Loading...
HomeMy WebLinkAboutRC Construction NOD ResponseRECONS1RUCtION CO. INC. P. o. BOX 1998 818 WALNUT STREET GREENWOOD, MS 38935-1998 (662)453-2424 PHONE (662)453-6783 FAX August 1; 2017 State of North Carolina, Environmental Quality Department of Energy, Mineral, and Land Resources Fayetteville Regional Office 225 Green Street, Suite 714 Fayetteville, NC 28301 ATTN: Timothy L. LaBounty, PE RE: NOTICE OF DEFICIENCY (NOD -2017 -PC -0205) NPDES General Permit NCG140000 RC Construction Company, Inc., Certificate of Coverage NCG140424 Cumberland. County AUG 7 2017 Subject: Response to NOD -2017 -PC -0205 Mr. LaBounty: In response to Notice of Deficiency (NOD -2017 -PC -0205) for Certificate of Coverage NCG140424, we offer the following: RC Construction acknowledges the deficiencies in compliance with NPDES General Permit requirements. The portable nature of the batch plant and lack of consistency of production by the batch plant over the past several years is a contributing factor to the non-compliance. Since 2014, the batch plant has been demobilized and remobilized three times, and has not consistently been in production for any significant length of time over that period. However, to prevent these deficiencies from recurring, the compliance responsibility is being transferred to our Paving Quality Control Department, as these personnel will maintain a constant presence at the project site anytime the plant is producing concrete. Corrective action for the specific issues listed in the Notice of Deficiency are listed below: 1. No documentation of annual employee training,for 2015 or 2016. As noted above, our Paving QC Department will .take control of all permit compliance responsibilities. As part of this responsibility, our Quality Control Manager will compile training criteria and ensure that annual training is provided to all personnel working on the batch plant site. The Quality Control Manager will also ensure that training is properly documented and electronically filed for review by NC I DEQ or other interested agencies. This training will be a part of the new -hire orientation package for all RC employees, and will also be provided to all subcontractor employees as part of the site-specific orientation process. For projects that overlap calendar years, annual refresher training will be provided to all Family owned and operated since 1987 www.rcconst.net employees in January of the calendar year. This annual refresher training will include specifically the employees that regularly work around the batch plant, but also include any personnel that are regularly at the batch plant site. All subcontractors that demobilize from the site for an extended period of time will receive refresher training upon remobilization. As an immediate solution to bring the site into compliance for 2017, the Quality Control Manager will be conducting training with all on-site management employees and batch plant personnel associated with the Pope Army Airfield site by August 31, 2017. Documentation of the training provided, as well as a listing of personnel receiving the training will be provided to DEMLR, FRO no later than September 8, 2017. 2. Analytical Monitoring has not been conducted and recorded in accordance with permit requirements. RC Construction has contacted Building & Earth Sciences, who is contracted to perform construction materials testing for concrete pavements and regularly ,has qualified technicians on-site during production operations, to conduct quarterly analytical monitoring as required by NPDES General Permit NCG140000. The batch plant is currently scheduled to be remobilized and placed back into production in early October, 2017. During this production period, and all quarterly periods of production going forward, the Quality Control Manager will coordinate with, Building & Earth Sciences to perform the required quarterly analytical monitoring. An analytical monitoring report for 4Q, 2017 will be provided to DEMLR, FRO no later than January 15, 2018. 3. One final note concerning the name of the facility. The name on the Air Quality Permit (No. 10260R03) for the facility has previously been revised to be R.C. Construction Company/Pope Army Airfield. Changing of the name on the NPDES portion of the permit was simply an oversight as it was assumed that both would be revised accordingly. The Quality Control Manager will be submitting a Permit Name/Ownership .Change Form for Certificate of Coverage NCG 140424 to revise the name of the facility, as well as. change the responsible person to be himself. If there are any questions regarding this response, please contact the undersigned at (662) 453-2424, or Mr. Mustafa Elias, Quality Control Manager, (melias(arcconst.net) at (512) - 966-.2294.