Loading...
HomeMy WebLinkAbout20180725 Ver 1_PCN Form Submission_20180524Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 5/24/2018 1:31:22 PM (Start Event) Accept by Carpenter,Kristi 5/24/2018 5:10:42 PM (DOT Initial Review) . The task was assigned to Carpenter,Kristi. The due date is: May 29, 2018 5:00 PM 5/24/2018 1:32 PM �� � 6fvlslaa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf A. Processing Information County(or Counties) where the project is located:* Columbus Is this project a public transportation project?* �' Yes C' No This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* �' Yes C' No (NCDOT only) T.I.P. or state project number: B-4479 WBS # 17. BP.6. R.92 (for NCDOT use only) 1a. Type(s) of approval sought from the Corps:* rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* �J Nationwide Permit (NWP) r Regional General Permit (RGP) � Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E-PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 23 - Categorical Exclusions NWP Number Other: List all MN nurrbers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply ri 401 Water Quality Certification - Regular r 401 Water Quality Certification - E�ress r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit � 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: �' Yes C•' No f Yes C•' No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from rritigation bank or in-lieu fee program �' Yes �' No Acceptance Letter Attachment C7ick the upload button or drag and drop files here to attach docurrent RLE NF� MJST BE FDF 1f. Is the project located in anyof NC's twentycoastal counties?* C' Yes �' No 1h. Is the project located in a designated trout watershed?* C' Yes C' No Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-PrograrrUAgency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Jim Rerko 1b. PrimaryContact Email:* jjrerko@ncdot.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (910)364-0834 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner I nformation 2a. Name(s) on recorded deed: NCDOT Project 2b. Deed book and page no.: 2c. Responsible party: (for Corporations) 2d.Address Street Address 1000 Transporation Dr. Address Line 2 C7ty Fayetteville Fbstal / Zip Code 28302 2e. Telephone Number: (xxx)xxx-xxxx (910)364-0834 2f. Fax Number: (910)486-1959 (xxx)xxx-xxxx 2g. Email Address:* jjrerko@ncdot.gov State / R-ovince / I�gion NC Country C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* 17.BP.6.R.92/B-4479 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town:* Clarkton 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. From Raleigh, I-40 E to I-95 S, take exit 46 toward Elizabethtown and continue on NC-87 S 33 miles and turn right onto US-701 S and continue for 9.8 miles. Turn left onto US-701 Bus. and take first right onto Red Hill Rd. The project is located on the four bridges over Red I Hill Swamp. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) 2b. Propertysize: (in acres) 2c. Project Address Street Address Address Line 2 �� Fbstal / Zip Code State / Rovince / F�gion Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 34.449775 -78.661674 ex:34208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Red Hill Swamp 3b. Water Resources Classification of nearest receiving water:* 15-4-1 Surface Water Lookup 3c. What river basin(s) is your project located in?* Lumbe r RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project site is an existing road, SR 1700 (Red Hill Rd.), with four bridges. The majority of the road corridor immediately outside of the existing fill slope is a forested wetland. 4b. Attach an 8 1/2 X 17 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Qick the upload button or drag and drop files here to attach docurrent Fig2_ProjectStudyArea_B4479_Columbus.pdf 337.19KB Fle type rrust be pdf 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) I C1ick the upload button or drag and drop files here to attach docurrent Fig2_SoilsMap_B4479_Columbus.pdf 296.76KB Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 30 acres 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) wa 4f. Explain the purpose of the proposed project:* The project will replace four bridges, 230222, 230226, 230228, and 230230, on SR 1700 over Red Hill Swamp. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* State project 176P.6.R.92 involves the replacement of the existing NCDOT Bridges #230222, #230226, #230228, #230230 on SR 1700 over Red Hill Swamp. Bridge #230222 consists of 1@18.2', 1@17.3', 1@17.1', 1@16.7' concrete deck on I-Beams with concrete caps and timber piles. Bridge #230226 consists of 1@18.3', 1@18.1', 1@18.2', 1@18.8' concrete deck on I-Beams with concrete caps and timber piles. Bridge #230228 consists of 1@18.4', 2@18.2', 1@18.3' concrete deck on I-Beams with concrete caps and timber piles. Bridge #230230 consists of 1@18.5', 1@18.2', 1@18.4' concrete deck on I-Beams with concrete caps and timber piles. The proposed bridge for #230222 consists of 1@40', 1@50' 21" cored slab with 2'-6" caps. The proposed bridge for #230226 consists of 1@45', 1@50' 21" cored slab with 2'-6" caps. The proposed bridge for #230228 consists of 1@40', 1@50' 21" cored slab with 2'-6" caps. The proposed bridge for #230230 consists of 1@35', 1@40' 21" cored slab with 2'-6" caps.The proposed crossing is located in Zone AE of FIRM Map number 3720120400K and was studied by Limited Detail Study methods. At bridges #230222 and #230226, one stormwater outfall is proposed. At bridge #230228, twro stormwater outfalls are proposed. At bridge #230230, four stormwater outfalls are proposed. All stormwater outfalls will utilize a rip rap pad to dissipate the energy. No deck drains are required for the proposed bridges. 4h. Please upload project drawings for the proposed project. Qick the upload button or drag and drop files here to attach docurr�nt � B4479 Permit Package.pdf Fle type rrust be pdf 5. Jurisdictional Determinations 5.15M6 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* C' Yes C' No f" Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? * C' Preliminary C' Approved C' Unknown C' fWA Corps AID Number: 6carrple: SAV�2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Othe r: Heather Smith Ecological Engineering 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5d1. Jurisdictional determination upload C1ick the upload button or drag and drop files here to attach docurrent Fle type rrust be f�F 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes 7. Future Project Plans 7a. Is this a phased project?* C' Yes �' No C� No !' Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. This is a complete project replacing all four bridges over Red Hill Swamp. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): rJ Wetlands r Streams-tributaries r Open Waters r Pond Construction r Buffers 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site #- Reason for impact* 2b. Impact type * 2c. Type of wetland * 16+90/47+20 -L- LT fv�p label (e.g. F3�ad Qossing 1- Qilvert, dewatering, etc) 16+g0/47+20 -L- LT fV�p label (e.g. f�ad CYossing 1- Qalvert, dewatering, etc) 18+25/47+10 -L- RT N�p label (e.g. F�ad Qossing 1- CLlvert, dewatering, etc) 18+25/47+10 -L- RT N�p label (e.g. Finad Qossing 1- CLlvert, dewatering, etc) P F2rrrenent (Fj or Terrporary (� T F�rrranent (F) or Terrporary (� P F2rrranent (� or Terrporary (� T F2rrranent (Fj or Terrporary (� 2g. Total Temporary Wetland Impact 1.010 2g. Total Permanent Wetland Impact 0.580 2g. Total Wetland Impact 1.590 2h. Comments: Riverine Swamp Forest Riverine Swamp Forest Riverine Swamp Forest Riverine Swamp Forest E. Impact Justification and Mitigation 1. Avoidance and Minimization 2d. Wetland name *2e. 2f. Type of Forested * Jurisdicition * Red Hill Swamp Yes Both (404, 10) or W�R(401 other) Red Hill Swamp Yes Both (404, 10) or C!✓UR(401 other) Red Hill Swamp Yes Both (404, 10) ar D✓N2 (401 other) Red Hill Swamp Yes Both (404, 10) or D�/�R (401 other) 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The project is replacing all four bridges at the same time and is utilizing 3:1 slopes instead of a more gradual slope. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* The project is utilizing hand clearing in areas to minimize permanent impacts to wetlands. Sediment and erosion control devices will be installed to prevent additional impacts from sedimentation outside of the construction limits. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C� Yes C' No 2g. Impact area* 0.360 (acres) 0.540 (acres) 0.220 (acres) 0.470 (acres) 2c. If yes, mitigation is required by (check all that apply): r7 DWR �J Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank r7 Payment to in-lieu fee program r Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. r7 Yes 4b. Stream mitigation requested: (linear feet) 4c. If using stream mitigation, what is the stream temperature: 4d. Buffer mitigation requested (DWR only): (square feet) 4e. Riparian wetland mitigation requested: (acres) 1.16 acres 4f. Non-riparian wetland mitigation requested: (acres) 4g. Coastal (tidal) wetland mitigation requested: (acres) 4h. Comments i NCDOT will use NCDMS to fulfill riparian wetland mitigation at a 2:1 ratio. 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. C' Yes �' No F. Stormwater Management and Diffuse Flow Plan (required by DWR) ""* Recent changes to the stormwater rules have required updates to this section .*"* 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes �' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: The project is located in the Lumber River Basin where there are no NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* �' Yes C' No G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* C� Yes C' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?* C' Yes C•' No Comments:* See attached approved CE documentation 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * C' Yes C•' No 2b. Is this an after-the-fact permit application?* C' Yes �' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* C' Yes C•' No 3b. If you answered "no," provide a short narrative description. This is a complete project that will replace all four bridges along this section of road. There is no anticipated additional development related to the replacement of these bridges. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? * C' Yes C•' No C' rUA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? * G Yes l' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes l" No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* �' Yes C' No What Federal Agency is involved? FEMA 5e. Is this a DOT project located within Division's 1-8?* c' Unknown r Yes C' No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? On-site investigations were during the appropriate USFWS survey windows in 2015. No specimens of any protected species were observed during the surveys of suitable on-site habitat. See attached CE documentation 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes C•' No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina historyand archaeology)?* C' Yes C•' No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * See attached historic and prehistoric upload. 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent Historic and Prehistoric for Upload.pdf 3.21 MB Fle rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* �' Yes C' No 8b. If yes, explain how project meets FEMA requirements: A type 1 MOA was submitted to FEMA and is awaiting approval. 8c. What source(s) did you use to make the floodplain determination?* FIRM Map number 3720120400K Miscellaneous Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrent 64479_CE. pdf 2.02MB SR 1700 - Bridges 222 224 228 230 (B-4479) - Division 6- RW - LU 06.pdf 62.22KB Fle rrust be FDF or FMQ Signature � By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* James J. Rerko, PWS Signature � �.,,nr � f �t�', r�"/�'� S Date Submitted: 5/24/2018 Initial Review Is this project a public transportation project? *(?) C•' Yes C' No Change only if needed. Has this project met the requirements for acceptance in to the review process?* C� Yes C' No BIMS # Assigned* 20180725 Version#* 1 Reviewing Office * Wilmington Regional Office - (910) 796-7215 Select Project Reviewer* Joanne Steenhuis:eads\jhsteenhuis Is a payment required for this project?* C' No payment required G Fee received C' Fee needed - send electronic notification