HomeMy WebLinkAboutNCG020926 Inspection 05222017-06152018Compliance Inspection Report
Permit: NCG020926 Effective: 03/19/18 Expiration: 09/30/20 owner: Southern Lands & Timber LLC
SOC: Effective: Expiration: Facility: Hatcher Mine
County: Pitt 2242 Sheppard Mill Rd
Region: Washington
Greenville NC 27834
Contact Person: Joseph D Briley Title: Phone: 252-341-0722
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 05/25/2017
Primary Inspector: Thom Edgerton
Secondary Inspector(s):
Certification:
Phone:
Entry Time: 01:OOPM Exit Time: 02:30PM
Phone: 252-946-6481
Reason for Inspection: Other Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
Page: 1
Permit: NCG020926 Owner - Facility: Southern Lands & Timber LLC
Inspection Date: 05/25/2017 Inspection Type : Compliance Evaluation Reason for Visit: Other
Inspection Summary:
See the Event Tab which presents the time line
Many emails have gone back and forth, but we are still awaiting DWR approval of the O&M Plan (POM) in order to complete
the intent of the NOV. This is a fairly new process as DWR was delegated the responsibility of POM Approval. Much has
been accomplished in finding our way through this fairly new process. Chris Pullinger is awaiting the Mining Permit 74-86,
Mining Map, which is to include the POM process language to be included on the actual Mining Permit Map. This is
intended to assist the 3 programs, such that each are on the same page. Historically each program; Mining, NPDES SW,
and the 401 Section have independently processed with little correspondence between programs. It is WaRO's intention to
establish a process which will improve processing by reducing, duplication and potential impacts.
I have closed out the NOV-2017-PC-0311, as of issuance of this NPDES SW Permit (3/19/18), however the process has yet
to be completed.
Marc Edwards presented language on 5/2/18, and Chris Pullinger accepted the language on 5/7/18, however, DWR requires
the language of the POM to be presented on the 74-86 Mining Map to complete this process.
Please complete this requirement by the close of business on 7/16/18, in order to prevent additional action.
Please contact Thom Edgerton (252) 948-3963 for additional information.
Page: 2
Permit: NCG020926 Owner - Facility: Southern Lands & Timber LLC
Inspection Date: 05/25/2017 Inspection Type : Compliance Evaluation Reason for Visit: Other
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Yes No NA NE
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
1:11:11:11:1
❑ 1:11:1 ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ 1:11:1
❑
Yes No NA NE
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
Page: 3