HomeMy WebLinkAbout20180807 Ver 1_CAMA Application_20180611Coastal Management
ENVIRONMENTAL QUALITY
1013
20180807
MEMORANDUM
Ms. Karen Higgins
Env. Biological Supervisor
Division of Water Quality Wetlands Unit
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRAXTON C. DAVIS
Director
JUN 1 1 2018
FROM: Greg Bodnar Respond to Greg Bodnar
Major Permits Processing Coordinator Morehead City Office
Coastal Management Division
400 Commerce Avenue
Morehead City NC 28557
DATE: 08 June 2018
SUBJECT: CAMA Application Review
APPLICANT: Ocracoke Foundation Inc
PROJECT LOCATION: Project site is located SR 1328 at 272 Irvin Garrish Hwy on the east side of Silver Lake
known as the Ocracoke Community Square in the Village of Ocracoke, Hyde County, North Carolina.
PROPOSED PROJECT: The applicant proposes to replace the existing Community Square docks, construct
additional slips and platforms, provide new structural support to the "Watermen's Museum" building, stabilize the
project shoreline with new bulkhead with a portion further protected by riprap revetment.
Please indicate below your position or viewpoint on the proposed project and return this form by 29 June 2018.
Please contact Steve Trowell at 252-948-3854, if you have any questions regarding the proposed project. When
appropriate, in depth comments with supporting data are requested.
REPLY
Signed
This office has no objection to the project as proposed.
This office has no comment on the proposed project.
This office approves of the proposed project only if the recommended changes are
incorporated. See attached.
This office objects to the proposed project for reasons described in the attached
comments.
Date
!'-'Nothing Compares '�,f_.
5u-#of\ctfiCwdma En+zlonmmrta:Qaa:+ty CouW%1sw*m#rI
9:3 tt'a,hvY:or S are \ta;: %Va►htntxn.\C ."339
5: 936 63 s:
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Ocracoke Foundation, Inc.
2. LOCATION OF PROJECT SITE: The project site is located off SR 1328 at 272 Irvin Garrish HWY on the
east side of Silver Lake known as the Ocracoke Community Square in the Village of Ocracoke, Hyde County,
North Carolina.
Photo Index - 2006: 90-7883; M-6 2000: 90-1041; L-1 1995: 90-960; L-13
State Plane Coordinates - 350 06' 48.40"N 750 58' 58.49"W
3. INVESTIGATION TYPE: CAMA/Dredge and Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — Multiple dates including 18 October 2017
Was Applicant Present - Yes
5. PROCESSING PROCEDURE: Application Received — 18 May 2018
Office - Washington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Hyde County
Land Classification - Community (uplands), Conservation (Water)
(B) AEC(s) Involved: EW, PTA, CS
(D) Water Dependent: Yes
(D) Intended Use: Commercial
(E) Wastewater Treatment: Existing — Septic System
Planned — New Septic system
(F) Type of Structures: Existing — Nonconforming "Watermen's Museum" associated platform, access
piers, slips, finger piers, bulkhead.
Planned — Replacement of existing docks, piers, platforms additional slips,
finger piers and platforms.
(G) Estimated Annual Rate of Erosion: N/A
7. HABITAT DESCRIPTION: [AREA]
DREDQF,D FTT .T .F.1) OTUFT?
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands
±7,649 ft' (Shaded)
Silver Lake Bottom)
f582 ft' (Riprap)
(C) Other
2,160 ft' (bulkhead
(Uplands)
backfill)
(D) Total Area Disturbed: 10, 391 ft' (0.24 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SC
Open: No
8. PROJECT SUMMARY: The applicant proposes to replace the existing Community Square docks, construct
additional slips and platforms, provide new structural support to the "Watermen's Museum" building,
stabilize the project shoreline with a new bulkhead with a portion further protected by a riprap revetment.
The Ocracoke Foundation Inc.
Ocracoke Community Square Revitalization Project (Docks)
Silver Lake
Hyde County
Project Setting
The 0.62 -acre project site is owned by the Ocracoke Foundation Inc. and is located at 272 Irvin
Garrish HWY (NC 12) adjacent Silver Lake off the Pamlico Sound in the village of Ocracoke,
Hyde County, North Carolina. The site is known as the Community Square, a retail business center
consisting of 5 buildings built around a central asphalt parking area. Individual businesses rent
the buildings/retail space. Minor CAMA permit no. 01-16 was issued on 17 March 2016 to the
Ocracoke Foundation for replacement of the asphalt pavement with a permeable concrete, repair
of the existing septic system and the construction of a marine pump out with associated pump tank.
The new drain field for the repaired septic system is to be in the center of the existing asphalt
parking area. The repair of this system has been approved by the Hyde County Health Department.
The Ocracoke Foundation was unsuccessful in obtaining authorization for the pump tank to
support the proposed marine pump out. Construction of the permeable concrete and repair of the
septic system has begun.
The project site has ±200' of shoreline on Silver Lake of which 130' is hardened with a concrete
bulkhead from the southern property line adjacent the Bluff Shoal motel to the existing damaged
boat ramp next to the "Willis Dock". Other than a groin consisting of concrete and brick rubble,
the shoreline from the old boat ramp to the northern property line adjacent Marion Dilday is an
active sandy shoreline with erosion threatening the existing building known as the "Water Plant
Office". The surge created by ferry vessels entering Silver Lake shifts the sand along this
shoreline.
The Community Square has an associated marina consisting of two docks/piers: the "main dock"
located on the south side of the riparian area adjacent the Bluff Shoal motel and the "Willis Store
dock". The riparian area of this commercially developed property is congested with piers and
slips. The "main dock" is 6' wide x 154' long with an existing 12' x 18' platform at the end, 13
fixed slips defined by mooring pilings, 12 on the south side and 1 on the north side. There is space
on the north side of the "main dock" available for temporary "side to" mooring. There are 3
existing -finger piers on the south side of the main dock, the longest being 21'. There is a 6' wide
x 50' long "Dingy Dock" that extends from the southern property line to an existing 2 story
building known as the "William Ellis Williams house". There are two narrow (f3' wide) piers
between the two aforementioned docks. The "Willis Dock" is t6' wide x 48' long leading to a
nonconforming building over Silver Lake known as the "Willis Store and Fish House "that houses
the Watermen's Museum. There is a 30'x32' platform at the end of the "Willis Dock".
Water depths in the footprint of the marina range from minus 3' below the normal water level
(NWL) next to the bulkhead and deepen gradually reaching 7', 75' offshore the bulkhead, and
minus 12 at the end of the two aforementioned docks. Silver Lake is part of a US Army Corps of
Engineers (US ACOE) Federal navigation project subject to setbacks. The existing "main dock"
crosses
The Ocracoke Foundation Inc.
Ocracoke Community Square Revitalization Project (Docks)
Silver Lake
Hyde County
Page Two
into the setback by ±35'. Silver Lake is classified as Coastal Waters by the Marine Fisheries
Commission and SC by the Environmental Management Commission and is closed to shellfishing.
Project Description
The Ocracoke Foundation has received grant money from Golden Leaf Foundation, the Ocracoke
Occupancy Tax Board, and the Marion Stedman Covington Foundation to assist in covering the
cost to replace the two existing docks structures, increase the number of slips from 16 to 18,
construct additional platforms for different types of water access, construct a new pile supported
support system for the "Willis Store and Fish House" or Watermen's Museum as well as refurbish
the aforementioned structure. The proposed support structure for the "Willis Store and Fish House"
will raise the structure 23" and will result in the support system being separate from the adjacent
dock and platforms. The purpose of this work is to continue the educational activities associated
with the Watermen's Museum and to provide a base of operation for working watermen both
commercial and charter vessels as well as provide dock space for visiting recreational boaters. A
mixed type of boats currently utilizes the site from skiffs providing day trips to Portsmouth Island
to +40' sailboats. Limited overnight and liveaboard dockage is allowed at the marina.
A new vinyl bulkhead will replace the existing concrete bulkhead and will be constructed to the
northern property line eliminating the existing boat ramp and stabilizing the unprotected shoreline
in front of the "Water Plant Office" building. Granite or broken concrete is proposed to armor the
toe of the proposed bulkhead from the existing concrete rubble groin to the northern property line.
The purpose of this riprap is to defuse ferry wash and reduce scour along the bulkhead in this
location.
The "Willis Dock" will be replaced and widened from f6' wide to 10'wide. Platform no 4 that
provides access to the front door of the "Willis Store and Fish House building will be enlarged to
12' x 32'. Platform no. 5 will be replaced in the existing 32' x 30' footprint. Seasonal "side to"
mooring occurs at the "Willis dock" for skiffs conducting Portsmouth island tours as well as for
one charter fishing vessel. Three utility pedestal are shown on the plans where this aforementioned
mooring occurs and are not counted/designated as a slip(s).
A new 12' wide x 44' long platform (Platform no. 3) is proposed at the foot of the "Willis Dock"
extending along the new bulkhead from the old boat ramp across the front of the "Water Plant
Office" building. Platform no. 3 will connect to proposed platform no. 2, an irregular shaped
platform totaling 1,273 ft2 that will provide access to 4 proposed 10' x 12' slips (slips no. 15-18)
with 4 proposed 3' x 12' finger piers. The proposed platforms no. 2 and 3 will be used to provide
a launch and retrieval site for SUP and kayaks.
The Ocracoke Foundation Inc.
Ocracoke Community Square Revitalization Project (Docks)
Silver Lake
Hyde County
Page Three
The "main dock' will be replaced and widen from 6' to 8' and the platform (Platform no. 1) will
be replaced in the current footprint 18.5' x 11.5'. A total of 13 perpendicular slips are proposed
along the spine of the "main dock" with no new slips within the USACOE setback. The south side
of the "main dock" is proposed to have 3-12' wide x 30' long slips accessed by 3-3'x 12' finger
piers, two -16' wide x 40' long slips, one -20' wide x 40' long slip, one — 18' wide x 40' long slip
and one - 12' wide x 40' long slip to be accessed by 5 — 3' wide x 16' long finger piers. There is
a "side to" slip designated at the end of the "main dock" adjacent platform no. 1. The north side
of the "main dock" is to have 2-12'wide x 30' long slips accessed by 2-3' x 12' finger piers, and
1-14'wide x30' long slips accessed by2-3' x 14' long finger piers. The "dingy dock" that extends
from the southern property line along and -over the existing concrete bulkhead is to be replaced
and widened from 6' to 8'.
Anticipated Impacts
The dock system and platform construction will result in a shading of ±7,649 ft' of Silver Lake
bottom. The bulkhead and riprap construction will result in the filling of 532 ft' of Silver Lake
bottom. The new slip configuration will increase the fixed structural congestion in the project's
riparian area. In some areas, the dock system congestion will limit the size of vessels that are able
to reach a slip. The project may result in an increase in vessels using the marina and their
associated impacts.
Steve Trowell — Washington Regional Office — 29 May 2018
APPLICATION for
N,Vor Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
2. Agent/Contractor Information
Business Name
N/A
Agent/ Contractor 1: First Name
MI
Last Name
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
ZIP
Phone No. 1
-
- ext.
Phone No. 2
- - ext.
FAX No.
Contractor #
Street Address (if different from above)
City
State
ZIP
Email
<Form continues on back>
252-808-2808 .. 1-888-4RCOAST .. wwwnccoastaimanagement.net
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
ect Location
be multiple)
Street Address
State Rd. #
26,780
Community Square 272-294 Irvin Garrish Highway
NC 12
Ebeel
Name
City
State
Zip
e. Vegetation on tract
Ocracoke
NC
27960- 1689
-story containing 6 retail shops; storage shed; picnic tables
Lot No.(s) (if many, attach additional page with list)
0321 ext. Moble
1 lot - Community Square,
NC river basin is the project located?
b. Name of body of water nearest to proposed project
Tar -Pamlico
Silver Lake
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Pamlico Sound
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
National Register listed or eligible property?
Subject to Ocracoke Development Ordinance
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
216.12
26,780
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
1 lot - 26,780,
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
2.5 ❑NHW or ®NWL
e. Vegetation on tract
Various landscaping shrubs and upland grasses
f. Man-made features and uses now on tract
5 1 buildings
-story containing 6 retail shops; storage shed; picnic tables
�Py
P
g. Identify and describe the existing land uses adiacent to the proposed project site.
West - Down Creek Condominiums [6 units] O
East - Bluff Shoal Motel
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
(Attach zoning compliance certificate, if applicable)
No Zoning on Ocracoke
❑Yes []No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ®Yes []No ❑NA
National Register listed or eligible property?
<Form continues on next page>
X
Form DCM MP -1 (Page 3 of 4)
m. (i) Are there wetlands on the site?
(ii) Are there coastal wetlands on the site?
(iii) If yes to either (i) or (ii) above, has a delineation been conducted?
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Amphidrome Treatment System permitted by Hyde County Heath Department.
o. Describe existing drinking water supply source.
Water Plant - Ocraocke Sanitary District
p. Describe existing storm water management or treatment systems.
Currently none; pervious pavement to replace existing asphalt permitted by CAMA Minor
5. Activities and Impacts
a. Will the project be for commercial, public, or private use?
APPLICATION for
Major Development Permit
❑Yes ®No
❑Yes ®No
❑Yes ®No
� ,e\\J
nGM'�
v1slcommercial LJPubliclGovemment
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
Slips and piers to accommodate transient, monthly, annual boat dockage; way
point for sailing and boat tours; launch area
for kayaks, SUP's, canoes and other small craft; historic Willis structure and dock ishome to Ocracoke Working Wa ermen's
Exhibit, display of island's maritime heritage. Shoreline stabilization.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Standard marine construction: one in water barge with boat tender, booster pump, small crane to be stored on barge during
construction period. On shore equipment of small crane, excavator, truck and carpentry tools stored in Community Square
parking lot.
d. List all development activities you propose.
Replace and repair 2 Docks, 17 finger piers, dinghy dock, kayak and small craft launch areas, 5 existing platform areas,
increase dockage slips from 16 to 18; save histroic Willis structure by raising 23" to make secure and level.
e. Are the proposed activities maintenance of an existing project, new work, or both? Both
f. What is the approximate total disturbed land area resulting from the proposed project? -0- No upland disturbance.
❑Sq.Ft or []Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Parking Lot repaved April 2018 with concrete drivelane and pervious pavers in parking areas; grading designed to redirect
stormwater away from Silver Lake to water absorbing paver and soil areas, significanly reducing runoff into Silver Lake.
i. Will wastewater or stormwater be discharged into a wetland? ®Yes ®No [INA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA
j. Is there any mitigation proposed? ❑Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
�C•'£&8- 83 ;.r# t t� 3 WWVV.r;CC0a3ta7,s� age
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. AddIdonal In %rmation
In ad ftn to this completed application form, (MP 1) the following #ems below, if applicable, must be submitted in order fru the application
package to be complete- Items (a) - (i) are always applicable to any major development application. Please consult the application
instruction booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
Proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
drT A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
he appropriate application fee. Check or money order made payable to DENR.
A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Marian Dilday Phone No. 252-943-7567
Address PO Box 159, Belhaven, NC 27810
Name Daniel Wayne Garrish Phone No. 252-928-4301
Address Bluff Shoal Motel, PO Box 217, Ocracoke, NC 27960
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
NC -DEQ CAMA Minor Development Permit # 01-16 issued to Ocracoke Foundation on 17 March 2016
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date May 16, 2018 Print Name Scott Bradley f,
Signature
Please indicate application attachments pertaining to your proposed project.
®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development
®DCM MP -4 Structures Information
252-303-28103 ., 1=383-4RCOAST �:v�,nucc�sxal�a�agemeant,net
Form DCM MP -2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet
1. EXCAVATION ®This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetlandstmarsh
Access
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
Other
❑CW ❑SAV ❑SB
Channel
(NLW or
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
P�
Q
2. DISPOSAL OF EXCAVATED MATERIAL
®This section not applicable
a. Location of disposal area.
b. Dimensions of disposal area.
Breakwater
shoreline
❑Yes []No [INA
NWL)
(ii) If no, attach a letter granting permission from the owner.
(ii) If yes, where?
e. (i) Does the disposal area include any coastal wetlands/marsh
f. (i) Does the disposal include any area in the water?
(CW) submerged aquatic vegetation (SAV), shell bottom (SB),
stabilization)
Length
number of square feet affected.
(ii) If yes, how much water area is affected?
❑CW ❑SAV ❑SB
OWL []None
Width
252-808-2808 :; 1-888-4RtwOAST n vvww.nccoastaimanaggtmei t.netr:e riled: I2 2�if'6
Avg. Existing
Depth
NA
NA
Final Project
Depth
NA
NA
1. EXCAVATION ®This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetlandstmarsh
d. High -ground excavation in cubic yards.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
[:]None-
(ii) Describe the of the excavation in these
�GCj � v%❑WL
purpose areas:
\�►`P`� o
P�
Q
2. DISPOSAL OF EXCAVATED MATERIAL
®This section not applicable
a. Location of disposal area.
b. Dimensions of disposal area.
c. (i) Do you claim title to disposal area?
d. (i) Will a disposal area be available for future maintenance?
❑Yes []No [INA
❑Yes []No [INA
(ii) If no, attach a letter granting permission from the owner.
(ii) If yes, where?
e. (i) Does the disposal area include any coastal wetlands/marsh
f. (i) Does the disposal include any area in the water?
(CW) submerged aquatic vegetation (SAV), shell bottom (SB),
❑Yes []No ❑NA
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
(ii) If yes, how much water area is affected?
❑CW ❑SAV ❑SB
OWL []None
(ii) Describe the purpose of disposal in these areas:
252-808-2808 :; 1-888-4RtwOAST n vvww.nccoastaimanaggtmei t.netr:e riled: I2 2�if'6
Form ®CM MP -.2 (Excavation and Fill, Page 2 of 3)
3. SHORELINE STABILIZATION ❑This section not applicable
(If development is a wood groin, use Mp-4 — Structures)
T. of chnrolinn �«..{:1:-..,«:....•
®Bulkhead ®Riprap v ❑Breakwater/Sill []Other
c. Average distance waterward of NHW or NWL: Bulkhead 2' and
Riprap 5'
e. Type of stabilization material:
Vinyl Bulkhead with preassure treated wood; Riprap is granite or
broken concrete
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill 0 Riprap 300SF
Breakwater/Sill0 Other
i. Source of fill material.
To Be Determined
U. LC11y[r1. L 1 O
Width: .5'
d. Maximum distance waterward of NHW or NWL: Bulkhead 2' and
Riprap 5'
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ®No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material. VV RE�+EN
SO
riprap toe armor
MAY
DCM'W ARD
4. OTHER FILL ACTIVITIES ®This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b_ (i) Will fill matarial he nlnrui—#� l
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
5. GENERAL
a. How will excavated or fill material be kept on site and erosion
controlled?
Fill material to be contained behind bulkhead and to be graded,
sloped, and stabilized with grass groundcover.
b.
C. (i) Will navigational aids be required as a result of the project? d.
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
MAy 16, 2018
Date
Community Square Revitalization Project
Project Name
.... X-11
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
(ii) Describe the purpose of the fill in these areas:
What type of construction equipment will be used (e.g., dragline,
backhoe, or hydraulic dredge)?
Standard marine construction: one inwater barge with boat tender,
booster pump, small crane on barge; on shore - small crane,
truck, excavator.
(i) Will wetlands be crossed in transporting equipment to project
site? []Yes ®No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
The Ocracoke Foundation, Inc. by Scott Bradley
Applicant Name
282-808-2808 :: 1-888-4RCOAST :: wwm.rlccoast_a_Irrla"aBeenen .ree#
revised, 1226iJS
Form 8CM MP -4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACIUTY/MARINA CHARACTERISTICS ❑This section not applicable
a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public?
®Commercial ❑PubliclGovemment ❑Private/Community ®Yes ❑No
c. (i) Dock(s) and/or pier(s)
(ii) Number 3 docks
(iii) Length Dinghy 50'- Main 154'- Willis 120'
(iv) Width Dinghy 8'- Main 8'- Willis 10'
(v) Floating ❑Yes ®No
e. (i) Are Platforms included? ®Yes ❑No
If yes:
(ii) Number 5
(iii) Length (1) 18.5' (2) 5T (3) 44' (4) 32' (5) 32'
(iv) Width (1) 11.5'(2) width varies 10'-37'1273 total SF
(3) 12'(4) 12'(5) 30-
(v) Floating ❑Yes ®No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
18
(ii) Number of slips existing
16
i. Check the proposed type of siting:
❑ Land cut and access channel
[]Open water, dredging for basin and/or channel
®Open water, no dredging required
❑Other; please describe:
k• Typical boat length: 15-48'
d. (i) Are Finger Piers included? ®Yes []No
If yes:
(ii) Number 17
(iii) Length (9) at 12'(3) at 14'(5) at 16''
(iv) Width 1 at 3'
(v) Floatina nYes MNn
f. (i) Are Boatlifts included? ❑Yes
If yes:
(ii) Number
(iii) Length
(iv) Width
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ('civet slips") only, number of slips: 18
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
Mixed Types of charter, commercial and recreational boats
power and sail length 15-48'
I. (i) Will the facility be open to the general public?
252-808-2308 ;: -888• BCeAST ;: www.nccoastaimana
..Gement.net revised: 12;'27;06
Form DCM MP -4 (Structures, Page 2 of 4)
m. (i) Will the facility have tie pilings?
Eyes ❑No Eyes []No
(ii) If yes number of tie pilings?
19
2• DOCKING FACILITy/iWARfNA OPERATONS
a. Check each of the following sanitary facilities that will be included in the proposed project. El This Section not applicable
❑ Office Toilets
® Toilets for patrons; Number: 2-4 [Seasonal]; Location: Portable Toilets located in parking lot, serviced 2x week or weekly
[depending on season]
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater. G
c. Describe the disposal of solid waste, fish offal and trash.
Bag lined trash cans provided on-site, emptied and cleaned regularly.
d. How will overboard discharge of sewage from boats be controlled?
Visival inspection of water, with follow-up with on -board inspection if concerns for suspicious activity of discharge.
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
Posted at base of each dock and at slips # 4, 8, 11, and end of Willis Dock.
(ii) Give the location and number of "Pumpout Available" signs proposed.
N/A
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
N/A - Such activities will not be allowed on the premises.
9• Where will residue from vessel maintenance be disposed of?
N/A - Such activities will not be allowed on the premises.
h• Give the number of channel markers and "No Wake" signs proposed. -0-
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
N/A - No fuels sold on the site.
j. What will be the marina policy on overnight and live -aboard dockage?
Allowed on a limited, authorization -only basis with proper waste holding/discharge verified for strict compliance with applicable
Federal, State and Hyde County laws and regulations. Hyde County is currently developing regulations for boats mooring in
Silver Lake, using regulations esgtablished in Brunswick County [and other boating communities] as a resource. Any limited
ovemight and live -aborad dockage will be required to adhere to Hyde Counhty regulations for moored boats.
252-808-2808 •: 1-888-4RCOAST :: ;+yww.nccoastairaaa oaaze ,gin#..tee
revised: 12;27OS
Form DCM MP -4 (Structures, Page 3 of 4)
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
Wet Slips dockage for mixed -type boats
M. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ®No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ®No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
p. Is the proposed madna/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leasehokier(s), and give the proximity to the lease.
3. BOATHOUSE (including coveted lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑PublictGovemment ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
A GROIN (e.g., wood, sheetpile, etc. if a rack groin, use MP -2, Excavation and Fill.) ® This section not applicable
a• (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) 0This section not applicable
a. Length b. Average distance from NM, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING MUNGS and BUOYS
a. Is the structure(s): b. Number
❑Commercial ❑Public/Govemment ❑Private/Community
252-808-2808 :: 1-888-4RCOAST :: vvvv.nccoastalmanaaersae k. zef
®This section not applicable
revisedn 12;'2?'Ge-
Form DCVI MP -4 (Structures, Page 4 of 4)
c• Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERA!
a. Proximity of structure(s) to adjacent riparian property lines
10-15'
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
Silver Lake: 1600' Iona, approx. 800' wide Ivariesl
e. (i) Will navigational aids be required as a result of the project?
❑Yes ®No [INA
(ii) If yes, explain what type and how they will be implemented.
d. Description of buoy (color, inscription, size, anchor, etc.)
b. Proximity of structure(s) to adjacent docking facilities.
30'
d. Water depth at waterward end of structure at NLW or NWL
12'
8. OTHER [I This section not applicable
a. Give complete description:
Please see Cover Letter with Application.
May 16, 2018
Date
Community Square Revitalization Project
Project Name
The Ocracoke Foundation, Inc. by Scott Bradley
Applica m
Appli Signature
2552-808-2808 :: 1-88€3-4RCOAST -- ww-yv_.nccoasta)rnanagemeni.net revised. 12:27?06
X 12' O
N X 12' O PLATFORM NO.1 X 11.5'
IIIIIIIIIIIIIIIIIIIIIIII
0
•
BY
10-3-2017
H.G.
10-5-2017
16' 5' 16'
1-19-2018 H.G.
11-8-2017
H.G.
2-26-2018 H.G.
L
H.G.
REMOVE & REPLACE N
DRAWN
z
z
H.G.
EXISTING DINGHY DOCK
JoB
— �A OE�t6xCKCST
N
ZLo
4457
N
SHEET
WN o
N
Z z d li
1
O.V
OF 1
PLATFORM NO.3
uj
a <
W� a
10
K) X 9.5'
K)—
DINGHY DOC
V N
Lu
NEW BULKHEAD BENEATH DOCK
16'
Lu
?
M.H.W. ON FACE OF EXISTING &NEW
LAUNCH AREA FOR
CLOSE
WATER
PROPERTY
J
BULKHEAD EXCEPT WHERE SHOWN
KAYAKS & SUPs
EXISTING
PLANT
ae
O
BOAT
OFFICE
Lu
PLAN OF COMMUNITY SQUARE DOCKS
RAMP
SCALE: 1" = 20'
— —
UZ O
OQ O Z
x 8' •
DeZ w Z
C) o
N w
— - X11'
LL,
� J �
8'
OU
Z y) =
X7
z
w- Z
O O
U cn
Lu
O
X 9'
o
O
•
PLATFORM NO. 5
-�
14'
•
11
EXISTING
X 7'
PLATFORMWILLIS
STORE & FISH HOUSE
24'
/-
TO 5E PLACED ON SEPARATE
O
•
SUPPORT SYSTEM AND RAISED
MAIN
-�
23" ABOVE PRESENT ELEVATION
DOCK
12
;4 18'
—
X 6'
•
X 10'
•
UTILITY
O
13
N
PEDESTAL X 5'
EXISTING
�Typ,�
WILLIS
TOR
X 5'
• •
X 6,
•
�®
&FISH
0115
�+
10' 14'
N O3
�
12'12'
OOv
EXISTING
X 8'
PLATFORM
•
X 4'
PLATFORM NO.4Lu
Lu
w18
�- -
N 1O
10'
N
ze
z
10'
10'A
10'
15
16
17
18
10'
Lu
x 3'
o
z
•
w
o
WILLIS
u,
Q
X 3'
PLATFORM
N0.2
DOCK
0
REVISIONS
BY
10-3-2017
H.G.
10-5-2017
H.G.
1-19-2018 H.G.
11-8-2017
H.G.
2-26-2018 H.G.
L
H.G.
REMOVE & REPLACE N
DRAWN
z
z
H.G.
EXISTING DINGHY DOCK
JoB
Wn
N
ZLo
4457
N
SHEET
WN o
N
Z z d li
1
O.V
OF 1
PLATFORM NO.3
uj
a <
W� a
CV '�
DINGHY DOC
V N
Lu
NEW BULKHEAD BENEATH DOCK
GARRISH
Lu
?
M.H.W. ON FACE OF EXISTING &NEW
LAUNCH AREA FOR
CLOSE
WATER
PROPERTY
J
BULKHEAD EXCEPT WHERE SHOWN
KAYAKS & SUPs
EXISTING
PLANT
ae
O
BOAT
OFFICE
Lu
PLAN OF COMMUNITY SQUARE DOCKS
RAMP
SCALE: 1" = 20'
UZ O
I �
X
11J
RIP RAP TO
ARMOR 1
I
w
z
DILDAY
CL PROPERTY
0
2O DENOTES SLIP NUMBER <
U
X 4' DENOTES APPROXIMATE WATER DEPTH ON 10-31-17 Q
REVISIONS
BY
10-3-2017
H.G.
10-5-2017
H.G.
1-19-2018 H.G.
11-8-2017
H.G.
2-26-2018 H.G.
12-6-2017
H.G.
5-10-2018 H.G.
DRAWN
H.G.
JoB
Wn
N
ZLo
4457
N
SHEET
WN o
N
Z z d li
1
O.V
OF 1
�Z XOw F-
I—
vi m z
a <
W� a
O w
V N
Lu
H�
0to w
wOz
a 0 D
Z
J
O
Q
U
UZ O
OQ O Z
DeZ w Z
C) o
N w
LL,
� J �
OU
Z y) =
z
w- Z
O O
U cn
Lu
O
U
2O DENOTES SLIP NUMBER <
U
X 4' DENOTES APPROXIMATE WATER DEPTH ON 10-31-17 Q
DATE
3-10-2017
SCALE
DRAWN
H.G.
JoB
4457
SHEET
1
OF 1
SHEETS
CONSTRUCTION
ENGINEERING
SERVICES, INC.
P.O. Box 665, Manteo, NC 27954
(252) 473-9733
FAX (252) 473-4191
I NOTE: ALL TIM5ER 70 5E
PRESSURE TREATED
iN ACCORDANCE
'APTH ANPA USE
CATEGORY UC55
AS NOTED ON DW(—
ALL HARDWARE
TO 5E HOT DIPPEC
GFiLVANIZED
JOB -
SHEET NO. t OF 3
CALCULATED By H DATE.
CHECKED BY DATE
SCALE
L :6 T. C A 5C`AR'%S
P R:
CN BOTH =ACES 0,4 CAI
— 5:Ir,. T
SCC a�6 cHORf-.
'2'
S -CRE' OARD
S ET
rMCAL SECTION OF BULKHEAD
- A..WLE
CL T Ca 2• c -c
- .•�"•r�" ?,- r��t- iTIMEER
,VALE '2.5 `4jwi
f -L 50 TS Ca
'AFPROK MID -SPAN
b vv EN 7iE RODS
I ' ' ALL SPLICES
N.W. L
— RF R,`;F "CE AR MOR
A%HERE !NDICA,T"
Ci' P;-, A i-�:
-oO�0
Q SEAL r 9
204
_
gi*4'r
01111100
D PRODUCT 207
CONSTRUCTION
ENGINEERING JO6
SERVICES, INC. SHEET NO.
P.O. Box 665, Manteo, NC 27954 OF 7
(252) 473-9733 CALCULATED BY ;
FAX (252) 473-4191 DATE
CHECKED BY
DATE
SCALE
- 3 7'2" :< 16" =.T.
u�ULAM BEARhJG — 12' BUTT C+A.. P.T. r;�nBEo — 6" x'C' ?T
C'CK 24" i .1 P!LE 3 TC, J Mei. BLARiN SAPcry
' 5LCC;:'8
vu'=
BO"C Pik ,_,F CAPACI-, i, YF.) BCL -ED C Pf
�•1
j EXiS- l 4C- Sri 1FE Aaov= — --- 1
i
E;Y1Sn G = U 1.2E aBCr'E
FOUNDATION / SHORING PLAN FOR RAISING BUILDING
lDCM-
t N CAR
o¢'tsSio
,2 a
SEAL —_
Cy� 204
SAY GO���~\
//111111111\\`\
0 PRODUCT 207
CONSTRUCTION
ENGINEERING
SERVICES, INC.
P.O. Box 665, Manteo, NC 27954
FAX52) 4-9733
(252)7473-4191
JOB i (- R - r. _
�a c
SHEET NO.
OF �.
CALCULATED BY
DATE
CHECKED BY
DATE
SCALE
- EX,STN'(3 StU BEAM ,
EXIST:'N5 S-RUCT''JRE
- v.7 16" F.7
? CIA. P'. TIMBER
vI-ULAM BEAaPIN, 6" P.T. SAFE7,' I) FILE a TCN "IN. BEARING
I F'_00<<4 0 C� BLOB 18'-ONG I r CA'a.C, �(-iP.-,
���111111/�
PILE :"'�;'� j `BOL w� O P+-�
�N CARS -- ---_r
7�
SEAL _
2044 = I �
4e,Q —�
10,
eF
' JAY
1
TYPICAL SECTION OF FOUNDATION ; SHORING
C°
5(, A. �.` - M13E.1
�Q LE 4 V MIN. BEARIN _� U_AP BEAMS —
iJ CA'ACi--'Y' TY?
I
_I
� gL `" lG LOWSI ?
I II , •
�'--7r-- -I- -I--_i C
I-- _ -
i
?c
E
ti S g' S t' ESS I yl
5EAF:
ASHERS ---
C!C
- —i i--�
PLAN AT YEW PILE
3c =
SECTION A -A
SECTION B-3
D PRODUCT 207
a
Google Maps 934 Washington St, Washington, NC 27889 to Ocracoke Foundation Drive 184 miles, 4 h 25 min
I el Q) 1,
—, .bg..d � j K I 1—ii
' fibs
SppeA
Ulk LO Palmetto4pearifee
Grab -w Prise 0'
Rocky Mount
ji� 4 h 25nnn P-0sin Lakes tg I
d,,' miles e, N
ark [.'bon,
Ro Afllgatc�raer
.rpsW,q (icek""31,0011IF— Refuge
Game Land
BAab C'IyCIL11 Wo r_ncse
Ity ft.dbnd
A ... Alligator
G', Riw National
(4it Scar [;lass Wildlife
MdcciysllnVd U
Refuge
ti -v
v." N-
Erndy a
Pneyer
B.ck6dge...
'I'd rd
tli��3 Greenville P:nomwn Wilkinson
R'.d the
934 Washington StreetW
AQ 41l 17 min
aN JN66.1 .1l..
C,
ch—i ty P—, Rd
Ayd-
Madannuskeet
Ch—d t. flashNanonal
Hook.o." Wildlife — �r-
Refuge
(KY w. —tr'
r.
I'D Xo I?", Gull Rock
InmlrulcC —�') :
Game Land Av
0
Woods A— Fd—d
La G—ge
''s.... �' tss L n L --d
('Ri KinnontL') 1 11 1
sprang 'Doter Winterg—n Hobucken 11 1 island
C, �) AlbnW
C—Cny
H.'n
�C Ocracoke Foundation
Pnklnr Ll Imn—
P.-"'—h
"A Goix le
Map data @2018 Google 5 mi L,____j
via US -64 E and NC -12 S 4 h 25 min
Best IOLJt(-
A 184 miles
Fc
via US -264 E and Swan Quarter - Ocracoke
40 4h 17 min
C,
;t/.