Loading...
HomeMy WebLinkAbout20180751 Ver 1_Riparian Buffer Authorization_20180529DWR��✓ � \# 201 80751 „ `� G State of North Carolina �` Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .02S0 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information la. Name of project: 106 McWaine Lane -Home Addition 1 b. County: Wake 1 c. Nearest municipality: Cary 1 d. Subdivision name: Northwoods 1 e. Is the project located in any of North Carolina's twenty coastal counties? If yes, answer if below. Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? _ Yes ® No 2. _ Owner Information 2a. Name on Recorded Deed: Ariadna Alonso Perez and Carlos Jesus Sibello Hernandez 2b. Deed Book and Page No. 016623 / 01174 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 016623, 01174 2d. Responsible Party for Corporations): 2e. Street address: 106 McWaine Ln 2f. City, state, zip: Cary, NC, 27513 2g. Telephone no.: 9195971516 2h. Fax no.: 2i. Email address: carlosjsibello@gmail.com 3. Applicant Information (if different from owner) 3a. Applicant is: 0 Agent 0 Other, specify: J 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: T 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 10-2013 Page 1 of 5 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0764662439 1 b. Site coordinates (in decimal degrees): Latitude: 35.800897 1 Longitude: -78.776697 1c. Property size: 0.26 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Black Creek 2b. Water Quality Classification of nearest receiving water: C; NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Home addition _ 3b. Attach an 8 '/: x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 115 linear feet _ 3e. Explain the purpose of the proposed project: Accommodate family row 3f. Describe the overall project in detail, including the type of equipment to be used: We are going to be adding some extra square footage to the home. 811 will be called to mark utilities and _ excavation will be done using a walk behind trencher. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all priorphases) in thepast? ❑ Yes No El Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project(including all priorphases) in thepast? ❑ Yes ❑ No ® Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 5 C. Proposed Impacts Inventory 1. Avoidance and Minimization 1 a. Addition to the house will be built with the closest area to the bank at least 30 feet away from it. The project will be designed to have the least possible impact upon the natural resources on the site and the site's 1. Buffer Impacts expected. 1 b. - Protected area will the taped off to ensure that the workers respect the buffer limit - Excavation for the foundation, plumbing, etc will be done using lightweight or manual equipment 1a. Project is in which protected basin? M Neuse ❑ Randleman El Tar -Pamlico ❑ Jordan El Catawba ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact Reason for number— impact Permanent (P) or Temporary T Type of impact Stream name (exempt, allowable, allowable w/ mitigation) Buffer mitigation required? Zone 1 Zone 2 impact impact (sq ft) (sq ft) B1 ® P ❑ T Home addition Allowable UT to Black Creek ❑ Yes ® No 225 B2 El P El T LJ Yes Ll No B3 LJ P H T El Yes No Yes Ll No B4 El P Ll T 0 Yes El No 2e. If no, then discuss what type of mitigation is proposed. B5 El P LJ T 1 0 Yes L1 No B6 LJ P Ll T LJ Yes LJ No Total buffer impacts 225 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Addition to the house will be built with the closest area to the bank at least 30 feet away from it. The project will be designed to have the least possible impact upon the natural resources on the site and the site's vicinity. This project is taking place due to the need for extra space since the family grew and another child is expected. 1 b. - Protected area will the taped off to ensure that the workers respect the buffer limit - Excavation for the foundation, plumbing, etc will be done using lightweight or manual equipment - No vegetation will be damaged or removed during the construction project - All the construction debris will be hauled away from the project site 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that Yes No requires buffer mitigation? 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet s uare feet Zone 1 N/A 0 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS Yes Ll No proposed? 2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 5 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ® Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1 b. If you answered "yes" to the above, does the project require preparation of an If due to site constraints, a BMP other than a level spreader is proposed, please provide a environmental document pursuant to the requirements of the National or State (North plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Carolina) Environmental Policy Act NEPA/SEPA ? Manual and attach a BMP Supplement Form. 1 c. If you answered "yes" to the above, has the document been finalized by the State F. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public federal/state land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act NEPA/SEPA ? 1 c. If you answered "yes" to the above, has the document been finalized by the State Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations -1�- 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated ❑ Yes ® No Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules 15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): h(A)64 Applicant/Agent's Printed Name Appli ant/Agent's Signature Date (Agent's signature is valid onl if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by For government transportation projects sent by First Class Mail via the US Postal Service: delivery service (UPS, FedEx, etc.): NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 For all other projects sent by First Class Mail via the US Postal Service OR For all other projects sent by delivery service (UPS, FedEx, etc.): FORM: BA 10-2013 Page 4 of 5 Karen Higgins Karen Higgins NCDWR — 401 & Buffer Permitting Branch NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM: BA 10-2013 Page 5 of 5 Impact map: 106 McWaine Lane, Cary Note�: Addition is going to be a 2 story building attached to current house, Building is going to take an area of 15'x1S' of Zone 2.