Loading...
HomeMy WebLinkAboutWQ0040044_Application_20180608• •C_ TRANSMITTAL ORSBORN ENGINEERING GROUP 610 EAST MOREHEAO STREET, SUITE 106 Project: 16034 CHARLOTTE, NORTH CAROLINA 28202 1100 Matthews -Mint Hill Road PHONE 704.749.1432 RECEIVED/NCDENR/DWR FAx 704.749.1433 JUN 5 2018 To: Fast Track Permitting Date: 06/04/2018 WOROS NCDENR MOORESVILLE REGIONAL OFFICE 610 E. Center Ave. Sent Via: FedEx Mooresville, NC 28115 (704)663-1699 Otv. Date Dacrrintinn 2 Applications 1 Fee $480 1 Flow Acceptance/Flow Tracking 1 USGS Quad Map 1 Cover Letter ® For Approval ❑ For Your Use ❑ As Requested Copied To: ❑ For Review and Comment ❑ Approved as Submitted ❑ Approved as Noted ❑ Returned for Corrections ❑ Returned After Review ❑ Resubmit for Approval Signed: r _M — Mackenzie McCool, E ORSSORN ENGINEERING GROUP 1100 Matthews -Mint Hill Matthews, North Carolina Project Narrative May 17, 2018 The overall development includes a new development lot containing 7 multi -family buildings with 359 total apartment (for -rent) units, separated by 2 new private streets. The public sewer system, maintained by Charlotte Water, will be extended across the new private streets. All buildings will share a private 8" collection system that connects to the new public sewer extension. State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300 —FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources [[�� ( FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: *'Y't� e—T (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: 1100 Matthews -Mint Hill LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other RECEIVED/NCDENR/DWR 3. Signature authority's name: Wyatt Dixon per 15A NCAC 02T .0106(b) JUN td nip Title: Manager 4. Applicant's mailing address: 1355 Greenwood Cliff, Suite 150 MWOROS OORESVILLE REGIONAL OFFICE City: Charlotte State: NC Zip: 28204- 5. Applicant's contact information: Phone number: (704) 817-9126 Email Address: wvatt,proffittdixon.com II. PROJECT INFORMATION: 1. Project name: 1100 Matthews -Mint Hill 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000_ and issued date: _ If new construction but part of a master plan, provide the existing permit number: W000_ 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.116. Longitude: -80.704' 5. Parcel ID (if applicable): 21508112 (or Parcel ID to closest downstream sewer) 111. CONSULTANT INFORMATION: 1. Professional Engineer: Jeffery C. Orsborn License Number: 028786 Firm: Orsborn Engineering Group, PA Mailing address: 610 E Morehead St., Suite 106 City: Charlotte State: NC Zip: 28202-2614 Phone number: (704) 749-1432 Email Address: iorsborn(c�orsborn-eng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McAlpine Creek W WTP Permit Number: NCO024970 Owner Name: CLT W ater(CMUD) V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQUnkown Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS_ Owner Name(s): CLTWater(CMUD) FORM: FTA 04-16 Pagel of5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities - ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial Industrial (See I5A NCAC 02T.0 103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T.0 1 14(f)? ❑ Yes ® No > If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.01 14(f) Daily Design Flow "b No. of Units Flow Apartments 135 gal/unit 359 48,465 GPD Amenity Center 50 gal/ 100 ft' 2,315 1,157 GPD Pool 10 gal/person 120 1,200GPD gal/ GPD gal/ GPD gal/ GPD Total 50,822 GPD a See 15A NCAC 02T .0114(b) (d), (e)( 1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 50,822 GPD (per 15A NCAC 02T .01 14) > Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T a03O5 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 999 PVC ➢ Section Il & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable)—02T.0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _ gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B).* ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T.0305(0): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(0 & (g) )o 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ®Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS -1 waters of Class 1 or Class It impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS -1 or WS -V), B, SA, ORW, HOW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches D 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnage ➢ If noncompliance with 02T.0305(f) or (€), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction Y As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No Y Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high-priority?" Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permittingof f Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the reauest is required Prior to submittal of the Fast Track Application and sutmortine documents. 2. Professional Engineer's Certification: C. Orsborn, PE Engineer's name from Application Item III.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seat signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): I Wyatt Dixon, Manager attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: ✓ / / �U FORM: FTA 04-16 Page 5 of 5 CHARLOTTE W(' )TE R June 1, 2018 Mr. Jeff Orsborn Orsborn Engineering Group, P.A. 610 East Morehead Street Ste. 102 Charlotte, NC 28202 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE MATTHEWS PARK 1100 MATTHEWS-MINT HILL ROAD CHARLOTTE NC CLTWATER TRACKING# 2018748 After an analysis of the sanitary sewer associated with the proposed design of project 2018748, Matthews Park, it was determined that there is sufficient capacity to accommodate the proposed sewer flow of 50, 822gallons per day (359 apartment units x 135 gpd/unit; 120 x 10 gal/person; 2315 sf x 50 gal/100 sq ft) at the connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek Wastewater Treatment Plant, NPDES permit number NC0024970, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see the attached NC DEQ FTSE form. Charlotte Water (CLTWater) agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water Supply Management Plan, PWS ID # 0160010 on file with the Public Water Supply Section of NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow. The applicant should understand that due to the involvement of other agencies and continuing growth of the water system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLTWater system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct or extend private water or sewer systems, as the appropriate local or State permits are required prior to construction. If the appropriate authorization to construct permits are not obtained construction has not started within (2) years of issuance of this flow acceptance and payment for any service connections have not been received within (2) years of issuance of this flow acceptance letter, this flow acceptance approval shall be rescinded and a new flow acceptance request must be made. If you have any questions, please do not hesitate to contact me at (704) 336 - 1006. Sincerely, gvearda2yrs 25'"WA Gwendolyn Banner Engineering Assistant Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org Operated by the City of Charlotte State of North Carolina Department of Environmental Quality Division of Water Resources Division of water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Orsborn Engineering Group, PA Project Name for which flow is being requested: Matthews Park More than one FTSE may be required far a single project if the owner of the WWTP is not responsible for all pump stations along the route ofthe proposed wastewaterfToit,. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NCO024937 Al/ flows are in MGD c. WWTP facility's permitted flow 99.0 d. Estimated obligated flow not yet tributary to the WWTP 11.39 e. WWTP facility's actual avg. flow 65.0 f. Total flow for this specific request 0.050 g. Total actual and obligated flows to the facility 76.44 h. Percent of permitted flow used 77.2% 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pt), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): CreStdale Crossing, PH 2 Downstream Permit Number: 203-572 Page 1 of 6 FTSE 04-16 na'%8 o� A v n� �5 MATTHE HINT HILL ROAD01 B� `�. SITE DARY d PROPOSED PRIVAT SEWER PR PE P E PUBLIC SE ITTE SEPARATELY �O 1 EXISTING PUB SE �rANk � JOB N 16034 USGS QUAD MAP EXHIBIT FOR --- DATE: 05/17/18 SCALE: 1"=500' DRAWN BY: MLM 1100 Matthews -Mint Hill MATTHEWS, NORTH CAROLINA ORS13ORN ENGINEERING GROUP 630 EAST MOREHEAD STREET, SUITE 106 APPROVED BY: KID A CHARLOTTE, NC 28202 P) 704-749-1432. F) 704-749-1433 North Carolina Secretary of State Search Results Page 1 of 1 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online Add Entity to My Email Notification List • View Filings • Print an Amended a Annual Report form • Print a Pre -Populated Annual Report form Limited Liability Company Legal Name 1100 Matthews Mint Hill, LLC Information Sosld: 1682765 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 3/23/2018 Fiscal Month: January Registered Agent: Teague Jr, Joe F Addresses Reg Office 1355 Greenwood Cliff Rd Ste 150 Charlotte, NC 28204 Company Officials Reg Mailing 1355 Greenwood Cliff Rd Ste 150 Charlotte, NC 28204 All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. https://www.sosnc.gov/online_services/search/Business_Registration_Results 6/5/2018