HomeMy WebLinkAboutNC0022934_NOV-2018-PC-0184_20180525Water Resources
ENVIRONMENTAL QUALITY
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
Certified Mail # 7016 1370 0000 2596 0245
Return Receipt Requested
May 25, 2018
Mr. Lawrence Schwartz
UCS, Inc.
P.O. Box 657
Lincolnton, NC 28092
Subject: Notice of Violation
NOV-2018-PC-0184
Compliance Inspection
UCS Main Plant
NPDES Permit No. NCO022934
Gaston County
Dear Mr. Schwartz:
Enclosed is a copy of the Compliance Inspection report for the inspection conducted at
the subject facility on May 22, 2018, by Ori Tuvia. Jason Schwartz's cooperation during the site
visit was much appreciated. Please advise the staff involved with this NPDES Permit by
forwarding a copy of the enclosed report.
Overall, the wastewater treatment system needs attention and maintenance. One of the
main areas of concern observed during the inspection was that the lagoon has not been
maintained and this issue has been identified during previous inspections. There is woody
vegetation, animal burrows, and erosion, on the side slopes/dikes. The outfall structure is
deteriorating and needs maintenance; the access to the outfall structure appears unstable. The
outfall structure, which contains the chlorine disinfection box, is part of permitted wastewater
system and must be maintained. Additionally, the Permittee should conduct an engineering
evaluation of the system to verify its integrity. This includes confirming the path/piping for
influent wastewater to the lagoon, assessing the sludge level in the lagoon, assessing the
structural stability of the lagoon slopes/dikes after vegetation removal, and an evaluation of the
outfall structure (an older report in DWR files suggests that the reason for no discharge from the
system may be a leak in the structure below the water line). In addition, facility staff must locate
the effluent pipe location. Please note that Part II, Section C, Condition 2 of your permit requires
that, "the Permittee shall at all times properly operate and maintain all facilities and systems of
treatment and control (and related appurtenances) which are installed or used by the Permittee to
achieve compliance with the conditions of this permit."
Mooresville Regional Office
Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115
Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748
Please be advised that this letter is a Notice of Violation. You are requested to respond to
this Notice in writing within fifteen (15) days of receipt indicating your Plan of Action to ensure
future compliance. This Plan of Action should include a timeline within which the items will be
adequately addressed. Failure to respond and/or failure to resolve the violations could subject
you for further action by the Division of Water Resources.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at
ori.tuvia&ncdenr. gov.
Sincerely,
DocuSigned by:
A41 . H Nuft
F161FB69A2D84A3... for
W. Corey Basinger
Regional Supervisor
Mooresville Regional Office
Water Quality Regional Operations Section
Division of Water Resources
Cc: NPDES Unit, MRO Files (Laserfiche)
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 I 3 I NCO022934 111 12 I 18/05/22 I17 18 I S J 19 LG] 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
67 1.0 70 IJ 71 I„ I 72 n 73 �74 751 I I I 1 1 1 I80
u
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Numbed
09:30AM 18/05/22
15/11/01
UCS Main Plant
511 Hoffman Rd
Exit Time/Date
Permit Expiration Date
Lincolnton NC 28092
11:10AM 18/05/22
20/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Jonathan David Gragg/ORC/828-396-4444/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Cindy Lints,511 Hoffman Rd Lincolnton NC 28092//704-732-9922/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Operations & Maintenance 0 Self-Monitoring Program 0 Facility Site Review
Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
Ori ATuvia MROWQ//704-663-1699/ 5/25/2018
IBB057A2DE017498...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax NuDocusigned by: Date
TA4-.' H Nuft
Andrew Pitner MRO WQ//704-663-1699 Ext.21 5/25/18
1`161 F869AMUAI..
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO022934 111 121 18/05/22 1 17 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
The main area of concern observed during the inspection was that the lagoon has not been maintained
and this issue has been identified during previous inspections. The outfall structure, which contains the
chlorine disinfection box, is deteriorating and needs maintenance; the access to the outfall structure
appears unstable.
Page#
Permit: NCO022934 Owner - Facility: UCS Main Plant
Inspection Date: 05/22/2018 Inspection Type: Compliance Evaluation
Yes No NA NE
Type of lagoons?
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
❑
0
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
M
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The current Dermit exDires on July 31. 2020. The subiect Dermit is for a stabilization laaoon
followed by chlorine disinfection.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ❑ 0 ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ 0 ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The CIRC conducts weekly visits to the site: all indicate no flow and the facilitv has not
recorded discharge in many years.
The outfall structure, which contains the chlorine disinfection box is deteriorating and needs
maintenance; the access to the outfall structure seems unstable. Given that the facility has
not discharged in more than 14 years, the permitee should conduct an engineering
evaluation of the wastewater system, including confirmation of the path of influent
wastewater to the lagoon. In addition, the facility staff must locate the effluent pipe location
and maintain access to it.
Lagoons
Yes No NA NE
Type of lagoons?
# Number of lagoons in operation at time of visit?
1
Are lagoons operated in?
# Is a re -circulation line present?
❑
❑
0
❑
Is lagoon free of excessive floating materials?
❑
0
❑
❑
# Are baffles between ponds or effluent baffles adjustable?
❑
❑
0
❑
Are dike slopes clear of woody vegetation?
❑
❑
❑
Are weeds controlled around the edge of the lagoon?
❑
❑
❑
Are dikes free of seepage?
❑
❑
❑
0
Are dikes free of erosion?
❑
0
❑
❑
Are dikes free of burrowing animals?
❑
0
❑
❑
# Has the sludge blanket in the lagoon (s) been measured periodically in multiple
❑
❑
0
❑
locations?
# If excessive algae is present, has barley straw been used to help control the growth?
❑
❑
0
❑
Page# 3
Permit: NC0022934
Inspection Date: 05/22/2018
Lagoons
Is the lagoon surface free of weeds?
Is the lagoon free of short circuiting?
Owner - Facility: UCS Main Plant
Inspection Type: Compliance Evaluation
Yes No NA NE
❑ ■ ❑ ❑
❑ ❑ ❑ ■
Comment: The laaoon has not been maintained. There is woodv veaetation. animal burrows. and
erosion on the side slopes/dikes. Additionally, the facility should evaluate sludge level in the
lagoon, stability of the lagoon banks and the condition of the outfall structure (an older DWR
report suggests that the reason for no discharge is a leak in the structure below the water
line).
Page#