Loading...
HomeMy WebLinkAbout20061151 Ver 2_Time Ext Request_20090423Mcmillan, Ian From: Buckner, Todd H [TBUCKNER@wilbursmith.com] Sent: Thursday, April 23, 2009 2:30 PM To: ian.mcmillan@ncmail.net Subject: Apex Peakway DWQ Project # 06-1151, Ver. 2 Ian, We held a meeting with Annette Lucas on Tuesday April 21, 2009 to discuss the above mentioned project and the requirements for the stormwater management plan. We would like to request an extension for the resubmittal of the required information until May 29, 2009. Please let us know if this will be acceptable. Thanks Todd H. Buckner, PE, LEED AP Project Manager - Civil Infrastructure Wilbur Smith Associates 421 Fayetteville Street, Suite 1303, Raleigh, NC 27601 main: 919.755.0583 direct: 919.573.4191 fax: 919.832.8798 tbuckner cz,wilbursmith.com www.wilbursmith.com A As part of Wilbur Smith Associates' "Green Initiative", please consider the environment before printing this email.