Loading...
HomeMy WebLinkAbout20180152 Ver 2_Approval Letter_20180525Water Resources ENVIRONMENTAL QUALITY May 25, 2018 Arroyo Capital I, LLC Attn: Leigh Austin 100 W. Broadway, Suite 680 Long Beach, CA 90802-4463 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director DWR #18-0152 v2 Wake County Subject: APPROVAL OF 401 WATER.QUALITY CERTIFICATION WITH ADDITIONAL'CONDITIONS AUTHORIZATION CERTIFICATE --PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES (15A NCAC 02B.0233) WITH ADDITIONAL CONDITIONS Ferrell Farm To Whom It'May Concern: You have our approval for the impacts listed below for the purpose described in your received by the Division .of Water Resources (Division) on April 20, 2018 and with payment received on April 20, 2018. These impacts are covered by the attached Water Quality General Certification Number 4139 and the conditions listed below. This.certification is associated with the use of Nationwide Permit Number 29 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any'other federal, state or local permits before proceeding with 'your project, including those required, by (but not limited to) Sediment and Erosion -Control, Non -Discharge, and Water Supply Watershed regulations. This 401 Water Quality Certification and Authorization Certificate for DWR 18-0152 v2 replaces'the 401 Water Quality Certificatidn.and Authorization Certificate for 18-0152 v1 dated March 91 2018. This approval requires you to fallow the conditions listed in the enclosed certification and the following additional conditions: 1. The following impacts are hereby approved provided,that all of the other specific and . general conditions of the Certification and Buffer Rules are meta No other impacts are approved, including incidental impacts., [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B .0233(8)] Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portil.ncdetir.org/web/-,Vq/,ips 1628 Mail Service Center, Raleigh, NC 27699-1628 ' Phone: (919) 791-4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 ' Fax: (919) 788-7159 Ferrell Farm DWR #18-0152 v2 401 AND BUFFER APPROVAL Page 2 of 5 Type of Impact Amount Approved (units) Permanent Amount Approved , (units) Temporary Wetland Mitigation Required W1-Fill/Excavation 0.395 (acres)_ 0 (acres) Stream Wild lands. Holdings, II; LLC 03020201 -Not in Falls S1 -Culvert 107 (linear feet) 0 (linear feet) S27D'ewatering 0 (linear feet) 19 (linear feet) Buffers — Zone 1 03020201 -Not in Falls B1 -Road Crossing 12,944 (square feet) 0 (square feet) B2 -Sewer Relocation 1,462 (square feet) 0 (square feet) B3 -Sewer Removal 0 (square feet) 1,037.(square feet) B4 -Sewer Connection 158 (square feet) 0 (square feet) Buffers — Zone 2 B1 -Road Crossing: ! '' 5,880 (square feet) 0 (square feet) B27Sewer Relocation 1,686 (square feet) 0 (square feet) B3 -Sewer Removal 0 (square feet) 361 (square feet) B4 -Sewer Connection 745. (square feet) 0 (square feet) . B5 -Sewer Connection 242 (square feet) 0 (square feet) .2. Stormwater Management Plan (SMP) Approval from Local Community Required' . The stormwater management plan (SMP) must be approved by the City of Cary and meet the requirements of this Certification. The aSMP may not be modified without prior Written authorization from the City of Cary. [15A N,CA'C 02H .0506(b)(3)] .3. .Compensatory Mitigation Using a Private Mitikation Bank Mitigation musf_.be provided for the proposed, impacts as specified in the table below. The Division has received an acceptance letter from Wildlands Engineering to meet this mitigation requirement. Until Wildlands Engineering receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to Wildlands Engineering to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: Compensatory Bank Sponsor River & Sub -basin Mitigation Required Number Buffer -Zone 1 38,832 (square feet) Wild lands. Holdings, II; LLC 03020201 -Not in Falls Lake Watershed Buffer -Zone 2 8,820 (square feet) Wildlands Holdings, II, LLC 03020201 -Not in Falls Lake Watershed Ferrell Farm DWR #18-0152 Q 401 AND BUFFER APPROVAL Page 3 of 5 4. .No Waste; Spoil, Solids, or Fill of Any'Kind No waste, spoil,.solids,'or fill of.any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification.' All construction, activities, including the design, installation; operation, and mai.ntenance,of sediment and erosion control Best Management Practices, shall'be perform`ed'so, that no violations of state water quality standards, statutes, or rules occur. [15A NCAC'02H .0501 and .0502] Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that -have been approved to, infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H.0500. [15A NCAC 024 .0506 (b)(2),and (c)(2) and 15A NCAC 02H .0507 (c)] 6. This approval is for the purpose and design described in your. application. The plans and specifications for this project -are incorporated by reference as part of the Certification and Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval Fetter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] 7. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51 This Certification and Buffer Authorization can be contested as provided in Articles 3'and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative"Hearings (hereby known as OAH). :A petition.form maybe obtained from'the OAH at http://WwW.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information." Within sixty (60) calendar days of receipt of this.notice, a petition must be filed with the OAH. A petition is considered filed when the original and one'(1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours -(Monday through Friday between 8:00am and 5':00pm, excluding.official state holidays). The petition may befaxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail via the US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Ferrell Farm DWR #18-0152 v2 401 AND BUFFER APPROVAL Page 4 of 5 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DWR-401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NC DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 This letter completes the review of the Division under section 401 of the Clean Water Act and the Neuse Riparian Buffer Rules as described in 15A NCAC 02B .0233. Please contact Stephanie Goss at 919-791-4256 or stWh Th ie.goa�('@ncdenr.gov if you have any questions or concerns. Sincerel , i Danny Smi Supervisor, Water Quality Regional Operations Section Ferrell Farm DWR #18-0152 v2 401 AND BUFFER APPROVAL Page 5 of 5 Enclosure: GC 4139 cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 -Heritage Trade Dr., Ste. 105; Wake Forest, NC 27597 DWR RRO 401/Riparian Buffer file DWR 401 & Buffer Permitting Unit via Laserfiche Sean Clark via e-mail at sclark!2sageecological.co