Loading...
HomeMy WebLinkAbout20160071 Ver 2_Approval Letter_20180531Environmentul Quality ROY COOPER t,,,� � �,�� �� MICHAEL S. REGAN �, „����„��, LINDA CULPEPPER n��,-, �,:, n�.., �,�,� M�v +I.'_018 Johnston Countv DW'R Pruject No.?0160071 ver? Sam's E3ranch Greem�av TIP No. U-Si;OLB MOUIFIC�TION of APPROV.4L ol'a01 WATER QI��ALITY CERI�IFI('Al'ION and NEUSF. BLiFFGR AUTHORIZ.ATION,.tiith ADDITIOtiAL CONDITIOIVS Mr. David DeYoung. Planning Dirutor Town of Cla���on PO Bo� 777' l la��ron, NC ?7?j'_8 Dear Mr. DeYoun¢: You have uur approval, in accordancz aith thz cundi�ions listzd below�. for the followin�; ReviseJ impucts Ior thz purpos� of the Sam's Branch Greem+�a� in .lohnston County: Site I Total Bank StabilizAtion to In[ermiftenf Stream 10 10 Total S[ream Impact for Pru,ject III linear feet. in [he Neuse River Basin ar ft) Total Stream Im 10 10 Wetland Im acts in the Ncuse River 13asin (No Revision) Sitc Tem orarv Fill (ac) �1 ..:. 0.01 5 < 0.0 I 7 < 0.01 S 0.0? 10 O.O I Total 0.0� Ibtul N'etland Impac[ tor Nro�ect: U.Ua acres. SI�IrulNunh<�orulind Fnni'nnmtntalllpalil� Inl7 h1,ul Srn�ier Ccnwr �. Rul�•ieh. Nurlh Corolina _7ro+,J-1�,17 i2evised lYeuse Ri arian Buffer Im acts Site Zone 1 Im act s ft Zone 2 Im act s ff Total Im act (s ft) 1 � 4245 2282 6527 2 3557 .i318 6875 3 0 153 153 6 3222 1416 46.i 8 9 1144 2909 4053 11 3466 1332 4798 12 3674 - 1453 5127 Totals 19308 12863 32171 * n/a = Total for Site is less than 1/3 acre and 150 linear teet of impact, no mitijation required 'I'otal Buffer Impact for Project: 32171 square feet. The project shall be constructed in accordance with your application received January 19, 2016 and Modification Requested received May 21, 2018. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 4135 This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. This approval is also valid for the Neuse Riparian Buffer Rules (15A NCAC 2B.0233. In addition, you should acquire any other federal, state or local permits before you proceed with your project includin� (but not limited to) Sediment and Erosion Control, Non-Dischar�e and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. [f the property is sold, the new owner must be �iven a copy of this Certification and approval letter, and is thereby responsible�for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (►�ow or in the future) eYceed 1�0 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .Oi06 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 2B.0233. (For this approval to remain valid, you must adhere to the conditions listed in the General Certification and any additional conditions listed below. Condition of Certification: 1. All conditions in the ori;inal Water Quality Certification for this project, dated February 23, 2016, still apply. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearin�s. You must file the petition with the office of Administrative Hearin�s within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office.of Administrative Hearin�s during normal office hours. The Office of Administrative Hearings accepts filings Monday throu�h Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The ori�inal and one (1) copy ofthe petition must be filed with the Office of Administrative Hearinas. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearin's within five (�) business days following the faxed transmission. The mailin� address for the Offtce of Administrative Hearin�s is: � Office of Administrative Hearings 6714 Mail Service Center Ralei�h, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Nlr. Sam M.Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Rob Ridings at 919-707-8786. Sincerely, �if. Linda Culpepper, Interim Director Division of Wa[er Resources Electronic copy only distribution: Tom Steffens, US Army Corps of Engineers, Washington Field Office David Cooper, Ecological Engineering, LLP File Copy Environmenru( Quafity NCUWR Pruject No.: .4pplicanL• Project Name: DAtc uf Issuance of 101 W'a[er Qualitq Certilication: County: _ ROY COOPER �;�.��,��,��,� MICHAEL S. REGAN �.-� �, r�„� LINDA CULPEPPER i„�.����,�� i,�,��•���,,,� Cer[ificate uf Completion Upon tumpletion of all work approved �ci�hin the -301 �4'ater Quali[y Certifica[iun or applicable BidTer Rules, and am subsequem modiYications, the applicant is required to re[urn this certitica[e to the J01 Transportation Pennitting UniL North Carolina Divisiun of Water Rciuurces, 1617 Mail Senice Center, Ralei�h. NC,'_7699-1617. This form may be rotumed to NCDW'R by the �pplicant, the applicant's audinrized a!,ent, ur ihe piuject zngineer. I� is not necessan� to send ceniticates froin nll oFthese. :I pplicanl'+ CerliJicutin�t I. _. hereb�� state that, to the bes� uf nry abilities, due care and dili_ence was used in the obserrvation nf the construction such that the construc�iun �va� obszrveJ tu be built �ri�hin subs[antial cnmpliancc and intcnt ofthc -l01 Warer Quali�� Certification and Quffer Rules. the approved pl.ms and specifications. snd othur supponin� matrrials. Signmure: -- _ ------ - _ - -- — - Date: 4genr'c CertiJicatinn I, , hzreb}� state iha[. to the best uf m�� abilities. dur care and diligence �+�as used in [he observation of the comtruction such that the construction �as ubserved �u be built within sub,[antial compliance and in[ent of Ihe -701 W'atzr Quality Certitication and Buffer Rules. the approved plans and specifica[ions, and o[her suppuning matcrials. Si�nature: F�rgineer's Certijirurro�e Panial Final _ Date: _ _ - — -- 1, . as a dul�� registered Professionul Eneineer in the Sia�e uf Nordi Carolina. havino been au[horized to observe (p�riodically. weekly, tull [ime) the construction uf the project for the Perniittee hereb� s[ate �hat, to �he best uf mp abilities, due care anJ dili�encr was used in the observatiun ot the construe�ion such that thr constivetion was ob+erved tu bc buih within substantial compliance and intent ol lhe d01 Water Qualiq Certification and Buffer Rules, tha epproved plans and specifications. and other supporting materials. Si�nature Datz Reeistration No. SWtc of Nonh Carolmu I l_ncinnnnenml (lua6n I"17hladtipi��i;lrntrr Ralrrvh.VurlhCarolina'769��-I"I�