Loading...
HomeMy WebLinkAbout20171605 Ver 1_Mitigation Bank Information_20170831d� T/ 04 WILDLANDS fNGINEf KING Daniels Creek Mitigation Site — The Initial Proiect of the Middle Cape Fear Umbrella Mitigation Bank Harnett County, NC Wildlands Engineering, Inc. proposes the creation of the Daniels Creek Stream and Wetland Mitigation Site ("bank site") in the Cape Fear River Basin, Cataloging Unit 03030004 in Harnett County, North Carolina. This will be done underthe newly created Middle Cape Fear Umbrella Mitigation Bank. The bank site will provide 13,090 stream mitigation credits, 4.53 riparian wetland mitigation credits, and 0.5 nonriparian wetland mitigation credits. The site is described below. DANIELS CREEK SITE The Daniels Creek Site encompasses 55 acres and will include 8,492 linear feet (LF) of stream restoration, 2,087 LF of stream enhancement I, 7,761 LF of stream enhancement II, and 1,037 LF of stream preservation. The site will also include 3.50 acres of riparian wetland rehabilitation, 3.68 acres of riparian wetland enhancement, and 0.97 acres of non -riparian wetland enhancement. The implementation of the mitigation concept will result in significant ecological improvements within the Daniels Creek watershed. Among these are improvements to aquatic and riparian habitat, reduction of nutrient, bacteria, and sediment loads, connection of the onsite streams to their floodplains, improvements to wetlands, and restoration of native riparian buffers. The attached figures illustrate the location of the bank site as well as the mitigation activities proposed. The tables below summarize the credits generated by the site, including proposed mitigation ratios. 1 WILDLANDS ENGINEERING CREDIT SUMMARY Daniels Creek Stream Mitigation Stream Reach Approach Length Ratio Credits Daniels Creek Restoration 3,352 1.0 3,352 TI Restoration 1,994 1.0 1,994 T1 Enhancement II 906 2.5 362 T1 Preservation 1037 7.5 138 T1A Enhancement II 267 2.5 107 TIB Enhancement 11 303 2.5 121 T2 Enhancement 1 502 1.5 335 T2 Enhancement II 338 2.5 135 T2S Enhancement If 150 2.5 60 T3 Restoration 1,062 1.0 1,062 T3 Enhancement II 639 2.5 256 T3A Enhancement II 310 2.5 124 T4 Restoration 1,497 1.0 1,497 T4 Enhancement II 188 2.5 75 T4A Enhancement II 256 2.5 103 T48 Enhancement II 213 2.5 85 T4C Enhancement II 326 2.5 130 T5 Enhancement 1 451 1.5 301 T5 Enhancement II 330 2.5 132 T6 Restoration 216 1.0 216 T6 Enhancement II 650 2.5 260 T7 Enhancement 1 1134 1.5 756 T8 Restoration 371 1.0 371 T8 Enhancement II 489 2.5 196 T9 Enhancement II 596 2.5 239 T9A Enhancement II 322 2.5 129 T10 Enhancement II 956 2.5 383 T10A Enhancement It 431 2.5 173 TOTAL 19,287 13,090 W WILDLANDS INC;..I t...I Daniels Creek Wetland Mitigation Wetland Approach Area (ac) Ratio Credits Riparian Rehabilitation 3.50 1.3 2.69 Riparian Enhancement 3.68 2.0 1.84 Nonriparian Enhancement 0.97 2.0 0.49 DIRECTIONS TO SITE Daniels Creek From Raleigh take US -1 South to US -421 in Sanford. Take exit 70A for US -421 Bypass East and follow to merge onto US -421 South. Take exit 143A to stay on US -421 South for 5 miles toward Lillington. Turn left on Seminole Rd. and then right shortly after on Tim Patterson Lane. Meet on Tim Patterson Lane before turning onto driveway (ample parking space available). Use 78 Tim Patterson Lane, Broadway, NC 27505 for mapping purposes. _ - - --- - -- r --i 54 � IProjectArea- Daniels Cr. ten; 1 _ c_an C., Raleigh 11 RALEIGHi n6.VJiAlll � - .. IE(lI5 iYU1nV` �p1' J 1 A i 1. 36 Q mOo,J lal'nnF � _ 91m o re e { 87 Bank BB Location 0 27 - EPv F.1I6yFr64:E PrHaral / 1"•xn / / 1i IA�nnin rl I, GeAan:J�en" % IUtlAr=I m.n ''� u < Ny1t�`As n za 1 - 1 UN„1` an JA rvs Enreaa ';ms' Fertl aaBr 1 !.._il P�glq ' P fGFi�NSun i ii 210 }S 9r 01 1 t r,y t<YIYc = Figure 1. Vicinity Map Daniels Creek Mitigation Site 0 5 10 Miles p Fall Line Umbrella Mitigation Bank WILD LANDSI I I I IJN, Cape Fear River Basin 03030004 ENGINEERING Harnett County, NC