HomeMy WebLinkAbout20180648 Ver 1_Approval Letter_20180530
State of North Carolina | Environmental Quality | Water Resources
2090 U.S. Highway 70, Swannanoa, North Carolina 28778
828-296-4500
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director Water Resources
Environmental Quality
May 30, 2018
DWR# 18-0648
Henderson County
Annabel Benito
110 Sycamore Avenue
Bridgewater, NJ 08807
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL
CONDITIONS
Benito Horse Farm
Dear Ms. Benito:
You have our approval for the impacts listed below for the purpose described in your
application dated May 2, 2018, received by the Division of Water Resources (Division) May 11,
2018, with subsequent information received May 16, 2018. These impacts are covered by the
attached Water Quality General Certification Number 4139 and the additional conditions listed
below. This certification is associated with the use of Nationwide Permit Number 29 once it is
issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other
federal, state or local permits before proceeding with your project, including those required by
(but not limited to) Sediment and Erosion Control, Non-Discharge, Water Supply Watershed,
and Trout Buffer regulations.
This approval requires you to follow the conditions listed in the enclosed certification(s) or
general permit and the following additional conditions:
1. The following impacts are hereby approved provided that all of the other specific and
general conditions of the Certification are met. No other impacts are approved,
including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)]
DocuSign Envelope ID: C67D05E4-03B3-4192-B173-AF5BE8DB2C6F
Benito Horse Farm
DWR# 18-0648
401 Approval
Page 2 of 3
Type of Impact
Amount Approved
(units)
Permanent
Amount Approved
(units)
Temporary
Stream
S1 60 (feet) 20 (feet)
2. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification.
If you change your project, you must notify the Division and you may be required to
submit a new application package with the appropriate fee. If the property is sold, the
new owner must be given a copy of this approval letter and General
Certification(s)/Permit/Authorization and is responsible for complying with all
conditions. [15A NCAC 02H .0507(d)(2)]
3. Any additional impacts to streams and/or wetlands as a result of future roads, buildings,
driveways, utility lines or other development related activities will require a
modification of the 401 Water Quality Certification approval. [15A NCAC 02H .0506(4)
and 15A NCAC 02H .0501 and .0502]
This approval and its conditions are final and binding unless contested. [G.S. 143 -215.5]
This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by
filing a written petition for an administrative hearing to the Office of Administrative Hearings
(hereby known as OAH) within sixty (60) calendar days.
A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the
OAH Clerk’s Office at (919) 431-3000 for information. A petition is considered filed when the
original and one (1) copy along with any applicable OAH filing fee is received in the OAH during
normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official
state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of
the petition along with any applicable OAH filing fee is received by the OAH within five (5)
business days following the faxed transmission.
Mailing address for the OAH:
If sending via US Postal Service: If sending via delivery service (UPS,
FedEx, etc):
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
DocuSign Envelope ID: C67D05E4-03B3-4192-B173-AF5BE8DB2C6F
Benito Horse Farm
DWR# 18-0648
401 Approval
Page 3 of 3
One (1) copy of the petition must also be served to DEQ:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review by the Division under section 401 of the Clean Water Act as
described in 15A NCAC 02H .0500. Please contact Andrew Moore at 828-296-4684 or
Andrew.W.Moore@ncdenr.gov if you have any questions or concerns.
Sincerely,
Zan Price, P.E., Assistant Regional Supervisor
Water Quality Regional Operations
Asheville Regional Office
Enclosures: GC 4139
Certificate of Completion
cc: Shawn Anderson – Anderson Construction (via email)
David Brown – USACE Asheville Regulatory Field Office (via email)
Andrea Leslie – NCWRC (via email)
Stan Aiken – Division of Energy, Mineral and Land Resources (via email)
DWR ARO 401 files
G:\WR\WQ\Henderson\401s\Non-DOT\Benito Horse Farm\20180530_BenitoHorseFarm_APPRV.docx
DocuSign Envelope ID: C67D05E4-03B3-4192-B173-AF5BE8DB2C6F
State of North Carolina | Environmental Quality | Water Resources
2090 U.S. Highway 70, Swannanoa, North Carolina 28778
828-296-4500
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
Water Resources
Environmental Quality
WR Project No.: __________________ County: ____________________________________
Applicant: __________________________________________________________________________
Project Name: ______________________________________________________________________
Date of Issuance of 401 Water Quality Certification: ________________________________________
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and
Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh,
NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant’s authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant’s Certification
I, _____________________________________, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: ______________________________ Date:_________________________________
Agent’s Certification
I, _____________________________________, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: ______________________________ Date:_________________________________
If this project was designed by a Certified Professional
I, ____________________________________, as a duly registered Professional ___________ (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to
the best of my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: ______________________________________ Registration No. ________________
Date ____________________