Loading...
HomeMy WebLinkAboutNC0000396_Inspection_20180613 (2)United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NC0000396 111 12 I 18/05/30 I17 18 I S J 19 LG] 201 I 211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166 Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA ----------------------Reserved------------------- 67 70 I I 71 I I 72 I r l u I� 73 I I 174 751 I I I 1 1 1 I80 I I i Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 09:OOAM 18/05/30 07/11/01 Asheville Steam Electric Power Plant 200 CPL Dr Exit Time/Date Permit Expiration Date Arden NC 28704 02:OOPM 18/05/30 10/12/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Teresa Lynne Williams/ORC/828-687-5240/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted William A Phipps,200 Cp L Dr Arden NC 28704//828-687-5201/8286875204 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Operations & Maintenance 0 Records/Reports 0 Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Timothy H Heim DocuSigned by: ARO WQ//828-296-4665/ �b�fk6�6/13/2018 E-V1082131 105A3CA418... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers pr--�,)� �/� Date 6/13/2018 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type (Cont.) NC0000396 111 121 18/05/30 1 17 18 JCJ Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Tim Heim and Ted Campbell of the Asheville Regional Office performed a Compliance Evaluation Inspection on May 30, 2018. Teresa Williams and Chuck Cranford of Duke Energy were present at the time of the inspection. Ms. Williams is now BORC, and Maria Keezel is ORC and Lab supervisor. The inspection included a file review as well as a facility inspection of all NPDES Outfalls, including Outfalls 001, 002, 004, and the FDG and plant domestic effluent to MSD's sewer. Sample record keeping is thorough and well organized. This facility's NPDES records are also reviewed with a high level of detail annually by a court appointed auditor. At the time of the inspection, all treatment units and outfalls appeared to be operating within compliance to permit NC0000396 and no violations of permit conditions were observed. The new combined cycle gas turbine units were under construction in the '82 Ash Basin, and work to remove CCP from the '64 Ash Basin is anticipated to continue for several more years. Page# Permit: NC0000396 Inspection Date: 05/30/2018 Owner - Facility: Asheville Steam Electric Power Plant Inspection Type: Compliance Evaluation Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: No negative impact to receiving stream observed during the inspection. Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Page# 3