Loading...
HomeMy WebLinkAbout20180791 Ver 1_PCN Form Submission_20180608Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 6/8/2018 1:35:38 PM (Start Event) Accept by Carpenter,Kristi 6/11/2018 3:40:00 PM (DOT Initial Review) . The task was assigned to Carpenter,Kristi. The due date is: June 13, 2018 5:00 PM 6/8/2018 1:37 PM i i �� � ����� �ivislan af Water Resour�es Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Orange Is this project a public transportation project?* C Yes l' No lhis is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* f• Yes r No (NCDOT only) T.I.P. or state project number: U-5846 WBS # 50236.1.1 (for �ICDOT use only) 1a. Type(s) of approval sought from the Corps:* fJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E-PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 23 - Categorical Exclusions NWP Number Other: List all MNnurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply r% 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non-404 Jurisdictional General Permit �rJ Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: f Yes C' No For the record onlyfor Corps Permit: C' Yes f' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? IF so, attach the acceptance letter from rritigation bank a- in-lieu fee program l" Yes f' No 1f. Is the project located in anyof NC's twentycoastal counties?* f Yes C•' No 1h. Is the project located in a designated trout watershed?* C' Yes C No Link to trout information: http://�wvw.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Jerry Parker, Division 7 Environmental Supervisor 1b. PrimaryContact Email:* jparker@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (336)256-2063 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) r Agent/Consultant (Checkall that apply) 2. Owner Information 2a. Name(s) on recorded deed: 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d. Address Street Address Address Line 2 a�y Fbstal / Zip Code 2e. Telephone Number: (xxx)xxx-xxxx 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* State / Fhovince / I�gion Country jparker@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Intersection Improvements at Greensboro Street and Estes Drive 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:'� Carrboro 1d. Driving directions* IF it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. Project is located at the intersection of N. Greensboro Street and Estes Drive Extension. 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address Street Address Address Line 2 �� Fbstal / Zip Code State / Rovince / FZegion Courdry 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For e�cample, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude: * 35.917203 ex:34.208504 3. SurFace Waters Longitude:* -79.075175 -77.796371 3a. Name of the nearest body of water to proposed project:* UT to Bolin Creek 16-41-1-15-1-(0.5) 3b. Water Resources Classification of nearest receiving water:* WS-V; NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* Cape Fear RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The study area lies in the Piedmont physiographic region of North Carolina. Topography in the project vicinity is comprised of mostly rolling country with stream beds in Orange County ranging in elevation from 200 to 500 feet. Elevations in the study area range from 430 to 460 ft. above sea level. Land use in the project vicinity consists primarily of residential development along roadways and narrow wooded buffers along stream corridors. A paved greenway trail is located within the riparian buffer. Copy of the NRTR is attached. 4b. Attach an 8 7/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent U-5846_Fig3_USGS. pdf Fle type rrust be pdF 2.85MB 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrent U-5846_Fig4_NRCS_soils.pdf 279MB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0.047 AC within the study area. 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 349 feet within the study area 4f. Explain the purpose of the proposed project:* A traffic roundabout will be constructed for the purpose of making the intersection safer and more effective in handling existing and future traffic. It is needed to improve traffic operations through the reduction of backups, reduction of delays and the ability to handle traffic growth in the area. A secondary purpose for the project is to maintain safety for the volume of pedestrian and bicyclists in the area as traffic increases. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:'� The followtext was taken from the attached CE document. The proposed single-lane roundabout will include a grassed raised center and contain a berm area to connect to future sidewalks along Estes Drive Extension. The roundabout will allowtrucks with trailers up to 62-feet long; trucks with longer trailers will fit except for right turns from North Greensboro Street onto Estes Drive Extension. New sidewalks will be constructed around all three sides of the intersection, with pedestrian crosswalks on both North Greensboro Street sides of the roundabout as well as the Estes Drive Extension side. Two other crosswalks will also be constructed - one across Todd Street (located approximately 60-feet west and parallel to the Frances Lloyd Shetley Bikeway) to facilitate pedestrian travel long North Greensboro Street. The other is proposed across North Greensboro Street about 1,100 feet north of the roundabout, west of Williams Street. This mid-block crosswalk was negotiated with the Town of Carrboro to address the significant volume of pedestrians in the corridor and the community's concern with pedestrian (especially children walking to local schools) safety through the new roundabout. The project also includes replacement of the "fork" in the existing multi-use Frances Lloyd Shetley Bikeway with separate bicycle ramps for ccess on and off the roundabout. This is to satisfy the NCDOT policy that does not allow bike lanes within roundabouts, therefore bicycles will be required to operate as vehicles through the proposed roundabout. The proposed sidewalk on the Bikeway side of the roundabout will be split to cross the bike lane ramp connections to the roundabout. 4h. Please upload project drawings for the proposed project. Click the upload button or drag and drop files here to attach docurrent Fle type m�.st be pdF 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas? * C Yes C' No f Unknown Comme nts: A site visit was conducted on 8/9/2016 with representatives of the Corps and DWR. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* f Preliminary Corps AID Number: 6carrple: SAV�2017-99999 r Approved 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: C' Unknown Eric Black and Kim Hamlin f•' f�llA SEPI Engineering and Construction 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. A site visit was conducted on 8/9/2016 with representatives of the Corps and DWR. 5d1. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurrent RE_ PJD status.pdf 14.64KB Fle type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* f Yes �' No �' Unknown 7. Future Project Plans 7a. Is this a phased project?* l" Yes l•' No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): rJ Wetlands rJ Streams-tributaries rJ Buffers r Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site #- Reason for impact* 2b. Impact type * 2c. Type of wetland* Site 4 Rock Cross Vanes P N�p label (e.g. f�ad Qossing 1- Qalvert, F2rrranent (Fj or dewatering, etc) Terrporary (� Site 4 Roundabout T ConStCUCtlon F2rrranent (Pj or fv�p label (e.g. f�ad C7ossing 1- Qalvert, Terrporary (� dewatering, etc) Site 5 Roundabout T construction F2rrranent (Fj or N�p label (e.g. Finad Qossing 1- Qalvert, Terrporary (� dewatering, etc) Floodplain Pool Floodplain Pool Floodplain Pool 2d. Wetland name *Ze. 2f. Type of Forested* Jurisdicition* WA Yes Corps (404, 10) or D✓�R(401 other) WA Yes Corps (404, 10) or CMR (401 other) 2g.lmpact area* 0.010 (acres) 0.001 (acres) WB Yes Corps 0.010 (404, 10) or CM�R(401, (acres) other) 2g. Total Temporary Wetland Impact 0.011 2g. Total Permanent Wetland Impact 0.010 2g. Total Wetland Impact 0.021 2h. Comments: Permanent wetland impacts are the result of constructing a step-pool channel with rock cross vanes to lo�r the stream bed elevation to match the proposed culvert invert elevation. Temporary impacts are a result of hand clearing. 3. Stream Impacts ff there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * type * S7 1 Dewatering T Dewatering UTto Bolin Creek N�p label (e.g. Finad Qossing F2rrranent (� or 1) Terrporary (� g2 1 Rock Cross Vane P Stabilization UT to Bolin Creek fv�p label (e.g. I�ad Qossing F�rrranem (Fj or 1) Terrporary (� S3 1 Dual 60" RCP P Culvert N�p label (e.g. Fd�ad Qossing F2rrranem (Fj or 1) Terrporary (� S4 2 Bank Stabilization P Stabilization fv�p label (e.g. F3�ad Qossing �rrranent (� or 1) Terrporary (lj UTto Bolin Creek UTto Bolin Creek 3e. Stream 3f. Type of Type* Jurisdiction* Intermittent Both F2rennial (� or interrritterd (If� Intermittent Both F2rennial (F9� or interrrittent (IfVn Intermittent Both F�rennial (FH� or interrrittent (IfVn Intermittent Both F2rennial (�2) or intermittent (If� S5 2 Dewatering T Dewatering UTto Bolin Creek Intermittent Both N�p label (e.g. 13�ad CYossing F�rrranerd (Fj or F2rennial (Fffl) or 1) Terrporary (� imerrrittent (IfVn S6 3 UtilityConstruction T Other UTto Bolin Creek Intermittent Both N�p label (e.g. Fd�ad Qossing F2rrranent (P/ or F2rennial (F$2) or 1) Terrporary (� irderrci[tent (If� *� All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 139 3i. Total temporary stream impacts: 102 3i. Total stream and tributary impacts: 241 3j. Comments: S2 stream impacts are the result of constructing a step-pool channel with rock cross vanes to lower the stream bed elevation to match the proposed culvert. S3 the invert of the 60" RCP will be buried one foot. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 3g. Stream 3h. Impact sqfe� width * length * 5 20 1 Average (linearfeet) 0 (feet) 0 5 76 3 Average Qinearfeet) $ (feet) 0 5 41 2 Average (linearfeet) 0 (feet) 5 5 22 1 Average (linearfeet) 1 (feet) 0 5 19 9 Average Qinearfeet) 5 (feet) 5 63 3 Average (linearfeet) 7 (feet) 5 6a. Project is in which protect basin(s)? * C�eck all that apply. r Neuse r Catawba r Goose Creek r Other r Tar-Pamlico r Randleman �J Jordan Lake 6b. Impact Type * 6c. Per or 6d. Stream name'� Temp* 1 Concrete Sidewalk P UTto Bolin Creek Location and 6cerrpt, Allowable, allowable w/ F2rrranent (Fj or rritigation Terrporary (lj 1 Roundabout Construction T UTto Bolin Creek Location and 6cerrpt, Allowable, allowable w/ F�rrranent (P� or rritigation Terrporary (� 2 UtilityConstruction T UTto Bolin Creek Location and 6cerrpt, Allowable, allowable w/ F2rrranem (F�j or rritigation Terrporary (� 3 Concrete Sidewalk P UTto Bolin Creek Location and 6cerrpt, Allowable, allowable w/ F2rrranem (Fj or rritigation Terrporary (� 3 Roundabout Construction T UTto Bolin Creek Location and Exerrpt, Allowable, allowable wl F�rrranem (Fj or rritigation Terrporary (� 4 Concrete Sidewalk P UTto Bolin Creek Location and Exerrpt, Allowable, allowable wl F2rrranem (Fj or rritigation Terrporary (� 4 Roundabout Construction T UT to Bolin Creek Location and 6cerrpt, Allowable, allowable w/ F2rrranent (Fj or rritigation Terrporary (lj 6h. Total buffer impacts: Temporary impacts: Permanent impacts: Zone 1 17 ,215.00 Zone 1 1,131.00 Zone 2 5,288.00 Zone 2 573.00 6e. Buffer mitigation 6f. Zone 1 6g. Zone 2 required?* impact* impact* No 381 197 (squarefeet) (squarefeet) No 1,214 375 (squarefeet) (squarefeet) No 4,939 516 (squarefeet) (squarefeet) No 311 202 (squarefeet) (squarefeet) No 3,276 699 (squarefeet) (squarefeet) No 439 174 (squarefeet) (squarefeet) No 1,786 3,698 (squarefeet) (squarefeet) Zone 1 Zone 2 Total buffer impacts: 12,346.00 5,861.00 6i. Comments: All permanent buffer impacts are a result of the sidewalk construction and total less than 150 feet. All temporary buffer impacts result from vegetation clearing required to complete project construction. Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Qick the upload button or drag and drop files here to attach docurrent U5846_BUFFER_PERMIT_20180604.pdf 2.94MB Fle rrust be F�F E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Design Standards for Sensitive Watersheds were implemented. The length of the new culvert was designed at the minimum length to accomplish project goals and safety. The culvert invert will be buried one foot. A step pool system was used in place of a riprap line channel. The step pool channel provides better habitat than a riprap channel. All ditches and concentrated flow points were eliminated. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Design Standards for Sensitive Watersheds were implemented. Culvert construction will take in the dry. All disturbed areas will be stabilized with vegetation within 14 days. A detailed streambank reforestation plan comprised of native species will be planted. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Permanent wetland impacts are less than 0.01 acres. Permanent stream impacts are less than 0.01 acres and less than 150 feet. Permanent buffer impacts are are between 40 and 150 linear feet and less than 1/3 of an acre which is allowable under road crossing of streams. F. Stormwater Management and Diffuse Flow Plan (required by DWR) �** Recent changes to the stormwater rules have required updates to this section ."� 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C Yes C' No 1b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SMNT) �J Other SCM that removes minimum 30% nitrogen (check all that apply) For a list of options to meet the diffuse flow requirements, click here. Diffus Flow Documentation Qick the upload button or drag and drop files here to attach docurrent U5846_re u_CompleteSet. pdf Fle type rrust be FDF 2. Stormwater Management Plan 5.41 MB 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * f Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* G Yes f No To look up low density requirement click here 15A NCAC 02H .1003(2). G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * f• Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* f• Yes l" No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPAor SEPAfinal approval letter.)* C Yes C' No NEPA or SEPA Final Approval Letter C7ick the upload button or drag and drop files here to attach document U-5846 CE.pdf 3.86MB RLE NFE M,15T BE FDF 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* C' Yes C•' No 2b. Is this an after-the-fact permit application?* f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes C No 3b. If you answered "no," provide a short narrative description. The project is located in a residential area of Carrboro. The goal of the project is to make the intersection safer and more effective in handling existing and future traffic. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* f Yes r No �' f�/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * f• Yes �' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* l•' Yes f" No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* C•' Yes f" No What Federal Agency is involved? f Unknown FHWA 5e. Is this a DOT project located within Division's 1-8?* f• Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Orange County species list, June 8, 2015. NCNHP data, September 13, 2016. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* f Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?'� Correspondence with NCDOT archaeologist and architectural historian. 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach docurr�nt 15-11-0021 NHPA.pdf 4.76MB AR15-11-0021 NoSurvey.pdf 1.68MB Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* f Yes �' No 8c. What source(s) did you use to make the floodplain determination?* FIRM Map 3710977800K, effective on11/17/2017 Miscellaneous Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent U-5846 CE.pdf 3.86MB Fle rrust be FDF or fWQ Signature fJ By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Robert Lepsic Signature ��GC.�i� LC�dLC Date Submitted: 6/8/2018 Initial Review Is this project a public transportation project?* (') G' Yes C' No C�ange only 'rf needed. Has this project met the requirements for acceptance in to the review process? * G' Yes C' No BIMS # Assigned * 20180791 Version#* Reviewing Office * Central Office - (919) 707-9000 Select Project Reviewer* April Norton:eads\arnorton Is a payment required for this project?* f No payment required f• Fee received l' Fee needed - send electronic notification