HomeMy WebLinkAbout20080050 Ver 1_Reports_20090505
Beverly Eaves Perdue
Governor
Division of Water Quality
Coleen H. Sullins
Director
May 5, 2009
Mr. J. J. Swain, Jr., P.E.
Division 13 Engineer
N.C. Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Subject: Inspection- NC Highway 19/19E
DWQ Projcct 08-0050
TIP No. B-4038
Burke County
Dear Mr. Swain:
Dee Freeman
Secretary
On April 29, 2009 1 inspected the construction work on the NC Highway 183 Bridge project in Burke County.
Construction is continuing with the new bridge with the girders being set and work starting on the bridge deck.
The project appears to be in good condition and no problems were observed.
Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and
mulching are performed as required to protect State surface waters. A copy of the inspection report is attached
to this letter.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental
"Transportation Permitting Unit
Niki Maher, NPS Assistance and Compliance Oversight Unit
Mike Parker, Asheville Regional Office
(Swain) B-4038 Inspection Letter April 2009
SURFACE WATER PROTECTION SECTION - Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 328-295-45001 PAX: 828-299-7043
Customer Service: 1-877-6236748
Internet www.nmatemualitv.oro
An Equal Opportunity 1 ABrmative Action Employer
NC®ENR
North Carolina Department of Environment and Natural Resources
One
NorthCarolina
Natlrraltr,?
DWQ Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: April 29, 2009
County: Buncombe Region: Asheville
DOT Division: Division 13
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 401 #: 20080050 NW Permit #:0 IP #:
Project Name:
Location of Project:
6ridee Replacement 6-4038
NC 1-lighway 183 1 mile northeast of the intersection of UD Highway 221 and NC
Highway 183
Project Complete: ?Yes X No
Activities (DOT):
X? Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
? Bank Stabilization
? Other Fill
If no, estimated date of completion:
Water Quality Concerns (DWQ):
X? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
X? Failed E & S control measures
X? Sedimentation Impacts
Stormwater Permit Violation
? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes ? no Estimated Acres
? Zone I Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear fcet=?
Estimated linear feet of impact:
Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba
Zone l: ?Ycs ?No Est linear ft/ acreage of buffer impact fU ac
"Lone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited
6
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
UT to Linville River and Linville River
Basin/ Subbasin: CT13 03-08-30
Wetland Type: ?Isolated ?Non-Isolated (Waters of US)
Stream Class: X?Class B ?303d Listed X?WS-II ?WS-V ?SB
?Class C ?ORW X?Trout ?WS-III ?NSW
?FIQW ?WS-1 ?WS-IV ?SA ?CA
Type of Authorized Impact: X?Culvert ?Bottomless Culvert
X?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabil ization X?Fill
Authorized Wetland Impacts: ?0- 1/10" acre X?1/1Ini to 1/3`d acre
X? 1 /3`d to 1.0 acre ?> 1.0 acre
Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet
Additional comments: 160 linear ft. of stream impacts.
Construction on new bridge has progressed to the point the point that the girders have been set and
work has just started on the deck.
Sediment and erosion control structures appear to be working properly.
Continue to ensure that the sediment and erosion control structures are maintained properly, to help
protect the State's surface waters.
March 2009 Inspection US Highway 19 R-2518 A &B