Nitrogen and phosphorus totals will be used on following BMP worksheets. Disconnected Impervious - This area will be used to provide an adjusted post development composite curve number (CNadivated) to allow a credit for the use of disconnected impervious. Site plans should clearly indicate areas of disconnected impervious. Note: There is only one engineer input on this sheet and all exeedances from DA worksheets will be flagged in red. DA BMP worksheets require engineer to input proposed BMP information. BMPs are categorized by sub -basins within the drainage area. Engineer should input BMP device name, type, and volume provided. BMP requirements are automatically imported from previous inputs. Engineer should input land uses by sub -basin. Off-site drainage to the BMP should be included to ensure that the water quality volume required is calculated correctly. 4 BMPs are required in each DA where post -development peak flow is higher than pre -development peak flow by 10%. Note that there is no 10% for projects within the Falls and Jordan Lake Watersheds. DA BMP worksheets will ensure that proposed BMPs meet requirements for peak flow, TCN, and for Nitrogen and Phosphorus. Engineer must input post -BMP discharge. BMP SUMMARY worksheet summarizes the pre and post BMP runoff, and peak flow per drainage area based on inputs from DA BMP worksheets. 5 Nitrogen and Phosphorus Loading: calculated based on the inputs on DA BMP worksheets. Note: There are no engineer inputs on this sheet and all exeedances from DA BMP worksheets will be flagged in red. TOOL DIRECTIONS Page 1 �eU 7KJ 7F+ Wl COUNTY NOUN N ('.AIMI IN, 1�1110=197_rlr_1 Wake County Storm -ter Hybrid Tool Version 2.2 SITE DATA Page 2 Project Information Project Name: ROBERTSON MILLPOND PHASE II Permit No (if known): Applicant: WAKE COUNTY DEPARTMENT OF PARKS AND RECREATION Applicant Contact Name: ERIC STAEHLE Applicant Contact Number: 919-856-6369 Contact Email: ERIC.STAEHLE(a-)WAKEGOV.COM Last Modified Date: Site Data: River Basin: Neuse Regulatory Watershed: N/A Physiographic/Geologic Region: Piedmont Type of Development (Select from Dropdown menu): Non -Residential Zoning: R-40 Total Site Area (Ac): 81.91 Existing Lake/Pond Area (Ac): 65.51 Proposed Disturbed Area (Ac): Proposed Impervious Surface Area from DA Sheets (acre): 0.71 Percent Built Upon Area (BUA): 1 % Is the proposed project a site expansion? Yes Number of Drainage Areas on Site (Points of Analysis): Annual Rainfall (in): 45.41 One-year, 24-hour rainfall (in): 3.00 Two-year, 24-hour rainfall (in): 3.60 Proposed Residential Stormwater Details (if applicable): Site Square Footage: 3,568,000 Total Acreage in Lots: Lot Square Footage: Number of Lots: Average Lot Size (SF): Proposed Impervious Surface Area from DA sheets (SF): 30,928 Proposed Impervious Surface Area Devoted to Lots (SF): Total Impervious Surface Area Devoted to Roads (SF): Other Impervious Surface Area (SF): SITE DATA Page 2 W akeCou ntyStormwaterDesignTooIV2.2 Project Name: ROBERTSON MILLPOND PHASE II DRAINAGE AREA 1 WAKE STORMWATER PRE -POST CALCULATIONS COUNTY LAND USE & SITE DATA PRE -DEVELOPMENT POST -DEVELOPMENT Drainage Area (Acres)= 0.49 1.45 Site Acreage within Drainage= 0.49 1.45 One-year, 24-hour rainfall (in)= 3.00 Land Use (acres) by Soil Group: A Soils B Soils C Soils D Soils A Soils B Soils C Soils D Soils Commercial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot Roof I I I Open/Landscaped I I Industrial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot Roof Open/Landscaped Transportation Site Offsite Site I Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site I Offsite Site Offsite High Density (interstate, main) I I High Density (Grassed Right-of-ways) Low Density (secondary, feeder) Low Density (Grassed Right-of-ways) Rural Rural (Grassed Right-of-ways) I Sidewalk I Misc. Pervious Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Managed pervious (Open Space) Unmanaged (pasture) Woods (not on lots) Residential Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Roadway I Grassed Right-of-ways I I Driveway Parking lot 0.00 0.44 Roof Sidewalk (Includes Patios) Lawn I Managed pervious (Open Space) j 0.49 I 0.70 I Woods (on lots) 0.31 Land Taken up by BMP JURISDICTIONAL LANDS Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Natural wetland Riparian buffer (Zone 1 only) I Open water I Totals (Ac)= 0.00 0.00 0.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.45 0.00 0.00 0.00 0.00 0.00 DA1 Page 3 W akeCou ntyStormwaterDesignTooIV2.2 SITE FLOW PRE -DEVELOPMENT Tc POST -DEVELOPMENT Tc Sheet Flow Length (ft)= Slope (ft/ft)= Surface Cover: n -value= T, (hrs)= 0.00 0.00 Shallow Flow Length (ft)= Slope (ft/ft)= Surface Cover: Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= 0.00 0.00 Channel Flow 1 Length (ft)= Slope (ft/ft)= Cross Sectional Flow Area (ftz)= Wetted Perimeter (ft)= Channel Lining: n -value= Hydraulic Radius (ft)= 0.00 0.00 Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= 0.00 0.00 Tc (hrs)= 0.08 0.08 RESULTS PRE -DEVELOPMENT POST -DEVELOPMENT Site Impervious Surface Area (Ac) = 0.00 0.44 Lot Impervious Surface Area (Ac) = 0.00 0.00 1 -year, 24-hour storm (Peak Flow) Volume of runoff (ft') = 649 5,549 Volume change (ft) = 4,900 Runoff (inches) = Q*= 0.3651 1.0543 Peak Discharge (cfs)= Q= 0.2334 2.4648 Composite Curve Number (DA)= 61 71 Composite Curve Number (Site only)= 61 71 DISCONNECTED IMPERVIOUS - Credit given only to residential development with drainage area with less than 30% impervious Percent Disconnected Impervious Credit (Residential Only) _ Disconnected impervious area (Ac) = 0.00 Drainage Area CNedi„s,ad= 71 Site Only CN, ius d= 71 Post -development peak flow exceeds pre -development peak flow for this DA! DA1 Page 4 Wake County SW Hybrid Tool Version 2.2 Project Name: ROBERTSON MILLPOND PHASE II `�� DRAINAGE AREA 2 WAKE STORMWATER PRE -POST CALCULATIONS COUNTY LAND USE & SITE DATA PRE -DEVELOPMENT POST -DEVELOPMENT Drainage Area (Acres)= 1.33 0.52 Site Acreage within Drainage= 1.33 0.52 One-year, 24-hour rainfall (in)= 3.00 Land Use (acres) by Soil Group: A Soils B Soils C Soils D Soils A Soils B Soils C Soils D Soils Commercial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot I I I Roof I Open/Landscaped Industrial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot Roof Open/Landscaped I I Site Offsite Site Offsite Site Offsite Site Offsite site fsiteTransportation Site j Offsite Site j Offsite High Density (interstate, main) High Density (Grassed Right-of-ways) Low Density (secondary, feeder) Low Density (Grassed Right-of-ways)AN Rural I I I Rural (Grassed Right-of-ways) I I I I Sidewalk Misc. Pervious Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Managed pervious (Open Space) Unmanaged (pasture) Woods (not on lots) I I Residential Site I Offsite Site I Offsite Site Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Roadway Grassed Right-of-ways Driveway Parking lot 0.10 Roof 0.02 I I I Sidewalk (Includes Patios) I I I Lawn I I I Managed pervious (Open Space) 1.31 0.42 Woods (on lots) Land Taken up by BMP JURISDICTIONAL LANDS Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Natural wetland I Riparian buffer (Zone 1 only) I Open water Totals (Ac)= 0.00 0.00 1.33 0.00 0.00 0.00 0.00 0.000.00 0.00 1 0.52 0.00 0.00 0.00J 0.00 0.00 j DA2 Page 5 Wake County SW Hybrid Tool version 2.2 SITE FLOW PRE -DEVELOPMENT T. POST -DEVELOPMENT Tc Sheet Flow Length (ft)= Slope (ft/ft)= Surface Cover: n -value= T, (hrs)= 0.00 0.00 Shallow Flow Length (ft)= Slope (ft/ft)= Surface Cover: Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= 0.00 0.00 Channel Flow 1 Length (ft)= Slope (ft/ft)= Cross Sectional Flow Area (ft)= Wetted Perimeter (ft)= Channel Lining: n -value= Hydraulic Radius (ft)= 0.00 0.00 Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= 0.00 0.00 Tc (hrs)= 0.08 0.08 RESULTS PRE -DEVELOPMENT POST -DEVELOPMENT Site Impervious Surface Area (Ac) = 0.02 0.10 Lot Impervious Surface Area (Ac) = 0.02 0.00 1 -year, 24-hour storm (Peak Flow) Volume of runoff (ft) = 1,937 1,562 Volume change (ft) _ -376 Runoff (inches) = Q*= 0.4013 0.8273 Peak Discharge (cfs)= Q= 0.7484 0.6846 Composite Curve Number (DA)= 62 68 Composite Curve Number (Site only)= 62 68 DISCONNECTED IMPERVIOUS - Credit given only to residential development with drainage area with less than 30% impervious Percent Disconnected Impervious Credit (Residential Only) _ Disconnected impervious area (Ac) = 0.00 Drainage Area CNadiue,ed= 68 Site Only CN,dluered= 68 DA2 Page 6 Project Name: WAKE COUNTY ROBERTSON MILLPOND PHASE II DRAINAGE AREA 3 STORMWATER PRE -POST CALCULATIONS W akeCountyStormwaterDesignTooIV2.2.xlsz LAND USE & SITE DATA PRE -DEVELOPMENT POST -DEVELOPMENT Drainage Area (Acres)= 0.45 0.86 Site Acreage within Drainage= 0.45 0.86 One-year, 24-hour rainfall (in)= 3.00 Land Use (acres) by Soil Group: A Soils B Soils C Soils D Soils A Soils B Soils C Soils D Soils Commercial Site Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Parking lot I Roof Open/Landscaped Industrial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot Roof I Open/Landscaped I Transportation Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site j Offsite Site Offsite Site j Offsite High Density (interstate, main) High Density (Grassed Right-of-ways) Low Density (secondary, feeder) Low Density (Grassed Right-of-ways) Rural I Rural (Grassed Right-of-ways) I Sidewalk Misc. Pervious Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Managed peMous (Open Space) Unmanaged (pasture) Woods (not on lots) I Residential Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Roadway I I I I I I I I Grassed Right-of-ways Driveway Parking lot 0.13 Roof Sidewalk (Includes Patios) 0.01 Lawn I I I I Managed pervious (Open Space) j 0.44 0.33 Woods (on lots) 0.40 Land Taken up by BMP JURISDICTIONAL LANDS Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Natural wetland Riparian buffer (Zone 1 only) I Open water I Totals (Ac)=i 0.00 1 0.00 1 0.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.86 0.00 0.00 0.00 0.00 0.00 I DA3 Page 7 W akeCountyStormwaterDesignTooIV2.2.xlsz SITE FLOW PRE -DEVELOPMENT T, POST -DEVELOPMENT Tc Sheet Flow Length (ft)= Slope (ft/ft)= Surface Cover: n -value= T, (hrs)= 0.00 0.00 Shallow Flow Length (ft)= Slope (ft/ft)= Surface Cover: Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= 0.00 0.00 Channel Flow 1 Length (ft)= Slope (tuft)= Cross Sectional Flow Area (ft)= Wetted Perimeter (ft)= Channel Lining: n -value= Hydraulic Radius (ft)= 0.00 0.00 Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= To (hm)= RESULTS myPRE-DEVELOPMENT 0.00 0.08 0.00 0.08 POST -DEVELOPMENT Site Impervious Surface Area (Ac) = 0.01 0.13 Lot Impervious Surface Area (Ac) = 0.01 0.00 1 -year, 24-hour storm (Peak Flow) Volume of runoff (ft) = 684 2,010 Volume change (ft) = 1,327 Runoff (inches) = Q'= 0.4185 0.6440 Peak Discharge (cfs)= Q= 0.2641 0.8090 Composite Curve Number (DA)= 62 64 Composite Curve Number (Site only)= 62 64 DISCONNECTED IMPERVIOUS - Credit given only to residential development with drainage area with less than 30% impervious Percent Disconnected Impervious Credit (Residential Only) _ Disconnected impervious area (Ac) = 0.00 Drainage Area C1,110 - 64 Site Only CN,dj � = 64 Post -development peak flow exceeds pre -development peak flow for this DA! DA3 Page 8 WAKE COUNTY Project Name: I ROBERTSON MILLPOND PHASE II DRAINAGE AREA 4 STORMWATER PRE -POST CALCULATIONS W akeCountyStormwaterDesignTooIV2.2.)dsx LAND USE & SITE DATA PRE -DEVELOPMENT POST -DEVELOPMENT Drainage Area (Acres)= 0.99 0.42 Site Acreage within Drainage= 0.99 0.42 One-year, 24-hour rainfall (in)= 3.00 Land Use (acres) by Soil Group: A Soils B Soils C Soils D Soils A Soils B Soils C Soils D Soils Commercial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot I I I Roof I Open/Landscaped Industrial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot Roof Open/Landscaped I I Site Offsite Site Offsite Site Offsite Site Offsite site fsiteTransportation Site j Offsite Site j Offsite High Density (interstate, main) High Density (Grassed Right-of-ways) Low Density (secondary, feeder) Low Density (Grassed Right-of-ways)AN Rural I I I Rural (Grassed Right-of-ways) I I I I Sidewalk Misc. Pervious Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Managed pervious (Open Space) Unmanaged (pasture) Woods (not on lots) I I Residential Site I Offsite Site I Offsite Site Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Roadway Grassed Right-of-ways Driveway Parking lot 0.04 Roof I I I Sidewalk (Includes Patios) I I I Lawn I I I Managed pervious (Open Space) 0.49 Woods (on lots) 0.50 0.38 Land Taken up by BMP JURISDICTIONAL LANDS Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Natural wetland I Riparian buffer (Zone 1 only) I Open water Totals (Ac)= 0.00 0.00 0.99 0.00 0.00 0.00 0.00 0.000.00 0.00 1 0.42 0.00 0.00 0.00J 0.00 0.00 j DA4 Page 9 W akeCountyStormwaterDesignTooIV2.2.)dsx SITE FLOW PRE -DEVELOPMENT Tc POST -DEVELOPMENT Tc Sheet Flow Length (ft)= Slope (ft/ft)= Surface Cover: n -value= T, (hrs)= 0.00 0.00 Shallow Flow Length (ft)= Slope (ft/ft)= Surface Cover: Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= 0.00 0.00 Channel Flow 1 Length (ft)= Slope (ft/ft)= Cross Sectional Flow Area (ft)= Wetted Perimeter (ft)= Channel Lining: n -value= Hydraulic Radius (ft)= 0.00 0.00 Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= 0.00 0.00 Tc (hrs)= 0.08 0.08 RESULTS PRE -DEVELOPMENT POST -DEVELOPMENT Site Impervious Surface Area (Ac) = 0.00 0.04 Lot Impervious Surface Area (Ac) = 0.00 0.00 1 -year, 24-hour storm (Peak Flow) Volume of runoff (ft') = 981 671 Volume change (ft) = -310 Runoff (inches) = Q*= 0.2730 0.4399 Peak Discharge (cfs)= Q= 0.2802 0.2242 Composite Curve Number (DA)= 58 59 Composite Curve Number (Site only)= 58 59 DISCONNECTED IMPERVIOUS - Credit given only to residential development with drainage area with less than 30% impervious Percent Disconnected Impervious Credit (Residential Only) _ Disconnected impervious area (Ac) = 0.00 Drainage Area CNedi„g,ad= 59 Site Only CN, ius d= 59 DA4 Page 10 WAKE COUNTY Project Name: I ROBERTSON MILLPOND PHASE II DRAINAGE AREA 5 STORMWATER PRE -POST CALCULATIONS Wake County SW Hybrid Tool Version 2.2 LAND USE & SITE DATA PRE -DEVELOPMENT POST -DEVELOPMENT Drainage Area (Acres)= 78.66 78.66 Site Acreage within Drainage= 78.66 78.66 One-year, 24-hour rainfall (in)= 3.00 Land Use (acres) by Soil Group: A Soils B Soils C Soils D Soils A Soils B Soils C Soils D Soils Commercial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot I I I Roof I Open/Landscaped Industrial Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Parking lot Roof Open/Landscaped I I Site Offsite Site Offsite Site Offsite Site Offsite site fsiteTransportation Site j Offsite Site j Offsite High Density (interstate, main) High Density (Grassed Right-of-ways) Low Density (secondary, feeder) Low Density (Grassed Right-of-ways) Rural I I I Rural (Grassed Right-of-ways) I I I I Sidewalk Misc. Pervious Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Managed pervious (Open Space) Unmanaged (pasture) 1.00 2.00 1.00 2.00 Woods (not on lots) 3.00 1.20 I 1.68 2.90 I 3.00 1.20 1.68 I 2.90 Residential Site I Offsite Site I Offsite Site Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Site I Offsite Roadway Grassed Right-of-ways Driveway Parking lot Roof I I I Sidewalk (Includes Patios) I I I Lawn I I I Managed pervious (Open Space) Woods (on lots) Land Taken up by BMP JURISDICTIONAL LANDS Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Site Offsite Natural wetland I Riparian buffer (Zone 1 only) I Open water 66.88 66.88 Totals (Ac)= 70.88 0.00 3.20 0.00 1.68 0.00 2.90 0.00 70.88 0.00 3.20 0.00 1.68 0.00 2.90 0.00 j DA5 Page11 Wake County SW Hybrid Tool version 2.2 SITE FLOW PRE -DEVELOPMENT T. POST -DEVELOPMENT Tc Sheet Flow Length (ft)= 16 Slope (ft/ft)= Surface Cover: n -value= T, (hrs)= 0.00 0.00 Shallow Flow Length (ft)= Slope (ft/ft)= Surface Cover: Average Velocity (ft/sec)= 0.00 0.00 T, (hrs)= 0.00 0.00 Channel Flow 1 Length (ft)= 3700.00 3700.00 Slope (ft/ft)= 0.00 0.00 Cross Sectional Flow Area (ft)= 3900.00 3900.00 Wetted Perimeter (ft)= 662.00 662.00 Channel Lining: Weeds Weeds n -value= 0.04 0.040 Hydraulic Radius (ft)= 5.89 5.89 Average Velocity (ft/sec)= 7.68 7.68 T, (hrs)= 0.13 0.13 Tc (hrs)= 0.13 0.13 RESULTS PRE -DEVELOPMENT POST -DEVELOPMENT Site Impervious Surface Area (Ac) = 0.00 0.00 Lot Impervious Surface Area (Ac) = 0.00 0.00 1 -year, 24-hour storm (Peak Flow) Volume of runoff (ft') = 1,126,651 1,126,651 Volume change (ft) = 0 Runoff (inches) = Q*= 3.9457 3.9457 Peak Discharge (cfs)= Q= 185.8941 185.8941 Composite Curve Number (DA)= 8 8 Composite Curve Number (Site only)= 8 8 DISCONNECTED IMPERVIOUS - Credit given only to residential development with drainage area with less than 30% impervious Percent Disconnected Impervious Credit (Residential Only) _ Disconnected impervious area (Ac) = 0.00 Drainage Area CNadiug,ad= 8 Site Only CNadius,ad= 8 DA5 Page 12 WAKE COUNTY NORTH CAROLINA DA SITE SUMMARY STORMWATER PRE -POST CALCULATIONS Wake County SW Hybrid Tool Version 2.2 Project Name: IBERTSON MILLPOND PHA SITE SUMMARY DRAINAGE AREA SUMMARIES DRAINAGE AREA: DA1 DA2 DA3 DA4 DA5 DA6 Pre -Development (1 -year, 24-hour storm) Runoff (in)=Q* = 0.365 0.401 0.419 0.273 3.946 Peak Flow (cfs)=QPost = 0.233 0.748 0.264 0.280 185.894 Post -Development (1 -year, 24-hour storm) Proposed Impervious Surface (acre) = 0.44 0.10 0.13 0.04 Runoff (in)=Q* = 1.054 0.827 0.644 0.440 3.946 Peak Flow (cfs)=Qpost = 2.465 0.685 0.809 0.224 185.894 TARGET CURVE NUMBER (TCN) - Residential Only SITE \SOIL COMPOSITION HYDROLOGIC SOIL GROUP Site Area % Target CN A 70.88 87% N/A B 6.45 8% N/A C 1.68 2% N/A D 2.90 4% N/A Total Site Area (acres) = 81.91 Zoning = R-40 Target Curve Number (TCN) = N/A % Impervious = 1% Post Development CNadjusted = 11 Required Volume to be Managed (TCN)= ft = N/A SITE NITROGEN AND PHOSPHORUS LOADING Nitrogen and Phosphorus Targets (Based on Regulatory Watershed) Target Nitrogen Load (Ib/ac/yr)= 3.6 Target Phosphorus Load (Falls and Jordan Lakes Only) (Ib/ac/yr)= N/A • N Loading Reduction Option for Expansions (Falls and Jordan Lakes Only) = N/A • Loading Reduction Nitrogen Target (Falls and Jordan Lakes Onlv) (Ib/ac/yr)= • P Loading Reduction Option for Expansions (Falls and Jordan Lakes Only) = N/A % Loading Reduction Phosphorus Target (Falls and Jordan Lakes Only) (Ib/ac/yr)= Pre Development Nitrogen and Phosphorus Load Total Nitrogen (Ib/ac/yr)= 1.15 Total Phosphorus (Ib/ac/yr)= N/A Post Development Nitrogen and Phosphorus Load Total Nitrogen (Ib/ac/yr)= 1.68 Total Phosphorus (Ib/ac/yr)= N/A SITE SUMMARY Page 13 WAKE COUNTY Project Name: I ROBERTSON MILLPOND PHASE II DRAINAGE AREA 1 BMP CALCULATIONS Wake County SW Hybrid Tool Version 2.2 DRAINAGE AREA 1 - BMP DEVICES AND ADJUSTMENTS DA1 Site Acreage= 1.45 DA1 Off -Site Acreage= 0.00 Total Required Storage Volume for Site TCN Requirement (ft)= Will site use underground water harvesting? Enter % volume reduction in decimal form= Note: Supporting information/details should be submitted to demonstrate water usage. ENTER AREA TREATED BY BMP Land Use (acres) Sub-DA1(a) (Ac) Sub-DAII(b) (Ac) Sub-DA1(c) (Ac) Sub-DA1(d) (Ac) Sub-DA1(e) (Ac) Commercial Site I Off-site Site I Off-site Site I Off-site Site I Off-site Site Off-site Parking lot I I I I Roof Open/Landscaped Industrial Site Off-site Site Off-site Site Off-site Site Off-site Site Off-site Parking lot Roof Open/Landscaped I I I I Transportation Site Off-site Site Off-site Site Off-site Site Off-site Site j Off-site High Density (interstate, main) I I I I High Density (Grassed Right-of-ways) Low Density (secondary, feeder) Low Density (Grassed Right-of-ways) Rural I I I I Rural (Grassed Right-of-ways) I I I I Sidewalk Misc. Pervious Site Off-site Site Off-site Site Off-site Site Off-site Site Off-site Managed pervious Unmanaged (pasture) Woods (not on lots) Residential Site Off-site Site Off-site Site j Off-site Site j Off-site Site j Off-site Roadway I I I I Grassed Right-of-ways I I I Driveway Parking lot 0.44 Roof Sidewalk I I I I Lawn I I I I Managed pervious 0.70 ' Woods (on lots) 0.31 Land Taken up by BMP JURISDICTIONAL LANDS Site Off-site Site Offsite Site Offsite Site Offsite Site Offsite Natural wetland I I I I Riparian buffer (Zone 1 only) Totals (Ac)= 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Sub-DAII(a) BMP(s) Device Name (As Shown on Plan) Device Type Water Quality Volume (c.f.) Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow N (Ib/ac/yr) Outflow P EMC (mg/L) Total Outflow P (Ib/ac/yr) Provided Volume Managed (c.f.) Dry Detention Basin Dry Detention Pond 1,701 1.56 5.19 0.40 1.33 1.24 4.10 0.22 0.73 4,200 Outflow Total Nitrogen (Ib/ac/yr)= 4.10 Outflow Total Phosphorus (lb/ac/yr)- 0.73 DA1_BMPs Page 14 Wake County SW Hybrid Tool Version 2.2 Sub-DA1(b) BMP(s) If Sub-DA1(b) is connected to upstream sub-basin(s), select all contributing sub-basin(s from dro down menus): Device Name (As Shown on Plan) Device Type Water Quality Volume (c.f.) Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow N (Ib/ac/yr) Outflow P EMC (mg/L) Total Outflow P (Ib/ac/yr) Provided Volume Managed (c.f.) Outflow Total Nitrogen (Ib/ac/yr)= Outflow Total Phosphorus (Ib/ac/yr)= Sub-DA1 (c) BMP(s) If Sub-DA1(c) is connected to upstream sub-basin(s), select all contributing sub-basin(s): Device Name (As Shown on Plan) Device Type Water Quality Volume c.f. Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow N (Ib/ac/yr) Outflow P EMC (mg/L) Total Outflow P (Ib/ac/yr) Provided Volume Managed c.f. Outflow Total Nitrogen (Ib/ac/yr)= Outflow Total Phosphorus (Ib/ac/yr)= Sub-DA1 (d) BMP(s) If Sub-DA1(d) is connected to upstream sub-basin(s), select all contributing sub-basin(s): Device Name (As Shown on Plan) Device Type Water Quality Volume c.f.IblaG Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (Ib/ac/yr) Outflow N EMC (mg/L) Total Outflow (lb/ac/yr) N Outflow P EMC (mg/L) Total Outflow ( P y) r Provided Volume Managed c.f. Outflow Total Nitrogen (Ib/ac/yr)= Outflow Total Phosphorus (Ib/ac/yr)= Si (e) BMP(s) If Sub-DA1(e) is connected to upstream sub-basin(s), select all contributing sub-basin(s): Device Name (As Shown on Plan) Device Type Water Quality Volume (c.f.) Inflow N EMC (mg/L) Total Inflow N (Ib/ac/yr) Inflow P EMC (mg/L) Total Inflow P (lb/ac/yr) Outflow N EMC (mg/L) Total Outflow N (Ib/ac/yr) Outflow P EMC (mg/L) Total Outflow P (lb/ac/yr) Provided Volume Managed (c.f.) Outflow Total Nitrogen (Ib/ac/yr)= Outflow Total Phosphorus (Ib/ac/yr)= DA1 BMP SUMMARY Total Volume Treated (c.f.)= 4200 DA1 Outflow Total Nitrogen (Ib/aGyr)= 4.10 DA1 Outflow Total Phosphorus (Ib/ac/yr)= 0.73 1 -year, 24-hour storm Pre Development Peak Discharge (cfs)= Ql_yea 0.23 Post BMP Peak Discharge (CfS)= Ql_yea 0.00 DA1_BMPs Page 15 Wake County SW Hybrid Tool Version 2.2 Project Name: PBERTSON MILLPOND PHAS WAKE DA SITE SUMMARY COUNTY BMP CALCULATIONS NORTH CAROLINA BMP SUMMARY DRAINAGE AREA SUMMARIES DRAINAGE AREA: DA1 I DA2 I DA3 DA4 DA5 DA6 Post -Development (1 -year, 24-hour storm) Peak Flow (Cfs)=Q1_year= 2.47 1 0.69 1 0.81 0.22 185.89 Post -Development with BMPs (1 -year, 24-hour storm) % Impervious= 1% Volume Managed (CF)= 4,200 Post BMP Peak Discharge (Cfs)= Qt -year= 0.75 1 0.26 1 0.28 185.89 Have Target Curve Number Requirements been met? N/A Pre Development Nitrogen and Phosphorus Load Total Nitrogen (Ib/ac/yr)= 1.15 Total Phosphorus (Ib/ac/yr)= N/A Post Development Nitrogen and Phosphorus Load Total Nitrogen (Ib/ac/yr)= 1.68 Total Phosphorus (Ib/ac/yr)= N/A Post -BMP Nitrogen Loading Outflow Total Nitrogen (Ib/ac/yr)= 1.58 Outflow Total Phosphorus (Ib/ac/yr)= 0.40 Has site met the Target? YES Has site met requirements for offsetting? YES BMP SUMMARY Page 16 Appendix E Soils Report USAGE No Authorization Required Letter May 30, 2014 Wake County Facilities Design and Construction P.O. Box 550 Raleigh, North Carolina 27602 Attn: Mr. Eric O. Staehle, RLA Email: eric.staehle@wakegov.com Re: Report of Geotechnical Services New Parking Lot and Access Drives Robertson's Mill Pond Park Robertson Pond Road Wendell, Wake County, North Carolina Terracon Project No. 70145073 Dear Mr. Staehle: Irerracon Terracon Consultants, Inc. (Terracon) has completed the report of geotechnical services for the above referenced project. The purpose of this study was to evaluate the existing subgrade conditions and provide geotechnical engineering recommendations for earthwork and thickness design of the gravel surfaced parking lot and access drives. Additionally, a Seasonal High Water Table (SHWT) determination was performed by a licensed soil scientist to assist with stormwater design. These services were performed in accordance with our Proposal No. P70130547 -R dated May 14, 2014. 1.0 PROJECT INFORMATION Our understanding of the project is based on correspondence with you and the provided site plan. ITEM DESCRIPTION The planned improvements include constructing stone base course Project Components drive lanes and 21 associated parking spaces, a stormwater management feature, and additional landscaping. Up to four feet of cut are planned for the northeast portion of the Grading proposed parking area. We expect balanced earthwork quantities for the project. Traffic loads will primarily consist of passenger vehicles. Some Traffic loading maintenance vehicles and grading equipment will use the new road. Terracon Consultants, Inc. 2401 Brentwood Road, Ste 107 Raleigh, North Carolina 27604 Report of Geotechnical Services Irerracon Proposed Robertson's Mill Pond Park Wake County, North Carolina May 14, 2014 Terracon Project No. P70145073 Should any of the above information or assumptions be inconsistent with the planned construction, we request the opportunity to revise our report. The following table outlines the existing conditions and is based on our site visit and our discussions with project designers. ITEM DESCRIPTION The new park is planned for an existing open area located near the intersection of Robertson Pond Road and Old Mill Farm Drive near Location Wendell, North Carolina. For further details regarding project location, refer to the attached Site Location Plan. The site is adjacent to the Robertson's pond dam and the remaining portion of the historic former mill. The site is gated and Existing improvements contains an existing shelter and an overhead light. There is also a single -story residence and a water supply well. The majority of groundcover within construction areas is grassed. Current groundcover Two rock outcrops exist at the surface near the entrance. The site slopes down gently to the south and west towards the Existing topography. Robertson Pond Road and the existing pond. 2.0 FIELD EXPLORATION Soil samples were obtained through depths of up to 10 feet below the existing surface at the six requested locations. The exploration locations were established in the field by measuring from existing site features and estimating right angles. Hand-held GPS technology was used record geographic coordinates of the boring locations. Ground surface elevations were estimated using the obtained geographic coordinates, mapping software, and topographic contours from available Wake County GIS data. A Geoprobe Model 6620DT was used to obtain soil samples from the subsurface profile. Soil samples were obtained by alternating between advancing a split -barrel sampler and a direct push sampler. In the split -barrel sampling procedure, the number of blows required to advance a standard 2 -inch O.D. split -barrel sampler the last 12 inches of the typical total 18 -inch penetration by means of a 140 -pound safety hammer with a free fall of 30 inches, is the standard penetration resistance value (SPT -N). This value is used to estimate the in-situ relative density of cohesionless soils and consistency of cohesive soils. Soil samples were taken at approximately 2.5 -foot intervals. An automatic SPT hammer was used to advance the split -barrel sampler in the borings performed on this site. A greater efficiency is typically achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. Published Responsive ■ Resourceful ■ Reliable 2 Report of Geotechnical Services Irerracon Proposed Robertson's Mill Pond Park Wake County, North Carolina May 14, 2014 Terracon Project No. P70145073 correlations between the SPT values and soil properties are based on the lower efficiency cathead and rope method. This higher efficiency affects the standard penetration resistance blow count (N) value by increasing the penetration per hammer blow over what would be obtained using the cathead and rope method. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information within this report. The samples collected in the field were tagged for identification, sealed to reduce moisture loss, and taken to our laboratory for further examination, testing, and classification. A field log of each boring was prepared by the drill crew. These logs included visual classifications of the materials encountered during drilling as well as the driller's interpretation of the subsurface conditions between samples. Final boring logs included with this report represent the engineer's interpretation of the field logs and include modifications based on laboratory observation of the samples. Information provided on the final boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and groundwater conditions in accordance with the enclosed General Notes. Also shown are estimated Unified Soil Classification System (USCS) symbols. A brief description of the USCS is attached to this report. All classification was performed using visual manual procedures. Additionally, we retained licensed soil scientist Fred Smith to perform a seasonal high water table (SHWT) evaluation for the purpose of assisting with design of the stormwater BMP at the site. Mr. Smith performed two hand auger borings at the requested locations. The hand auger is an open cylinder with curved cutting blades. As the auger is twisted, soil cuttings from the blades are collected within the cylinder where they can be retrieved for visual examination when the auger is pulled from the ground. The cuttings from the hand auger borings were observed for characteristics including soil type, texture, structure and color to determine the presence and depth to a seasonal high water table. Soil descriptions in Mr. Smith's report are in accordance with the United States Department of Agriculture (USDA) classification system. 3.0 RESULTS Geologically, the project site is located in the Piedmont Physiographic Province, an area underlain by ancient igneous and metamorphic rocks. The residual soils in this area are the product of in- place chemical weathering of rock. The typical residual soil profile consists of clayey soils near the surface where soil weathering is more advanced, underlain by sandy silts / silty sands that generally become harder / denser with depth to the top of parent bedrock. In residual materials the transition from soil to rock occurs gradually over a vertical distance ranging from a few feet to tens of feet. This transitional zone is termed "partially weathered rock" which is defined for engineering purposes as residual material that can be drilled with soil drilling methods and exhibits standard penetration test values in excess of 100 blows per foot. Standard penetration test N -values of 50 or more blows with no penetration are indicative of crystalline bedrock. Responsive ■ Resourceful ■ Reliable 3 Report of Geotechnical Services Irerracon Proposed Robertson's Mill Pond Park Wake County, North Carolina May 14, 2014 Terracon Project No. P70145073 According to the 1985 Geologic Map of North Carolina, the bedrock under the site is foliated to massive granitic rock of the Permian period. The bedrock outcrop observed near the site entrance consisted of light red and gray granitic rock. At the subsurface sampling locations, two to five inches of grass and topsoil were encountered. The subsurface materials generally consisted of slightly clayey, low to moderately plastic, residual silty sand. These materials were generally loose to medium dense. Partially weathered rock and apparent bedrock were encountered at depths of approximately 3 feet below the surface in Boring Nos. B-1 and B-4, respectively. These locations are on the west and southwest portion of the site near the pond and the depth to the top of rock corresponds to an approximate elevation of 289 feet. As previously noted, rock outcrops were also encountered at the surface in the vicinity of Boring No. B-4. The open boreholes were observed for the presence and level of groundwater following the completion of sampling. Groundwater was encountered at a depth of 4 feet below the surface in Boring No. B-1 which was performed near to the existing pond. The water encountered at this location is likely perched or trapped over the underlying rock. Groundwater was not encountered in the other borings performed at the site. Licensed soil scientist Fred Smith did not find evidence of a seasonal high water table (SHWT) through maximum exploration hand auger exploration depths of 72 inches in the proposed BMP area. Mr. Smith's complete findings are detailed in the attached report. 4.0 GEOTECHNICAL RECOMMENDATIONS The near surface soils are moisture sensitive and subject to degradation when exposed to moisture. To the extent practical, construction should be performed during periods of dry weather to avoid degrading and otherwise acceptable subgrade. Some remedial measures for the subgrade may become necessary if earthwork is performed during periods of wet weather. 4.1 Earthwork Earthwork should begin by stripping the existing topsoil and rootmat. We expect stripping depths of 2 to 5 inches, however, actual stripping depth may vary and should be evaluated at the time of construction. Prior to placing fill or upon reaching the subgrade elevation in cut areas, a representative of the geotechnical engineer should evaluate the subgrade and observe proofrolling operations. Proofrolling should be performed with a moderately loaded, tandem -axle dump truck or similar rubber -tired construction equipment. The proofrolling operations should be performed after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. Areas exhibiting excessive deflection or rutting, or areas where otherwise unsuitable material is encountered should be remediated as directed by the geotechnical engineer. We do not expect Responsive ■ Resourceful ■ Reliable 4 Report of Geotechnical Services Irerracon Proposed Robertson's Mill Pond Park Wake County, North Carolina May 14, 2014 Terracon Project No. P70145073 significant remediation for unsuitable areas if earthwork is performed during periods of favorable weather. Engineered fill should meet the following material property requirements: Fill Type' USCS Classification Acceptable Location for Placement Imported Low- to 9 -inches or less in loose thickness (4" to 6" lifts when hand - Moderate-Plasticity2 2 CL, ML, SC or SM All locations and elevations Soil with at least 20% dry density (ASTM D698) fines Moisture Content as determined by the standard Proctor test at the time of Sand / Gravel with placement and compaction less than 20% fines 2 GW/GP, SW/SP 2 NCDOT CABC within gravel -surfaced drive lanes and parking sections (silt and clay) On-site Soil SM All locations and elevations 1. Controlled, compacted fill should consist of approved materials that are free of organic matter and debris. A sample of each material type should be submitted to the geotechnical engineer for evaluation. 2. Soil with less than 20% fines (silt and clay) should not be used as general fill to raise site grades to prevent perched water conditions where water infiltrating the surface zone becomes trapped over the underlying less -permeable soil zone. Compaction Requirements Item Description Fill Lift Thickness 9 -inches or less in loose thickness (4" to 6" lifts when hand - operated equipment is used) Compaction Requirements Minimum of 95% of the materials standard Proctor maximum dry density (ASTM D698) Within the range of -3% to +3% of optimum moisture content Moisture Content as determined by the standard Proctor test at the time of placement and compaction 1. Engineered fill should be tested for moisture content and compaction during placement. If in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the tests should be reworked and retested as required until the specified moisture and compaction requirements are achieved. Responsive ■ Resourceful ■ Reliable 5 Report of Geotechnical Services Irerracon Proposed Robertson's Mill Pond Park Wake County, North Carolina May 14, 2014 Terracon Project No. P70145073 Excavations Near surface partially weathered rock (PWR) and rock outcrops were encountered near the western and southwestern portions of the site. We understand that the grading plan will be developed to avoid cuts in these areas. Therefore, we do not expect difficult excavation conditions to be encountered. If requiring removal, rock or PWR will likely require the use of pneumatic hammering or other means to excavate. Vehicle Surfaces An approved subgrade is expected to be suitable for support of the proposed crushed stone base surfacing. Stone base course thickness design for vehicle traffic is dependent upon: ■ the anticipated traffic conditions; ■ subgrade and material characteristics; ■ climatic conditions of the region. We anticipate relatively light traffic loading (less than 30,000 18 -kip ESALs) for the new drive lanes and parking spaces. We recommend that the surface consist of layer of compacted crushed aggregate base course (NCDOT CABC) at least 5 inches thick. Base course materials should conform to the North Carolina Department of Transportation (NCDOT) "Standard Specifications for Roads and Structures." The performance of all pavements and unpaved roads can be enhanced by minimizing excess moisture which can reach the subgrade soils. We recommend constructing the base course surface with a minimum 1/4 inch per foot (2%) slope to promote proper surface drainage and site grading at a minimum 2 percent grade away from the pavements. Maintaining the proper slope over the life of the drive lanes with motor grades or by other means will ensure the best long term performance. Responsive ■ Resourceful ■ Reliable 6 Report of Geotechnical Services Irerracon Proposed Robertson's Mill Pond Park ) Wake County, North Carolina May 14, 2014 i Terracon Project No. P70145073 CLOSURE We trust that the information in this letter and attachments is sufficient for your present purposes. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please feel free +001 tt Q us. ELS�Sff►p�YO��tiq Sincerely, Terracon Consultants Inc = SEAL 03+4749 :...: Thomas R. Bartlett, EI R. L. "Levi" Denton, II, f9F/VptNFr�s••;�0�.� Staff Geotechnical Engineer Principal 1 Geotechnical �Nfa •• et- DV��`�� Registered, NC 034749 1111111 Attachments: Site Location Plan Boring Location Plan Boring Logs (B-1 through B-6) General Notes Unified Soil Classification System (USCS) Report of a Soil Evaluation for Stormwater Treatment (Fred D. Smith Soil Consulting) Responsive Resourceful j Reliable 7 ROCKY 8RANCH y -Church Rd- 'I �`'� + WoGo.TRACE-AM p RON y� MAlRGAhT..MQNTAGUE FARM $- {: _ ALEN CEDAIp'ii1 'ACRES Fo) f ARkA, NGLEN ,}.* 'w .MSEY FARMS MINNIE FA;tm � ` ' CO LI N TRY , 'l Shanley'' dd.Rd' RIDGE HAVEN CAN D LEWCKV. EGEMotlr ~'r -' ESTATES � WHITEHORSE 09 1 ROBERTSON VALLE a . r CEDARWOOD I' O E LILES 14 BI4IDGE6Il1 i T ROBIhI HOOD EDGENIQNT �' ESTATES' � FoREsr _ LDIlJ6`=: ;• _ . Raleigh East A"irP71Nx lip :4L .� ende�� BM+�d 1L* AW iAL N .. NOW- { { - HUNTEC RSH qt �}� }' Eagle Rocklkw T. -771 EArsuwY QI}'F'ARNIS I I HERITAGE WAY' I�rcda- STAR SKY Project Mngr. project No. BORING LOCATION PLAN EXHIBIT TRB 70145002 irerracon Drawn By: Approx.GEOTECHNICAL ENGINEERING REPORT AsS TRB As shown PROPOSED NEW PARKING LOT & ACCESS DRIVES Checked By: File Name: Consulting Engineers &Scientists TRB 70145002.A-2 ROBERTSON'S MILL POND PARK Approved By: Date: 2401BmnMwdRoad, Suite 107 Raleigh, NoOhCarolina27604 VVENDELL, NORTH CAROLINA A-2 RLD MAY 2014 PH. (919) 8732211 FAX. (919) 873-9555 a O v M M w 0 a W J a W W BORING LOG NO. B-1 Page 1 of 1 PROJECT: Robertson's Mill Park CLIENT: Wake County Facilities Design & Construction Raleigh, North Carolina SITE: Robertson's Pond Road Wendell, North Carolina Q O LOCATIONz w V WO ¢ } wJ - a _ a Wit WF d > o Lu 0 Approximate Surface Elev: 292 (Ft.) +/- o m ¢ w Lu W O DEPTH ELEVATION Ft. TOPSOIL + SILTY SAND (SM), fine to medium grained, brown, loose, trace roots 5-4-3 N=7 3.0 289+/- PARTIALLY WEATHERED ROCK (MR), brown, granite 50/5" 5 - 5.5 286.5+/- Direct Push Refusal at 5.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Advanced direct push probe. procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Backfilled upon completion abbreviations. Elevation estimated from Wake Co. GIS WATER LEVEL OBSERVATIONS Irerracon Boring Started: 5/27/2014 Boring Completed: 5/27/2014 �,Z_ Free water encountered @ 4 feet after sampling Drill Rig: GEOPROBE 6620DT Driller: WTD 2401 Brentwood Road, Suite 107 Raleigh, North Carolina Project No.: 70145073 a O v M M w 0 w Q J a W w BORING LOG NO. B-2 Page 1 of 1 PROJECT: Robertson's Mill Park CLIENT: Wake County Facilities Design & Construction Raleigh, North Carolina SITE: Robertson's Pond Road Wendell, North Carolina c9 O LOCATIONz w V WO Q } wJ - a = a Wit WF d > o Lu 0 Approximate Surface Elev: 297 (Ft.) +/- o m ¢ w Lu w O DEPTH ELEVATION Ft. TOPSOI L + SILTY SAND (SM), fine to medium grained, tan, loose to medium dense, micaceous 3-3-3 N=6 3-3-4 N=7 5 3-4-5 N=9 9-10-11 10.0 10 Boring Terminated at 10 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Advanced direct push probe. procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Backfilled upon completion abbreviations. Elevation estimated from Wake Co. GIS WATER LEVEL OBSERVATIONS Irerracon Boring Started: 5/27/2014 Boring Completed: 5/27/2014 No free water observed Drill Rig: GEOPROBE 6620DT Driller: WTD 2401 Brentwood Road, Suite 107 Raleigh, North Carolina Project No.: 70145073 BORING LOG NO. B-3 Page 1 of 1 PROJECT: Robertson's Mill Park CLIENT: Wake County Facilities Design & Construction Raleigh, North Carolina SITE: Robertson's Pond Road Wendell, North Carolina c9 O LOCATIONz w V WO Q } wJ - a = as o in w it d WF > 0 Approximate Surface Elev: 299 (Ft.) +/- o m ¢ w Lu w O DEPTH ELEVATION Ft. TOPSOIL + SILTY SAND (SM), fine to medium grained, brown to tan, loose to medium dense, 2-2-2 micaceous N=4 3-4-6 N=10 5 4-3-3 N=6 4-3-6 1 110.0 10 Boring Terminated at 10 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Advanced direct push probe. procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Backfilled upon completion abbreviations. Elevation estimated from Wake Co. GIS WATER LEVEL OBSERVATIONS Irerracon Boring Started: 5/27/2014 Boring Completed: 5/27/2014 No free water observed Drill Rig: GEOPROBE 6620DT Driller: WTD 2401 Brentwood Road, Suite 107 Raleigh, North Carolina Project No.: 70145073 a O v M M w 0 a W J a W W BORING LOG NO. B-4 Page 1 of 1 PROJECT: Robertson's Mill Park CLIENT: Wake County Facilities Design & Construction Raleigh, North Carolina SITE: Robertson's Pond Road Wendell, North Carolina Q O LOCATIONz w WO } wJ - a 1:¢ a Wit WF d > o Lu 0 Approximate Surface Elev: 292 (Ft.) +/- o m ¢ w Lu W O DEPTH ELEVATION Ft. TOPSOIL + SILTY SAND (SM), fine to medium grained, tan, loose, micaceous 3-3-2 N=5 3.2 289+/ - SPT Refusal on Apparent Bedrock at 3.2 Feet 50/0" Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Advanced direct push probe. procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Backfilled upon completion abbreviations. Elevation estimated from Wake Co. GIS WATER LEVEL OBSERVATIONS Irerracon Boring Started: 5/27/2014 Boring Completed: 5/27/2014 No free water observed Drill Rig: GEOPROBE 6620DT Driller: WTD 2401 Brentwood Road, Suite 107 Raleigh, North Carolina Project No.: 70145073 a O v M M a 0 W Q J a W W BORING LOG NO. B-5 Page 1 of 1 PROJECT: Robertson's Mill Park CLIENT: Wake County Facilities Design & Construction Raleigh, North Carolina SITE: Robertson's Pond Road Wendell, North Carolina Q O LOCATIONz w V WO Q } wJ - a = a Wit WF d > o Lu 0 Approximate Surface Elev: 301 (Ft.) +/- o m ¢ w Lu W O DEPTH ELEVATION Ft. TOPSOIL + SILTY SAND (SM), fine to medium grained, tan, very loose to medium dense, micaceous 3-3-3 N=6 X2-3-4 N=7 5— 2-3-7 N=10 2-1-2 X N=3 10.0 __ 10 Boring Terminated at 10 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Advanced direct push probe. procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Backfilled upon completion abbreviations. Elevation estimated from Wake Co. GIS WATER LEVEL OBSERVATIONS Irerracon Boring Started: 5/27/2014 Boring Completed: 5/27/2014 No free water observed Drill Rig: GEOPROBE 6620DT Driller: WTD 2401 Brentwood Road, Suite 107 Raleigh, North Carolina Project No.: 70145073 a O v M M a 0 W Q J a W W BORING LOG NO. B-6 Page 1 of 1 PROJECT: Robertson's Mill Park CLIENT: Wake County Facilities Design & Construction Raleigh, North Carolina SITE: Robertson's Pond Road Wendell, North Carolina Q O LOCATIONz w V WO Q } wJ - a = a Wit WF d > o Lu 0 Approximate Surface Elev: 301 (Ft.) +/- o m ¢ w Lu W O DEPTH ELEVATION Ft. TOPSOIL + SILTY SAND (SM), fine to medium grained, brown to tan, loose, micaceous 4-3-2 N=5 X2-4-5 N=9 5— 2-3-4 N=7 2-3-3 X N=6 10.0 __ 10 Boring Terminated at 10 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic Advancement Method: See Exhibit A-3 for description of field Notes: Advanced direct push probe. procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and Abandonment Method: Backfilled upon completion abbreviations. Elevation estimated from Wake Co. GIS WATER LEVEL OBSERVATIONS Irerracon Boring Started: 5/27/2014 Boring Completed: 5/27/2014 No free water observed Drill Rig: GEOPROBE 6620DT Driller: WTD 2401 Brentwood Road, Suite 107 Raleigh, North Carolina Project No.: 70145073 GENERAL NOTES DESCRIPTION OF SYMBOLS AND ABBREVIATIONSH P DESCRIPTIVE SOIL CLASSIFICATION Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. LOCATION AND ELEVATION NOTES Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY Descriptive Term(sl Percent of Major Component Particle Size of other constituents Dry Weight of Sample Trace < 15 Boulders Over 12 in. (300 mm) With 15-29 Cobbles 12 in. to 3 in. (300mm to 75mm) Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm) Sand #4 to #200 sieve (4.75mm to 0.075mm Silt or Clay Passing #200 sieve (0.075mm) RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION Descriptive Term(s) Percent of Term Plasticity Index of other constituents Dry Weight Non -plastic 0 Trace < 5 Low 1 -10 With 5-12 Medium 11 -30 Modifier > 12 High > 30 Irerracon Exhibit B-1 Water Initially (HP) Hand Penetrometer Encountered Water Level After a Auger Split Spoon � Specified Period of Time (T) Torvane ' � J � Water Level After W a Specified Period of Time i— (b/f) Standard Penetration N Ue Z U) Test (blows per foot) Shelby Tube Macro Core W W —i Water levels indicated on the soil boring J (PID) Photo -Ionization Detector a � logs are the levels measured in the � W borehole at the times indicated. U) Q Groundwater level variations will occur � (OVA) Organic Vapor Analyzer Ring Sampler Rock Core � over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. e � Grab Sample No Recovery RELATIVE DENSITY OF COARSE-GRAINED SOILS CONSISTENCY OF FINE-GRAINED SOILS (More than 50% retained on No. 200 sieve.) (50% or more passing the No. 200 sieve.) Density determined by Standard Penetration Resistance Consistency determined by laboratory shear strength testing, field Includes gravels, sands and silts. visual -manual procedures or standard penetration resistance � Descriptive Term Standard Penetration or Ring Sampler Descriptive Term Unconfined Compressive Standard Penetration or Ring Sampler � (Density) N -Value Blows/Ft. (Consistency) Strength, Qu, psf N -Value Blows/Ft. � Blows/Ft. Blows/Ft. W H Very Loose 0-3 0 - 6 Very Soft less than 500 0-1 < 3 2 L7F_Loose 4-9 7 - 18 Soft 500 to 1,000 2-4 3 - 4 Z W Medium Dense 10-29 19-58 Medium -Stiff 1,000 to 2,000 4-8 5 - 9 wH Dense 30-50 59-98 Stiff 2,000 to 4,000 8-15 10 - 18 N Very Dense > 50 > 99 Very Stiff 4,000 to 8,000 15-30 19-42 Hard > 8,000 > 30 > 42 UNIFIED SOIL CLASSIFICATION SYSTEM Soil Classification Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Group Group Nameg Symbol Coarse Grained Soils: More than 50% Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines ° Cu >_ 4 and 1 < Cc < 3- VW Well -graded gravel' Cu < 4 and/or 1 > Cc > 3 E GP Poorly graded gravel F Gravels with Fines: More than 12% fines ° Fines classify as ML or MH GM Silty gravel F,G,H Fines classify as CL or CH GC Clayey gravel F,G,H retained on No. 200 sieve Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines ° Cu >_ 6 and 1 < Cc < 3 E SW Well -graded sand' Cu < 6 and/or 1 > Cc > 3 E SP Poorly graded sand' Sands with Fines: More than 12% fines ° Fines classify as ML or MH SM Silty sand cA' Fines classify as CL or CH SC Clayey sand c•H•' Fine -Grained Soils: 50% or more passes theInorganic: No. 200 sieve Silts and Clays: Liquid limit less than 50 Silts and Clays: Liquid limit 50 or more Inorganic: PI > 7 and plots on or above "A" line J CL Lean clay K,L,M PI < 4 or plots below "A" line J ML Silt K,L,M Organic: Liquid limit ov"dried < 0.75 OL Organic clayK,L,M," K,L,M,O Organic silt Liquid limit -no G PI plots on or above "A" line CH K,L,M Fat clay PI plots below "A" line MH Elastic Silt K,L,M Organic: Liquid limit - oven dried < 0.75 OH Organic clay K,L,M,P Organic silt K,L,M,Q Liquid limit - not dried Highly organic soils: IPrimarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3 -inch (75 -mm) sieve B If field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name. ° Gravels with 5 to 12% fines require dual symbols: GW -GM well -graded gravel with silt, GW -GC well -graded gravel with clay, GP -GM poorly graded gravel with silt, GP -GC poorly graded gravel with clay. ° Sands with 5 to 12% fines require dual symbols: SW -SM well -graded sand with silt, SW -SC well -graded sand with clay, SP -SM poorly graded sand with silt, SP -SC poorly graded sand with clay E Cu = D6o/D10 Cc= (D30) 2 0)2 D10 x D 6 F If soil contains >_ 15% sand, add "with sand" to group name. G If fines classify as CL -ML, use dual symbol GC -GM, or SC -SM. 60 50 CL W 40 a Z 1 30 U Q 20 J 0- 10 7 4 H If fines are organic, add "with organic fines" to group name. ' If soil contains >_ 15% gravel, add "with gravel" to group name. If Atterberg limits plot in shaded area, soil is a CL -ML, silty clay. K If soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel," whichever is predominant. L If soil contains >_ 30% plus No. 200 predominantly sand, add "sandy" to group name. M If soil contains >_ 30% plus No. 200, predominantly gravel, add "gravelly" to group name. " PI >_ 4 and plots on or above "A" line. ° PI < 4 or plots below "A" line. P PI plots on or above "A" line. ° PI plots below "A" line. For classification of fine-grained soils and fine-grained fraction of coarse-grained soils Equation of'W' - line Horizontal at P1=4 to LL=25.5. — then P1=0.73 (LL -20) iOX\ Equation of "U" - line Vertical at LL= 16 to PI=7, G then P1=0.9 (LL -8) ' , O G MH or OH CL - ML IML or OL 0 0 10 16 20 30 40 50 60 70 so LIQUID LIMIT (LL) Irerracon 90 100 110 Exhibit -2 FRED D. SMITH SOIL CONSULTING. May 2$, 2014 Mr. Thomas Bartlett Terracon Engineering 2401 Brentwood Rd Suite 107 Raleigh, NC 27604 Subject: Report of a Soil Evaluation for Stormwater Treatment Robertson's Mill Park Wendell, NC Dear Mr. Bartlett, This letter concerns the soil evaluation I performed at the above mentioned proposed sites chosen for stormwater BMP's. You authorized me to perform a soil evaluation to determine the depth to the `seasonal high water table' (SHWT) at two locations. You provided me with site drawings that show the location of the two hand auger locations and other deep borings. The soils were classified into the USDA Classification system and are presented in Table 1. I also reviewed the deep boring logs that correspond to my stormwater evaluation. Seasonal High Water Table (SHWT) The SHWT has become more frequently used as an indicator of the highest level of water table fluctuations due to agricultural considerations, regulations for septic system designs and, more recently, stormwater design. The SHWT is routinely estimated by Soil Scientists from soil morphology (soil forming factors) and landscape position. Soil colors are evaluated because gray colors are associated with saturated and chemically reducing soil environments- the presence or absence of iron. Red, reddish yellow, brown, and brownish yellow colors are associated with aerobic and chemically oxidizing conditions. During weathering of soil minerals, over a period of time, soluble constituents are removed from the soil profile and more stable compounds will precipitate. Iron is released from minerals and coats soil particles with thin oxide coatings that give soils their red to yellow colors. The natural color of soil particles is gray until they are coated with iron. Soils also contain microorganisms that generate energy from the oxidation of soil organic matter. When the soil becomes saturated from flooding or slowly percolating water, oxygen is removed from the soil layer and anaerobic conditions prevail. Under anaerobic conditions, other types of soil microbes can derive energy the chemical reduction of oxidized iron and change its state from ferric to ferrous iron (loss of an electron). The requirements for this chemical -microbiological process are the absence of oxygen for several weeks, a temperature of at least 41 degrees (F), and the presence of organic matter (roots, etc). During periods of alternative wetting and drying cycles, or SHWT cycles, ferrous iron may move short distances and precipitate during the drying (reoxidation) process. These mottling patterns are called redoximorphic colors. Soil Scientists use the Munsell Color System to evaluate the degree of color changes visible in the soil. Low chroma colors are considered to be gray or black in the Munsell System (chroma less than 2). We normally consider that once a soil layer has about 5% gray colors and redoximorphic patterns (red - yellow colored mottles), then that soil is saturated at least 21 days and qualifies as a SHWT. Offfce/Mobile (252) 9084369 Post Office Box If 75 - Nashville, North Carolina 27856 Some SHWT's are actually `perched'. A perched water table forms above an impermeable layer of soil or rock or saprolite that separates it from the actual groundwater table below. This happens in some piedmont soils and some upper coastal plain soils in NC. Perched water tables are identified by a layer of soil that does not contain redoximorphic conditions between the main water table and the layer in question. Soils The site is a grassed field beside the mill pond. Rock outcrops are present inside the gate and near the pond. The soils are formed from granite, gneiss and schist. Slope at the site is about 3 to 4 percent. The landscape position at the designated location of the stormwater borings is ridge or shoulder. The soils consist of sandy loam topsoils underlain by clayey `B' horizons to about 30 inches below the surface. Below 30 inches in deptfi is a transition horizon of sandy clay loam that grades into the sandy loam saprolite. Saprolite was present to at least 72 inches beneath the surface. Colors of the soil profile at S -I did not show redoximorphic properties. However, gray colors were present at S-2 throughout the profile below the topsoil. No groundwater was found in any of the hand auger borings or deep borings except B-1 which is beside the pond. Conclusions Boring B -5/S-1 did not show any evidence of seasonal or perched groundwater conditions. B -6/S-2 is only about 30 feet away from B-5. This boring had gray colored mottling in the clayey `B' horizon and `C' saprolite horizon. This coloring pattern is from relic colors of the parent rock at the site and is not from perched or seasonal water tables. Some saprolite material is mixed into the `B' horizon. I appreciate the opportunity to work with you on this project. Please contact me if you have questions or need additional information. Sincerely, I red D. Smith NC Licensed Soil Scientist Office/Mobile (252) 988-4369 Post Office Box 1175 — Nashville, North Carolina 27856 Table 1 Boring Descriptions in USDA Classification Robertson's Mill Park Wendell, NC S-1 and B-5 Landscape position — ridge, shoulder Slope — 3% Horizon/ Depth (inches) Texture Color and description A/ 0-8 Sand loam Dark brown 0 OYR 4/4) Bt/ 8-28 Clay Strong brown (7.5YR 516); firm to very firm, sticky, plastic; moderate, medium suban lar blocky structure. B -C/ 28-48 Sandy clay loam Strong brown (7.5YR 516); very firm, sticky, very plastic; coarse blocky to massive. C/ 48-72+ Sand loam Brownish yellow 10YR 616); firm; massive S-2 and B-6 Landscape position — Ridge/shoulder Slope — 3 to 4% Horizon/ Depth Texture Color and description (inches) A/ 0-6 sandy Dark brown (1 OYR 414) loam B2t/ 6-32 Clay Strong brown (7.5YR 516) with gray (7.5YR 6/2) mottles; very £irm; mottles appear to be relic from the grainy parent rocks. Massive, possiblycompacted. C/ 32-72+ Sandy clay Brownish yellow (I OYR 616) and gray (I OYR 612); massive; rock -like. loam Offl-Ce/Mo6ffe (252) 90&4369 Post Office Box If 75 — Nashville, North Carolina 27856 SAW -2014-02316 U.S. ARMY CORPS OF ENGINEERS COPY WILMINGTON DISTRICT Action ID. SAW -2014-02316 County: Wake NO DEPARTMENT OF THE ARMY AUTHORIZATION REQUIRED Property Owner: Mark Forestieri Wake County Facilities Design & Construction Address: Wake CoynL Office Building 336 Fayetteville Street RaleiLyh, North Carolina 27601 Telephone Number: 919-856-6356 Size and Location of Property waterbod road name/number, town etc.: The project area is located on the northeast corner of the intersection of Buffalo Creek and Robertson Pond Road in Wendell, Wake County, North Carolina. Description of Activity: The placement of Pilinas in 'urisdictional wetlands to facilitate the construction of a raised boardwalk which would be used to access a dock. Your work as proposed does not require Department of the Army authorization for the following reason(s): - There are no jurisdictional waters or wetlands within the boundaries of the property. _ The proposed project does not impact jurisdictional waters or wetlands. X The proposed project does not require a permit by Department of the Army regulation. Specify: Placement of pilings in waters of the United States that does not have or would not have the effect of a discharge of fill material shall not require a section 404 permit. Placement of ilin s for linear ro'ects such as bridges, elevated walkways, and powerline structuresgenerally does not have the effect of a discharge of fill material. 323.3(c). This Department of the Army determination does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. For any activity within the twenty coastal counties, before beginning work, you must contact the N.C. Division of Coastal Management in Washington, North Carolina, at (252) 956-6481 to discuss any required State authorization. Any changes in the above described work must be coordinated with the Corps of Engineers prior to commencement. If you have any questions regarding the Corps of Engineers regulatory program, please contact David Shaeffer at telephone number 919-554-4884 X31 or David.L.Shaeffer@usace.army.mil. Regulatory Project Manager Signature —L�—" Date: 5/5/2015 SAW -201.4-02316 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://reizulatoa.usacesurvey.com/ SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORM, ETC., MUST BE ATTACHED TO THE YELLOW (FILE) COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnished: BeEky Ward Ward ConsulfinLy Engineers, P.C. 4805 Green Rd. Ralei h NC 27616 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW -2014-02316 County: Wake U.S.G.S. Quad: NC-KNIGHTDALE NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Wake County Facilities Design & Construction Mark Forestieri Address: Wake County Office Building 336 Fayetteville Street Raleigh, North, 27601 Telephone Number: 919-856-6356 Size (acres) Unknown Nearest Waterway Buffalo Creek USGS HUC 03020201 Nearest Town Wendell River Basin Neuse Coordinates Latitude: 35.8174 Longitude: -78.4118 Location description: The project area is located on the northeast corner of the intersection of Buffalo Creek and Robertson Pond Road in Wendell Wake County, North Carolina. Indicate Which of the Following Apply.- A. pply:A. Preliminary Determination X Based on preliminary information, there may be waters of the U.S. including wetlands on the above described project area . We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. B. Approved Determination _ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are waters of the U.S. including wetlands on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (C WA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the waters of the U.S. including wetlands on your project area delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The waters of the U.S. including wetlands on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. Page 1 of 2 There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311), if you have any questions regarding this determination and/or the Corps regulatory program, please contact David Shaeffer at 919-554-4884 X31 or David.L.Shaeffer(&usace.army.mil. C. Basis For Determination: Based on the delineation report submitted by the applicant, the site exhibits criteria for waters of the U.S. as defined in 33 CFR 328.3 the 1987 Wetland Delineation Manual and the Regional Supplement to the 1987 Manual: Eastern Mountains and Piedmont v2.0. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Date: 5/5/2015 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at htt ://re ulato ,usacesurve .coin/. - - - - - - - - - - - - - - - - - ..... .......... ........ ..... Applicant: Mark Forestieri File Number: SAW-2014-02316 Date: 5/5/2015 Wake County Facilities Design & Construction Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT (Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I -The following identifies your rights and options regarding an admin 'trative appeal of the above decision. Additional information may found at http://www.usace.army.inil/Missions/Civi Works/Re ulator Pro amandPermits:as x or Co s re ulations at 33,CFR Part331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section I1 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION I1- REQUEST FOR APPEAL; or OBJECTIONS TO AN INI�IAL PR .FFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR UESTIONS OR INFORMATION: j If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Attn: Mr. Jason Steele, Administrative Appeal Review Officer David Shaeffer, 3331 Heritage Trade Drive, Suite 105, CESAD-PDO Wake Forest, North Carolina 27587 U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room lOMIS Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, David Shaeffer, For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 ATTACHMENT PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): 5/5/2015 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Wake County Facilities Design & Construction, Mark Forestieri Address: Wake County Office Building 336 Fayetteville Street Raleigh, North, 27601 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: SAW -2014-02316 (Wake County Facilities Design and Construction, Robertson Mill Pond, PIN#1775345450 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Robertson's Millpond Preserve, Robertson Pond Road (SR 2324), Wake County, NC. The land area included in this determination is shown in red on Figure 2 dated September 2014 titled Jurisdictional areas included in the administrative record. State: North Carolina County/parish/borough: Rowan County Center coordinates of site (latllong in degree decimal format): Lat. 35.8174260, Long. -78.411867°. Name of nearest waterbody: Buffalo Creek, Robertsons Pond Identify (estimate) amount of waters in the review area: Nan -wetland waters: 0 linear feet: --width (ft) Cowardin Class: -- Stream Flow: -- Wetlands: 0.24 acre. Cowardin Class: PSS1A, PSS1A Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: 0 Non -Tidal: 0 E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ® Office (Desk) Determination. Date: 5/5/2015 ❑ Field Determination. Date(s): 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. 2 Estimated Site Cowardin amount of Class of number Latitude Longitude Class aquatic resource aquatic resource in review area 1. Wetland non -Section 10 WA 35.817765 -78.412033 PFO1A 0.21 acre wetland 2. Wetland 35.817005 -78.412717 PFO1A 0.03 acre non -section 10 WB wetland