Loading...
HomeMy WebLinkAbout20180724 Ver 1_Bladen Bridge 16&17_Wetland Impact Summary_20180524WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Existing Existing Permanent Fill in Mechanized Hand Clearing Channel Natural Temp Fill in Excavation in Permanent SW Temp. SW Channel Site No. Station (From/To) Structure Size/Type Wetlands (sf) Temp. Clearing in in Wetlands Impacts Stream Fill in Wetlands (sf) Wetlands (sf) Wetlands (sf) Wetlands (sf) (sf) impacts (sf) impacts (sf) permanent Impacts Design (ft) (ft) Temp. (ft) BRIDGE 17 BENT 9& 10 716 BRIDGE 16 BENT 6& 7 365 Work Bridges 4200 Totals 1081 4200