Anen, Steven C
From:Anen, Steven C
Sent:Wednesday, June 13, 2018 3:20 PM
To:'Chris Hopkins'; Joe Ervin
Cc:Nathan V. Bass
Subject:RE: \[External\] RE: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
Good afternoon,
th
Thank you for your quick response. I’ll change the deadline for submission to June 29 and add this email to our records
to ensure that you’re given the extra time.
Thanks,
Corey Anen
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
919-807-6378
Corey.Anen@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Chris Hopkins \[mailto:CHopkins@ucseng.com\]
Sent: Wednesday, June 13, 2018 2:49 PM
To: Anen, Steven C <corey.anen@ncdenr.gov>; Joe Ervin <JErvin@ucseng.com>
Cc: Nathan V. Bass <NBass@ucseng.com>
Subject: RE: \[External\] RE: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
Report Spam.
Hi Corey,
This afternoon, we submitted our erosion control plans to Matthew Gantt, per his request, for an informal review.
Because our project has been through several revisions thus far, he requested this informal review prior to us formally
submitting for Express Permitting. We believe that we have satisfied your comments that were included in your letter,
and we plan to being the permitting process within a week of the completion of Mr. Gantts review.
With that being said, we would like to request that your office allow us until June 29, 2018 to provide the information,
per your May 17, 2018 letter. Please confirm if this request is acceptable. Should anything change prior to the June 29
date, we will update you immediately.
1
Our team thanks you for your continued assistance with this project.
Thank you,
Christopher J. Hopkins
Associate Engineer
UC Synergetic, LLC
803.835.7924
123 N. White Street
Fort Mill, SC 29715
chopkins@ucseng.com
From: Anen, Steven C \[mailto:corey.anen@ncdenr.gov\]
Sent: Wednesday, June 13, 2018 1:46 PM
To: Joe Ervin <JErvin@ucseng.com>
Cc: Chris Hopkins <CHopkins@ucseng.com>; Nathan V. Bass <NBass@ucseng.com>
Subject: RE: \[External\] RE: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
Hi Joe,
th
This is a reminder that I sent an additional info request on May 17 regarding this project. The stormwater regulations at
th
15A NCAC 02H .1042 require the applicant to submit the requested information within 30 days of the request (June 16)
or the application will be deemed denied. If you need additional time, please let me know by then and indicate the date
by which you expect to submit the required information.
Thank you,
Corey Anen
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
919-807-6378
Corey.Anen@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Joe Ervin \[mailto:JErvin@ucseng.com\]
Sent: Thursday, May 24, 2018 12:27 PM
To: Anen, Steven C <corey.anen@ncdenr.gov>
Cc: Chris Hopkins <CHopkins@ucseng.com>; Nathan V. Bass <NBass@ucseng.com>
Subject: RE: \[External\] RE: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
Report Spam.
2
Thanks Corey. Appreciate the help
Joe Ervin, P.E., LEED-AP
Facilities Planning and Siting
UC Synergetic, LLC (a Pike Company)
123 North White Street
Fort Mill, SC 29715
843 697 0606 Cell
803-835-6154 Office
803-835-7824 Fax
jervin@ucseng.com
From: Anen, Steven C \[mailto:corey.anen@ncdenr.gov\]
Sent: Thursday, May 24, 2018 12:22 PM
To: Joe Ervin <JErvin@ucseng.com>
Cc: Chris Hopkins <CHopkins@ucseng.com>; Nathan V. Bass <NBass@ucseng.com>
Subject: RE: \[External\] RE: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
Joe,
I double checked with my supervisor about the longitudinal slope requirements, and she confirmed that using
engineered matting to stabilize the channel should be fine. It’s not necessary to reduce the slope to 7%.
Corey Anen
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
919-807-6378
Corey.Anen@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Joe Ervin \[mailto:JErvin@ucseng.com\]
Sent: Wednesday, May 23, 2018 4:36 PM
To: Anen, Steven C <corey.anen@ncdenr.gov>
Cc: Chris Hopkins <CHopkins@ucseng.com>; Nathan V. Bass <NBass@ucseng.com>
Subject: RE: \[External\] RE: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
Report Spam.
That's great. Thanks for the review.
3
With respect to the discharge, using this product in the swales along the road will allow us to keep the road
culverts as shown discharging directly to a dissipater pad, correct?...also, given the tightness of the site, can
we leave the swales with 2H:1V side slopes? 3H:1V on existing 2H:1V slopes makes it difficult to tie grades
back.
Please let me know your thoughts. Thanks
Get Outlook for Android
From: Anen, Steven C <corey.anen@ncdenr.gov>
Sent: Wednesday, May 23, 2018 4:19:20 PM
To: Joe Ervin
Subject: RE: \[External\] RE: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
Good afternoon,
I looked at the link that you sent. As long as the channels are vegetated and engineering calculations show that there
will not be any erosion during the 10-year storm, a product like that would be acceptable to meet the regulations.
Please let me know if you have any other questions.
Thank you,
Corey Anen
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
919-807-6378
Corey.Anen@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Joe Ervin \[mailto:JErvin@ucseng.com\]
Sent: Monday, May 21, 2018 9:44 AM
To: Anen, Steven C <corey.anen@ncdenr.gov>
Subject: \[External\] RE: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to
Report Spam.
Mr. Anen,
We’ve reviewed the comments received for the substation and understand the issue of vegetated swales. We are
actually just improving an existing dirt road on site and creating the road side swale. The existing road grade is
approximately 23% - 25% and all slopes on the property are steeper than 3H:1V. Trying to reduce slope would be
impossible. In addition, the proximity of the existing “stream” on the left side of the access road makes it difficult to
create “dispersed” flow from the uphill side of the new road to the stream.
4
In order to meet the requirements of low density, would it be acceptable to line the channel with something like the
attached that would provide the necessary armoring we need for the steep channel but also provide a “vegetated”
swale?
Please let me know your thoughts. Thank you
http://www.flexamat.com/
Joe Ervin, P.E., LEED-AP
Facilities Planning and Siting
UC Synergetic, LLC (a Pike Company)
123 North White Street
Fort Mill, SC 29715
843 697 0606 Cell
803-835-6154 Office
803-835-7824 Fax
jervin@ucseng.com
From: Anen, Steven C \[mailto:corey.anen@ncdenr.gov\]
Sent: Thursday, May 17, 2018 11:58 AM
To: Joe Ervin <JErvin@ucseng.com>
Cc: mhigh@blueridgeenergy.com; Gantt, Matt <matt.gantt@ncdenr.gov>
Subject: Blue Ridge EMC Lansing Substation Stormwater Permit SW4180301
Good morning,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application
th
for the subject project on March 26, 2018. A review of that information has determined that the application is not
complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to
contact me. My contact information is listed below
Corey Anen
Environmental Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
919-807-6378
Corey.Anen@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
The information contained in this electronic message is information intended for the use of only the individual or entity named above and may be PRIVILEGED and
CONFIDENTIAL. If the reader of this message is not the intended recipient or the employee or agent responsible for delivering it to the recipient, you are hereby
notified that any review, disclosure, dissemination, distribution, or copying of this communication is strictly prohibited. If you received this electronic message in
5
error, please notify the sender immediately by replying to this e-mail and permanently delete the original message.
Thank you.
The information contained in this electronic message is information intended for the use of only the individual or entity named above and may be PRIVILEGED and
CONFIDENTIAL. If the reader of this message is not the intended recipient or the employee or agent responsible for delivering it to the recipient, you are hereby
notified that any review, disclosure, dissemination, distribution, or copying of this communication is strictly prohibited. If you received this electronic message in
error, please notify the sender immediately by replying to this e-mail and permanently delete the original message.
Thank you.
The information contained in this electronic message is information intended for the use of only the individual or entity named above and may be PRIVILEGED and
CONFIDENTIAL. If the reader of this message is not the intended recipient or the employee or agent responsible for delivering it to the recipient, you are hereby
notified that any review, disclosure, dissemination, distribution, or copying of this communication is strictly prohibited. If you received this electronic message in
error, please notify the sender immediately by replying to this e-mail and permanently delete the original message.
Thank you.
The information contained in this electronic message is information intended for the use of only the individual or entity named above and may be PRIVILEGED and
CONFIDENTIAL. If the reader of this message is not the intended recipient or the employee or agent responsible for delivering it to the recipient, you are hereby
notified that any review, disclosure, dissemination, distribution, or copying of this communication is strictly prohibited. If you received this electronic message in
error, please notify the sender immediately by replying to this e-mail and permanently delete the original message.
Thank you.
6