Loading...
HomeMy WebLinkAbout20090448 Ver 1_Notice of Violation_20090527. X?w NCENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 27, 2009 Mr. Scott Banks 717 Dillingham Road Barnardsville, NC 28709 Subject: Request for More Information 401 Water Quality Certification Sardis Road Project DWQ Project # 09-0448 NOV-2008-OP-0055 and NOV-2008-CV-0018 Buncombe County Response deadline: June 26, 2009 or 30 days from receipt Dear Mr. Banks: The Division of Water Quality (DWQ) has performed a preliminary review of a 401 Water Quality Certification application submitted for the above referenced property. Additional information will be required in order to complete the review process. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. The site plan for the project indicates that 145 feet of stream will be culverted to accommodate a portion of the facility parking lots. As the proposed front parking lot is the purpose for these impacts and that you own property directly adjacent to this project, all alternatives must be fully explored and submitted along with all efforts to avoid and minimize necessary impacts per 15A NCAC 2H .0506(b). You must include a thorough "avoidance and minimization" discussion, which addresses these requirements. 2. Please explain why Fill area "B" will not be restored. The Division required, as part of the Notice of Violation, that this area be restored in addition to Fill area "A". You must re-submit your restoration plan which includes this area. 3. For the stream restoration work, you must submit final design and construction drawings based on surveyed reference reach conditions (pattern, dimension, and profile) in the immediate Hominy Creek drainage, representative of pre-project conditions. Location 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296-45001 FAX: 828-299-7043i Customer Service: 1-877-623-6748 On Internet: www ncwaterquality.org N?o/}ahCai-oll ii na An Equal Opportunity '•. Affirmative Action Employer v ? atmjally Scott Banks May 27, 2009 Page 2 of 3 4. You must submit a final monitoring plan, which includes stream stability and vegetation success criteria. The monitoring should be for minimum of 5 (five) years, on an annual basis, and include both a "failure to meet success criteria" plan and an annual reporting component. You should include the proposed two cross sections (specified in Part 3.2 of the plan) and the longitudinal profile. 5. It should be noted, that if future development equals or exceeds 24% impervious surface, you will be required to develop, submit for DWQ approval, and implement Stormwater Management Plans. The stormwater management plan must include construction plans, specifications, stormwater BMP worksheets, and supporting calculations. The stormwater best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. Protective mechanisms which ensure that the above condition will be complied with must be submitted. Please provide your response in writing to the addresses below prior to June 29, 2009 or 30 days from receipt. Four copies of the required information should be provided to the 401 Permitting Unit at: Ms. Cyndi Karoly 401 Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 and a single copy to the Asheville Regional Office at: Ms. Susan A. Wilson Surface Water Protection Section 2090 US HWY 70 Swannanoa, NC 28778 If we do not hear from you by the deadline, we will assume that you no longer want to pursue this project and we will consider the project withdrawn. However, timely resolution of the associated NOVs will still be required through necessary stream restoration and sediment removal. Scott Banks May 27, 2009 Page 3 of 3 This letter only addresses the preliminary application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Wilson at 828-296-4500, if you have any questions. Sincerely, Roger C. Edwards Regional Office Supervisor Surface Water Protection Section cc: Ms. Liz Hair - US Army Corps of Engineers Asheville Field Office David McHenry - North Carolina Wildlife Resources Commission Cyndi Karoly - 401 Permitting Unit Buncombe County Planning ARO File copy G:\WPDAI'A\DGMWQ\Buncombe\Complaints\Banks-West\Banks Sardis Road addinfo 5 2009.doc