Loading...
HomeMy WebLinkAbout20071668 Ver 2_Triage Check List_20090529Triage Check List Date: -41 6 Project Name: DWQ#: O-? ` ZO lp g Has n County: To: ? ARO Roger Edwards ? WaRO Kyle Barnes FRO Ken Averitte ? WiRO Joanne Steenhuis/Chad Coburn ? MRO Alan Johnson ? WSRO Sue Homewood ? RRO Lauren Witherspoon From: o?n 11/1 C M.1 \ 0A Telephone : (919) ?? 3' 1750 The file attached is being forwarded to your for your evaluation. Please call if you need assistance. Stream length impacted Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps Minimization/avoidance issues Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? Check drawings for accuracy Is the application consistent with pre-application meetings? Cumulative impact concern Comments: