Loading...
HomeMy WebLinkAboutNCS000312 1995 PermitState of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director Mr. Jon Nagle Heritage Environmental Ser. 4132 Pompano Rd. Charlotte, NC 28216 Dear Mr. Nagle: A19W;WA Am, V 0 Amftwd� IV 1:3EHNF1 September 29, 1995 Subject: Permit No. NCS000312 Heritage Environmental Ser. Mecklenburg County In accordance with your application for a stormwater discharge permit received on July 5, 1995, we are forwarding herewith the subject state - NPDES permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, Post Office Drawer 27447, Raleigh, North Carolina 27611 -7447. Unless such demand is made, this decision shall be final and binding. Please take notice this permit is not transferable. Part 11, B.2. addresses the requirements to be followed in case of change in ownership or control of this discharge. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Bill Mills at telephone number 919/733-5083. Sincerely, ODIC- �A.. SIGNED BY ,,RAD -,Y F31;NNL A. Preston Howard, Jr, P. E. cc: Mr. Roosevelt Childress, EPA Mooresville Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Permit No. NCS000312 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT PERMIT ill 1.14MUO.a&I10]: &P,L,V/_U11tlaI't2 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Heritage Environmental Services, Inc. is hereby authorized to discharge stormwater from a facility located at 4132 Pompano Road Charlotte Mecklenburg County to receiving waters designated as Stewart Creek, a class C stream, in the Catawba River Basin in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV hereof. This permit shall become effective November 1, 1995. This permit and the authorization to discharge shall expire at midnight on October 31, 2000. Signed this day September 29, 1995. 089A0 Y wFff A. Preston Howard, Jr., P.E., Director Division of Environmental Management By the Authority of the Environmental Management Commission Permit No. NCS000312 PERMITTED ACTIVITIES Until this permit expires or is modified or revoked, the permittee is authorized to discharge stormwater to the surface waters of North Carolina or separate storm sewer system which has been adequately treated and managed in accordance with the terms and conditions of this Permit. All discharges shall be in accordance with the attached schedules as follows: Part I: Monitoring, Controls, and Limitations for Permitted Discharges Part II: Standard Conditions for NPDES Stormwater Permits Part III: Limitations Reopener Part IV: Administering and Compliance Monitoring Fee Requirements Any other point source discharge to surface waters of the state is prohibited unless covered by another permit, authorization or approval. This permit does not relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgement, or decree. Page 2 ✓J✓ r � �� ., � � � // �r ti�� I;-�' �.,� �� �823 "•�� ��� �, �. "'a,• - 00 � �„ I _ -�. _. `� ,� '�; • _ ref \r•---- - . ' • // 1 _ _ - z`, � BM qac.; ��'z1 1{' /I fe ,� 17'3011 �` E noel— ti 3905 j� C p - �� . • : �. f �- - I Jn �-?� _ • �J RadioTowe °o 17 C. • :/"E ✓•_JgmesLea}dC _( ="—mss _ v �� lJ� `�. _• •• �i/' eserV0 39 [omeacetad ..�• 805 �. • ,1 -.. I f = �'� ;� _ �.. ;_. 04 OW 73111 ��l/Jai2r@ �✓ .- cs� 1\r�` `` o-4 . �. .�- T - _ : Fellowship .• �� w. \\ _ ���L I �� a6r'. � Toddville• - y _ r� , 0�.'`��A�• ~� y _ a �✓ .,/� � �^ r - i ,� � t S � Fpm // , : %' � � � 1 � � 0 . •% V r.. _ —/-Rod io TAwE[3 �(. �% oo - �-- i' "?., j�J v - ✓r i� ;\ < o -�J 3902 mss:- 7 kinV. ca 1:1Z X 42 Forest Law ` • �} •' • /Cor f.14homarib -I" _ �� �I \ �•. ti /4 mem may_ .• { {,-i y it ��'.: Fay Jti�� ..� Ch 39Q1oo0m.�. gym. �r -35' 15' 55' 509 2.8 W 70 U.S. 74 INTERIOR—GEOLOGICAL SURVEY' ESTON, VERGINIA-1988 50.52130" S0 51 I000m.E. ROAD CLASSIFICATION 'cv I MILE Primary highway, Light-duty road, hard or <o hard surface._.... improved surface Secondary highway, hard surface ..........= Unimproved road • Interstate Route U- S. Route O State Route /^■Nc � QUADRA14GLE LOCATION MOUNTAIN ISLAND LAKE. N. C. 35080 -C8 -TF -024 !n n')nn, Permit No. NCS000312 PART I MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: FINAL LIMITATIONS AND CONTROLS FOR STORMWATER_DISCHARGES During the period beginning on the effective date of the permit and lasting until expiration, the Permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled, limited and monitored as specified below. 1. Stormwater Pollution Prevention Plan The Permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as the Plan. This Plan shall be considered public information in accordance with Part II, Standard Conditions, Section E.$. of this permit. The Plan shall include, at a minimum, the following items: a. Site Plan. The site plan shall provide a description of the physical facility and the potential pollutant sources which may be expected to contribute to contamination of stormwater discharges. The site plan shall contain the following: (1) A general location map (USGS quadrangle map or appropriately drafted equivalent map), showing the facility's location in relation to transportation routes and surface waters, the name of the receiving water(s) to which the stormwater outfall(s) discharges, or if the discharge is to a municipal separate storm sewer system, the name of the municipality and the ultimate receiving waters; and accurate latitude and longitude of the point(s) of discharge. (2) A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices. (3) A site map drawn to scale with the distance legend indicating location of industrial activities (including storage of materials, disposal areas, process areas and loading and unloading areas), drainage structures, drainage areas for each outfall and activities occurring in the drainage area, building locations and impervious surfaces, and the percentage of each drainage area that is impervious. For each outfall, a narrative description of the potential pollutants which could be expected to be present in the stormwater discharge. (4) A list of significant spills or leaks of pollutants that have occurred at the facility during the 3 previous years and any corrective actions taken to mitigate spill impacts. (5) Certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in accordance with the requirements found in Part II, Standard Conditions, Section B.9. Page 4 Permit No. NCS000312 b. Stormwater Management Plan. The stormwater management plan shall contain a narrative description of the materials management practices employed which control or minimize the exposure of significant materials to stormwater, including structural and nonstructural measures. The stormwater management plan, at a minimum, shall incorporate the following: (1) A study addressing the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater. Wherever practicable the permittee shall cover all storage areas, material handling operations, manufacturing or fueling operations to prevent materials exposure to stormwater. In areas where elimination of exposure is not practicable, the stormwater management plan shall document the feasibility of diverting the stormwater runoff away from areas of potential contamination. (2) A schedule to provide secondary containment for bulk storage of liquid materials, storage of Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) water priority chemicals, or storage of hazardous materials to prevent leaks and spills from contaminating stormwater runoff. If the secondary containment devices are connected directly to stormwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices [which shall be secured with a locking mechanism] and any stormwater that accumulates in the containment area shall be at a minimum visually observed for color, foam, and visible sheens, prior to release of the accumulated stormwater. Accumulated stormwater shall be released if found to be uncontaminated. Records documenting the individual making the observation, the description of the accumulated stormwater and the date and time of the release shall be kept for a period of five years. (3) A narrative description shall be provided of Best Management Practices (BMPs) to be considered such as, but not limited to, oil and grease separation, debris control, vegetative filter strips, infiltration and stormwater detention or retention, where necessary. The need for structural BMPs shall be based on the assessment of potential of sources to contribute significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. (4) Inspection schedules of stormwater conveyances and controls and measures to be taken to limit or prevent erosion associated with the stormwater systems. c . Spill Prevention and Response Plan. The Spill Prevention and Response Plan shall incorporate a risk assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel (or team) responsible for implementing the plan shall be identified in the plan. A responsible person shall be on-site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. d . Preventative Maintenance and Good Housekeeping Program. A preventative maintenance program shall be developed. The program shall document schedules of inspections and maintenance activities of stormwater control systems, plant equipment and systems. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. e. Employee Training. Training schedules shall be developed and training provided at a minimum on an annual basis on proper spill response and cleanup procedures and preventative maintenance activities for all personnel involved in any of the facility's Pa(re 5 Permit No. NCS000312 operations that have the potential to contaminate stormwater runoff. Facility personnel (or team) responsible for implementing the training shall be identified in the Plan. f. Responsible Party. The Stormwater Pollution Prevention Plan shall identify a specific position(s) responsible for the overall coordination, development, implementation, and revision to the Plan. Responsibilities for all components of the Plan shall be documented and position(s) assignments provided. 9. Plan Ammendment. The permittee shall amend the Plan whenever there is a change in design, construction, operation, or maintenance which has a significant effect on the potential for the discharge of pollutants to surface waters. The Stormwater Pollution Prevention Plan shall be reviewed and updated on an annual basis. The Director may notify the permittee when the Plan does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the Plan to meet minimum requirements. The permittee shall provide certification in writing (in accordance with Part II, Standard Conditions, Section B, #9) to the Director that the changes have been made. h. Facility Inspections. Inspections of the facility and all stormwater systems shall occur at a minimum on a semiannual schedule, once in the fall (September -November) and once during the spring (April -.lune). The inspection and any subsequent maintenance activities performed shall be documented, recording date and time of inspection, individual(s) making the inspection and a narrative description of the facility's stormwater control systems, plant equipment and systems. Records of these inspections shall be incorporated into the Stormwater Pollution Prevention Plan. Visual monitoring as required in I.A.2.g.(3) shall be performed in addition to facility inspections. Implementation. Implementation of the plan shall include documentation of all monitoring, measurements, inspections and maintenance activities and training provided to employees, including the. log of the sampling data and of activities taken to implement BMPs associated with the industrial activities, including vehicle maintenance activities. Such documentation shall be kept on-site for a period of five years and made available to the Director or his authorized representative immediately upon request. Pacre 6 Permit No. NCS000312 2. Minimum Monitoring and Reporting Requirements Minimum monitoring and reporting requirements are as follows unless otherwise approved in writing by the Director of the Division of Environmental Management. a. If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, the permittee may petition the Director for representative outfall status. If it is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status, then sampling requirements may be performed at a reduced number of outfalls. b. Visual monitoring for color, odor, solids, foam, outfall staining, visible sheens and dry weather flow shall be performed at all stormwater discharge outfall locations. All visual monitoring shall be documented and records maintained with the Stormwater Pollution Prevention Plan. The initial visual monitoring event shall be performed simultaneously with the first analytical monitoring event and documentation of only this initial visual monitoring event shall be submitted along with the required analytical monitoring submittal. C. For purposes of the stormwater sampling required in this permit, all samples shall be collected from a discharge resulting from a representative storm event (See Part II, Standard Conditions, Section A). Failure to monitor storm events in accordance with the specified frequency shall constitute a violation of this permit. If the stormwater runoff is controlled by a detention pond, the following sampling requirements shall apply: (1) If the detention pond detains the runoff generated by one inch of rainfall for 24 hours, visual observations for color, foam, outfall staining, visible sheens, and dry weather flow are required, but analytical sampling shall not be required. (2) If the detention pond discharges only in response to a storm event exceeding a 25 - year, 24-hour storm (See Part II, Standard Conditions, Section A), the pond shall be considered a non -discharging stormwater control system and not subject to NPDES requirements, unless the discharge causes a violation of water quality standards. d. Samples analyzed in accordance with the terms of this permit shall be submitted on forms provided by the Director no later than January 31 for the previous year in which sampling was required to be performed. Analytical results from sampling during the final year of the permit term shall be submitted with the permit renewal application. f. This permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stormwater conveyance system are: (1) All other discharges that are authorized by a non-stormwater NPDES permit. (2) Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings, water from footing drains, flows from riparian habitats and wetlands. (3) Discharges resulting from fire -fighting. Paae 7 Permit No. NCS000312 If the storm event monitored and reported in accordance with this permit coincides with a non-stormwater discharge, the permittee shall separately monitor and report all parameters as required under the non-stormwater discharge permit and provide this information with the stormwater discharge monitoring report. g. Specific Stormwater Monitoring Requirements The specific stormwater monitoring requirements includes both analytical and visual monitoring of stormwater samples. Specific monitoring requirements are defined below. (1) Analytical Monitoring Stormwater Discharge Characteristics Units Measurement Freuenc 1 Sample T 2 Sample Location3 Biological Ox gen Demand m Annually Grab SDO Chemical Oxygen Demand m Annually Grab SDO Lead, Total Recoverable m Annually Grab SDO Total Rainfai14 inches Event Duration4 minutes Total Flow4 MG SDO Footnotes: 1 Measurement Frequency: Once per year with samples taken during the sampling window of April through November. The facility must perform analytical sampling during the first and last year of the permit term regardless of cut-off concentration conditions. 2 Sample Type: Defined in Part II, Standard Conditions, Section A. 3 Sample Location: Samples to be taken at each stormwater discharge outfall (SDO) unless representative outfall status has been granted. 4 For each sampled representative storm event the total precipitation, storm duration, and total flow must be monitored. Total flow shall be either; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the amount of built -upon (impervious) area, and the total amount of rainfall, or (c) estimated by the measurement of flow at 20 minute intervals during the rainfall event. (2) Cut-off Concentrations The arithmetic mean of all analytical sampling results collected during the term of the permit shall be calculated for each parameter and compared to the cut-off concentrations listed below. If the arithmetic mean meets the specified cut-off concentration condition for a given parameter, then the facility is not required to continue annual analytical monitoring for that parameter during the term of the permit unless a significant change in facility operations or configuration occurs. If a cut-off concentration results in discontinued analytical monitoring, the permittee is Page 8 Permit No. NCS000312 required to maintain facility operations that ensure the continuation of stormwater runoff quality. The permittee must perform analytical sampling during the fust and last year of the permit term regardless of cut-off concentration conditions. Analytical results from sampling during the final year of the permit term must be submitted with the permit renewal application. Stormwater Dischar e Characteristics Cut-off Concentration Biological Oxygen Demand < 30 m Il Chemical Ox en Demand < 120 m Lead, Total Recoverable < 0.033 m /l (3) Visual Monitoring Visual monitoring requires a qualitative visual inspection of each stormwater outfall, regardless of representative outfall status, for the purpose of evaluating the effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of stormwater pollution. No analytical tests are required. Visual monitoring of stormwater outfalls does not need to be performed during a representative storm event. Stormwater Discharge Characteristics Fre uenc 1 Monitoring lype2 Monitoring Location3 Color Semi -Annual Visual SDO Odor Semi -Annual Visual SDO Clarity Semi -Annual Visual SDO Floating Solids Semi-Airarual Visual SDO Suspended Solids Semi -Annual Visual SDO Foam Semi -Annual Visual SDO Oil Sheen Semi -Annual Visual SDO Other obvious indicators of stormwater pollution Semi -Annual Visual SDO Footnotes: 1 Frequency: The first visual monitoring event during the term of the permit must be performed during the initial analytical monitoring event. All subsequent visual monitoring will be performed twice per year, once in the spring and once in the fall. 2 Monitoring Type: Visual monitoring requires a qualitative visual observation of each stormwater outfall. No analytical testing or sampling is required. 3 Sample Location: Stormwater Discharge Outfall (SDO) Page 9 Permit No. NCS000312 (4) Analytical Monitoring Requirements for Vehicle Maintenance Activitiesl Stormwater Discharge Characteristics Units Measurement Fre uenc 2 Sample Type Sample Location3 H standard annually Grab SDO Oil and Grease mo annually Grab SDO New Motor Oil Usage gallons/month annually Estimate SDO Total Flow4 MG annually Grab SDO Lead, Total Recoverables ma annually Grab SDO Total Suspended Solids mo annually Grab SDO Detergents (14BAS)6 mg/1 annually Grab SDO Footnotes: 1 Stormwater discharges from any vehicle maintenance activity occurring on-site which uses more than 55 gallons of new motor oil per month when averaged over the calendar year shall be monitored by the permittee as specified above. 2 Measurement Frequency: Once per year with samples taken within the sampling window of April through November. 3 Sample Location: Samples to be taken at each stormwater discharge outfall (SDO) that discharges stormwater runoff from area(s) where vehicle maintenance activities occur. 4 Total flow shall be; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the atnount of built-upoll (impervious) area, and the total amount of rainfall, or (c) estimated by the measurement of flow at 20 minute intervals during the rainfall event. Total Precipitation and duration of the rainfall event measured shall result from the sampled representative storm event. 5 Total recoverable lead monitoring is required only at facilities where fueling occurs. 6 Detergent monitoring is required only at facilities which conduct vehicle cleaning operations. (5) Cut-off Concentrations for Vehicle Maintenance Activities The arithmetic mean of all analytical sampling results collected during the term of the permit shall be calculated for each parameter and compared to the cut-off concentrations listed below. If the arithmetic mean meets the specified cut-off concentration condition for a given parameter, then the facility is not required to continue annual analytical monitoring for that parameter during the term of the permit unless a significant change in facility operations or configuration occurs. If a cut-off concentration results in discontinued analytical monitoring, the permittee is Page 10 Permit No. NCS000312 required to maintain facility operations that ensure the continuation of stormwater runoff quality. The permittee must perform analytical sampling during the first and last year of the permit term regardless of cut-off concentration conditions. Analytical results from sampling during the final year of the permit term must be submitted with the permit renewal application. Stormwater Disrhar e Characteristics Cut-off Concentration 2H1 within range 6.0 - 9.0 Oil and Grease < 30 mg/1 Lead, Total Recoverable < 0.033 m /l Total Suspended Solids < 100 m Detergents (MBAS) < 0.50 m /1 Footnotes: 1 pH cannot be averaged due to the nature of the logarithmic pH scale. The most recent pH sample result shall be used for cut-off concentration purposes. Page 11 Permit No. NCS000312 SECTION B: SCHEDULE OF COMPLIANCE 1. The permittee shall comply with Final Limitations and Controls specified for stormwater discharges in accordance with the following schedule: The Stormwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of this permit and updated thereafter on an annual basis. Secondary containment, as specified in Part I, Section A, 1. b. 2. of this permit, shall be accomplished within 12 months of the effective date of this permit. 2. Permittee shall at all times provide the operation and maintenance necessary to operate the permitted storrnwater controls at optimum efficiency. Page 12 Individual. Stormwater Page Al PART II STANDARD CONDITIONS FOR NPDES STORMWATER PERMITS E TI N A: DEFIN M N 1.Act or" Ar CMLA The Federal Water Pollution Control Act, also known as the Clean Water Act, as amended, 33 USC 1251, et. seq. 2. t ManagQmenft BM Schedules of activities, prohibitions of practices, maintenance procedures, and other management practices to prevent or reduce the pollution of waters of the United States. BMPs also include treatment requirements, operation procedures, and practices to control plant site runoff, spillage or leaks, sludge or waste disposal, or drainage from raw material storage. 3. C elation „ —f Means Means shall be calculated according to the following definitions: a. Arithmetic Mean: The arithmetic mean of any set of values is the summation of the individual values divided by the number of individual values. b . Geometric Mean: The geometric mean of any set of values is the Nth root of the product of the individual values where N is equal to the number of individual values. The geometric mean is equivalent to the antilog of the arithmetic mean of the logarithms of the individual values. For purposes of calculating the geometric mean, values of zero (0) shall be considered to be one (1). C. Weighted by Flow Value: Weighted by flow value means the summation of each concentration times its respective flow divided by the summation of the respective flows. Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers having a total storage capacity of greater than 1,320 gallons. 5. C& 3-dar Dgy The period from midnight of one day until midnight of the next day. However, for purposes of this permit, any consecutive 24-hour period that reasonably represents the calendar day may be used for sampling. 6. Coal Pile Runoff The rainfall runoff from or through any coal storage pile. Individual Stormwater Page A3 container, rolling stock, or concentrated animal feeding operation from which pollutants are or may be discharged to waters of the state. 15. n v Even A storm event that is between 0.2 and 0.8 inches of rainfall and which has a duration of greater than 3 hours and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1 inches has occurred. 17. Runoff Coefficient The fraction of total rainfall that is not infiltrated into or otherwise retained by the soil, concrete, asphalt or other surface upon which it falls that will appear at the conveyance as runoff. 18. Secondary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25 -year, 24-hour storm event. 19. &-ction 313 Water Priority Chemigal A chemical or chemical category which: a. Is listed in 40 CFR 372.55 pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right -to -Know Act of 1986; b. Is present at or above threshold levels at a facility subject to SARA title III, Section 313 reporting requirements; and C. That meet at least one of the following criteria: (1) Is listed in appendix D of 40 CFR part 122 on either Table II (organic priority pollutants), Table III (certain metals, cyanides, and phenols) or Table IV (certain toxic pollutants and hazardous substances); (2) Is listed as a hazardous substance pursuant to section 31l(b)(2)(A) of the CWA at 40 CFR 116.4; or (3) Is a pollutant for which EPA has published acute or chronic water quality criteria. 20. Significanj Materials Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; raw materials used in food processing or production; hazardous substances designated under section 101 (14) of CERCLA; any chemical the facility is required to report' pursuant to section 313 of Title III of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges. Individual Stormwater Page A5 g. Steam electric power generating facilities, including coal handling sites; h. Transportation facilities classified as Standard Industrial Classifications 40, 41, 42, 44, and 45 which have vehicle maintenance shops, equipment cleaning operations, or airport deicing operations. Only those portions of the facility that are either involved in vehicle maintenance (including vehicle rehabilitation, mechanical repairs, painting, fueling and lubrication), equipment cleaning operations, airport deicing operations, or which are otherwise identified under (a) -(g) or (i) -(k) of this definition are associated with industrial activity; i. Treatment works treating domestic sewage or any other sewage sludge or wastewater treatment device or system, used in the storage treatment, recycling, and reclamation of municipal or domestic sewage, including lands dedicated to the disposal of sewage sludge that are located within the confines of the facility, with a design flow of 1.0 mgd or more, or required to have an approved pretreatment program under 40 CFR part 403. Not included are farm lands, domestic gardens or lands used for sludge management where sludge is beneficially reused and which are not physically located in the confines of the facility, or areas that are in compliance with section 405 of the CWA; j . Construction activity including clearing, grading and excavation activities except: operations that result in the disturbance of less that five acres of total land area which are not part of a larger common plan of development or sale; k. Facilities under Standard Industrial Classifications 20, 21, 22, 23, 2434, 25, 265, 267, 27, 283, 285, 30, 31 (except 311), 323, 34 (except 3441), 35, 36, 37 (except 373), 38, 39, 4221-25, (and which are not otherwise included within (a) -(j) of this definition). For the categories of industries identified in (a) through 0) of this definition the term includes, but is not limited to, stormwater discharges from industrial plant yards; immediate access roads and rail lines used or traveled by carriers of raw materials, manufactured products, waste material, or by-products used or created by the facility; material handling sites; refuse sites; sites used for the application or disposal of process wastewaters; sites used for the storage and maintenance of material handling equipment; sites used for residual treatment, storage, or disposal; shipping and receiving areas; manufacturing buildings; storage areas (including tank farms) for raw materials, and intermediate and finished products; and areas where industrial activity has taken place in the past and significant materials remain and are exposed to stormwater. For the categories of industries identified in (k), the term includes only stormwater discharges from all areas listed in the previous sentence (except access roads) where material handling equipment or activities, raw material, intermediate products, final products, waste material, by-products, or industrial machinery are exposed to ston7nwater. Material handling activities include the: storage, loading and unloading, transportation, or conveyance of any raw material, intermediate product, finished product, by-product or waste product. The term excludes areas located on plant lands separated from the plant's industrial activities, such as office buildings and accompanying parking lots as long as the drainage from the excluded areas is not mixed with stormwater drained from the above described areas. Individual Stormwater Page A7 30. Wq Any non -containerized accumulation of solid, non -flowing waste that is used for treatment or storage. 31. 2- 24 hour storm. event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years. Individual Stormwater Page A9 Nothing in this permit shall be construed to preclude the institution of any Iegal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject to under NCGS 143-215.75 et seq. or Section 311 of the Federal Act, 33 USC 1321. Furthermore, the permittee is responsible for consequential damages, such as fish kills, even though the responsibility for effective compliance may be temporarily suspended. 5. PrQptM Rights The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local Iaws or regulations. 6. S-emyerabiI4 The provisions of this permit are severable, and if any provision of this permit, or the application of any provision of this permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby. The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit or to determine compliance with this permit. The permittee shall also furnish to the Director upon request, copies of records required to be kept by this permit. 8. ExpiratiQn of Permit The permittee is not authorized to discharge after the expiration date. In order to receive automatic authorization to discharge beyond the expiration date, the permittee shall submit such information, forms, and fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date. Any permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will be subjected to enforcement procedures as provided in NCGS § 143-2153.6 and 33 USC 1251 et. seq. 9. SignatoryR irmn All applications, reports, or information submitted to the Director shall be signed and certified. a. All applications shall be signed as follows: (1} For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a Individual Stormwater Page AI I 11. Permit Actions This permit may be modified, revoked and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any permit condition. SECUQN PERATI N AND MADMN-A—N—CE OF PQLUMON NTR L ' �s� ice- .�� • The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of the permit. I • 'MY006 It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this permit. 3. Bing.of StormwgJLrCn 1 F ili a. Definitions (1) "Bypass" means the known diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established or operating mode for the facility. (2) "Severe property damage" means substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. b. Bypass Not Exceeding Limitations. The permittee may allow any bypass to occur which does not cause limitations to be exceeded, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of Paragraphs c. and d. of this section. c. Notice (1) Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and affect of the bypass. Individual Stormwater Page A13 (2) The permitted facility was at the time being properly operated; and (3) The permittee submitted notice of the upset as required in Part If, E. 5. (b) (B) of this permit. (4) The permittee complied with any remedial measures required under Part II, A. 2. of this permit. d. Burden of Proof In any enforcement proceeding the permittee seeking to establish the occurrence of an upset has the burden of proof, f r • •' i :.0: •; I. Rzresenlglivelin Samples collected and measurements taken, as required herein, shall be characteristic of the volume and nature of the permitted discharge. Samples shall be taken on a day and time that is characteristic of the discharge. All samples shall be taken before the discharge joins or is diluted by any other waste stream, body of water, or substance. Monitoring points shall not be changed without notification to and approval of the Director. 2. R= rtin Duplicate signed copies of all reports required herein, shall be submitted to the following address: Division of Environmental Management Water Quality Section ATTENTION: Central Files Post Office Box 29535 Raleigh, North Carolina 27626-0535 3. Flow Measurements Where required, appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136. To meet the intent of the monitoring required by this permit, all test procedures must produce minimum detection and reporting levels that are below the permit discharge requirements and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. If no approved Individual Stormwater Page A15 a. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this permit; b . Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit; C. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit; and d . Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location. Pl=ed Chango The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required only when: a. The alteration or addition to a permitted facility may meet one of the criteria for determining whether a facility is a new source in 40 CFR Part 122.29 (b); or b . The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants which are subject neither to effluent limitations in the permit, nor to notification requirements under 40 CFR Part 122.42 (a) (1). 2. An 'cipated NQncormphance The permittee shall give advance notice to the Director of any planned changes in the permitted facility or activity which may result in noncompliance with the permit requirements. 3. Transfers This permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary under the Clean Water Act. 4. MonitQrin.z Reports Monitoring results shall be reported at the intervals specified elsewhere in this permit. 5. Tw n , -f ur Hour Reporting a. The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment. Any information shall be provided orally within 24 hours from the time the permittee became aware B Individual Stormwater Page A17 PART III LIMITATIONS REOPENER This permit shall be modified or alternatively, revoked and reissued, to comply with any applicable effluent guideline or water quality standard issued or approved under Sections 302(b) (2) (c), and (d), 304(b) (2) and 307(a) of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved: a. contains different conditions or is otherwise more stringent than any effluent limitation in the permit; or b . controls any pollutant not limited in the permit. The permit as modified or reissued under this paragraph shall also contain any other requirements in the Act then applicable. PART IV ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the permit.