Loading...
HomeMy WebLinkAbout20180623 Ver 1_DWR Additional Information Requested (project on-hold letter)_20180524ROY COOPER Governor MICHAEL S. REGAN Secretary Water Resources LINDA CULPEPPER Environmental Quality Director May 24, 2018 DW R If 18-0623 Dare County CERTIFIED MAIL: 70171070 0000 99221534 RETURN RECEIPT REQUESTED Mark and Anita Frena 119 South Dogwood Trail Southern Shores, North Carolina 27949 Subject: REQUEST FOR ADDITIONAL INFORMATION 121 South Dogwood Trail, Southern Shores — Proposed construction of a bulkhead, filling behind the bulkhead, excavation of a two -slip basin, dredging within a man- made canal, construction of a boathouse and pier within the basin, and installation of a wooden boardwalk around the basin. Dear Mr. and Mrs. Frena: On May 7, 2018, the Division of Water Resources (Division) received your application dated February 5, 2016, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Impact Justification (Avoidance and Minimization) Please provide more details regarding avoidance and minimization of impacts to 0.13 acres of waters/wetlands associated with the construction of the bulkhead, basin, boathouse, pier, and boardwalk. (15A NCAC 02H.506 (f) and (g)). (f) A lack of practical alternatives may be shown by demonstrating that, considering the potential for a reduction in size, configuration or density of the proposed activity and all alternative designs the basic project purpose cannot be practically accomplished in a manner which would avoid or result in less adverse impact to surface waters or wetlands. (g) Minimization of impacts may be demonstrated by showing that the surface waters or wetlands are able to continue to support the existing uses after project completion, or that the impacts are required due to: (1) The spatial and dimensional requirements of the project; or (2) The location of any existing structural or natural features that may dictate the placement or configuarion of the proposed project; or (3) The purpose of the project and how the purpose relates to placement, configuration or density. • This should include alternative designs and layouts of the project area. • This Office believes that the wetland impacts labeled on the plan as proposed can be moved or reconfigured to avoid the impacts to the 404/401 wetlands. Please revise the plans to Ci Nothing Compares:.._ State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina27889 252-946-6481 avoid the impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to avoid impacts to the open waters. Pursuant to 15A NCAC 2H. 0506 (6)(f) and Title 15A NCAC 02H .0506 (6)(g), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Chris Pullinger at 252-948-3922 or chris.oullinaerC@ncdenr.¢ov if you have any questions or concerns. Sincerely, Chris Pullinger, Environmental Specialist II Water Quality Regional Operation Section Division of Water Resources, NCDEQ cc: Josh Pelletier, USACE Washington Regulatory Field Office (via email) Shane Staples, DCM Washington (via e-mail) Maria Dunn, NCWRC Washington (via e-mail) Ron Renaldi, DCM Elizabeth City (via e-mail) Gregg Bodnar, DCM Morehead City (via e-mail) George Wood, Environmental Professionals, Inc. (via email —obxwood@yahoo.com) DWR WaRO 401 files Laserfiche K I ! - r�o Coastal Management ENVIRONMENTAL QUALITY May 4, 2018 MEMORANDUM TO: RECEIVCD!,N1 CDENR1D WR MAYO 7 2018 tj Fec�iorlal i "ion Wrsh:ic -l;:n F;onicnc..l ^+rir.•a ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Anthony Scarbraugh, DWR - Water Quality - 401, WaRO FROM: Doug Huggett, Major Permits Coordinator c/o Gregg Bodnar, Assistant Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Permit Application Review Applicant: Mark and Anita Frena Project Location: 121 S. Dogwood Trail, Dare County Proposed Project: Construct a bulkhead, excavate a two -slip basin, dredge within a man-made canal, construct a boathouse and pier within the basin and install a wooden boardwalk around the basin. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05/25/18 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Ron Renaldi at (252) 264- 3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �,Irk�-J DATE r1 � �v,s '1- aoIS-aba3 --:�" Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St., Ste 3001 Elizabeth City, NC 27909 252-264-39011252-331-2951 [fax] Strickland, Bev From: Pullinger, Robert C Sent: Thursday, May 24, 2018 5:02 PM To: Bodnar, Gregg Cc: Pelletier, Josh R CIV CESAW CESAD (US); Staples, Shane; Dunn, Maria T.; Renaldi, Ronald Subject: FW: Mark and Anita Frena - 121 S. Dogwood Trail (Southern Shores) - DWR Additional Information Requested (project on -hold letter) Attachments: 2018-0623 DWR On -hold letter for CAMA MAJOR.pdf, 2018-0623 DWR comment sheet for CAMA MAJOR.PDF G regg, Please find attached the comment sheet for this project, as well as the letter sent to the applicant requesting additional information required to process/consider the application by DWR. The current DWR project number is 2018-0623, but there is also a previous project that was requested for the same property (and subsequently returned/withdrawn) , with the DWR/BIMS project number of 2016-0478. If you have any questions, please let me know how I can be of help. Chris Pullinger Environmental Specialist II Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3922 office chris.pullingera-ncdenr.gov 943 Washington Square Mall Washington, NC 27889 From: Pullinger, Robert C Sent: Thursday, May 24, 2018 5:00 PM To: 'George Wood' <obxwood@yahoo.com> Subject: Mark and Anita Frena - 121 S. Dogwood Trail (Southern Shores) - DWR Additional Information Requested (project on -hold letter) Mr. Wood (George), Please find attached an electronic carbon copy of the additional information request being sent to the Frenas, for the project at 121 S. Dogwood Trail (Southern Shores, NC) in Dare County, as part of their CAMA Major Permit application. If you have any questions, please let me know how I can be of help. Chris Pullinger Environmental Specialist II Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3922 office chris.pullinger(a)ncdenr.gov 943 Washington Square Mall Washington, NC 27889