Loading...
HomeMy WebLinkAbout20180772 Ver 1_401 Application_20180618Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/4/2018 4:18:33 PM (Start Event) Accept by Montalvo, Sheri A 6/6/2018 1:21:20 PM (Non DOT Initial Review) • The task was assigned to Montalvo, Sheri A. The due date is: June 7, 2018 5:00 PM 6/4/2018 4:19 PM DWR Dfutslon of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf A. Processing Information County (or Counties) where the project is located:* Carteret Is this project a public transportation project?* r Yes G No This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. 1a. Type(s) of approval sought from the Corps:* PF Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* r% Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Number Other: List all WV nun-bers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non -404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: b Yes b No O Yes a No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? V so, attach the acceptance letter from mitigation bank or in -lieu fee program r Yes r No 1f. Is the project located in anyof NC's twenty coastal counties?* r Yes r No 1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* r Yes r No r Unknown 1h. Is the project located in a designated trout watershed?* r Yes F No Link to trout information: http://wwv.saw.usace.army.miI/Missions/Regulatory-Permit-Progrann/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Andy Munday 1b. Primary Contact Email:* amundy@stroudengineer.com 1c. Primary Contact Phone:* (XXX)XXX-XXXX 1d. Who is applying for the permit? r Owner V Applicant (other than owner) V Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: Salvation Army 2b. Deed book and page no.: DB 1582 PG 477 2c. Responsible party: (for Corporations) Town of Morehead City 2d. Address Street Address 706 Arendell Street Address Line 2 City Morehead City Fbstal / Zip Code 28557 2e. Telephone Number: (XXX)XXX-XXXX 2f. Fax Number: State / Province / Flegion NC Country USA (252)247-4098 (xxx)xxx-xxxx 2g. Email Address:* amunday@stroudengineer.com 3. Applicant Information (if different from owner) 3a. Applicant is: r Agent r Other IF other please specify. 3b. Name: Andy Munday 3c. Business Name: (if applicable) Stroud Engineering PA 3d. Address Street Address 3302-C Bridges Street Address Line 2 City State / Province/ Fbgion Morehead City NC Fbstal / Zip Code Country 28557 USA 3e. Telephone Number: (252)247-7479 (XXX)XXX-XXXX Fax Number: (252)247-4098 (xxx)xxx-xxxx 3g. Email Address:* amunday@stroudengineer.com .. ...... ..... ...... 4. Agent/Consultant (if applicable) 4a. Name: 4b. Business Name: (if applicable) 4c. Address Street Address Address Line 2 CKY State/ Province/ Region Fbstal / Zip Code Country 4d. Telephone Number: (XXX)XXX-XXXX Fax Number: (xxx)xxx-xxxx 4f. Email Address:* amunday@stroudengineer.com Agent Authorization Letter* Rease provide the Agent Authorization Letter if you are submtting this docurrent. Age ntAuthForm. pdf 242.6KB RLETYPE M- ST BE RDF ..... ...... ...... ..... ...... ...... ..... .......... C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Church Street Drainage Project 1b. Subdivision name: (if appropriate) N/A 1c. Nearest municipality / town: * Town of Morehead City 1d. Driving directions* IF it is a new project and can not easily be found in a GPS mapping system Rease provide directions. At the Northeast corner of Bridges Street and Church Street. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 637616836242000 2b. Property size: (in acres) 3.47 2c. Project Address Street Address N/A Address Line 2 City Fostal / Zip Code State / Province / Fbgion Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 34.726936 -76.741022 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Calico Creek 3b. Water Resources Classification of nearest receiving water:* SC; HQW Surface Water Lookup 3c. What river basin(s) is your project located in?* White Oak River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The land itself is vacant; to the North there are individual lots; to the East there are apartments; to the South is Lowe's Foods and to the West is a church. 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent USGS Map.pdf 283.08KB File type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent Soils Maps.pdf 527.96KB File type rust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: 0.46 acres 4e. List the total estimated linear feet of all existing streams on the property: (intermittent and perennial) 440 If 4f. Explain the purpose of the proposed project:* Control flooding along Church Street 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: The project includes installation of stormwater piping and catch basins along Church Street. The stormwater will be piped along a 20' drainage easement on the Northern boundary of the Salvation Army property. 4h. Please upload project drawings for the proposed project. Click the upload button or drag and drop files here to attach docurrent PM1248-6 SM RO.pdf 217.75KB PM1248-6 SH2 RO. pdf 490.78KB File type rust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* F Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Unknown f N/A Corps AID Number: Exarrple: SAW2017-99999 SAW -2017-00331 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Larry Baldwin Agency/Consultant Company: Land Management Group Other: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. April 4, 2018 5d1. Jurisdictional determination upload Click the upload button or drag and drop files here to attach docurrent PM2422 USACE SH1.pdf 181.56KB PM2422 USACE SH2.pdf 124.2KB File type rrust be FCF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes G No r Unknown 7. Future Project Plans 7a. Is this a phased project?* r Yes G No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands r- Streams -tributaries r- Buffers r- Open Waters r- Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site # -Reason for impact* 2b. Impact type * 2c. Type of wetland* 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* Installation of storm drain T Bog Unknown No Both 0.070 piping Fbrrranent (F) or (404, 10) or DAR (401, (acres) Wp label (e.g. Road Crossing 1 - CLlvert, Temporary (T) other) dewatering, etc) 2g. Total Temporary Wetland Impact 0.070 2g. Total Permanent Wetland Impact 0.000 2g. Total Wetland Impact 0.070 2h. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Impact is to minimize by running the stormwater piping along the Northern boundary line 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Will recommend using smaller equipment for clearing & installation of pipe 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Neither blueline or on soils map F. Stormwater Management and Diffuse Flow Plan (required by DWR) ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ...... ..... ..... ....... *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: Neither blueline or on soils map 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes F No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No To look up low density requirement click here 15A NCAC 02H .1003(2). 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state - approved local government stormwater program?* F Yes r No Fant: projects that have vested rights, exerrptions, or grandfathering from state or locally irrplerrented storrrwater programs or projects that satisfy state or locally-irrplerrented storrrwater programs through use of comrunity in -lieu prograrrs should answer no to this question. 2d. Which of the following stormwater management program(s) apply (check all that apply):* rJ Local Government r- State Local Government Stormwater Programs* rJ Phase II F- NSW r- USMP r- Water Supply Please identify which local government stormwater program you are using.* Phase II G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments: Local funds through Town of Morehead City. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H.0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)? r Yes r No 2b. Is this an after -the -fact permit application?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This is a stormwater project to drain areas that flood along Church Street 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r No r "A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8?* r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No r Unknown Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* None 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* None 7c. Historic or Prehistoric Information Upload click the upload button or drag and drop files here to attach docurrent File rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* Survey; flood elevation is 6.0'; panel 6376; map 37200637600J. Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurrent File rrust be KF or INR Signature Pr By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* J. A. Munday Signature ,T ,4. M,014CICY Date Submitted: 6/4/2018 Initial Review Is this project a public transportation project?* (? r Yes r No Change only f needed. Has this project met the requirements for acceptance in to the review process?* r Yes r No BIMS # Assigned* 20180772 Version#* 1 Reviewing Office Wilmington Regional Office - (910) 796-7215 Select Project Reviewer* Robb Mairs:eads\rlmairs2 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification What amout is owed? r $240.00 * $570.00