Loading...
HomeMy WebLinkAbout19850081 Ver 1_COMPLETE FILE_19850408t f State of North Carolina Department of Natural Resources and Community Development 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor _ -S. Thomas Rhodes, Secretary May 2, 1985 Mr. Mike Nicodeme Fairfield Harbour, Inc. 750 Broad Creek Road New Bern, NC 28560 Subject: Certification Pursuant to Section 401 of the Federal Clean Water Act, Proposed Expansion of Marina 'Fairfield Harbour, Inc. Craven County Dear Mr. Nicodeme: Attached hereto are two (2) copies of Certification No. 1795 issued to Fairfield Harbour, Inc. dated May 2, 1985. If we can be of further assistance, do not hesitate to contact us. Sincerely yours, ORIr;In Al. `1?'?1rD R. Paul Wilms Director cc: Wilmington District Corps of Engineers 9 Wa hington Regional Office l - William Mills Mr. David Owens P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-4984 An Equal Opportunity / Affirmative Action Employer NORTH CAROLINA Craven County y CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirement=s: 'of Section 401 Public Laws 92-500 and 95-217 of the United--States:an&.subject to the North Carolina Division of Environmental Management--Regulations-,in r5_NCAC 2H, Section .0500 to Fairfield Harbour, Inc. pursuant :to an:application filed on the 22nd day of October, 1984 to construct a.marina expansion and condominium complex. The Application provides adequate assurance that the 'discharge of fill and rip-rap into the waters of Northwest Creek in conjunction with thel proposed marina expansion in Craven County will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sections 301, 302, 303, 306.,-107 of PL 92-500 and PL 95-217 if conducted in accordance with the application and- conditions hereinafter set forth. Condition(s) of Certification: 1. That the activity be conducted in such a manner as to prevent significant increase in turbidity outside the area of construction or construction- related discharge (increases such that the turbidity in the Stream is 25 NTU's or less are not considered significant). F 2. That a lock-head policy shall be posted and enforced. 3. That marine pump-out facilities be provided for boats with heads. Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null and void unless the above conditions are made conditions of the Federal Permit. This the 2nd day of May, 1985. DIVISION OF ENVIRONMENTAL MANAGEMENT ORIGINAL SOIGNED gY: D.R.I . R. Paul Wilms, Director WQC# 1795 DIVISION OF ENVIRONMENTAL MANAGEMENT wit April 25, 1985 SMORANDUM TO: Bill Mills Permits and Engineering THROUGH: Jim Mulligan, Regional Supervisor , Washington Regional Office ?-/ FROM: William J. Moore, Environmental Engineering Tech W Water Quality Section Washington Regional Office SUBJECT: Regional Office Review and Recommendations R E C E I V E D Fairfield Harbor Craven County A preliminary review of the proposed project indicates that: A 401 Water Quality Certification will not be required. APR 2 6 1985 WATER QUALITY SECTION OPERATIONS BRANCH A 401 Water Quality Certification will be required, and will require public notice advertisement. A 401 Water Quality Certification will be required, but should meet the conditions of the General Certification for and therefore will not require public notice. Final review and recommendations 4/24/85 A 401 Water Quality Certification will not be required, this office has no objections to the proposed project. It is trecommended that a 401 Water Quality Certification be issued containing a turbidity limit of 25 : 50 NTU. This office has no objections to the proposed project. The proposed project appears to meet the conditions of the General Certification for: This office has no objections to the proposed project. Additional Comments: - Proposed expansion of marina basin (200'x2001 x -"V .deep) - 1100 l.f, of bulkhead (riprap and wood) - All storm runoff routed to detention ponds or lakes designed for 25 year - 24 hour storm event - Overflow to Northwest Creek, Class SC WJM/ekw cc: '.;,,?:. -STATE, ? State of North Carolina Department of Natural Resources and Community Development 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor S. Thomas Rhodes, Secretary Office of Coastal Mgt. PO 769 Morehead City NC 28557 919 726-7021 February 20, 1985 Sun Journal New Bern, N. C. 28560 Gentlemen: Please publish the attached Notice in your February 26, 1985, issue of the Sun Journal. Send us bill in duplicate and Affidavit of Publication- as soon as possible. JLM/t encl. ordially yours, ames L. Mercer Field Consultant 7?E Fairfield Harbour Marina FEB 21 1W5 <sERMITS & ENGINEERING P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-4984 • An Equal-Opportunity / Affirmative. Action Employer 40 0" NOTICE; OF FILITIG OF PPLICA1'IO,T FOR CANA 11A.-J 3R DEVELOPMENT , Er'.!-1I14 AND WATER QUALITY CERIIFICATIO111 Pursuant to i;CCS 11.3A-119(b) and 143-215 3(a)(1)(c), the DeparCmo.nt of Natural Resources and Comnunity Dovelopmcnt hereby gives Public ?Totice that Craven County Fairfield Harbottr Marina of Fairfield Harbour -Subdiv:, filed an appIi- P-ation on Jan. 30, 1985 for a permit from the Office of Coastal Manacenent to develop in an Area of Environrental Concern and for Certification 'from' the Division of Environmntal Ma' nager:ient. that a disch arse of fill materia? in project wetlands will not violate applicable Slater Quality Standards. According to said application, the applicant proposes to expand existing marina facility by excavating an additional.40,000 sq.ft. of highground basin adjacent to Northwest Creek. Other highground development includes a new clubhouse and ccnTnercial area with•parking lot and a condominium complex. A copy of the entire application and 'additional information n:a- be c?:anincd (or copies furnished, upon payment of reproduction costs) during.normal business hours at the Office of Coastal Management, James L. Mercer, Div. Marine Fisheries Building, Morehead City, NC 28557 and/or the Division of Environi:%antal Management, Bill Moore, NRCD Field Office, Washington,. N. C. 27889. The Division of Environmental Management proposes to take final ac=ion on this Water Quality Certification on or after April 8, 1985 The issuance of the CAMA Major Developmant .Permit and the Section 401 Cerrific-.tion may deviate from this projected date depending upon the nature of the com;itnts submitted aad subsequent hearings that may result. .All persons desiring to make comments should do so in writing to --Dave Owens, Director, Office of Coastal Management, P. 0. Box 27687, Raleigh, N. C.- 27611 prior to March 13, 1985 M for consideration under the LAMA Permit decision, and to Mr. Cecil G. Madden, Jr., Divi- sion of Environmental Management, PO Box 27687, Raleigh, N. C. 27611 March 28, 1985 prior to ? for consideration under the Water Quality Certification decision. -' • PERMIT.S-. & ENGINEERING i f i i 1 r i l i i T DIVISION OF ENVIRONMENTAL MANAGEMENT February 13, 1985 w MEMORANDUM TO: Bill Mills Operations Branch THROUGH: Jim Mulligan, Regional Supervisor Washington Regional Office FROM: William J. Moore, Environmental Engineering Tech Washington Regional Office - WaRO SUBJECT: Joint Public Notice Fairfield Harbor (Marina) Craven County The following determination has been made regarding the subject project: MA 401 Water Quality Certification will be required. OA 401 Water Quality Certification will not be required. See additional comments below. Additional comments pending. WJM/ekw cc: Jim Mercer Mom' North Carolina Department of Natural COASTAL MANOFFICE OF AGEMENT nt l D it e &C W. Owens David opme eve ommun y Resourc s Director James B. Hunt, Jr., Governor James A. Summers, Secretary Telephone 919733-2293 Feb. 8, 1985 Mr. Robert Helms, Director Division of Environmental Manage nt Raleigh, North Carolina 27611 Dear Mr. Helms: The attached copy of an application submitted by: Fairfield Harbour (Marina, NW Creek) Applicant's Fairfield Harbour Subdiv. MAJOR MODIFICATION REQUEST PERMIT NO. 95-82 Craven ?6) 0 yG 2 <" Location of Project County X for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major development permit... for a CAMA major development permit (only) ... ... is being circulated to State and Federal agencies having jurisdiction over the subject matter which might be affected by the project. Please indicate on the reverse side of this form your viewpoint on the proposed work and return it to me not later than Feb. 25, 1985 JRP:ap:483 Sincerely, Jo n . Parker, ?Jr.,Chi Major Permits Processing Section P. O. Box 27687 Raleigh, N. C. 27611-7687 An Equal Opportunity Affirmative Action Employer (A) This agency interposes no objection to the proposed w --Irk. (B) Dredge and/or Fill. This agency objects to the pr. as proposed. The objection is based upon findings'whi lead to the conclusion that..there will be one. or more adverse effects as covered in G. S. 113-229 (e) 1-5., (e) (1) ...that there will be significant adverse'effect of the proposed dredging and filling on the use of the water by the public; (e) (2) ...that there wi11 be significant adverse effect on the value and enjoyment of the property of any riparian owners; (e) (3) ...that there will be significant adverse effect on public health, safety, and welfare; (e) (4) ...that there will be significant adverse effect on the conservation of public and private water supplies; (e) (5) that there will be significant adverse effect on wildlife or fresh water, estuarine or marine fisheries; (C) CAMA Major Development. This agency objects to"the project as proposed. The objection is based upon findings which lead to the conclusion that a violation would occur as covered in G.S. 113A-120 and/or 15 NCAC 71. The following reference indicates the specific citation by which objections have been made. (D) Agency findings relating to item(s) A and/or B and/or C are hereby detailed. (E) Comments are submitted that do not directly relate to item B and/or C but are relevant to the public interest. (These comments will be forwarded by the Department of Natural Resources and Community Development to appropriate State or Federal agencies). signed date MAJOR MODIFICATION TO Long. 76 58 02 EXISTING PERMIT 95-82 OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT .' r 1.`s p lid's name Fairfield Harbour (Marina expansion and condos) 2. Location of project site SR 1600 Fairfield Harbour Subdiv. Harbour Side 44y, d. & NW 3. Investigation type: Dredge & Fill X CAMA X ???,7 4. Investigative procedure: (A) Dates of site visit 1-11-85 9, Photo Log E grid systeTV (B) Was applicant present yes strip #46, Frame 4867 @ M-12 5. Processing procedure: Application received 1-30-85 Office Morehead City 6. Site description: (A) Local Land Use Plan Draven County LUP Feb. 1982 Land classification from LUP• Rural/Conservation Development constraints identified in LUP See CAMA Review section (B) AEC(s) involved: Ocean Hazard Estuarine shoreline Coastal wetlands X Public trust waters X Estuarine waters Other inland waters (C) Water dependent: Yes No Other Y (D) Intended use: Public Private X Commercial (E) Type of waste water treatment: Existing Approved treatment plant Permit 266-84 Planned (F) Type of structures: Existing marina - office and clubhouse. Planned marina basin expansion plus highground condo development (G) Estimated annual rate of erosion 0 Source site observation 7. Habitat description: AREA (A) Vegetated wetlands: Dredged Filled Other Cattail (saltmeadow grass) 1,895 sqft black needlerush, bulrush, salt reed grass .295 sq.ft. (B) Non-vegetated wetlands: existing basin bottomland 6,000 sq.ft. 12,000 sq.ft. (C). Other: landscape highground basin 40,000 sq.ft. 7.5 ac: (D) Total area disturbed: vegetated wetland - 2,185 sct.ft., non-wet 18,000 scrft. 8. Project summary App. proposes to expand their marina facility highground 7.5 ac. by excavating an addtl. 40,000 sq.ft. of highground basin adj. to NW Creek. Other high- ground dev. near the basin includes a new clubhou$e and commercial area with parking lot and a condominium complex. 9., Narrative description Fairfield Harbour Subdivision is located at the-end of SR 1600 between Northwest Creek-and Upper Broad Creek on the Neuse River in Craven County. The location of the current project proposal is centered around the existing marina which is at the end of Harborside Blvd. on NW Creek. In brief, the project involves expanding the highground ma- rina basin and developing a new commercial center and condominium type area. The new highground basin will open onto the SE corner of the existing marina. It will be semi-circular in shape and will require the excava- tion of approximately one acre of highground property. The project depth of -6' NWL is compatible with the existing water depths in the marina that opens on to NW Creek. Approximately 17,700 cu.yds. of ex- cavated material will be relocated as fill and landscape immediately adjacent to the new basin. As proposed the entire shoreline will be bulkheaded with a combination of some 1,100 lin.ft. of concrete, wood, and riprap. One section of the bulkhead (about 2801) will be installed some 40' waterward of the NWL. This will involve filling in about 300 11,000 sq.ft. of open water area. This will also displace about sq.ft. of intermittent marsh fringe vegetation characterized by black needlerush, salt marsh grass, and bulrush. A notation is made that this portion of the existing marina was ori- ginally excavated from the applicant's highground property. In con- junction with this filling operation,the overall elevation of the property will be raised from a +5' elevation to a final grade of ap- proximately +12'.elevation. Elsewhere along the shoreline the bulkhead and riprap will displace an additional 1600 sq.ft. of wetlands which include cattails and salt reeed grass. This will occur primarily along the southern.face of the proposed bulkhead alignment. About 7.5 acres of highground property are involved for development under this application proposal. This area can be broken down into two distinct land uses known as the "marina village complex" and park- ing lot on about 4.2 acres and the "marina condo" complex on about 3.2 acres. Plans for the marina/condos show that 25 units will be constructed creating a.unit density of 8.7. A majority of the condo- minium construction activities will take place within 75' of the shore- line. The proposed marina basin will service the slip and docking needs of only those residents located in the adjacent condominium complex. 'In order to accommodate upland drainage and stormwater management, an 8.5 acre landlocked lake will be excavated This re .servoir will retain high volumes of rain water that are directed to it through prescribed drainage patterns from throughout the develop- ment.' The lake elevation and its retention capability is designed to allow some overflow and discharge into the existing marina basin on'NW Creek. 10. Anticipated impacts The general shape-or design configuration of the proposed basin sug- gests that flushing within the basin and existing marina will not be a problem. This is to say that the overall extent of the basin into high ground is not excessively long, and that the basin opens wide on to the existing waterway. The applicant plans to excavate the one acre basin in the dry and conduct all bulkheading construction activities prior toopening the bain to the existing waterway. The project plans also show the use of sedimentation and erosion control devices throughout the construc- tion phase of development. It is also noted that the development will be serviced by a .new wastewater treatment plant that will discharge into the Neuse River. CAMA Permit No. 266-84 was issued to NE Craven Utility Company and authorizes the construction of the discharge pipe into the Neuse River. The proposed project is then considered a modification to the overall development plans for the Antiqua Section of Fairfield Harbour as au- thorized by State Permit No. 95-82. The applicant's engineering con- sultants have indicated to this office that the originally permitted, lengthy canal system as authorized will not be undertaken by Fairfield, and Fairfield's current proposal represents a significant reduction in the amount of open water alterations to be made. The new Master LUP as provided on Sheet 2 of 14 illustrates the overall scope of development for the Antiqua Section. CAMA Review The applicant is working closely with Craven ? County in an effort to amend the county's LUP and ultimately the classification map. Spe- cifically, the project area in and around the existing marina on NW Creek and the subdivision area known as Antiqua are presently classi- fied as "rural." This classification does not.allow for high density. development or population growth. In addition, the rural clo ssifi- cation does not allow for the operation of a community sewer system. Therefore, in order to accommodate the proposed development, the land classification scheme must be changed t.o either "transition" or "developed." The OCM supports-Craven County's conservation desig- nation for the coastal salt marshes and the wooded swamp wetlands that border a large marjority of the Antiques shoreline. Submitted by Jas. L.' Mercer Date Feb. 7, 1985 APPLICATION FOR PERMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION i j 'rte y Y Vim;^! y` )REC2-'I "Y . 1 EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT ---- - -- Department of Administration State of North Carolina Department of the Army - yy -" (GS 14612) Department of Natural Resources and Community Oevetopment Corps of Engineers, Wilmington (GS 113.229,143.215.3(a)(1), 143-215.3(c), 113A•119 (33 CFR 209.320.329) '/4;??0 ?-e i G BI o Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. r? .11196? v 144 Applicant Information A. Name Fairfield Harbour Inc. Last First Middle B. Address 750 Broad Creek Road Street, P. O. Box or Route New Bern. NC 28560_638-901 1 City or Town State Zip Code Phone It. Location of Proposed Project: A. County Craven B. 1. City, town, community or landmark Fairfield Harbour - New Bern . 2. Is proposed work within city limits? Yes No X C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Northeast Creek Ill. Description of Project A. 1. Maintenance of existing project 2. Newwork Marina Basin Addition B. Purpose of excavation or fill 1. Access channel -length -width depth 2. Boat basin 200' length 200' width 200' depth 6' 3. Fill area length 300' width 40' depth 2' - 10' 4. Other length width depth C. 1. Bulkhead length 1100' Average distance waterward of MHW (shoreline) New Shoreline Establishment 2. Type of bulkhead construction (material) Rip Rap - Concrete - Wood D. Excavated material (total for project) 1. Cubic yards 17,700 2. Type of material Sand Loam E. Fill material to be placed below MHW (see also VI. A) 1. Cubic yards 3600 2. Type of material Sand Loam IV Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X B. Does the disposal area include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location On ro•e t site 2, Do you claim title to disposal area! Yes D. Fill material s+,wce if fill is to be trucked to N/A E. How will excavated material be entrapped and erosion controlled? Material to be excavated under drv conditions Silt basins - Silt fence - Straw bales F. Type of equipment to he used Scrapers, dozers dragline ' G. Will marshland he crossed in transporting equipment to project site? It yes, explain No D& F-i 1 Rev, lolls I I t V. Int ,&d use of Prot Area (DescrAte) A. 1.. Private 'Marina With Shops 2. Commercial Condominiums 3, dousing Development of Industrial 4. Other B. 1. Lot size(,)6+ 2. Elevation of lot(s) above mean high water 3. Soil type and texture Sandy Loam Wood Frame • 4. Type of building facilities or structures X ?tanned X S. Sewage disposal artdlor waste water treatment A. Existing - Existing with expansion this year 10 8. Describe _ ._._ 6. Land Ctassificauor. Icircle one) DEVELOPED TRAN!:iMONAL CO SM` NI ,b Local LRnd Use Plan Synopsis) CON'SERVAT10fv OTHER -- VI. Pertaining to Fill and Water Quality A. Does the proposed pro;tc: rr•.?olre the pl iWnem rA rill materials below mean hit h water? Yrs No B. 1, Will any runoff or cischarge entt:r adjacent waters as a result of protect acuvity or planned use of the area following protect completion? Yes X No Storm Water Runoff 2. Type of Jischarge Northeast Creek 3. l.ocatwr, of discha at Marina Unknown VII. Present rate of shcreline erosion Of known): Vill. List permit numbers and issue dates of re previous Department Y Cops of Engin0343 & tNCr oofor - 82 ' work in project area, if applicable: 1 ear IX. Length of time required to complete project. X. In addition to the completed application form, the following items must be provided: applicant A. Attach a copy of the deed (with State application only) or other instrument under which app claims title to the affected property. OR if applicant is not claiming to be the owner of said property, • then forward a ropy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an aCGUratr wort, plat drawn to scaie on 8,; X 11" white paper kee instruction booklet for details). Note: Or.ginal dra•+ings preferred • ony high quality copies accepted. C. A copy of the application and plat must be served upon adjacent riparian landowners by registered or certified mail or by ouhh-dtion!G.S. l t3-229 td))Enter date served D. List names and ; ampietc addre:,ses of the riparian landuwners with property adjoining applicant's. Such owner, have 30 tl.,vs in wh ch',(I Suhmlt comments it. agencies listed below. Darrel D. Daniels Sam L. \Vhitehurst p,p. Box 225 . Rt. 1 Box 329 New BernoC 28560 • New Bern NC 28560 XI. Certification requirement: i r;eftif•, that to the best of my knowledge, the proposed activity complies with the Stare jf North Caroline`s appe.,ved coa,tal management program and will he conducted in a manner consistent with vich prograrn XI1. Any permit issued pursu.,nt t.) thi; appttcation will allow only the development described in this Appli• cation and plat. appi:csrrts should therefure describe in the application and plat all Antic .pated devel- opment activiars, including construction, ear.avaiton, filling, and land clearing. " DATE 2 9 Applicant's azure DaF-82 SEE REVERSE SIDE fOR MAILING INSTRUCTIONS `. Rev. 10178 Introduction Fairfield Harbour is located in Craven County, North Carolina, approximately eight (8) miles east of New Bern, at the confluence of Northwest Creek with the Neuse River. Fairfield Harbour is developing into one of the more desirable resort communities located in this area. It is the developer's intent to develop a Master Land Use Plan that is harmonoius with the natural habitation of the area and that creates a positive influence on the environmental-ecological systems in existence; however, also with the accomplishment of economical feasibility and success. The growth rate of the Fairfield Harbour community is accelerating each year with the construction of single family homes, condominiums, resort facilities, and expansion into new development areas. Presently under construction is a second 18 hole golf course located on the east side of S.R. 1600. There are approximately 2334 single family lots of which 250 are built on and 170 existing multi-family type units. In addition, there are country club and restaurant facilities as well as marina facilities. Permit Review This project is being submitted for permit review and approval to the U.S. Army Corps of Engineers for administration of the federal review and to the North Carolina Department of Natural Resources and Community Development - Office of Coastal_ Mann-ement for adminstrationof the state review. The district office for the Corps is located in Wilmington, NC and the regional office for the Office of Coastal Management is located in Morehead City, NC. Permit applications are submitted to those offices. Description of Project This project will consist of the expansion of the present marina and boat basin at the Fairfield Harbour marina complex. Both commercial and condominium type facilities are planned to be constructed around the improved marina. Approximately one (1) acre of land will be excavated (17,700 cubic yards of material) to create the basin. Also, approximately .3 acre of the existing marina is planned to he filled_?urpny, 3600+ cubic yards of fill material. Bank treatment Oll consist of a combination i of wood bulkheading with rip rap placed on the outward slope in front of the bulkhead. Immediately in front and around the perimeter of the bulkhead is planned a system of wood pier and boat docks. Stormwater Management Stormwater run-off direct drainage to the stream system contributes to the degradation of water quality. Recognizing this, drainage will be diverted away from the stream system into grassed swales and pipe systems leading into one of the existing lakes within the project area which will act as a retention basin. The lakes will have over flow structures which will discharge into the boat basin. Erosion Control An erosion and sedimentation control plan will be submitted to the Land Quality Section, NRCD for approval prior to construction. Accepted erosion control methods will be mployed and all precautions as necessary will be taken to prevent sediments from entering the stream. Wastewater Treatment Facilities Northeast Craven Utility Company presently owns and oeprates the wastewater -treatment facilities serving Fairfield Harbour. NPDES permits are for .1 mgd to Upper Broad Creek and 1 mgd to the Neuse River. Existing plant capacity is :Imgd with new .3 mgd facilities under construction with start-up in early spring of 1985. Potable Water Supply Northeast Craven Utility Company presently owns and operates the water supply system serving Fairfield Harbour. Cater is supplied by 2 wells with storage capacity of .5mg,. Future wells are planned as needed. - 2- 1? G? Sp ftlN? WHITEH?RSZ x NI z GI Hp{Z9ou 36 2 Z O in VICINITY MAP TAKEN FROM 0.3.0.3. MAP OF NEW BERN. FAIRFIELD HARBOUR 1\1 10 DEVELOPED SITE TO N.C. 55 VICINITY MAP EXISTING LAKE V' EXPANSION PROPOSED FAIRFIELO HARBOUR MARINA LL.EwELLYN - l.? HAGY ANTIGUA Alo? LIMITS OF FAIRFIELD HARBOUR PROPERTY DAN I ELS NEUSE RIVER MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SITE PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 1 OF 14 CRAVEN COUNTY NORTH CAROLINA ?. SCALE: APPROX. 1" = 800' ? I ? { M mRilE o HAR80UR DEVELOPED Sp/RIND r TO N.C. 551 4TERWOOD CONDOS V' FAIRFIELD HARBOUR Z MARINA SANDST rr/ D EXPANSION MARINA PARCEL A W f111FuR?* WATERWOOD PEDESTA S? 1 HARSOURSIDE VILLA HAROURMASTER WATERWO VILLAS LAKE X HARSOURSIDE SAggND- .6CCOV E q5% MARINA AND LAKE\ VI LACE, POSED Z CONDOS O D 1 DS AKE PARCEL PROPOSED LAKE B HASE A J PARCEL H PARCEL = UNDER z ONSTR CEL G PARCEL PARCEL a LLEWELLYN- FAIRFIELD HARBOOR'-,E 'PHASE HAGY -0 513 I PARCEL ` ? ANTIGUA MARSH?I PARCEL `, K? ' - PROPOSED LAKE C L L ?• LET FOREST`•?'? PARCEL C ` D WASTEWATER `MARSH TRNT. `?`.? C?PLANT ?PAAI EL / LIMITS OF FAIRFIELD \\ ' HARBOUR PROPERTY DAN I ELS - NEUSE RIVER vt` :J SEE SHEETS 3 & 4 FOR MASTER LAND USE TABULATION ?- r? MARINA EXPANSION THOMAS ENGINEERING CONSULTANT , P.A• MASTER PLAN (ANTIGUA) NEW BERN, NORTH CAROL! A MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 2 OF 14 • SCP.LE: APPROX. 1 800' CRAVEN COUNTY NORTH CAROLINA • MASTER LAND USE TABULATION EXISTING LAND USE ACRES U/A UNITS WATERWOOD CONDOS SH 3.9 AC 4.7 U/A 18 WATERWOOD PEDEST. TS 6.5 AC 4.7 U/A 29 HARBOURSIDE VILLAS SR . 4.9 AC 13.3 U/A 24 HARBOURSIDE TS 1.9 AC 12.6 U/A 24 HARBOUR MASTER VILLAS SR 4.6 AC 17.4 U/A 80 SANDCASTLE I TS 5.6 AC 5.4 U/A 30 SANDCASTLE If TS 3.9 AC 7.7 U/A 30 SANDCASTLE COVE TS 4.4 AC 5.0 U/A 22 TRADEWINDS SH 4.3 AC 8.4 U/A 36 MARINA CONDOS SH 3.2 AC Y 8.7 U/A 28 SANDCASTLE LAKE 5.2 AC WATERWOOD'LAKE 4.4 AC MARINA VILLAGE & PARKING 4.2 AC POOL do REC. BUILDING 1.1 AC ROAD R.O.W. AT 60' 14.2 AC SUBTOTAL 72.3 AC 4.4 U/A 321 PROPOSED LAND USE ACRES U/A UNITS PARCEL A TS 5.4 AC 7.2 U/A 39 PARCEL B SH 7.8 AC 6.0 U/A 47 PARCEL C SH 4.9 AC 6.0 U/A 29 PARCEL D SH 2.5 AC 6.0 U/A 15 PARCEL E SH 4.5 AC 6.0 U/A 27 PARCEL F SH 1.9 AC 7.0 U/A 13 PARCEL G SH 2.8 AC 7.0 U/A 20 PARCEL H SH 1.2 AC 10.0 U/A 12 PARCEL I SH 3.8 AC 10.0 U/A 38 PARCEL J SH 6.8 AC - 10.0 U/A 68 PARCEL K SH 3.5 AC 10.0 U/A 35 PARCEL L S,-i 2.1 AC 7.0 U/A 15 PARCEL M SH 1.9 AC 10.0 U/A 19 ROAD R.O.W. at 60' 8.3 AC RECREATION FACILITY 5.0 AC YACHT BASIN EXPANSION 1.3 AC PROJECT FACILITY 8.3 AC LAKE A PHASE I 5.3 AC LAKE A PHASE II 2.7 AC LAKE B 8.5 AC _ LAKE C 3.7 AC -'' SUBTOTAL 92.2 AC 4.1 U/A 37 -?°`Jy • Y i r s r .- MARINA EXPANSION THOMAS ENGINEERING CONSULTANTSP.A. .• MASTER LAND USE TABULATION N5V BERN, NORTH CAROLINA. wf ?_ MARINA TILLAGE FAIRF,CLD HARBO UR JANUARY, 1985 SHEET 3 OF 1 4 CRAVEN COUNTY NORTH CAROLI NA SCALE: NONE MASTER LAND USE TABULATION Continued LAND USE SUMMARY ACRES UNITS MARINA VILLAGE 4.2 AC RECREATION FACILITY 6.1 AC 380 SHELTER (SH) AC 104 SHELTER RENTAL (SR) 5 AC 9. 9.5 214 TIMESHARE (TS) 2 AC LAKES 29.8 AC ROAD R.O.W. AT 60' 22.5 PROJECT FACILITY AC 8.3 WET FOREST 31.9 AC MARSH 21.9 AC NET DENSITY 7.9 U/A GROSS DENSITY 3.2 U/A TOTAL 212.6 AC 698 MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. MASTER LAND USE .TABULATION NEW BERN, NORTH CAROLINA 4 OF 14 JANUARY, 1985 SHEET MARINA VILLAGE FAIRFIELD HARBOUR SCALE: NONE CRAVEN COUNTY NORTH CAROLINA uu DOCK TO BE REWORKED AND BULKHEAD TO BE ADDED PROPOSED NEW MARINA NEW DOCKS AND BULKHEAD - EXISTING EDGE OF WATER-----,,,./ I - MARSH i / MARSH i I r C 11 ?? 1 r 1 [CAMA A.E.C. LINE TO FINFL- EW ?12. ? tlTtTlL.LL?L1J11W1fRTT111" ? I , 80 I PROPOSED PARKING / ' SANS TLE 1 ` r 1 1 11 OliQ 1 ? PROPOSED SANDCASTLE PARKING VILLAGE \ PROPOSED NEW CAMA A.E.C. LINE ` `'?--- \ PROPOSED CONDOMINIUM \ STRUCTURE (TYP.) I r PROPOSED LAKE OVERFLOW ELEVATION - +2.5 1- l MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. PROPOSED CONSTRUCTION PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 5 OF 14 SCALE: CRAVEN COUNTY NORTH CAROLINA 1" = 200' I ? i 1220 S. F. MARSH - - --- c. c EXISTING EDGE OF WATER ` I I n I 300 S. F. MARSH- 150 S.F. MARSH 1— 11 PROPOSED NEW I CAMA A.E.C. LINE TCAMA A.E.C. LINE i 225 S.F. MARSH \J ? r ?r ?r I? NOTE: SHADED AREAS INDICATE MARSH MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EXISTING MARSH AREAS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 5A OF 14 .CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 100' 2 F Q m a d0 ?Q 2 ? (A j xW W J W ?X F W ac as o n. -i _ 1 `. 1 MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION A - A NEW BERN, NORTH CAROLINA MARINA VILLAGE FAlRFIELQ HARBOUR JANUARY, 1985 SHEET 6 OF 14 SCALE: NONE CRAVEN COUNTY NORTH CAROLINA s g ..- a t T 3 a o I \lv yS WW1 I ? I i a 2 I ? . I I p E I 111 I O ' ? I 1 I I i I I I O h, 2 1 i 1 I W3 2o! I 20: pp ? I Op> < I W 2 U 1 I . I I I I I I I I ? h I 1 I J I w I I I I I p Q I Z W I O I it ?_ I z v.. I f.. 0 I 1 ?i o I N I ? 1 1 w lJ 1 1 \ N Q \ ? Q 1 •- 1 1 J & X-j G G 1 1 ?,`?il a3 ?u m MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION B - B NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 7 OF 14 CRAVEN COUNTY NORTH CAROLINA . SCALE: NONE W O Q cr_ O O W V Z U- V) 0 W O tY CL . W J r 00 V) 6 t\ _+ Y J? 41J W 0 O W O a- O O Z O Q ? W O cr_ Q Z E-- 't ? N W .t t YO <Q + 3 ? OW OJ 3 W Q O O Z _ Q O O_ > W W O H X Ln O it W x CL W d a Oa .w O F''t ti. -{?? O H I ? I ? MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION C - C NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR' JANUARY, 1985 SHEET 8 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE 1-1 UU ---,1 , PROPOSED \ I ' EDGE OF Y I / WATER 17 / i 1 COSTING EDGE OF WATER FILL AREA 3600 C.Y. IXGVATIOON EXISTING 17,700 C.Y. LAKE / I HIGH ELEV. +3.0 EXISTING EDGE OF WATER -?-,/ I CAMA A.E.C. LINE \ PROPOSED NEW \ CAMA A.E.C. LINE \ FILL AREA 14.100 C.Y. PROPOSED LAKE OVERFLOW ELEVATION - +2.5 \ \ REPRESENTS PLACEMENT OF EXCAVATED MATERIAL ^ w- • REPRESENTS MATERIAL TO BE EXCAVATED MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EARTH DISTRIBUTION PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 9 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' I?r L?J U 1 - - I r PEOGE OFD I I\ I F WATER ? i - \ I I I 'EXISTING WATERF - I I I I? (J 3 I I I I I `I?I -6 I I I j Ifl I - to EXISTING EDGE OF WATER 17 i ? e 1 f? J 1 EXISTING LAKE f / f ?I HIGH ELEV. +3.0 1 CAMA A.E.fk-I?NE - - \? 1 1 OG ?,' \ \ PROPOSED NEW v ?CAMA A.E.C. LINE j -'% PROPOSED LAKE OVERFLOW ELEVATION - +2.5 .I NOTE: ARROWS INDICATE DIRECTION, 1 OF STORM WATER RUNOFF rr r ?/ rrr rr ?I ?I MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. DRAINAGE PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 10 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" 200' Iii mn - L,Zi •w? .?,. 9 5 w 9 e a 4 a _ ? III '1? l f_ 15 'Til :t I W. Wa L? ale 7M?1 Y3ly Buoy vN .o-.c r' 1f417fliY' .0-.Z?I 1501 009 ? .Q•.t -! ' O e u gYt i? yy ? ??b ? i nti a; yl? = 4 w[ y1 IC v .. a lt! 0 0 z 12 J N 2 W F- cc U 10 _ V wW H r u o W F- O ? le a C' Z W O N ` J W< J AN 3 =... MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. I EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 11 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE ?a a .. ii •' SNo SECTION fENOaION'T 9o4OCR SON" ?--TMJLDOS TnNONrI? surf on" Ta or .wL sLa.c O? -.1 a C.- cave ~ .s .0apm *e . -- / OS.m[ .TN low Or 9-0.1" uff TEMPORARY SHOULDER BERM OITCH ?.,,,? ?[J1r. 0?rcKa - [LOON I J. L TpNoe saE ?N aeo. sr? NuLas or MUL 1 SASS a sroNE roe omen. ew*NaL .I?.KC anLn x.rn» q svaNCr- r lo' --11 T? aka. SILT eas" rm a wT M]U K UTN am ro wwmI swwmr. Tat O WILL SECTION-AA TEMPORARY SLOPE DRAIN DETAIL FLOW -+- SECTION A-A MANE OR NYLON BOUND SALES PLACED ON CONTOUR ?. ANGLE IIW STAKE TOWARD A ram- PREVIOUSLY LAID BALE I 2 Rf BAN! STEEL PICKETS,0. 2' . 2 STAKES 13'-LO I r IN MIOUIIO r n -. i I 1? I I 11 i? \ I I 11 I \ • II \1 (I `1 I \\ i1 1, II ?: A ? V "-• J A Pd 3 ELEVATION ' I STRAW BALE DIKE MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 12 OF 14 SCALE: NONE CRAVEN COUNTY NORTH. CAROLINA ?iCP? MTCY SLOPE ?1llibllliL?llll?iill1?11111?1111 ?1111I?11111?1111l?11111= AN OF OIrCN ROB IBIE U CTM IM FEET ECUAL!, E TAWS OF DITCH FLOB LIPS _ T" GRumAU 3CBF ACE Iilllf_ IIII??IIIIII?IIII IIII?IIIII?IlII?II!1?' ' I? _ =11 I-? =111 ELEVATION SILT BASIN DETAIL TYPE B B° I11??-FILE WE WAR. 21-r EIII,? m 1111 p- Goo" III 1 rrB r-o• [IF - IASI ?Illl?_- Qroua Lut ?IIII?II(II? I?(I?II(Iq??lll - =11I1I?1111??IIII?11111- CRO 4 .TIONAL IFw R'" c 1-41 3 S '+ SILT DITCH DETAIL J A,?l 3 r. MARINA EXPANSION THOMAS ENGINEERING CONSUL1AFJ-IS,7- -.:"` EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 13 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE FLAN f 4 IL I It, s-? NOTE ROCK SMALL 8E CLASS 1 RIP RAP OR STONE FOR EROSION CONTROLICLASS B'1. K. DISTANCE FROM BOTTOM OF DITCH TO LOWEST S10E OF ' DITC.tl BANK. T• I8' FOR CLASS 2 RIP RAP T. W MIN. STONE FOR EROSION CONTROL (CLASS '81. TO BE PAID FOR AT THE CONTRACT UNIT PRICE PER EACH 'ROCK SILT CHECK DAM'. PLAN KN SPILLWAY SMALL BE I' MIN. BELOW LEVEL OP LOWEST BANK. SPILLWAY SHALL BE rl'MIN BELOW LEVEL OF +? --? 2-0* LOWEST BANK. MIN. - - - - T T SECTION-AA SECTION-88 ROCK SILT CHECK DAM •1 MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA JANUARY, 1985 SHEET 14 OF 14 MARINA VILLAGE FAIRFIELD HARBOUR. SCALE: NONE CRAVEN COUNTY NORTH CAROLINA DIFICATION TO Long. 76 58 02 )7W PERMIT 95-82 OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 11 1. Ac/ant's name Fairfield Harbour (Marina expansion and condos) 2. Location of project site SR 1600 Fairfield Harbour Subdiv. '.arbour Side Blvd. & NW Creek at the marina. 3. Investigation type:' Dredge & Fill X CAMA X 4. Investigative procedure: (A) Dates of site visit 1-1_1-85 Photo Log E grid systew (B) Was applicant present yes Strip #46, Frame 4867 @ M-12 5. Processing procedure: Application received 1-30-85 Office Morehead City 6. Site description: (A) Local Land Use Plan Draven County LUP_Feb. 1982 R E C E' V E D Land classification from LUP' Rural/Conservation • Development constraints identified in LUP See CAMA Review section F INQPE. 101+ AC@pvolved: Ocean Hazard Estuarine shoreline Coastal wetlands X Public trust waters X _ Estuarine waters Other inland waters (C) Water dependent: Yes Y No Other (D) Intended use: Public Private X Commercial _ (E) Type of waste water treatment: Existing Approved treatment plant Permit 266-84 Planned (F) Type of structures: Existing. marina - office and clubhouses _ Planned marina basin expansion plus highground condo development (G) Estimated annual rate of erosion 0 Source site observation 7. Habitat description: AREA (A) Vegetated wetlands: Dredged Filled Other Cattail (saltmeadow grass) 1,895 sqft black needlerush, bulrush, salt reed grass .295 sq.ft. (B) Non-vegetated wetlands: existing basin bottonland 6,000 sq.ft. 12,000 sq.ft. (C). Other: landscape highground basin 40,000 sq.ft. 7.5 ac: (D) Total area disturbed: vegetated wetland - 2,185 sa ft non-wet 18.000 sq:ft. highground 7.5 ac. 8. Project summary App. proposes to expand their marina facility by excavating an addtl. 40,000 sq.ft. of highground basin adj. to NW Creek. Other high- ground dev. near the basin includes a new clubhouse and conmercial area with parking lot and a condominium comple*. r 9, Narrative description Fairfield Barbour Subdivision is located at the end of SR 1600 between Northwest Creek and Upper Broad Creek on the Neuse River in Craven County. The location of the current project proposal is centered around the existing marina which is at the end of Harborside Blvd. on NW Creek. In brief, the project involves expanding the highground ma- rina basin and developing a new commercial center and condominium type area. The new highground basin will open onto the SE corner of the existing marina. It will be semi-circular in shape and will require the excava- tion of approximately one acre of highground property. The project depth of -6' NWL is compatible with the existing water depths in the marina that opens on to NW Creek. Approximately 17,700 cu.yds. of ex- cavated material will be relocated as fill and landscape immediately adjacent to the new basin. As proposed the entire shoreline will be bulkheaded with a combination of some 1,100 lin.ft. of concrete, wood, and riprap. One section of the bulkhead (about 2801) will be installed some 40' waterward of the NWL. This will involve filling in about 11,000 sq.ft. of open water area. This will also displace about 300 sq.ft. of intermittent marsh fringe vegetation characterized by black needlerush, salt marsh grass, and bulrush. A notation is made that this portion of the existing marina was ori- ginally excavated from the applicant's highground property. In con- junction with this filling operation,the overall elevation of the property will be raised from a +5' elevation to a final grade of ap- proximately +12! elevation. Elsewhere along the shoreline the bulkhead and riprap will displace an additional 1600 sq.ft. of wetlands which include cattails and salt reeed crass. This will occur primarily along the southern.face of the proposed bulkhead alignment. About 7.5 acres of highground property are involved for development under this application proposal. This area can be broken down into two distinct land uses known as the "marina village complex" and park- ing lot on about 4.2 acres and the "marina condo" complex on about 3.2 acres. Plans for the marina/condos show that 25 units will be constructed creating a unit density of 8.7. A majority of the condo- minium construction activities will take place within 75' of the shore- line. The proposed marina basin.will service the slip and docking needs of only those residents located in the adjacent condominium, complex. In order to accommodate upland drainage and stormwater management, an 8.5 acre landlocked lake will be excavated This re- servoir will retain high volumes of rain water that are directed to it through prescribed drainage patterns from throughout the develop- ment. The lake elevation and its retention capability is designed to allow some overflow and discharge into the existing marina basin on • NW Creek. ,? 10. Anticipated impacts The general shapb-or design configuration of the proposed basin sug- gests that flushing within the basin and existing marina will not be a problem. This is to say that the overall extent of the basin into high ground is not excessively long, and that the basin opens wide on to the existing waterway. The applicant plans to excavate the one acre basin in the dry and conduct all bulkheading construction activities prior toopening the Bain to the existing waterway. The project plans also show the use of sedimentation and erosion control devices throughout the construc- tion phase of development. It is also noted that the development will be serviced by anew wastewater treatment plant that will discharge into the Neuse River. CAMA Permit No. 266-84 was issued to NE.Craven Utility Company and authorizes the construction of the discharge pipe into the Neuse River. The proposed project is then considered a modification to the overall development plans for the Antiqua Section of Fairfield Harbour as au- thorized by State Permit No. 95-82. The applicant's engineering con- sultants have indicated to this office that the originally permitted, lengthy canal system as authorized will not be undertaken by Fairfield, and Fairfield's current proposal represents a significant reduction in the amount of open water alterations to be made. The new Master LUP as provided on Sheet 2 of 14 illustrates the overall scope of development for the Antiqua Section. CAMP' Review The applicant is working closely with Craven County in an effort to amend the county's LUP and ultimately the classification map. Spe- cifically, the project area in and around the existing marina on NW Creek and the subdivision area known as Antiqua are presently classi- fied as "rural." This classification does not allow for high density. development or population growth. In addition, the rural cla,ssifi.- cation does not allow for the operation of a community sewer system. Therefore, in order to accommodate the proposed development, the land classification scheme must be changed to either "transition" or "developed." The OCM supports-Craven County's conservation desig- nation for the coastal salt marshes and the wooded swamp wetlands that border a large marjority of the Antiqua shoreline. Submitted by Jas. L.' Mercer Date Feb. 7, 1985 ,. ? a C T-Ir -' •:?1 117 . :1. y APPLICATION 1., f c FOR PERMIT TO EXCAVATE-AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPMENT] - - Department of Admintstration State of North Carolina Department of the Army "-"-- (GS 146121 Department of Natural Resources and Community Development Corps of Engineers, Wilmington obtrkt (GS 113.229, 143-215.3(1)(1), 143-215.3(c), 113A•113 (33 CFR 209.320329) Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. 1., Applicant Information A. Name Fairfield Harbour, Inc. Last First Middle B. Address 750 Broad Creek Road Street, P. 0. Box or Route New Bern NC 28560 638-8011 City or Town State Zip Code Phone 11. Location of Proposed Project. A. County Craven B. 1. City,, town, community or landmark Fairfield Harbour - New Bern 2. Is proposed work within city limits? Yes IVo ' X C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Northeast Creek - - Ill, Description of Project A. 1. Maintenance of existing project 2. New work Marina Basin Addition B. Purpose of excavation or fill 1. Access channel length _width depth 2. Boat basin 200' length 200' width 200' depth 6' - ..._-- 3. Fill area length 300' width 40'depth . 2' - 10' 4. Other length width_- depth C. 1. Bulkhead length 1 100' Average distance waterward of MHW (shwelinel New Shoreline Establishment 2. Type of bulkhead construction (material) Rip Rap - Concrete - Wood D. Excavated material (total for project) 1. Cubic yards 17,700 2. Type of material Sand Loam E. Fill material to be placed below MHW (see also VI. A) 1. Cubic yards 3600 2. Type of material Sand Loam IV Land Type, Disposal Area, and Construction Equipment: A. Does the area to be excavated include any marshland, swamps or other wetland? Yes No X B, Does the disposal arcs include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location On roiect site Do you claim title to disposal area! Yes 0. Fill material s,juice if fill is to be trucked in N/A - E. How will excavated material be entrapped and erosion controlled? Material to be excavated under dry conditions - Silt basins - Silt fence - Straw bales F. Type of cquivrncni w be used Scrapers, dozers dra lt; ine - ' G. Will marshland he crossed in transporting equipment to project site? It yes, explain No DR F-1111 Rev. 10172 ' ~ r V. Irntmded Us* of Project Area (Describe) A. 1.. Private iarina With Shops 2 Commercial Con dominiums 3. Housing Development or Industrial 4. Other B. 1. Locsize(s)?.N?A---- 6+ 2. Elevation of lot(s) above mean high water • Sandy Loam 3. Soil type and texture Wood Frame 4. Type of building facilities or structures X r Planned X S. Sewage disposal arcd/or waste water treatment A. Existing E?cistin); with expansion this year- B. Describe ....__._ 6. Land Classifii-41101" Icircln one-) DEVELOPED TRANSITIUNAL CO (See CA A Local Land LUse Plan Synopsis) C??"1SERVATIUt. OTHER - VI. Pertaining to Fill and Water Quality A. Does the proposed the piicemcrt r,. fill materialsbelow mean high water? Yes <o- ,-)IV.! ity B. 1. Will any wnofr or diui,arge enter adjacent waters as a result of pruiect activ or planned use of the area foil owin&waicct completion? Yes Xlvo 2. Typo of dis harRe Storm Water Runoff Northeast Creek at Marina. 3. Loeatiun of discharge _.---- VII. Present rate of shoreline erosion (if known): Unknown Vill. List permit numbers and issue dates of prreev:o s Department Y CNps. of Engineers o t to per Nof or - 82 , work in project area, if applicable: l year IX. Length of time required to complete project. )t. In addition to the completed application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a ropy of the deed or other instrument under which the owner claims title plus written permission from the owner to carry out the project on his land. B. Attach an accurate work plat drawn to scale on 8!, X 11" white paper 1<_ee instruction booklet for details). Nute: Or.ginai dra•.hings preferred . oriy high quality copies accepted. C. A copy of the application and plat must be served uoon adjacent riparian landogwn ers by registered or certified mad or by our1,-atv)h !G.S. 113-229 ;d!)Enter date served D. List names and complete adure,•ses of the riparian lanauwners with property adjoining applicant's. Such owner, nave 30 d..vs in wh ch tiff submit comments u• agencies listed below. Darrel D. Daniels Sam L. Whitehurst p,p• Box 225 Rt. 1 Box 329 New Bern, NC 28560 New Bern NC 28560 XI. Certification requirement: l •.crtif•, that to the best of my knowledge, the proposed activity complies with the Staw .)I Noith Carolinas app'•wed coa;tal management program and will he conducted in a manner,consistent w-th siich program X11. Any permit issued pursuant t-> thi; application A ill allow only the oleveloprnent described in this appli• cation and plat. Appi.caiits should ;herefur aw.cribe in ttnc application' and plat ail anticipated devel- opment activities, including construction, exr.avaiion, filling, and land clearing. DATE 2 DA F•82 Rev. 10179 Applicant's SEE REVERSE SIDE FOR MAILING INSTRUCTIONS ?F Introduction Fairfield Harbour is located in Craven County, North Carolina, approximately eight (8) miles east of New Bern, at the confluence of Northwest Creek with the Neuse River. Fairfield Harbour is developing into one of the more desirable resort communities located in this area. It is the developer's intent to develop a Master Land Use Plan that is harmonoius with the natural habitation of the area and that creates a positive influence on the environmental-ecological systems in exist'ance; however, also with the accomplishment of economical feasibility and success. The growth rate of the Fairfield Harbour community is accelerating each year with the construction of single family homes, condominiums, resort facilities, and expansion into new development areas. Presently under construction is-,a-second 18 hole golf course located on the east side of S.R. 1600. There are approximately 2334 single family lots of which 250 are built on and 170 existing multi-family type ;.snits. In addition, there are country club and restaurant facilities as well as marina fa.cilities. Permit Review This project is being submitted for permit review and approval to the U.S. Army Corps of Engineers for administration of the federal review and to the North Carolina Department of Natural Resources and Community Development - Office of Coastal Mana-ement for adminstrationof the state review. The district office for the Corps is located in Wilmington, NC and the regional office for the Office of Coastal Management is located in Morehead City, NC. Permit applications are submitted to those offices. Description of Project This project will consist of the expansion of the present marina and boat basin at the Fairfield Harbour marina complex. Both commercial and condominium type facilities are planned to be constructed around the improved marina. Approximately one (1) acre of land will be excavated (17,700 cubic yards of material) to create the basin. Also, approximately .3 acre of t existinf; marina is planneA ro be filled requirrnr, 3600+ cubic yards of fill material. Bank treatment will consist of a combination It of wood bulkheading with rip rap placed on the outward slope in front of the bulkhead. Immediately in front and around the perimeter of the bulkhead is planned a system of wood pier and boat docks. Stormwater Management Stormwater run-off direct drainage to the stream system contributes to the degradation of water quality. Recognizing this, drainage will be diverted away from the stream system into grassed swales and pipe systems leading into one of the existing lakes within the project area which will act as a retention basin. The lakes will have over flow structures which will discharge into the boat basin. Erosion Control An erosion and sedimentation control plan will be submitted to the Land Quality Section, NRCD for approval prior to construction. Accepted erosion control methods will be mployed and all precautions as necessary will be taken to prevent sediments from entering the stream. Wastewater Treatment Facilities Northeast Craven Utility Company presently owns and oeprates the wastewater --treatment facilities serving Fairfield Harbour. NPDES permits are for .l mgd to Upper Broad Creek and 1 mgd to the Neuse River. Existing plant capacity is lmgd with new .3 mgd facilities under construction with start-up in early spring of 1985. Potable Water Supply Northeast Craven Utility Company presently owns and operates the water supply system serving Fairfield Harbour. Water is supplied by 2 wells with storage capacity of .5mg. Future wells are planned as needed.- -2- VICINITY MAP TAKEN FROM r•? Y.3.4.3. MAP OF NEW BERN. \ h '?x FAIffIELD HARBOUR DEVELOPED SPRIG SITE v,c,r,il'Y ,oaP HuRSj TO N.C. 55 WH?ZE X Z i H Z EXISTING LAKE ? cl, V' pRopnSED FAIMELD HARBOUR MARINA EXPANSION LLE`MELLYN - NAGY ANTIGUA UMITS OF FAIRFIELD HARBOUR PROPERTY DAN I ELS NEUSE RIVER C k ti c s MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SiTE PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 . SHEET 1 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: APPROX. 1" = 800' ti. FAIRFIELD HARBOUR DEVELOPED SQ a ..TO N.C. 55-1, OO ATERWOOD ?• CONDOS C7• V' H SRS AND MARINA LAKE VI LAGEPROPOSED FAIRFIELD HARBOUR Z MARINA SANDC ST y EXPiN SI O N 11 WNITFHURS? WATERWOOD PEDESTA S? HARBOURSIDE VILLA HAROURMASTER WATERWO VILLAS LAKE X HARBOURSIDE SAggND- E `Oi,CAN MARINA PARCEL A CONDOS RADE,AKE PARCEL PROPOSED LAKE B HASE A J PARCEL H P?RCEL I UNDER N ONSTR PARCEL RCEL G PARCEL B FAIRFIELD HAR80UR- E PROPO PHASE PARCEL ` I ? ANTIGUA ? MARSH • PARCEL LLE :d ELLYN - HAGY 'K `' PROPOS L ED \ %% LAKE C L LWET FOREST"%\ PARCEL C ` D WASTEWATER `MARSH TRMT. aPLANT 1y ,L LIMITS OF FAIRFIELD MARS HARBOUR PROPERTY DANI ELS _ NEUSE RIVER ?a { \ v;• J SEE SHEETS 3 & 4 FOR MASTER LAND USE TABULATION MARINA EXPANSION THOMAS ENGINEERING CONSULTAiVT , P..._..-- MASTER PLAN (ANTIGUA) NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR. JANUARY, 1985 SHEET 2 OF 14 SCALE:APPROX. 1" = 800' CRAVEN COUNTY NORTH CAROLINA 111 MASTER LAND USE TABULATION EXISTING LAND USE ACRES U/A WATERWOOD CONDOS SH 3.9 AC 4.7 U/A WATERWOOD PEDEST. TS 6.5 AC 4.7 U/A HARBOURSIDE VILLAS SR 4.9 AC 13.3 U/A HARBOURSIDE TS 1.9 AC 12.6 U/A HARBOUR MASTER VILLAS SR 4.6 AC 17.4 U/A SANDCASTLE I TS 5.6 AC 5.4 U/A SANDCASTLE II TS 3.9 AC 7.7 U/A SANDCASTLE COVE TS 4.4 AC 5.0 U/A TRADEWINDS 5H 4.3 AC 8.4 U/A MARINA CONDOS SI-I 3.2 AC 1! 8.7 U/A SANDCASTLE LAKE 5.2 AC WATERWOOD•LAKE 4.4 AC MARINA VILLAGE & PARKING 4.2 AC POOL do REC. BUILDING 1.1 AC ROAD R.O.W. AT 60' 14.2 AC SUBTOTAL 72.3 AC 4.4 U/A PROPOSED LAND USE ACRES U/A PARCEL A TS 504 AC 7.2 U/A PARCEL B SH 7.8 AC 6.0 U/A PARCEL C SH 4.9 AC 6.0 U/A PARCEL D SH 2.5 AC 6.0 U/A PARCEL E SH 405 AC 6.0 U/A PARCEL F SH 1.9 AC 7.0 U/A PARCEL G SH 2.8 AC 7.0 U/A PARCEL H SH 1.2 AC 10.0 U/A PARCEL I SH 3.8 AC 10.0 U/A PARCEL J SH 6.8 AC 10.0 U/A PARCEL K SH 3.5 AC 10.0 U/A PARCEL L S,-I 2.1 AC 7.0 U/A PARCEL M SH 1.9 AC 10.0 U/A ROAD R.O.W. at 60' 8.3 AC RECREATION FACILITY 5.0 AC YACHT BASIN EXPANSION 1.3 AC PROJECT FACILITY 8.3 AC LAKE A PHASE I 5.3 AC LAKE A PHASE II 2.7 AC LAKE B 8.5 AC LAKE C 3.7 AC SUBTOTAL 92.2 AC 4.1 U/A UNITS 18 29 24 24 80 30 30 22 36 28 321 UNITS 39 47 29 15 27 13 20 12 38 68 35 15 19 4?q •J MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS N,P.A. MASTER LAND USE TABULATION NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFICLD HARBOUR JANUARY, 1985 SHEET 3 OF 14 CRAVEN COUNTY NORTH CAROLINNA SCALE: NONE e .rr ?y. MASTER LAND USE TABULATION Continued LAND USE SUMMARY ACRES UNITS MARINA VILLAGE 4.2 AC RECREATION FACILITY S 1 6 380 SHELTER (SH) TAL (SR) AC 5 . 9.5 AC 104 SHELTER REN TIMESHARE (TS) 27.9 AC 214 .LAKES 29.8 AC ROAD R.O.W. AT 60' 22. 5 PROJECT FACILITY AC 8 WET FOREST 9 AC . MARSH 21.9 AC NET DENSITY 7.9 U/A GROSS DENSITY 3.2 U/A f I TOTAL 212.6 AC 698 N MARINA EXPANSION THOMAS ENGINEERING CNCAROLNAr P.A. MASTER LAND USE ,TABULATION NEW BERN, NORTH SHEET 4 OF 14 ' MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SCALE: NONE CRAVEN COUNTY NORTH CAROLINA R ( 1 a EXISTING BUILDING TO BE DEMOLISHED PROPOSED COMMERCIAL BUILDING FIN. FL U l? ELEV? 12. PROPOSED I / EDGE OF I 1 i I / r DOCK TO BE WATER REWORKED AND B \ BULKHEAD 70 BE ADDED i 1 Elo EXISTING EDGE OF I I PROPOSED PARKING SANDCASTLE WATER COVE L / r I Mull 1.11.1.1 I ` PROPOSED I NEW l MARINA /j NEW DOCKS AND BULKHEAD ?? ICT 1 -?'?1 \ C EXISTING EDGE OF WATER MARSH i / ,T^ MARSH CLO. SANDCASTLE ' PARKING PROPOSED \ \ VILLAGE 1 / I I ? I CAMA A.E.C. LINE \ PROPOSED NEW CAMA A.E.C. LINE ?- \ PROPOSED CONDOMINIUM \ STRUCTURE (TYP.) \ \ PROPOSED LAKE \ OVERFLOW ELEVATION - +2.5 MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. PROPOSED CONSTRUCTION PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 5 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' .i \ I 1 1220 S. F. MARSH t EXISTING EDGE OF WATER / I I I I l 300 S.F. MARSH- 150 S.F. MARSH PROPOSED NEW I CAMA A.E.C. LINE U U I' -0-CAMA A.E.C. LINE i 225 S. F. MARSH,, P ? I? NOTE: SHADED AREAS INDICATE MARSH MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EXISTING MARSH AREAS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 5A OF 14 -CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 100' i . ° i + } its I b I I I N z I ? I 8 I 1 & 1 n 1 i I I I I I I I t I I ? I 1 1 I I I I I N '. %)C:7 -I- ? ` ?. 1 (ter, 111 tMARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION A - A NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 6 OF 14 • SCALE: NONE CRAVEN COUNTY NORTH CAROLINA (? i 1 W 2 7 d d I i .I I I I I i I I I ? ?fl I ? I I I W I p Q ( Z L1 ? ? O ? O ' Z ? d y ' N W ? ? W > I "j \ N O i 06 3 W? O W ? W ,1 O 3 m MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION B B NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 7 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE w p Q cr- p O Z p ? W O _ (y- to 0 LL Q U Z F- pW J V) N cn LL. W O ? 0O ? O ' ? J . i w ? J Q co Wr-? 2 + Y J j Z) [v m J W p O -i Q o ?+ a CL O OJ F- 3 W Q O Q O 20 j O 1 w w X O S Q W w d L O 0- F- J F- MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. .SECTION C -- C NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 8 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE \ PROPOSED NEW \ CAMA A.E.C. LINE \ \ FILL AREA \ 14,100 C.Y. \ PROPOSED LAKE ? OVERFLOW ELEVATION +2.5 \ \ ( ` COMA A.E.C. LINE r r PROPOSED \ I I / EDGE OF Y WATER I , 7 EXISTI EDGE OF WATER FILL AREA \ (? / / / / I 3800 C.Y. EXCAVATIOON ?ISIAKE 17,700 C.Y. I J 7 HIGH ELEV. +3.0 / (nom EXISTING EDGE OF WATER-// \ / / J l ? ? \ REPRESENTS PLACEMENT OF EXCAVATED MATERIAL ?'?'" „?? 11 % • s REPRESENTS MATERIAL TO BE EXCAVATED MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EARTH DISTRIBUTION PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 9 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' -,,-j ?uu? v° I I ./ '.7 f ? Lidi Ilt ' x1v - , , \ ? g ) , l I EXISTING LAKE HIGH ELEV. 1 +3.0 ?2 J 11 EDGE OF I I I? I / I l WAT IR It -10- 4' V £XISTING EDGE OF WATER-S4?% ICAMA &E.re.-?E \ I \ AMA A EDC.NLINE v NOTE: ARROWS INDICATE DIRECTION OF STORM WATER RUNOFF `P .I MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. 'DRAINAGE PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 10 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' 11 I 1 --% PROPOSED LAKE OVERFLOW ELEVATION a +2.5 I? - -T 1 PROPOS EDGE OF WATER I - I \ -7 bisnNG I - I EDGE F I WATER ? III I II I _g r I I ? j ? ? 'II I EX STI I I NG ED-GE Of WATER7t,<,,7 a7 -zz CAMA A.E.f.-NE \\\ _ OG ' `PROPOSED NEW ? AMA A.E.C. LINE v R ? 1 EXISTING ?t LAKE t HIGH ELEV. t / „ 1 +.3.0 11 3 r, A n\ l /sue ?ti` 1 \ j --% PROPOSED LAKE OVERFLOW ELEVATION - +2.5 r If ff ®AMARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. DRAINAGE PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 10 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' NOTE:. ARROWS INDICATE DIRECTION OF STORM WATER RUNOFF 7 sF I e iii X11, I 2/21 'MI R,i _ ' 'L = T? =4 f 1 3 ? I .:a 3ml ni„ - ?uan w .o-.c ? isa ?s o- a -I Y I? L E ¦ I Aw Rol- 31 8 a s It ; a .e 'v f9 I I •Y 3 ab w° W F 3 c » 5 J V co LL = ? v cc ac w nl W (r F- J~ J ?O ? 03 oW N3 z _?. hz J? W Q O.G..I dD CZ1t V d k' JAN 3 MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS; P.A. EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 11 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE J H W 0 U Z J Q m- w F- END SRRION __ I / ?-- rRK??rn PolORla @two . SMAA[R cesm-fte ?- TRYaolo w sal! DRAW //--I" a PILL lava Mss a $Yaw PrA tAOaoa CVITIa0. L-A c?Toe oo. s aau.RO TD . /rp?yq w1% .RRNT V sAft wA1R TENPORANY SHOULDER 9ERN DITCH TRrPw.n T?OIKOtA???-: arfH(i . RLWW am mm naDW STIR !AAUP OF OILL? Mss R STOKE MR DIOSOa Comm),, WMRRR OUTLET LOC,N n SUdRR IM TO SCdJR. Mur am- TM R ,IRT r? R UT&Q. ro COIfTIIR S[WaaM. Taa or rILI.-? SECTION-AA TEMPORARY SLOPE DRAIN DETAIL FLOW --+- SECTION A-A WINE OR NYLON BOUND !ALES PLACED ON CONTOUR - 1. ANGLE FIRST STAKE TOWARD A PREVIOUSLY LAID SALE I ram. NESAIIS, STEEL PICKETSLO. ?OR Z' a 2 STAKES I.S"- • I r IN 4ROUNO r n I I \\ I I \\ 11 1 gV,,Z'CJ?-.??i. .-,?. i A, 4 3 A L-?R ELEVATION STRAW BALE DIKE N KKR MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1,985 SHEET 12 OF 14 SCALE: NONE CRAVEN COUNTY NORTH. CAROLINA y IO/ OF OIICN SIOr( II . ^ IISE OF 0100 FOR •r• 01007 ?:?"! i'','?^T r.'.yj'?;;-Ty=-:??-/??i? ..•:-.?G; coy ice- ? - ? P \ ?? 1 • ? t p`""'S?h, ,?---'F• ? ?? a : ? f - ?..r+.?rrww•-?s?-'•? ? ?it;?i.lr ! I?\ 1' `l ?,?St? ??.N i I? s ?_. cr• yC,? .-.L' 'v N/' 5?,? lr 1.i:??.1 .?.. ?..:\ rrx? ???r: •i.?,r SASE Or MIN Eon EE1I WIN" 0Ia g >I I- Q QI- aOVE PLAN r- Ia 7E OIEV SLOK EL 111!I IIIIIQIIIIlpIIIIIp1IIIIg1III pI1i11=p 11lip 11111p11111= USE Q 010 EEOII lOE :TN IN FEET EQJALS E TIMES SAS' OF (NICK EIOt LIME _ i14 WIUN?GE 1CRF IU IIIIiI-?IIII?IIIIiI?ll?l IIII?III??I=IIIII?III!II ? Ir= = = 1= _' I I I ELEVATION SILT BASIN DETAIL TYPE 'B° Ill?EU aorE rr. r-o• ?IIII To Ia•-V CON LK III III,, ?1'ii IIII?IIIiI? IIII?IIiI?? _1j11j F o• -o- TO 2' •0' I I i ? ELITE ? I I I I ?- r?uo L44 I?II?IIiiNllll?lllll CROSS SECTIONAL VIFSILT DITCH DETAIL OCEI v EM JA,4 3 MARINA EXPANSION THOMAS ENGINEERING CONS ULTAN!S 7:7-7 EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 13 OF 14 SCALE: NONE CRAVEN COUNTY NORTH CAROLINA *iNLvi33HS 5861 '?I?dONdf d ? ._. 4 -? 3NON :3ldOS 'dN11021d0 H18ON ?l.1Nf100 N3Ad80 2?(lOQ2idN (?31J21t?fJ 39dlIlA VNI2ldW 02id0 HldON 'N2?39 M3N S?1d13(] ?02?1N00 NO11`d1?IS/NOIS02?.? l(1SN00 9N1833N19N3 SdWOHl NOISNddX3 `dN18`dW Wd0 >1:)3H:) 111S x008 88-NO1133S VV-NO11.03S ')tNVP 153MO1 ?•-- - -'NIW O-Z e [? !0 13A31 MO-130 NIN,1 I .07M Pn3U1. 36 11vN5 AVIAllldS -7INv6 iS3MOl s0 13A31 M0139 lnN M "Vpii 'N1N.I 36 1lVNS AVM'I-Wt NVId Nx ..wv0 M03N71115 %OOY. N7w3 U3d 3011ild 11Nf1 17VNINOD 3Nl 1V VDd OIVd 39 Ol '(.6. SSV10110tl1N07`N016063 NW 3N016 'NIN .91.1 dvU flu 1 LSvl3 Mod .6l -1 -11NV6 87110 i0 3015 163MO1 01 NOLIO d0 w01106 f10Nd 77Nv1510-N '(.6. SS V 15110N1N07 NO1SOW3 4101 3NO1S tl0 d" flu I SSWID 36 "INS P70N 31ON I ?..?, ,? -? `- __ ?: -. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 March 21, 1985 IN ncru ncrcn iu Regulatory Branch SUBJECT: File No. SAWCO85-N-025-0030 RECEIVED Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: WATERlr? ;:;.; y SECTION OPT; .'r: 11NCf f Reference the application of Fairfield Harbor, Incorporated, represented by Thomas Engineering Consultants, P. A., for a Department of the Army permit to expand marina facilities on Northeast Creek at Fairfield Harbor, near New Bern, in Craven County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. Work will be accomplished in strict accordance with revised plans dated January 1985. b. Emergent wetland vegetation and shallow water habitat lost through accomplishment of the work will be mitigated to the satisfaction of the U. S. Fish and Wildlife Service by one or a combination of the following three methods: 1. Physical modification of replacement habitat to convert it to the same type lost. habitat. 2. Restoration or rehabilitation of previously altered 3. Increased management of similar replacement habitat so that the inkind value of the lost habitat is replaced. ?- ?.. o'' ;. ?, . r ?? ; ' ? `Q y ?'?.. ... #`. -2- c. Construction activities will take place in isolation from the Neuse River or will be restricted to the period of October 1 through March 31 of any year to protect fishery resources. d. All excavated materials will be confined landward of the mean high water (MHW) elevation contour and any regularly or irregularly flooded marshlands. e. Excavation will not exceed 6 feet below the elevation of mean low water (MLW). f. The temporary placement or double handling or excavated materials within waters or wetlands is not authorized. Questions or comments may be addressed to Mr. David Baker, telephone (919) 343-4642. Sincerely, Charles W. Hollis Chief, Regulatory Branch Copies Furnished: Mr. William Mills Water Quality Section Division of Environmental . Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Ms. L. K. (Mike) Gantt U. S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service, NOAA Post Office Box 570 Beaufort, North Carolina 28516 Mr. Sheppard N. Moore Environmental Review Section Environmental Assessment Branch U. S. Environmental Protection Agency 345 Courtland Street, N. E. Atlanta, Georgia 30365 Mr. James Mercer Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 ., ?r \. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402.1890 May 23, 1985 IN Mt:FLT MthtN IV Regulatory Branch SUBJECT: File No. SAWC085-N-025-0030 RECEIVED N-1 AY 2 8 1985 Fairfield Harbour, Incorporated 750 Broad Creek Road New Bern, North Carolina 28560. Gentlemen: WATER QUALITY SECTION OPERATIONS BRANCH Reference your application for a Department of the Army permit to expand marina facilities on Northeast Creek at Fairfield Harbour, near New Bern, in Craven County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. SAWC080- N-000-0291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in a violation of Federal law. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be.sent promptly to this office and the N. C. Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions-or--comments may be addressed to Mr. David Baker, telephone (919) 343-4642. Sincerely, Charles W. Hollis Chief, Regulatory Branch Enclosure J? ., ?3 } ? ? , 3. ; A ? ? ??z ;,?, Awawlk -2- pies Furnished with enclosure: Director, Atlantic Marine Center National Ocean Survey, NOAA ATTN: CAM04, 439 W. York Street Norfolk, Virginia 23510 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 /Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 Ms. L. K. (Mike) Gantt U. S. Fish and Wildlife Service Post Office Box 25039 Raleigh, North Carolina 27611-5039 Mr. Randy Cheek National Marine Fisheries Service, NOAA Post Office Box 570 Beaufort, North Carolina 28516 Mr. Lee Pelej Environmental Review Section Environmental Assessment Branch U. S. Environmental Protection Agency 345 Courtland Street, N. E. Atlanta, Georgia 30365 Mr. Jim Mercer Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 . ?;,:; :a?i-mow ', r VICINITY MAP TAKEN FROM Y.3 G.S. NAP OF NEW BERN. FAWIELD HARBOUR OEVELOPEO SPRING SITE \ TO N.C. 55 VICINITY mAp WHITEH?RST EXt3 n" X t.A1tE ?-' , a VH pkl g?'l'Rg PRGPCISED FAIRFIELO HARBOUR a MARINA lop EkP:aNllOti O f? 7. ANTIGUA LLEWELLYN - NAGY UMITS OF FAIRFIE_ D EfiAFFB-OUR PROPERTY DANIELS NEUSE RIVER Y" cf?l MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.H. SITE PLAN NEW. BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 1 OF 14 CRAVE'! COUNTY NORTH CAROLINA SCALE: APPROX. 1" = 800' iw __ FA1 E HARBOUR DEVELOPED ? TO N.C. 55 ' WH,?EV WATERWOOD PEDESTA S? 0 HARBOURSIDE VILLA HAROURMASTER WATERWO TER ODD VILLAS LAKE CONDOS N, HARBOURSIDE AND- V' Z CAST E U1 O` C "AAaouRSt ANDCAS ?UTLc?'p MARINA Vll LAGE! LAKE POSED PARFIELD HAROOUR MARINA Y EXPANSION SANO11 ST 0 f n MARINA PARCEL A %% CONDOS p T??lAKE N, PARCEL PROPOSED LAKES q HAWSE A J PARCEL H PARCEL I UNDER ?• ONSTR PARCEL G PARCEL PARCEL a FAIRFIELD HARBOUR -Ne P OPO PHASE j PARCEL \I 1NT1Bt1A ? MARSH -? . PARCEL `. ?. LLEW ELLYN - NAQY ' - `PROPOSED \ L LAKE C \ L WET FOREST"' OREST, -''\\ ARCEL C TEWATER `MARSH D WAS TRMT. -.\ ?. PLANT LIMITS OF FAIRFIELD ?- MARS HARBOUR PROPERTY DANIELS NEUSE RIVER 3 SEE SHEETS 3 & 4 FOR MASTER LAND USE TABULATION MARINA EXPANSION THOMAS ENGINEERING CONSULTAN MASTER PLAN (ANTIGUA) NI 'W BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 2 OF 14 CRAVEN COUNTY NORTH -CAROLINA SCALE: APPROX.' 1" = 800' . 4 MASTER LAND USE TABULATION EXISTING LAND USE ACRES U/A UNITS WATER WOOD CONDOS SH 3.9 AC 4.7 U/A 18 WATER WOOD PEDEST. TS 6.5 AC 4.7 U/A 29 HARBOURSIDE VILLAS SR . 4.9 AC 13.3 U/A 24 HARBOURSIDE TS 1.9 AC 12.6 U/A 24 HARBOUR MASTER VILLAS SR 4.6 AC 17.4 U/A 80 SANDCASTLE I TS 5.6 AC 5.4 U/A 30 SANDCASTLE II TS 3.9 AC 7.7 U/A 30 SANDCASTLE COVE TS 4.4 AC 5.0 U/A 22 TRADEWINDS SH 4.3 AC 8.4 U/A 36 MARINA CONDOS SH 3.2 AC j! 8.7 U/A 28 SANDCASTLE LAKE 5.2 AC WATER WOOD LAKE 4.4 AC MARINA VILLAGE do PARKING 4.2 AC " POOL do REC. BUILDING 1.1 AC ROAD R.O.W. AT 60' 14.2 AC SUBTOTAL 72.3 AC 4.4 U/A 321 PROPOSED LAND USE ACRES U/A UNITS PARCEL A TS 5.4 AC 7.2 U/A 39 PARCEL B SH 7.8 AC 6.0 U/A 47 PARCEL C SH 4.9 AC 6.0 U/A 29 PARCEL D SH 2.5 AC 6.0 U/A 15 PARCEL E SH 4.5 AC 6.0 U/A 27 PARCEL F SH 1.9 AC 7.0 U/A 13 PARCEL G 5.9 2.8 AC 7.0 U/A 20 PARCEL H SH 1.2 AC 10.0 U/A 12 PARCEL I SH 3.8 AC 10.0 U/A 38 PARCEL J SH 6.8 AC - 10.0 U/A 68 PARCEL K SH 3.5 AC 10.0 U/A 35 PARCEL L Sii 2.1 AC 7.0 U/A 15 PARCEL M SH 1.9 AC 10.0 U/A 19 ROAD R.O.W. at 60' 8.3 AC RECREATION FACILITY 5.0 AC YACHT B _ 11<}P1 NBC PROJECT FACILITY 8.3 AC LAKE A PHASE 1 5.3 AC LAKE A PHASE If 2.7 AC LAKE B 8.5 AC LAKE C 3.7 AC SUBTOTAL 92.2 AC 4.1 U/A ? J MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. MASTER LAND USE TABULATION , NBV BERN, NORTH CAROLINA r- MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 3 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE J MASTER LAND USE TABULATION Continued LAND USE SUMMARY ACRES MARINA VILLAGE 4.2 AC RECREATION FACILITY 6.1 AC SHELTER (SH) 50.5 AC SHELTER RENTAL (SR) 9.5 AC TIMESHARE (TS) 27.9 AC LAKES 29.8 AC ROAD R.O.W. AT 60' 22.5 AC ' PROJECT FACILITY 8.3 AC WET FOREST 31.9 AC MARSH 21.9 AC NET DENSITY 7.9 U/A GROSS DENSITY 3.2 U/A TOTAL 212.6 AC UNITS 380 104 214 698 MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. MASTER LAND USE TABULATION NEW BERN, NORTH CAROLINA OF 14 JANUARY, 1985 MARINA VILLAGE FAIRFIELD HARBOUR SCALE: NONE CRAVEN COUNTY NORTH CAROLINA EXISTING BUILDING TO BE OEMOLISNED PROPOSED COMMERCIAL BUILDING FlN. FL ll U ELEV. 1 2. , PEDCE OFO I I / ' DOCK TO BE WATER REWORKED AND 8 \ BULKHEAD D I 180 70 BE ADDED i / EXISTING J EDGE Of I I r PROPOSED PARKING SANDCASTLE WATER `' - - - ; ?COVE PROPOSED' MARINA I .C 7 / J tI ? / v) NEW DOCKS AND BULKHEAD ?L?"ftt C EXISTING EDGE OF WATER------.,//` \ MARSH ? i / ? ?? i MARSH 1 ,, I \ 1 / C PROPOSED SANDCASTLE \ PARKING \ VILLAGE I ? LAMA A.E.C. LINE \ PROPOSED NEW CAMA A.E.C. LINE ?-.- \ PROPOSED COND MINIUM ? STRUCTURE (TYP.4 \ \ PROPOSED LAKE \ ? OVERFLOW ELEVATION t2.5 I _ ` MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. PROPOSED CONSTRUCTION PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 5 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' 1-1 /* I v >\ - c 1220 S. F. MARSH --- --------- d ` c --t -'\ u u EXISTING EDGE OF WATER \ I I I n I -.300 S.F. MARSH- 150 S.F. MARSH u I I 225 S.F. MARSH-? \ \ PROPOSED NEW CAMA A.E.C. LINE / rJ -c-CAMA A.E.C. LINE , , NOTE: SHADED AREAS INDICATE MARSH v MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EXISTING MARSH AREAS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 5A OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 100' 9 a ? m I R 2 • ? I R O 2O I I y F ,3 Nj g I xW W J W h 0. (L I ? oQ I z N.. 1 . I 1 I ( I I o I I 1 I 1 1 • i 1 o + F? I i 1 ? __ W3 1 zK 1 zn I MARINA EXPANSION 'THOMAS ENGINEERING CONSULTANTS, P.A. SECTION A - A NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 6 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE Of t I I I ? K I W O O ?0 1 1 Wa N 1 1 1 O Q W 1 Z 1 0 a Q 1 U 1 Z 1 O _ Z ( ? ? O 9 m 1 N 1 j ' W I J IJ 3 W IE r 1 O U W ° _ n O Ix N N, d t o Y am 1 W 00 . LOO-- 1 0 F.3 1 H a A-A g? f W O 4 0 k 3 MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION B - 8 NEW BERN,. NORTH CAROLINA JANUARY, 1985 SHEET 7 OF 14 MARINA VILLAGE FAIRFIELO HARBOUR . SCALE: NONE CRAVEN COUNTY NORTH CAROLINA W Q ' V O z D W O V). 4 u- wQ z Z r a W J ( N W W O W O ? c 1 C O i w J Q 00 6r? Z -1- Y J Q7 J • W O J O Q O 3>+ a- O O ? 3W c 0 1 z O <x -& n O w W F- X U) m r Nc' r MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION C - C NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEEP 8 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE li \ \ CAMA A.E.C. LINE \ FILL AREA 14,100 C.Y. \ PROPOSED LAKE \ OVERFLOW ELEVATION +4.3 \ % I CAMA A.E.C. LINE PROPOSED NEW PEDCE OF WATER 7 EEXISTING WATER F I' ! FILL AREA 3600 C.Y. EXCAVAT100N ` F EXISTING L700 C.Y. LAKE HIGH ELEV. EXISTING EDGE OF WATER--_1/ • • • / / / / \ \ \ \ \ \ REPRESENTS PLACEMENT OF EXCAVATED MATERIAL A j • • REPRESENTS MATERIAL TO BE EXCAVATED ''. .. MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EARTH DISTRIBUTION PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR. JANUARY, 1985 SHEET 9 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' A ?uu PROPOSED EDG y, I? I i II i I ill II I i li I M/4 -e - ---_- EXISTINC QGE OFWA]'ER f- ??ir JI 1 f -?., Y4' I? CAMA A.E.ri.•??fNE - - \ I ` PROPOSED NEW \ CAMA A.E.C. LINE ? I r 1 fffffTTTTTTT ? I -- _ r -- r: oz c?i e 1 - - 1 tt I I f EXISTING \? w LAKE HIGH ELEV. 1 +3.0 i v NOTE: ARROWS INDICATE DIRECTION OF STORM WATER RUNOFF MARINA EXPANSION DRAINAGE PLAN MARINA VILLAGE FAIRFIELD HARBOUR CRAVEN COUNTY NORTH CAROLINA -'\ PROPOSED LAKE OVERFLOW ELEVATION - +2.5 t ?F)'w / r r \Vf I r r I I? } THOMAS ENGINEERING CONSULTANTS, P.A. NEW BERN, NORTH CAROLINA JANUARY, 1985 SHEET 10 OF 14 . SCALE: 1 200' DUSTING EDGE OF I Ij I I WATER l ? I ? I Illl ? 1 . ICI DN! It'll * MR QS 3 a 7 L6 E WI: dp .L•.L - N,aa +r .o-. r 1541 ?Ti31f -????-+?• 0•.L '? A d 111' ism wm Y I- P1 ?? Y ? y IC v? u 3? IL?c tl 3 ? ? ? :4 J hQ- W W J r a W H V co U z OL w In J LL 0 W 0 o -E ZW Q a d W 3 R?.C..I.L l? 7d/ .i !+1.? JA;d 3 r MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 11 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE I ? 6 ? o v i .. •• tur ucnoN -? I .? rErvr+ swau rwn . .- rpAVA.w aorE atrw la a PILL SIOI ? la.ss ? nvc ? JBi?r? Ynosor m.r?a? L-A Yrro? ow .s aaa.m TO TEMMRARr SHOULDER SEAM OtTCN -- / ?w74 wrw ? Wff OF 9-40--4011 CLAW I L rIm.o.Nr. ?am CPA" CLo" M^1 E Sr17f rd OIVaGN caam, w•!nE ounAT lpfjTyM H AMECT Ena t? aas OF ALL ,a' ro xaw w ww rr.t r.r .uo IN uYa¢m to camlw ,min[Irf. ravFLLJ SECTION-AA TEMPORARY SLOPE DRAIN DETAIL Ilj ILOW ?? II lii I I SECTION A-A 'WIRE OR NYLON BOUND BALES PLACED ON CONTOUR ANGLE YIRSf STAKE TOWARD A raw PREVIOUSLY LAID BALE I E REBAKS? STCEL PICKETS. I ?ON YAOU1210 STAKES 9.9'-Ld . r n I f 11 \? I I \\ ? I 1 I I \1 1 \\ 1 \1 ( I 1 II \\ II \? I \1 1 1? 1 I( \ ? ?? Y?/ rl .._ ?:? \??jj tj /;,T, ??1`+?? //i ,/:? n/? ?` Y?\` I ?` 1; i `J?\?ii' ,it• ^?\`? RjJ?l..f .Y. .4.r A L-0- ELEVATION STRAW BALE DIKE M KIA MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY,. 1985 SHEET 12 OF 14 SCALE: NONE CRAVEN COUNTY NORTH CAROLINA sor ?r MIN sort ?llll ?IIIIl?IIIIg11111pIIllIEg IIIIPIIIII-,IIIIFHEi11111=11111 t 111m OF 01101 E100 Eu[ N;IN IN EEEI Q111!. I IIWS 1tS' OF 01IEN i1.01 lNE IIIII?IIIII?111111?1111 rl?lilllt =11111?11?1?1 ELEVATION SILT BASIN DETAIL TYPE "B" Illtrill AO?t 2•-0• ?Illl? EO 10••0- Wam F-- tY J1 _-III11? EY[ (III ..o•-o• - USTI ?I?II?IIII III11? 11?I?Ilil?lllli- To: o- 11??1 1111f11111f=1111= L0001UENlE CROSS SF(:TIONAI VIF`4' SILT DITCH DETAIL REC ' M JA?+ 31 ! ._.._.._._ MARINA EXPANSION THOMAS ENGINEERING CONS ULTANTS;-P-.K.-` EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 13 OF 14 • CRAVEN COUNTY NORTH CAROLINA SCALE: NONE FLAN , ..? ??• 4F NOTE ROCK SHALL BE CLASS 1 RIP RAP OR STONE FOR EROSION CONTROL tCLASS'S' I. - H•OISTANCE FROM BOTTOM OF DITCH TO LOWEST SIDE OF OITCM EANM. T•IE' FOR CLASS L RIP RAP T-12* MIN. STONE FOR EROSION CONTROL ICLASS '51. TO lE PAID FOR AT THE CONTRACT UNIT PRICE PER EACH 'ROOK SILT CHECK DAM'. KH .t PLAN SPILLWAY SHALL !E V MIN. OELOW LEVEL OF LOWEST GANN. SPILLWAY SHALL BE ? 2-0' MIN. - -+?-^i re MIN BELOW LEVEL OF LOWEST BANK. ? L?- M SECTION-AA T SECTION-BB ROCK SILT CHECK DAM T Ji+f. 3 ... MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 14 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE Aw . 0 - 'Y1i?••p ~?? - UMITED STATES DEPARTMENT OF COMMERCE' • Wational Oceanic and Atmospheric Administration. F? •t' °• NATIONAL MARINE FISHERIES SERVICE °„" Southeast Regional Office 9450 Koger Boulevard St. Petersburg, FL 33702 ..March' 8, 1985 F/SER111/AB • -9.19/728-5090 Colonel Wayne A. Hanson = = District Engineer, Wilmington District _ Department of the Army, Corps of Engineers P.O. Box 1890 Wilmington, NC 28402 Dear Colonel Hanson: _ The National Marine Fisheries Service has reviewed the project. plans advertised in the following public notices. .We _ anticipate that any- adverse effects that might occur. otl marine _ and anadromous fishery resources would be minimal _arid,__-therefore, do not object. to i,suance of-the permits: -- NOTICE DUE _ DATE- - DA - - NOTICE NO -_° APPLICANT - _.. .01/85- . 85-N-025-0118 (GP) John T. Taylor 02/28/85- 04/ 85-N-021-0129(GP) William H. Black 'Jr. 02/28/85= 04/01/85- 85-N-071-0133(GP) J. N. Honeycutt 02/28/85 04/071/85 85-N-025-0124(GP) Barbour Boat Works = 02/07/85 03/25/85 85-N-025-0099 (GP) Holiday Znn of- ew Berri 03/-01%8.5 04/01/8-5 Y 85-N-0-25-0-030(GP) Fairfield Harbour_02/11/85 03/18/85 S5-N-065-01-13 (GP) William M. 4apsev ., et.al.02/08-/85 :_ . 03/11/85 " 85-N-028-0087(GP) Desmond R. Foster, Jr. 02/08"/8.5 03/11/85 } _..? - Since-rte y yours, J0 Richard.J. Hoogland Chief, Environmental Assessment Branchi cc FWS, ATLA, GA FWS-, Raleigh, NC EPA, ATLA, GA NCDNRCD, Raleigh, NC NCDNRCD, Morehead City, NC F/SER11 WATER ; q FN! U - I%lk, Permit Number 69-85 s-oasial resources to _sston____ ?+ y ruIt a for MAY 2 2 1985 y? FE Major Development in an Area of EnvironmentaItR ftkl LCTlO Concern:pursuant to NCG,S'113A-218 OptRAT/ON 4 BRAncH a Excavation and/or filling pursuant to NCGS 113-229 Issuedto Fairfield Harbor, Inc., 750 Broad Creek Road, New Bern, NC 28560 authorizing development in Craven County at Northwest Creek (at Fairfield Harbor as requested in the permittee's application dated 10/22/84 including attached plats, sheets 1-14 of 14 dated 1/85 and 5A dated received 1/30/85. This permit, issued on 5 ?' is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or may cause the permit to be null and void. Construction (1) The excavation of the new boat basin will be accomplished under dry-bed conditions. An earthen plug will be left between the area to be excavated and the existing creek, and a 24-hour period after completion of excavation will elapse prior to the plug removal to prevent unnecessary siltation into the adjacent water body. (2) No excavated or fill material will be placed at any time in any marsh or surrounding waters outside of the prescribed bulkhead alignment and fill areas indicated on the attached work plats. (3) All excavated materials will be confined above the normal water level and landward of all regularly and irregularly flooded marsh, or behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. (4) Excavation will not exceed 6 feet below the elevation of mean low water (MLW). STATE OF NORTH CAROLINA Department of Natural Resources -and Community Development -and A (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance, as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31, 1988 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. (/,/ - 923??2 ') David W Owens, Director Office of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee 1 '? .? Fairfield Harbor, Inc. Permit #69-85 Page 2 of 2 ' ADDITIONAL CONDITIONS (6) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction-related discharge (increase such that the turbidity in the Stream is 25 NTUs or less are not considered significant). Mitigation Vegetated wetlands, which were either excavated or filled and totaled approxi- mately 2200 sq. ft. will be replaced on a 1 to 1 ratio at a nonwetland site in keeping with the satisfaction of the DCM in consultation with the N. C. Wildlife Resources Commission and the U. S. Fish and Wildlife Service. Marina Operation a) A locked-head policy shall be posted and enforced at the marina. b) Prior to occupancy of the new slips by any boats, a marine pumpout facilities shall be provided for boats with heads and will serve the entire marina. NOTE: Since more than one contiguous acre will be affected by activities of this project, an erosion/sedimentation control plan must be filed with the Division of Land Resources, Land Quality Section, N. C. Dept. of Natural Resources and Community Development, P. 0. Box 1507, Washington, N. C. NOTE: The permittee should contact the Vector Control Branch, Environmental Health Section, Division of Health Services, P. 0. Box 2091, Raleigh, N. C. 27602, 919/733-6407, for information concerning appropriate mosquito control measures. NOTE: Plans and specifications for any additions or improvements to the water system serving this development must be approved by the Division of Health Services prior to construction. The applicant should contact the Engineering Planning Branch, Environmental Health Section, Division of Health Services, P. 0. Box 2091, Raleigh, NC 27602, 919/733-2460 for information concerning submission of water system plans. NOTE: Future development on the "Parcels" designated on sheet 2 of 14 will require a modification of this permit. 1 .. APPLICATION FOR *kRMIT TO EXCAVATE AND/OR FILL WATER QUALITY CERTIFICATION EASEMENT IN LANDS COVERED BY WATER CAMA PERMIT FOR MAJOR DEVELOPM - --- Department of Administration State of North Carolina Department of the AYA1y -- (GS 14&12) Department of Natural Resources and Community Development Corps of Engineers, Wilmington District (GS 113.229.143.215.3(x)(1).143-215.3(c). 113A-113 (33 CFR 209.320.329) Pleue type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. 1. Applicant Information A. Name Fairfield Harbour. Inc. Last First Middle B. Address 750 Broad Creek Road Street, P. O. Box or Route New Bern NC 28560 638-8011 City or Town State Zip Code Phone II. Location of Proposed Project: A. County Craven B. 1. City, town, community or landmark Fairfield Harbour -New Bern 2. Is proposed work within city limits? Yes No X C. Creek, river, sound or bay upon which project is located or nearest named body of water to project Northeast Creek 111. Description of Project A. 1. Maintenance of existing project 2. New work Marina Basin Addition B. Purpose of excavation or fill 1. Access channel length width depth 2. Boat basin 200' length 200' width 200' depth 6' 3. Fill area length 300' width 40' depth 2' - 10' 4. Other length width depth C. 1. Bulkhead length 1100' Average distance waterward of MHW (shoreline) New Shoreline Establishment 2. Type of bulkhead construction (material) Rip Rap - Concrete - Wood D. Excavated material (total for project) 1. Cubic yards 17,700 2. Type of material Sand Loam E. Fill material to be placed below MHW (see also V1. A) 1. Cubic yards 3600 2. Type of material Sand Loam IV. Land Type. Disposal Area, and Construction Equipment: A. Does the area tube excavated include any marshland, swamps or other wetland? Yes No X B. Does the disposal area include any marshland, swamps or other wetland? Yes No X C. Disposal Area 1. Location On project site 2. Do you claim title to disposal area.' es D. Fill material s4lulce if fill is to be trucked in N/A E. How will excavated material be entrapped and erosion controlled? Material to be excavated under dry conditions Silt basins - Silt fence - Straw bales F. Type of equipment to be used Jl 1 aNcl a, uu421 J, u[ aK 11111C G. Will marshland he crossed in transporting equipment to project site? If yes, explain D& F41 Rev. 10173 7p Art +v / . \ 11* V. Irrtsrtto , Use of Proi)sct Arta (Descrrbe) A. 1 Private_._. 2. Commercial arena \.vr hive Ilia uu.,„ 3, Housing Development or Industrial 4. Other 6. 1. Lot size(s)-.!Lp + - 2. Elevation of lot(s) above mean high water 6 3. Soil type and texture sandy Loam wood Frame 4. Type of building facilities or structures -._.. ' S. Sewage disposal arrd/or wastewater treatment A. Existing X Planned X B. Describe Existin with expansion this year 6. Land Classification. Ieirele cone) DEVELOPED TRANSITIONAL COMMUNITY RURAL CONSERVATION OTHER ?- (See CAMA Local and Use Plan Synopsis) VI. Pertaining to F111 and Water Quality: A. Does the proposed Fra;rc: wvolve the pt;cemenc w fill materials below mean high water? Yes No 8. 1. Will any runofc or discharge enter adjacent waters as a result of project activity or planned use of the area followingp(aiect completion? Yes?XNo 2. Type of discharge Storm Water Runoff 3. Location of discharge Northeast Creek at Marina VII. Present rate of shcreline erosion (if known): Unknown VIII. List permit numbers and issue dates of previous Department of Army Corps of Engineers or State permits for D.O.A. No. SAWC081 - N - 025 - 0343 & NC No. 95 - 82 work in project area, if applicable: 1 year IX. Length of time required to complete project: X. In addition to the completed application form, the following items must be provided: A. Attach a copy of the deed (with State application only) or other instrument under which applicant claims title to the affected property. OR if applicant is not claiming to be the owner of said property, then forward a copy of the deed of other instrument under which the owner claims title plus written permission from the under to carry out the project on his land. S. Attach an accurate work plat drawn to scale on 8,, X 11" white paper (see instruction booklet for details). Note: O?.ginal drawings preferred • uny high quality copies accepted. C. A copy of the application and plat must he ser--ed upon adjacent riparian landowners by registered or certified mad or by out.11_ation!G.S. 113.2129 ,d))Enter date served - - 0. List names and complete addrec.ses of the riparian landowners with property adjoining applicant's. Such owners nave 30 davs in wh ch Ilia submit comments u. agencies listed below. Sam Darrel D. Daniels L. Whitehurst Darrel a Rt. 1 Box 329 Box D225 New Bern NC 28560 New Bern NC 28560 XI. Certification requirement: i rertif•, that to the best of my knowledge, the proposed activity complies with the State of Noah Carulind-S app^•rved coa,ta! management program and will he conducted in a manner consistent with such program XII. Any permit issued pursuant W tfti; application ^ill allow only the development described in this appli- cation and plat. AppELAWs should therefurc describe in the application and plat all anticipated devel- opment activities, including construction, txr.avatton, filling, and land clearing. DATE O Applicant's at/ure D&F-1112 SEE REVERSE SIDE FOR MAILING INSTRUCTIONS Rev. 10176 VICINITY MAP TAKEN FROM ? U. S.G.S. MAP OF NEW BERN. FAIIWELO HARBOUR OEVELOPEO SPR?N?. WHI?ENURS? Exls'TINs LAKE K a gpt?Ry?O? 4? MAis Z PROPOSED MARINA EXPANSION O fill till ANTiWA LIMITS OF FAIRFIELD HARBOUR PROPERTY NEUSE RIVER LLEYIIEL'LYN - HAaY DANIELS MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SITE PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 1 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: APPROX. 1" = 800' TO N.C. 55 VICINITY MAP 14 V' FAIRFIELO HARBOUR ??- rmomaLO otmwUR G DEVELOPED SPRING TO N.C. 55 WH?TEvR?t WATERWOOD PEDESTA O ?O HARBOURStOE ? VILL HVROLRAMASTER WATERW?E ATERW000 ?• X CONDOS HARBOURSIDE A G CZ.? `ptCCOgy E yb 140 AND MARINA D LAKE VI LASE1 PROPOSED PAIRPIELD HARBOUR RIAAINA SAN C ST EXPANSION 31 MAR ON?003 PARCEL A O C -LAKE PARCEL PROPOSED LAKE B HAAS SE A Z J PARCEL H EL I UNDER ONS (?f? ) 8 PARCEL PARCEB LLEWELLYN- ? ` FAIRFIELD HARBOUR PRPHas E 14"y .PARCEL AIM$UA K PROPOSED LAKE C L WET FOREST \ PARCEL 0 WASTEWATER \•? ` a TRMT. ,?? `•` PLANT 1M L LIMITS OF FAIRFIELD ' HARBOUR PROPERTY DANIELS NEUSE RIVER ?`r J SEE SHEETS 3 & 4 FOR MASTER LAND USE TABULATION MARINA EXPANSION THOMAS ENGINEERING CONSULTA . , .P ,•_?- MASTER PLAN (ANTIGUA) NEW BERN, NORTH CAROLiI' MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 2 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: APPROX. i" = 800' F4 MASTER LAND USE TABULATION EXISTING LAND USE ACRES U/A UNITS WATERWOOD CONDOS SH 3.9 AC 4.7 U/A 18 WATERWOOD PEDEST. TS 6.5 AC 4.7 U/A 29 HARBOURSIDE VILLAS SR . 4.9 AC 13.3 U/A 24 HARBOURSIDE TS 1.9 AC 12.6 U/A 24 HARBOUR MASTER VILLAS SR 4.6 AC 17.4 U/A 80 SANDCASTLE I TS 5.6 AC 5.4 U/A 30 SANDCASTLE II TS 3.9 AC 7.7 U/A 30 SANDCASTLE COVE TS 4.4 AC 5.0 U/A 22 TRADEWINDS SH 4.3 AC 8.4 U/A 36 MARINA CONDOS SH 3.2 AC 8.7 U/A 28 SANDCASTLE LAKE 5.2 AC WATERWOOD LAKE 4.4 AC MARINA VILLAGE do PARKING 4.2 AC " POOL do REC. BUILDING 1.1 AC ROAD R.O.W. AT 60' 14.2 AC SUBTOTAL 72.3 AC 4.4 U/A 321 PROPOSED LAND USE ACRES U/A UNITS PARCEL A TS 5.4 AC 7.2 U/A 39 PARCEL B SH 7.8 AC 6.0 U/A 47 PARCEL C SH 4.9 AC 6.0 U/A 29 PARCEL D SH 2.5 AC 6.0 U/A 15 PARCEL E SH 4.5 AC 6.0 U/A 27 PARCEL F SH 1.9 AC 7.0 U/A 13 PARCEL G SH 2.8 AC 7.0 U/A 20 PARCEL H SH 1.2 AC 10.0 U/A 12 PARCEL I SH 3.8 AC 10.0 U/A 38 PARCEL J SH 6.8 AC 10.0 U/A 68 PARCEL K SH 3.5 AC 10.0 U/A 35 PARCEL L SH 2.1 AC 7.0 U/A 15 PARCEL M SH 1.9 AC 10.0 U/A 19 ROAD R.O.W. at 60' 8.3 AC RECREATION FACILITY 5.0 AC YACHT BASIN EXPANSION 1.3 AC PROJECT FACILITY 8.3 AC LAKE A PHASE I 5.3 AC LAKE A PHASE II 2.7 AC LAKE B 8.5 AC LAKE C 3.7 AC SUBTOTAL 92.2 AC 4.1 U/A 37 . , V-6) , MARINA EXPANSION MASTER LAND USE TABULATION MARINA VILLAGE FAIRFIELD HARBOUR CRAVEN COUNTY NORTH CAROLINA THOMAS ENGINEERING CONSULTANTS, PA. NEW BERN, NORTH CAROLINA JANUARY, 1985 SHEET 3 OF. 14 SCALE: NONE `4-* r MASTER LAND USE TABULATION Continued LAND USE SUMMARY ACRES UNITS MARINA VILLAGE 4.2 AC RECREATION FACILITY 6.1 AC SHELTER (SH) 50.5 AC 380 SHELTER RENTAL (SR) 9.5 AC 104 TIMESHARE (TS) 27.9 AC 214 LAKES 29.8 AC ROAD R.O.W. AT 60' 22.5 AC PROJECT FACILITY 8.3 AC WET FOREST 31.9 AC MARSH 21.9 AC NET DENSITY 7.9 U/A GROSS DENSITY 3.2 U/A TOTAL 212.6 AC 698 0kd L', MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. MASTER LAND USE TABULATION NEW BERN, NORTH CAROLINA. MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 4 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE 1 F, coma au LOING TO BE DEMOLISHED PROPOSED ?MERWL INFL u F EL12. WATER 1 I DOCK TO BE REWORKED AND ? D "A u A D ED BEE TO 1 C EDGE OF 1 ?. i 1 ' PROPOSED N NA MA 1 NEW DOCKS AND BULKHEAD C EXISTING EDGE OF WATER ?MARSN-?? / MARSH I 1 // C II /? 1 CAMA A.E.C. LINE i PROPOSED PARKING VOW i nll.w I?I 1 1 I 1 1 PROPOSED \ SANDCASTLE PARKING \ VIUAGE \ \ ?? `M$1M CAMA A;E.C:: t51NE \ \ PROPOSED CON INIUM \ STRUCTURE (IYP ? ? ? i PROPOSED LAKE OVERFLOW ELEVATION - +2.8 ?•? mss' ? MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. PROPOSED CONSTRUCTION PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 5 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' I I I I - - - i. F. MARSH PROPOSED NEW CAMA A.E.C. LINE EXISTING EDGE OF WATER' 1 ? i n i l S.F. MARSH- LM S.F. MARSH "4-CAMA A.E.C. LINE 1 \v I? I? I? I? u 1 4.j* S.F MARSH--? 1 1 I? ?I ? i NOTE: SHADED AREAS INDICATE MARSH MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. k(? : ,Ir+4frRSN= .AS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 fOF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 100' 1, -/ g a a + $ I <o Wo a X I ? W.91 FI I ? I I I I o , C , I ? I I I I I I I I I I I Tw I 1 R" MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION A A NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 6 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE 1? ?. x 7 W p Q ? p O Z p D W O 0 Z Ww u- Q Z p J ~ .. LLJ J_ V) (V W LL. W \ O i C 0 w i IL w J Q Do W? 2+ Y J j m J W p O 0 CL Q 0 3 + CL a.. o wi J O ~ 3w a o i z O Qo n 22 w Z ' J X it 3 w 49 i i MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. SECTION C - C NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 8 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE ti i IL - l2i mmmw5 PROPOSED EDGE OF r I / WATER I 7 % OF EEXDIGE AREA ( +H . / 3600 Cy. / L Y _4. / / / / / ?r11 ? f// / // //// jJ / / EXISTING LAKE 17,700 n? EXISTING EDGE OF WATER- 01 HIGH ELEV. • ?• • • • / / / / / f / +3.0 1 / / a?`aaa??TTTT ?c • • • • • / // / i 1?k 1 CAMA A.E.C. LINE / 1 \ E8 x W \ \ nl C. LINE • ft??r ?' LN" FILL AREA 14.100 C.Y. PROPOSED LAKE OVERFLAW ELEVATION - +2.3 ?` ? \ ? REPRESENTS PLACEMENT OF EXCAVATED MATERIAL • • REPRESENTS MATERIAL TO BE EXCAVATED MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. EARTH DISTRIBUTION PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 9 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' i uu IG EDGE OF WADER-_ CAMA A.E.Ri-IINE 7 / lool ' 1k C XNE ? I \ ,9 A 4. NOTE: ARROWS INDICATE DIRECTION OF STORM WATER RUNOFF I EXISTING \ / LAKE / HIGH ELEV. +3.0 11 / 4 \ J `?~ PROPOSED LAKE OVERFLOW ELEVATION - +4.3 I .` \ v I ? 1! r? «f MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. DRAINAGE PLAN NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 10 OF 14" CRAVEN COUNTY NORTH CAROLINA SCALE: 1" = 200' I I I I i _7 ?ti ?t L I it till it ' 4 I i I y' 4 Lill Im _ v,t? •si m. ?a 7 '9 LL, l I? Id - ter ®? -.a.c II if ' s 5w j, 1 = *,we L" r i e. J? gig a W W J H J LL. LL. O? ?W d o Wa d 3 t J F O J N JAN 3 MARINA EXPANSION THOMAS ENGINEERING CONSULTANTS, P.A. I EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 11 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE a a r"L.HIN ro? 9F orn ant IIIiim {ill@?ilillplllltgp 11 lll]EE1 llll Illli lllli lllll llll?= BASE w alcm FLOII LIME LW IT" M FEET W&& a Tws Ur OF eIFUI FLOC LIME _ SHE GUNIA WOVA ?_ _ LI= _ = i. Tf(}=I III ELEVATION SILT BASIN DETAIL TYPE "B" I I I ?r FILL &WE ?illl? -9IIIIFIillt?lllll n Io•-r ?IIII? Fo r•o• III wa Illli WAM LK llll?llll?llll _ IIII?IIII?IIIfig-Iilly; VI SLT DITCH DETAIL J r; ?+ 31 MARINA EXPANSION EROSION/SILTATION CONTROL DETAILS MARINA VILLAGE FAIRFIELD HARBOUR CRAVEN COUNTY NORTH CAROLINA THOMAS ENGINEERING CONS ULTANTS;-TrF- NEW BERN, NORTH CAROLINA JANUARY, 1985 SHEET 13 OF 14 SCALE: NONE a?? NOTE ROCK SHALL BE CLASS I RIP RAP ON STONE FOR EROSION CONTROL (CLASS '9'1. H•OISTAMCE FROM BOTTOM Of DITCH TO LOWEST SIDE- OF OITCY BANK. T• IB' FOR CLASS L RIP RAP T• 12' MIM. STONE FOR EROSION CONTROL (CLASS '61. TO BE MID FOR AT TIIE CONTRACT UNIT PRICE PER EACH 'NOCK SILT CHECK DAM'. KH PLAN SPILLWAY SMALL BE 1' MW w w MIM BELOW LEVEL OF LOWEST BANK. 2? STREAM w10TH f ?- H r SECTION-AA SPILLWAY SHALL BE r I'MIN. BELOW LEVEL Of 2-0' MIN. - -+-? LOWEST BANK. SECTION-88 ROCK SILT CHECK DAM .T4 . ,7 ,"Ho MARINA EXPANSION THOMAS ENGINEERING CONSU7AI TS, P.A. EROSION/SILTATION CONTROL DETAILS NEW BERN, NORTH CAROLINA MARINA VILLAGE FAIRFIELD HARBOUR JANUARY, 1985 SHEET 14 OF 14 CRAVEN COUNTY NORTH CAROLINA SCALE: NONE I