Loading...
HomeMy WebLinkAbout20180451 Ver 1_Flume Stream Crossing 2_20180604Homewood, Sue From: Joey Lawler <JLawler@smeinc.com> Sent: Monday, June 4, 2018 8:39 AM To: Homewood, Sue Cc: Roden Reynolds, Bryan K CIV (US) Subject: [External] RE: PNG Line 442 Attachments: Flume Stream Crossing 2 - .pdf Sue/Bryan — for your records, attached is an additional temporary culvert crossing detail that was taken from DEQ's Erosion and Sediment Control Design Manual and included on our E&S drawing for this project. It differs slightly from the culvert crossing detail that I provided in the PCN, but there is no difference in the already approved temporary impact footprint, proposed limits of disturbance, restoration details or anything like that. The project should start up in about a month or so, and Sue we have also included your notes on the E&SC drawings. Thanks! j Joey Lawler, PWS Natural Resources Project Manager S&ME # 9751 Southern Pine Blvd. Charlotte, NC 28273 0: 704.523.4726 111 E M: 704 604 6474 www.smeinc.com au I L T FOR Linkedln I Twitter I Facebook VERSATILITY This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. From: Homewood, Sue [mailto:sue.homewood@ncdenr.gov] Sent: Friday, June 1, 2018 8:29 AM To: Joey Lawler <JLawler@smeinc.com> Cc: Roden Reynolds, Bryan K CIV (US) <Bryan.K.Roden Reynolds@usace.army.mil>; Munzer, Olivia <olivia.munzer@ncwildlife.org> Subject: PNG Line 442 Joey, As we discussed, this has a requirement to notify me upon completion of the work at Stream 30. 1 Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 20 -FEET MIN. SILT` BA SILT` DEWATERING HOSE77� O_ PROPOSED PIPELINE SEDIMENT TUBE OR EARTHEN BERM 20 -FEET MIN. 20 -FEET MIN. _� Lu Y z z Q m � OQL CL 0 O 1- 20 -FEET MIN. _� Lu w V Y V_ w � w w w w �m �m 102 FLUME & STONE STREAM CROSSING NOTES: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 11 12 13 14 15 16 17 SUBGRADE SPOIL PILE STREAM BED SUBSTRATE SPOILS COFFER DAM (TYP) TEMPORARY k CULVERT u z Lu CLASS B EROSION STONE NCDOT #5 OR #57 WASHED STONE 20 -FEET MIN. z Lu w V) Q Lu Z Lu z Q w 0- DURING CONSTRUCTION - TYPICAL FLUME & STONE STREAM CROSSING G G w ry Q w U Q a ry *INSTALL SECOND ROW OF SILT FENCE PARALLEL TO STREAM BANK WITH 2' OFFSET NCDOT #5 OR #57 WASHED STONE (AS NEEDED) 1/2 CULVERT DIAMETER OR 12" SEPARATION (WHICHEVER IS GREATER) 20 MIL HDPE LINER OR APPROVED EQUIVALENT A - A' PROFILE VIEW CLASS B EROSION STONE CULVERT CAPACITY = BANKFULL FLOW (USE MULTIPLE BARRELS IF NECESSARY) REFER TO AUTHORIZED PERMITS FOR ADDITIONAL LOCAL, STATE, AND FEDERAL REQUIREMENTS. STONE CROSSING AND CULVERT WILL BE INSTALLED SUCH THAT LOW FLOW PASSAGE OF WATER AND AQUATIC LIFE IS NOT INHIBITED. MECHANICAL EQUIPMENT SHALL NOT OPERATE WITHIN STREAMS OR TRAVERSE STREAMS WITHOUT THE USE OF TEMPORARY CROSSING. CONSTRUCT TEMPORARY STONE CROSSING AND COFFER DAM WITHIN CONSTRUCTION EASEMENT. CONSTRUCT DAMS USING SANDBAGS COVERED WITH CLEAN 20 MIL HDPE LINER. CONTRACTOR MAY USE OTHER METHODS FOLLOWING APPROVAL FROM THE ENVIRONMENTAL INSPECTOR AND THE OWNER. THE HEIGHT OF THE COFFER DAM SHALL BE CALCULATED BY USING H/4 + 1 -FEET WHERE H = HEIGHT OF STREAM BANK WITH A 2 -FEET MINIMUM DAM HEIGHT. ADDITIONAL HEIGHT MAY BE REQUIRED BASED ON FLOW CONDITIONS AT THE TIME OF CONSTRUCTION. COFFER DAMS TO BE REMOVED UPON COMPLETION OF OPEN CUT PIPELINE INSTALLATION AND STREAM BED RESTORATION TO ALLOW NATURAL WATER FLOW. CONTACTOR SHALL DEWATER AREA BETWEEN DAMS AND ENSURE TIGHT SEAL OF DAMS PRIOR TO TRENCHING. CONTRACTOR SHALL BE RESPONSIBLE FOR PASSING ALL WATER WHICH IS TO BE FILTERED THROUGH A SILT BAG. INSTALL 12 -INCH COMPOST FILTER SOCK ON THREE DOWNGRADIENT SIDES OF SILT BAG. PUMPS SHALL BE PLACED WITHIN SECONDARY CONTAINMENT TO REDUCE POTENTIAL FOR FUEL SPILLS. INSTALL FLUME PIPE AND PROVIDE A MINIMUM OF 12 -INCHES OF COVER OR 1/2 DIAMETER OF PIPE (WHICHEVER IS GREATER). CONTRACTOR IS RESPONSIBLE TO SIZE FLUME PIPE TO ADEQUATELY ACCOMMODATE BANK FULL FLOWS. ALIGN FLUME PIPE(S) TO PREVENT BANK EROSION AND STREAMBED SCOUR. ALL STREAM CROSSINGS SHOULD BE MADE PERPENDICULAR TO THE STREAM TO THE EXTENT PRACTICAL. INSTALL SILT FENCE PERPENDICULAR TO THE CONSTRUCTION EASEMENT AT STREAM CROSSINGS. EXTEND SILT FENCE 20 -FEET MINIMUM ON BOTH SIDES OF EDGE OF CONSTRUCTION EASEMENT OR AS SHOWN ON PLANS. LIMIT THE REMOVAL OF VEGETATION TO THE CONSTRUCTION EASEMENT AREA. ONLY HAND CLEARING IS ALLOWED ON STREAM BANKS AND WITHIN 10 -FEET OF TOP OF BANK. STREAM CROSSINGS SHOULD BE CONDUCTED "IN THE DRY" DURING LOW FLOW CONDITIONS. LOCAL WEATHER CONDITIONS SHALL BE MONITORED IN ORDER TO AVOID ANTICIPATED RAINFALL EVENTS DURING, OR IMMEDIATELY FOLLOWING, INSTALLATION OF THE PIPE. CROSSINGS SHALL BE EXECUTED IN THE MINIMAL AMOUNT OF TIME NECESSARY; BEGIN INSTREAM WORK IN THE MORNING, INSTALLATION AND RESTORATION SHALL OCCUR WITHIN A 24-HOUR PERIOD TO THE FULLEST EXTENT PRACTICAL. IN NO INSTANCE SHOULD INSTALLATION AND RESTORATION EXCEED 48 HOURS WITHOUT APPROVAL OF THE ENVIRONMENTAL MONITOR. CONTRACTOR SHALL ATTEMPT TO SEGREGATE STREAM BED SUBSTRATE FROM SUBGRADE. DO NOT REMOVE FLUME PIPE DURING TRENCHING, PIPELAYING, OR BACKFILLING ACTIVITIES, OR INITIAL STREAMBED RESTORATION EFFORTS. NO WASTES, SPOILS, SOLIDS OR FILLS WILL BE PLACED WITHIN STREAMS, WETLANDS, OR RIPARIAN AREAS BEYOND THE LIMITS OF THOSE DEPICTED ON THE DRAWINGS. ONCE CONSTRUCTION HAS BEEN COMPLETED STREAM CROSSINGS SHALL BE RESTORED TO ORIGINAL CONDITIONS TO FULLEST EXTENT PRACTICAL, INCLUDING SUBGRADE AND STREAM SUBSTRATE MATERIALS. ADDITIONAL SITE SPECIFIC MEASURES MAY BE NECESSARY IN ORDER TO PROTECT AFFECTED STREAMS AND PREVENT VIOLATIONS OF WATER QUALITY STANDARDS. ENVIRONMENTAL INSPECTOR TO ASSIST IN DETERMINATION OF WHETHER PUMP AROUND OR FLUME STREAM CROSSING METHOD IS TO BE USED. TYPICAL FLUME & STONE STREAM CROSSING DETAIL (OPTIONAL) sc NOT TO SCALE