HomeMy WebLinkAboutEmail RE NCG020926 - Hatcher Mine Pumping O and M PlanGeorgoulias, Bethany
From: Edgerton, Thom
Sent: Friday, June 15, 2018 2:04 PM
To: MARC EDWARDS
Cc: Tankard, Robert; Dumpor, Samir; Lucas, Annette; Georgoulias, Bethany; Patterson,
Robert D; Pullinger, Robert C; Edwards, James; Wehner, Judy
Subject: RE: [External] Fwd: NCG020926 - Hatcher Mine
Attachments: NCG020926 Inspection 05222017-06152018.pdf
Mr. Edwards,
Please see the attached inspection report and process as required.
In summary the report presents: 74-86 Mining Map is required to include the POM language by 7/16/18 in order to
maintain compliance with NCG020926.
Please let me know if additional information is needed.
Sincerely,
Thom
Thom Edgerton
Environmental Engineer
Division of Energy, Mineral and Land Resources/Land Quality Section
Department of Environmental Quality
252 946 6481 office
thom.edaerton(c)ncdenr.aov
Washington Regional Office
943 Washington Square Mall
Washington, North Carolina 27889
=.- ---'vNoth1n9 Compa sr
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Pullinger, Robert C
Sent: Monday, May 07, 2018 11:38 AM
To: MARC EDWARDS <mkedrafting@embarqmail.com>
Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov>; Tankard, Robert <robert.tankard@ncdenr.gov>
Subject: RE: [External] Fwd: NCG020926 - Hatcher Mine
Mr. Edwards (Marc),
That language looks sufficient/good/acceptable, thanks!. Please do still update that portion of the map.
Chris Pullinger
Environmental Senior Specialist
Division of Water Resources — Water Quality Regional Operations
Department of Environmental Quality
252 948 3922 office
chris.puIIingera-ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
From: MARC EDWARDS[mailto:mkedrafting@embargmail.com]
Sent: Thursday, May 03, 2018 10:13 AM
To: Pullinger, Robert C <chris.pullinger@ncdenr.gov>
Cc: Edgerton, Thom <thom.edge rton@ncdenr.gov>
Subject: Re: [External] Fwd: NCG020926 - Hatcher Mine
1 10 1, 1 External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
am.
Chris
Number 1 should say'south western' excavation area.
Marc
From: "Marc Edwards" <mkedrafting(o)embargmail.com>
To: "Robert C Pullinger" <chris.pullinger(o)ncdenr.gov>
Cc: "Thom Edgerton" <thom.edgerton(a)ncdenr.gov>
Sent: Wednesday, May 2, 2018 11:30:44 PM
Subject: Re: [External] Fwd: NCG020926 - Hatcher Mine
Hi Chris
Below is what I'm proposing for the O&M Plan as per our phone conversation:
1. Overflow only storm water discharge relates to the southeastern excavation area.
2. Perimeter berms have been installed.
3. A silt fence has been installed along the entire length of the outside of the eastern (low side) berm
as a measure to prevent sediment/erosion during pipe and rip rap installation.
4. The berm (at pipe location) has been curved inward toward the excavation area to create an area
for the rip rap so the rip rap will not encroach into the low area.
5. Geotextile fabric has been installed on both sides of the berm at pipe and rip rap locations.
6. Overflow pipe and rip rap has been installed per detail 5 on mine map.
7. Silt fence will remain.
8. The bottom of the pipe is above typical pond water level.
9. This measure is for over flow purposes only. No pumping will occur in this excavation area.
10. Overflow pipe and rip rap will be inspected routinely and repaired when required.
11. Receiving waters will be inspected routinely.
Let me know if this is an acceptable O&M Plan.
Also, let me know if this email will suffice or if I need to send an updated map.
Thank you.
Marc K. Edwards
252-258-4037
From: "Robert C Pullinger" <chris.pullinger(a)-ncdenr.gov>
To: "Thom Edgerton" <thom.edgerton(a)_ncdenr.gov>, "Marc Edwards"
<mkedrafting(a)-embargmail.com>
Sent: Thursday, April 12, 2018 4:10:38 PM
Subject: RE: [External] Fwd: NCG020926 - Hatcher Mine
Mark,
Just shooting you a quick e-mail to check and see if you had any questions concerning what I'd need (on the wetland
protection side) to be included in the O&M plan for the Hatcher Mine.
Chris Pullinger
Environmental Senior Specialist
Division of Water Resources — Water Quality Regional Operations
Department of Environmental Quality
252 948 3922 office
chris.pullingera-ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
From: Edgerton, Thom
Sent: Wednesday, March 28, 2018 3:47 PM
To: MARC EDWARDS <mkedrafting@embargmail.com>
Cc: Pullinger, Robert C <chris.pullinger@ncdenr.gov>
Subject: RE: [External] Fwd: NCG020926 - Hatcher Mine
Hello,
I spoke with Chris Pullinger which will review your O&M Plan for DWR.
Please submit a short narrative to Chris, as the Operations and Monitoring Plan. Present the work still to be completed,
description of how the work will be accomplished, the expected time frame, and the measures to be used to minimize
the chance of negative impacts. The plan should include the routine inspections as required by the NPDES SW permit
text (with notification to this office of any negative impacts observed to wetlands or other waters of the state by the
operation as proposed prior to continued operation).
Please copy me for my information and the file.
You may want to contact Chris directly with any questions or as always, feel free to contact me anytime for assistance.
Sincerely,
Thom
Thom Edgerton
Environmental Engineer
Division of Energy, Mineral and Land Resources/Land Quality Section
Department of Environmental Quality
252 946 6481 office
thom.edgerton@ncdenr.gov
Washington Regional Office
943 Washington Square Mall
Washington, North Carolina 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: MARC EDWARDS [mailto:mkedrafting@embargmail.com]
Sent: Tuesday, March 27, 2018 11:28 AM
To: Edgerton, Thom <thom.edgerton@ncdenr.gov>
Subject: [External] Fwd: NCG020926 - Hatcher Mine
External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
Report Spam.
Thom
See COC and cover letter attached from Robert Patterson.
I do already have an O&M Plan on the map but it is basic. I pasted it below. What are your thoughts
on this?
Thank you.
Marc K. Edwards
252258-4037
0 & M PLAN
1. PERIMETER BERMS HAVE BEEN INSTALLED AND
SITE GRADED TO DRAIN EXCAVA110N AREAS
INTERNA.LLY kTOWARDS THE EXCAVATION AREA).
AN OVERFLOW PIPE AND RIP RAP WILL BE
INSTALLED IN THE SOUTH—'�`ESTERN EXCAVATION
AREA, THIS PIPE I FOR OVERFLOW PURPOSES
ONLY. TYPICAL POND WATER ELEVATION IS
BELOW THE PIPE,
WATER WILL NOT BE PU iPED OUT OF TH F
EXCAVATION AREA.
4. THE OVERFLOW PIPE AND RIP RAP WILL BE
INSPECTED ROUTINELY AND REPAIRED IF/WHEN
REOUIRED,
5. RECEIVING WATERS WILL BE INSPECTED ROUTINELY_
From: "Robert D Patterson" <robert.patterson(a)-ncdenr.gov>
To: "Marc Edwards" <mkedrafting(a)-embargmail.com>
Sent: Monday, March 19, 2018 10:29:21 AM
Subject: NCG020926 - Hatcher Mine
Marc — Please see attached. An original signed copy is in the mail to the owner.
Master permit, technical bulletin, DMR forms: https:Hdeg.nc.gov/about/divisions/energy-mineral-land-
reso u rces/n pd es-sto rmwate r -g ps
Thanks.
Robert D. Patterson, P.E.
Environmental Engineer
919-807-6369 1 Robert. Patterson(�Ocdenr.gov
nc.aov/about/d ivisions/enerav-mineral-land-resou rces/stormwater
NC Dept. of Environmental Quality
DEMLR Stormwater Program
512 N. Salisbury St.
1612 Mail Service Center
Raleigh, NC 27699-1612
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.