HomeMy WebLinkAboutNC0065684_Compliance Evaluation Inspection_20180531N -Z
Water Resources
Eh ViAQNMEHTAL QVALiTV
May 31, 2018
Mr. Shannon V Becker
Aqua North Carolina Inc.
202 Mackenan Court
Cary, NC 27511
SUBJECT: Compliance Evaluation Inspection
Country Wood WWTP
NPDES Permit #NC0065684
Cabarrus County, NC
Dear Mr. Becker:
ROY C OOPE1R
Gayff var
A ICHNEL S_ REGAN
Secrelan.
LLVDA CLTLPEPPER
MRF1M D&gCfVr
On May 22, 2018, Roberto Scheller of this Office conducted an inspection at the subject facility.
This inspection was conducted as a Compliance Evaluation Inspection (CEI) to insure compliance with permit
requirements and conditions. At the time of inspection subject facility appeared to be well maintained and
operated. We wish to thank you and the operating staff for assistance regarding this inspection.
The enclosed report should be self-explanatory; however, should you have any questions, please do not hesitate to
contact Roberto Scheller, of the Mooresville Regional Office, at 704-663-1699 or roberto.scheller@ncdenr.gov.
Sincerely,
DocuSigned by:
14 C681AF 7425...
orey asinger, Regional Supervisor
Water Quality Regional Operations Section
Mooresville Regional Office
Enclosure: Inspection Report
cc: ORC — kashattuck@aquaamerica.com
State of North Carolina I Environmental Quality I Water Resources
610 East Center Avenue, Suite 301, Mooresville, NC 28115
704-663-1699
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 15 I 3 I NCO065684 111 12 I 18/05/22 I17 18 I S i 19 LG] i 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA ----------------------Reserved-------------------
67 70I�_71 I 72 Lr] 73I i74 751 I I I 1 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
09:55AM 18/05/22
16/10/01
Country Wood WWTP
NCSR 1004
Exit Time/Date
Permit Expiration Date
Monroe NC 28110
01:21 PM 18/05/22
21/04/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Shannon V Becker,202 Mackenan Ct Cary NC 27511/President/919-653-5570/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Roberto SchellerDoc�y: MRO WQ//252-946-6481/
5/31/2018
E91 C2A007838943E...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
6/1/2018
Page#
A14CC681AF27425...
NPDES yr/mo/day Inspection Type
NCO065684 I11 12, 18/05/22 117 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO065684 Owner - Facility: Country Wood WWTP
Inspection Date: 05/22/2018 Inspection Type: Compliance Evaluation
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
0
❑
❑
❑
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The current NPDES permit expires on April 30, 2021.
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported CM
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
❑
Comment: All records requested during inspection was readily available for review.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Page# 3
Permit: NCO065684
Inspection Date: 05/22/2018
Owner - Facility: Country Wood WWTP
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: This Office has received several complaints in regards to odor from the Country Wood
WWTP. Site was visited as result of complaint investigation on April 23, 2018. A Compliance
Evaluation Inspection was conducted on May 23, 2018. During both site visits no unusally
strong or offensive odors were noted. Aeration basins had an earthy smell and EQ basin
had light ammonia smell that disipated 20-30 feet away from basin.
Laboratory
Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
0
❑
1:11:1
Are all other parameters(excluding field parameters) performed by a certified lab?
0
❑
1:11:1
# Is the facility using a contract lab?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ 0 ❑
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ 0 ❑
Comment: Field analysis are performed under Field Certification #5035 for DO, pH, Temperature, and
Cl2. Field equipment calibration logs were reviewd. All other analysis are performed by
Water Tech Labs under Certification #50.
Equalization Basins
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: It was noted during inspection that construction on EQ basins was compleat and 2
treatment plants have been converted to equalization basins equiped with dual pumps, high
water alarms and related controls.
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Yes No NA NE
Page# 4
Permit: NCO065684
Inspection Date: 05/22/2018
Owner - Facility: Country Wood WWTP
Inspection Type: Compliance Evaluation
Mode of operation
Ext. Air
■
Bar Screens
Yes No NA NE
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
■
❑
Type of aeration system
❑
•
❑
❑
Is the basin free of dead spots?
0
❑
❑
❑
Are surface aerators and mixers operational?
❑
❑
0
❑
Are the diffusers operational?
0
❑
❑
❑
Is the foam the proper color for the treatment process?
0
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
0
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
❑
❑
0
❑
Comment: EQ basins pump to 3 treatment trains. Each treatment unit has EQ basin, areobic digester,
aeration basin, secondary clarifier and sand filter. Treatment units discharge into common
effluent pipe and passes through UV disinfection, flow meter and outfall pipe.
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
Yes No NA NE
■
❑
❑
❑
■
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
❑
■
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
❑
❑
❑
■
Comment: It was noted that on 2 of 3 treatment units sludge balls were popping up in secondary
clarifiers.
Page# 5
Permit: NC0065684
Inspection Date: 05/22/2018
Owner - Facility: Country Wood WWTP
Inspection Type: Compliance Evaluation
Is the capacity adequate?
0
❑
Pumps -RAS -WAS
Yes No NA NE
Are pumps in place?
0
❑
❑
❑
Are pumps operational?
0
❑
❑
❑
Are there adequate spare parts and supplies on site?
❑
❑
❑
0
Comment: RAS and WAS in moved with air lift purr
Aerobic Digester
Yes No NA NE
Is the capacity adequate?
0
❑
❑
❑
Is the mixing adequate?
0
❑
❑
❑
Is the site free of excessive foaming in the tank?
0
❑
❑
❑
# Is the odor acceptable?
0
❑
❑
❑
# Is tankage available for properly waste sludge?
0
❑
❑
❑
Comment: WAS is wasted to aerobic digesters and thickened before being removed for disposal
by
L&L Environmental Services, LLC. L&L was hauling sludge from facility at time of
inspection.
Filtration (High Rate Tertiary)
Type of operation:
Is the filter media present?
Is the filter surface free of clogging?
Is the filter free of growth?
Is the air scour operational?
Is the scouring acceptable?
Is the clear well free of excessive solids and filter media?
Comment: Air scour is operated manually. At time of in
no visible suspended solids.
Disinfection - UV
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
Comment: Intensity meter not operational.
\[-T-S►rem ►/_M►1=111111
Down flow
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
❑
❑
❑
■
❑
❑
❑
■
M
❑
❑
❑
effluent from sand filters was clear with
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ❑ ■
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Page# 6
Permit: NCO065684 Owner - Facility: Country Wood WWTP
Inspection Date: 05/22/2018 Inspection Type: Compliance Evaluation
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
0
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
0
❑
❑
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
0
❑
❑
❑
representative)?
Comment: At the time of insDection effluent samDler was recorded at 5 dearees Celsius. Influent
sampler was recorded at 4 degrees Celsius. New flow meter has been installed with
calibration done at time of installation by Johnson Inc. At time of inspection effluent at outfall
#001 was clear with no visible suspended solids. Foam was noted at point of discharge but
disipated within 2 feet of discharge point.
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
Comment:
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ ■
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Page# 7