Loading...
HomeMy WebLinkAbout20161268 Ver 1_RE U-4751 Site 1 -Y1RPD- Rip Rap Pad Ext_20180523Carpenter,Kristi From: Steenhuis, Joanne Sent: Wednesday, May 23, 2018 12:54 PM To: Herndon, T. Mason; Shaver, Brad Subject: RE: U-4751 Site 1-YlRPD- Rip Rap Pad Ext. I will add this to the file. Thank you From: Herndon, T. Mason Sent: Wednesday, May 23, 2018 12:35 PM To: Shaver, Brad <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Subject: U-4751 Site 1-Y1RPD- Rip Rap Pad Ext. Brad and Joanne, per our phone conversation the Division would like to extend the rip rap pad at the outlet of the 48" RCP at Sta. 15+05 RT. This JS non-mit makes a 90 degree turn and we would like to extend the rip rap around the bend to protect the opposite bank from scouring. The attached permit drawing 2 of 83 shows the site circled in red and the green area is the proposed footprint of the proposed pad extension and bank stabilization. I have also attached a separate detail of the site. The additional rip rap will be approximately 115 sq. ft. and will not change the permitted permanent SW impacts for this site. Please let me know if you have issues with this revision and/or if any further actions from your agency is required. Thanks! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile trrr�herndcrn(�ncdcrt.�crv 5501 Barbados Blvd Castle Hayne, NC 28429 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,