HomeMy WebLinkAboutNC0000396_Inspection_20180613Water Resources
ENVkRC"HEHTAL OL AUTY
June 13, 2018
William A Phipps
Duke Energy Progress LLC
200 CP & L Dr.
Arden, NC 28704
SUBJECT: Compliance Inspection Report
Asheville Steam Electric Power Plant
NPDES WW Permit No. NC0000396
Buncombe County
Dear Permittee:
ROY COOPER
Gm ern -,r
MICHAEL S_ BEGAN
secrew
LT -NDA CLTLPEPPER
IPJigl'al1Q DFFeC1FF
The North Carolina Division of Water Resources conducted an inspection of the Asheville
Steam Electric Power Plant on 5/30/2018. This inspection was conducted to verify that the
facility is operating in compliance with the conditions and limitations specified in NPDES WW
Permit No. NC0000396. The findings and comments noted during this inspection are provided
in the enclosed copy of the inspection report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a
response to this inspection report is not required.
If you should have any questions, please do not hesitate to contact me with the
Water Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or
via email at tim.heim@ncdenr.gov.
ATTACH M E NTS
Cc: WQS-ARO Server
LF
Sincerely,
DocuSigned by:
lwtb{k� f�Uwt
082B1105A3CA418...
Tim Heim, P.E., Environmental Engineer
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
20180612_NC0000396_2018 CEI Ltr.Rtf
State of North Carolina I Environmental Quality I Water Resources
2090 U.S. 70 Highway, Swannanoa, NC 28778
828-296-4500