Loading...
HomeMy WebLinkAbout20070156 Ver 1_More Info Letter_20070201QF WATFR Michael F. Easley, Governor P ~ ~; G William G. Ross Jr., Secretary ` Cq tT'... North Carolina Department of Environment and Natural Resources ~ ~ ~ .,C Alan W. Klimek, P.E. Director Division of Water Quality February 1, 2007 DWQ Project # 07-0156 Greene County CERTIFIED MAIL: RETURN RECEIPT REQUESTED F. H. Shackelford, Jr. P.O. Box 38 Hookerton, NC 28535 Subject Property: F. H. Shackelford, Jr., Dam Rainbow Creek [030407, 27-82-21, C, SW, NSW] REQUEST FOR MORE INFORMATION Dear Sir or Madam: On January 26, 2007, the Division of Water Quality (DWQ) received your application dated January 19, 2007, to impact 0.085 acres of 404/wetland, 2,100 linear feet of perennial stream (fill 3001inear feet, of stream and flood 1,8001inear feet of stream) and 0.00 square feet of Zone 1 Neuse River basin protected riparian buffer and 0.00 square feet of Zone 2 Neuse River basin protected riparian buffer to construct the proposed agricultural water storage and recreation pond. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: Please complete Section XIV Cumulative Impacts (required by DWQ) of the PCN application. 2. 300 feet of compensatory stream mitigation is required for this project since you plan to fill more than `-150 feet of this perennial channel. Please provide a compensatory mitigation plan. ;The plan must conform to the requirements in 15 NCAC 2H .500 and must be appropriate for the type of impacts proposed. 3. Please provide a planting plan for the area adjacent to the new lake shoreline. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn~//h2o.enr state.nc.us/ncwetlands No°e hCarolina ~aturally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper F. H. Shackelford, Jr. Page 2 of 2 February 1, 2007 Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact me in writing and Kyle Barnes of the DWQ Washington Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincere. , yndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/~m cc: Kyle Barnes, DWQ Washington Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Filename: 070156 FHShacklefordJrDam(G reeae)On_Hold