Loading...
HomeMy WebLinkAbout20050213 Ver 1_Certification of Completion_20090520Certification of Completion DWQ Project No Applicant: i Project Name: 0 ?- 0 -Z I - County: Date of Issuance of Isolated Wetland Permit: ,Q,up . a(. VU, /z-&-/0 ,ckson Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 160 Mail Service Center, Raleigh, NC, 27699-160. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification _P Isi T?V_. d was hereby state that, to the best of m abilities due care a used in the observation of the construction such that the construction was observed to be built with nllrsubstan al compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other suppo 'n materials. Signature: Date: Agent's Certification 1. , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designee[ by a Certified Professional f v as a duly registered rofessional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date MA,( 2 0 2009 i n . ,v r ? ? t 1 1 i . 4 Permit Number: 20053133.9 'Permit Type: GP30 ' Name of County: Jackson Name of Permittee: David and Sherry Sims . • Date of Issuance: March 9, 2005 Project Manager: Debbie Miller Upon completion of the activity authorized by this pen-nit and any mitigation required by the permit, sign this certification and return it to the following address: U.S. Army Corps of Engineers Attention: CESAW-RG-A 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the tenns and conditions of the said pennit, and required mitigation was completed in accordance with the permit conditions. ? ao Sig ure of ermi ee Date / I LV. Jevtb- --o-, 31-1c) i N G-D Env;r, Resowiy-es ?t)j4. of wo-4-ne Qvalil +? D aCqo U.S. P-WI 70 swa-mavoa NL 2??7?