Loading...
HomeMy WebLinkAboutNC0065749_ATC Application_20180522State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) SECTION 1: INSTRUCTIONS AND INFORMATION A. The Division of Water Resources will accept this application package for review only if all of the items are provided and the application is complete. Failure to submit all of the required items will result in the application package being returned as incomplete per 15A NCAC 02T .0105(b). B. Plans and specifications must be prepared in accordance with 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities. C. The plans and specifications submitted must represent a completed final design that is ready to advertise for bid. D. Any content changes made to this Form ATC -12-14 shall result in the application package being returned. E. The Applicant shall submit ONE ORIGINAL and ONE DIGITAL COPY (CD) of the application, all supporting documentation and attachments. All information must be submitted bound or in a 3 -ring binder, with a Section tab for each Section, except the Engineering Plans. F. Check the boxes below to indicate that the information is provided and the requirements are met. G. If attachments are necessary for clarity or due to space limitations, such attachments are considered part of the application package and must be numbered to correspond to the item referenced. H. For any project that requires review under the State Environmental Policy Act (SEPA), an Authorization to Construct cannot be issued prior to the completion of a State Clearinghouse advertisement period for a FONSI, EIS, etc. unless the project qualifies for a Determination of Minor Construction Activity. I. For more information, visit the Division of Water Resources web site at: https://deg.nc.gov/about/divisions/water-resources/water- resources-permits/wastewater-branch/npdes-wastewater/authorization-to-construct. J. In addition to this Authorization to Construct, the Applicant should be aware that other permits maybe required from other Sections of the Division of Water Resources (for example: reclaimed water facilities permits; Class A or B biosolids residuals permit). SECTION 2: APPLICANT INFORMATION AND PROJECT DESCRIPTION A. APPLICANT Applicant's name Charlotte Water Signature authority's name per 15A NCAC 02T .0106(b) Joseph C. Wilson, P.E. Signature authority's title Director of Engineering Complete mailing address 5100 Brookshire Blvd., Charlotte, NC 28216 Telephone number (704) 336-7600 Email address cwilson@ci.charlotte.nc.us B. PROFESSIONAL ENGINEER Professional Engineer's name William B Keaton, P.E. Professional Engineer's title Program Manager North Carolina Professional Engineer's License No. 045626 Firm name WK Dickson & Co., Inc. Firm License number F-0374 Complete mailing address 616 colonnade Dr. Charlotte, NC 28205 Application for Authorization to Construct Permit (FORM ATC -12-14) Page 1 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) Telephone number (704) 334-5348 Email address bkeaton@wkdickson.com C. NPDES PERMIT NPDES Permit number NCO065749 Current Permitted flow (MGD) — include permit 0.1 flow phases if applicable D. PROJECT DESCRIPTION Provide a brief description of the project: Replacement of the approximately 30 -year-old 100,000 gpd package WWTP used to treat domestic wastewater with a new package plant. The new plant will be similarly sized in footprint and constructed east of the existing plant within the FEMA 100 -year floodplain. The existing plant will be demolished and removed. SECTION 3: APPLICATION ITEMS REQUIRED FOR SUBMITTAL FOR ALL PROJECTS A. Cover Letter ® The letter must include a request for the Authorization to Construct; the facility NPDES Number; a brief project description that indicates whether the project is a new facility, facility modification, treatment process modification, or facility expansion; the construction timeline; and a list of all items and attachments included in the application package. ❑ If any of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02L North Carolina General Statute 133-3. North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities are not met by the proposed design, the letter must include an itemized list of the requirements that are not met. B. NPDES Permit ® Submit Part I of the Final NPDES permit for this facility that includes Part A (Effluent Limitations and Monitoring Requirements) for the monthly average flow limit that corresponds to the work that is requested for this project. C. Special Order by Consent ❑ If the facility is subject to any Special Orders by Consent (SOC), submit the applicable SOC. ® Not Applicable. D. Finding of No Significant Impact or Record of Decision ❑ Submit a copy of the Finding of No Significant Impact or Record of Decision for this project. ❑ Provide a brief description of any of the mitigating factors or activities included in the approved Environmental Document that impact any aspect of design of this project, if not specified in the Finding of No Significant Impact or Record of Decision. ® Not Applicable. E. Engineering Plans ® Per 15A NCAC 02T .0504(c)(1), submit one set of detailed plans that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. Application for Authorization to Construct Permit (FORM ATC -12-14) Page 2 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) ® Per 21 NCAC 56 .1103(a)(6), the name, address and License number of the Licensee's firm shall be included on each sheet of the engineering drawings. ® Plans must be labeled as follows: FINAL DRAWING — FOR REVIEW PURPOSES ONLY— NOT RELEASED FOR CONSTRUCTION. ® 15A NCAC 02H .0124 requires multiple (dual at a minimum) components such as pumps, chemical feed systems, aeration equipment and disinfection equipment. Is this requirement met by the design? ® Yes or ❑ No. If no, provide an explanation: N/A Plans shall include: ® Plans for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): ® Civil ❑ Not Applicable ® Process Mechanical ❑ Not Applicable ® Structural ❑ Not Applicable ® Electrical ❑ Not Applicable ® Instrumentation/Controls ❑ Not Applicable ® Architectural ❑ Not Applicable ® Building Mechanical ❑ Not Applicable ® Building Plumbing ❑ Not Applicable ® Plan and profile views and associated details of all modified treatment units including piping, valves, and equipment (pumps, blowers, mixers, diffusers, etc.) ® Are any modifications proposed that impact the hydraulic profile of the treatment facility? ❑ Yes or ® No. If yes, provide a hydraulic profile drawing on one sheet that includes all impacted upstream and downstream units. The profile shall include the top of wall elevations of each impacted treatment unit and the water surface elevations within each impacted treatment unit for two flow conditions: (1) the NPDES permitted flow with all trains in service and (2) the peak hourly flow with one treatment train removed from service. ® Are any modifications proposed that impact the process flow diagram or process flow schematic of the treatment facility? ❑ Yes or ® No. If yes, provide the process flow diagram or process flow schematic showing all modified flow paths including aeration, recycle/return, wasting, and chemical feed, with the location of all monitoring and control instruments noted. F. ® Engineering Specifications ® Per 15A NCAC 02T .0504(c)(2), submit one set of specifications that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. ® Specifications must be labeled as follows: FINAL SPECIFICATIONS — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION. Specifications shall include: ® Specifications for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): ® Civil ❑ Not Applicable ® Process Mechanical ❑ Not Applicable ® Structural ❑ Not Applicable ® Electrical ❑ Not Applicable ® Instrumentation/Controls ❑ Not Applicable Application for Authorization to Construct Permit (FORM ATC -12-14) Page 3 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) ® Architectural ❑ Not Applicable ® Building Mechanical ❑ Not Applicable ® Building Plumbing ❑ Not Applicable ® Detailed specifications for all treatment units and processes including piping, valves, equipment (pumps, blowers, mixers, diffusers, etc.), and instrumentation. ® Means of ensuring quality and integrity of the finished product including leakage testing requirements for structures and pipelines, and performance testing requirements for equipment. ® Bid Form for publicly bid projects. G. Construction Sequence Plan ® Construction Sequence Plan such that construction activities will not result in overflows or bypasses to waters of the State. The Plan must not imply that the Contractor is responsible for operation of treatment facilities. List the location of the Construction Sequence Plan as in the Engineering Plans or in the Engineering Specifications or in both: Engineering Plans H. Engineering Calculations ® Per 15A NCAC 02T .0504(c)(3), submit one set of engineering calculations that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer; the seal, signature and date shall be placed on the cover sheet of the calculations. For new or expanding facilities and for treatment process modifications that are included in Section 4.C, the calculations shall include at a minimum: ❑ Demonstration of how peak hour design flow was determined with a justification of the selected peaking factor. ❑ Influent pollutant loading demonstrating how the design influent characteristics in Section 4.13.2 of this form were determined. ❑ Pollutant loading for each treatment unit demonstrating how the design effluent concentrations in Section 4.6.2 of this form were determined. ❑ Hydraulic loading for each treatment unit. ❑ Sizing criteria for each treatment unit and associated equipment (blowers, mixers, pumps, etc.) ❑ Total dynamic head (TDH) calculations and system curve analysis for each pump specified that is included in Section 4.C.6. ❑ Buoyancy calculations for all below grade structures. ❑ Supporting documentation that the specified auxiliary power source is capable of powering all essential treatment units. I. Permits ❑ Provide the following information for each permit and/or certification required for this project: Permit/Certification Not Applicable Date Submitted Date Approved Permit/ Certification Number If Not Issued Provide Status and Expected Issuance Date Dam Safety X Soil Erosion and Sediment Control X USCOE /Section 404 Permit X Water Quality Certification (401) X USCOE / Section 10 X Application for Authorization to Construct Permit (FORM ATC -12-14) Page 4 J. Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) Stormwater Management Plan X CAMA X NCDOT Encroachment Agreement X Railroad Encroachment Agreement X Other: X Residuals Management Plan ❑ For all new facilities, expanding facilities, or modifications that result in a change to sludge production and/or sludge processes, provide a Residuals Management Plan meeting the requirements of 15A NCAC 02T .0504(1) and 15A NCAC 02T .0508; the Plan must include: ❑ A detailed explanation as to how the generated residuals (including trash, sediment and grit) will be collected, handled, processed, stored, treated, and disposed. ❑ An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. ❑ A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application. ❑ If oil, grease, grit or screenings removal and collection is a designated unit process, a detailed explanation as to how the oil/grease will be collected, handled, processed, stored and disposed. ® Not Applicable. Application for Authorization to Construct Permit (FORM ATC -12-14) Page 5 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) SECTION 4: PROJECT INFORMATION A. WASTEWATER TREATMENT PLANT FLOW INFORMATION —COMPLETE FOR NEW OR EXPANDING FACILITIES 1. Provide the following flow information: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 6 Plant Flows Existing Plant Design .1 MGD Current NPDES Permit Limit .1 MGD Current Annual Average (past 12 months) .047 MGD For Past 12 Months: Start Date: January/2017 End Date: December/2017 For Past 24 Months: Start Date: January/2016 End Date: December/2017 Maximum Month 0.0508 MGD 0.0508 MGD Maximum Day 0.138 MGD 0.138 MGD Peak Hour N/A MGD N/A MGD Application for Authorization to Construct Permit (FORM ATC -12-14) Page 6 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) B. WASTEWATER TREATMENT FACILITY DESIGN INFORMATION —COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR TREATMENT PROCESS MODIFICATIONS 1. Have all of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-31 North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities been met by the proposed design and specifications? ® Yes or ❑ No. If no, provide justification as to why the requirements are not met, consistent with 15A NCAC 02T .0105(n): 2. Provide the design influent and effluent characteristics that are used as the basis for the project design, and the NPDES permit limits for the following parameters: 3. Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? ® Yes or ❑ No. If no, describe how and why the Permit Limits will not be met: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 7 Project Basis of Design Design Influent Design Influent Influent Concentration Load Concentration - (Must be (Must be Current Annual supported by supported by Design Effluent Average (past Engineering Engineering Concentration and/or NPDES Permit Limits 12 months) if Calculations Calculations Load (monthly average) Parameter Available [Section 3.H]) [Section 3.H]) Ammonia Nitrogen 0.3 mg/L Summer 0.5 mg/L Summer (NH3-N) N/A mg/L 35.0 mg/L 29.2 Ib/day 0.3 mg/L Winter 0.5 mg/L Winter Biochemical 1.9 mg/L Summer 5.0 mg/L Summer Oxygen Demand N/A mg/L 250 mg/L 209 Ib/day (BODS) 1.9 mg/L Winter 10.0 mg/L Winter Fecal Coliform 200 per 100 mL 200 per 100 mL Nitrate + Nitrite Nitrogen (NO3-N + N/A mg/L N/A mg/L NO2-N) Total Kjeldahl N/A mg/L Nitrogen N/A mg/L N/A mg/L Total Nitrogen N/A Ib/year N/A Ib/year N/A mg/L N/A mg/L Total Phosphorus N/A mg/L 10.0 mg/L 8.34 Ib/day N/A Ib/year N/A Ib/year Total Suspended N/A mg/L 250 mg/L 209 Ib/day 5.0 mg/L 30.0 mg/L Solids (TSS) 3. Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? ® Yes or ❑ No. If no, describe how and why the Permit Limits will not be met: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 7 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) 4. Per 15A NCAC 02T .0505(1), by-pass and overflow lines are prohibited. Is this condition met by the design? ® Yes or ❑ No If no, describe the treatment units bypassed, why this is necessary, and where the bypass discharges: N/A 5. Per 15A NCAC 02T .0505(k), multiple pumps shall be provided wherever pumps are used. Is this condition met by the design? ® Yes or ❑ No. If no, provide an explanation: N/A 6. Per 15A NCAC 02T .0505(1), power reliability shall be provided consisting of automatically activated standby power supply onsite capable of powering all essential treatment units under design conditions, or dual power supply shall be provided per 15A NCAC 02H. 0124(2)(a). Is this condition met by the design? ® Yes or ❑ No. If no, provide (as an attachment to this Application) written approval from the Director that the facility: ➢ Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks, and ➢ Has sufficient storage capacity that no potential for overflow exists, and ➢ Can tolerate septic wastewater due to prolonged detention. 7. Per 15A NCAC 02T .0505(o), a minimum of 30 days of residual storage shall be provided. Is this condition met by the design? ® Yes or ❑ No. If no, explain the alternative design criteria proposed for this project in accordance 15A NCAC 02T .105(n): N/A 8. Per 15A NCAC 02T .0505(g), the public shall be prohibited from access to the wastewater treatment facilities. Explain how the design complies with this requirement: Facility will be enclosed within a security fence. 9. Is the treatment facility located within the 100 -year flood plain? ® Yes or ❑ No. If yes, describe how the facility is protected from the 100 -year flood: All equiptment to be two feet above the 100 -year flood plain. C. WASTEWATER TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION —COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR MODIFIED TREATMENT UNITS 1. PRELIMINARY AND PRIMARY TREATMENT (i.e., physical removal operations and flow equalization): *Additive alternate Application for Authorization to Construct Permit (FORM ATC -12-14) Page 8 No. ofPl an Sheet SReferencepecification Calculations Treatment Unit Units Type Size per Unit f Reerence Provided? (Yes or No) Manual Bar Screen 1 Coarse MGD at peak hourly flow 46 07 53 No Mechanical Bar * Fine MGD at peak hourly flow 46 07 53 No Screen Grit Removal N/A MGD at peak hourly flow 46 07 53 Flow Equalization 2 Rectangular 41,888 gallons P.4 46 07 53 Yes Primary Clarifier N/A Circular ft diameter; ft side water depth Primary Clarifier N/A Rectangular square feet; ft side water depth Other N/A *Additive alternate Application for Authorization to Construct Permit (FORM ATC -12-14) Page 8 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) SECONDARY TREATMENT (BIOLOGICAL REACTORS AND CLARIFIERS) (i.e., biological and chemical processes to remove organics and nutrients) 3. TERTIARY TREATMENT No. of Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) Aerobic Zones/ 4 Zone 78,540 gallons/Train P.4, P.5 46 07 53 Yes Tanks Series side water depth No Anoxic Zones/ N/A Rectangular gallons P.7 43 32 63 Tanks series) side water depth Anaerobic N/A Disc Filter gallons P.7 466146 Yes Zones/Tanks N/A tablet; liquid) square feet Sequencing Batch N/A -- gallons Reactor (SBR) N/A -- gallons Membrane N/A - gallons Bioreactor (MBR) N/A gallons Secondary Clarifier 2 Circular 16 ft diameter; 12 ft side water P.4, P.6 46 07 53 Yes depth Secondary Clarifier N/A Rectangular square feet; ft side water depth Other N/A 3. TERTIARY TREATMENT 4. DISINFECTION No. of Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) Tertiary Clarifier N/A Circular ft diameter; ft Series side water depth No Tertiary Clarifier N/A Rectangular square feet; ft P.7 43 32 63 series) side water depth Tertiary Filter 2 Disc Filter 30 square feet P.7 466146 Yes Tertiary Membrane N/A tablet; liquid) square feet Filtration Post -Treatment N/A -- gallons Flow Equalization Post -Aeration N/A gallons Other N/A 4. DISINFECTION Application for Authorization to Construct Permit (FORM ATC -12-14) Page 9 No. of Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) 250,000 gal/day per bank at Series peak hourly flow; 2 number of No Ultraviolet Light 2 (Parallel; in banks; 8 number of P.7 43 32 63 series) lamps/bank Chlorination N/A (Gas; gallons of contact tablet; liquid) tank/unit Application for Authorization to Construct Permit (FORM ATC -12-14) Page 9 Water Resources ENVIRONMENTAL QUALITY State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) Dechlorination N/A (Gas; gallons of contact Plan Sheet Specification Calculations Treatment Unit Units tablet; liquid) tank/unit Reference Reference Provided? 5. RESIDUALS TREATMENT 6. PUMP SYSTEMS (include influent, intermediate, effluent, major recycles, waste sludge, thickened waste sludge and plant drain pumps) Location No. of Purpose Type Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? 32.6 P.3 33 32 10 EQ Pumps 2 EQ (Yes or No) Gravity Thickening N/A P.3 square feet; ft side RAS Pumps 3 RAS Tank 105 92 water depth 46 07 53 Mechanical Thickening/ N/A dry Ib/hour Dewatering Aerobic Digestion 1 Sludge Holding 10,472 gallons P.4, P.5 46 07 53 Yes Anaerobic N/A gallons Digestion Composting N/A dry Ib/hour Drying N/A dry lb/hour Other N/A 6. PUMP SYSTEMS (include influent, intermediate, effluent, major recycles, waste sludge, thickened waste sludge and plant drain pumps) Location No. of Pumps Purpose Type Capacity of each pump plan Sheet Reference Specification Reference GPM I TDH Influent Pumps 2 Influent PS Submersible Grinder VFD 174 32.6 P.3 33 32 10 EQ Pumps 2 EQ Submersible 70 16.25 P.3 46 07 53 RAS Pumps 3 RAS Rotary Lobe 105 92 P.3 46 07 53 7. MIXERS Location No. of Mixers Purpose Type Power of each MP ixer plan Sheet Reference Specification Reference N/A Application for Authorization to Construct Permit (FORM ATC -12-14) Page 10 Water Resources ENVIRONMENTAL QUALITY 8. BLOWERS State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12-14) Location No. of Blowers purpose Type Capacity of each Blower (h lo plan Sheet Reference Specification Reference Plant 4 Provide Aeration and Mixing Rotary Lobe 350 P.3 46 07 53 Below Any habitable residence or place of assembly under separate 100 ft ® Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source 100 ft ® Yes ❑ No Surface waters (streams — intermittent and perennial, perennial 50 ft ® Yes ❑ No waterbodies, and wetlands) Any well with exception of monitoring wells 100 ft ® Yes ❑ No Any property line 50 ft ® Yes 9. ODOR CONTROL Location No. of Units Purpose Type Plan Sheet Reference Specification Reference N/A Treatment/Storage Design? If "No", identify Unit Setback Waivers in Item D.2 Below Any habitable residence or place of assembly under separate 100 ft ® Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source D. SETBACKS —COMPLETE FOR NEW WASTEWATER TREATMENT STRUCTURES The minimum distance for each setback parameter to the wastewater treatment/storage units per 15A NCAC 02T .0506(b) are as follows: Have any setback waivers been obtained per 15A NCAC 02T .0506(d)? ❑ Yes or ® No. If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No. If no, provide an explanation: N/A Application for Authorization to Construct Permit (FORM ATC -12-14) Page 11 Minimum Distance Is Minimum Distance Required from Nearest Requirement met by the Setback Parameter Treatment/Storage Design? If "No", identify Unit Setback Waivers in Item D.2 Below Any habitable residence or place of assembly under separate 100 ft ® Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source 100 ft ® Yes ❑ No Surface waters (streams — intermittent and perennial, perennial 50 ft ® Yes ❑ No waterbodies, and wetlands) Any well with exception of monitoring wells 100 ft ® Yes ❑ No Any property line 50 ft ® Yes ❑ No Have any setback waivers been obtained per 15A NCAC 02T .0506(d)? ❑ Yes or ® No. If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No. If no, provide an explanation: N/A Application for Authorization to Construct Permit (FORM ATC -12-14) Page 11 State of North Carolina Department of Environmental Quality sion of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC4244) SECTION 5: APPLICATION CERTIFICATION BY PROFESSIONAL ENGINEER Professional Engineer's Certification per 15A NCAC 02T .0105: I, William B Keaton, P.E., attest that this application package for an Authorization to Construct (Typed Name of Professional Engineer) for the Charlotte Water Ashe Plantation Wastewater Treatment Plant Upgrade (Facility and Project Name) was prepared under my direct supervisory control and to the best of my Knowledge is accurate, complete and consistent with the information supplied in the engineering plans, specifications, calculations, and all other supporting documentation for this project. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with all applicable regulations and statutes, 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities, and this Authorization to Construct Permit Application, except as provided for and explained in Section 4.13.1 of this Application. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon this Certification and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I further understand that the application package may be subject to a future audit by the Division. Although certain portions of this submittal package may have been prepared, signed and sealed by other professionals licensed in North Carolina, inclusion of these materials under my signature and seal signifies that I have reviewed the materials and have determined that the materials are consistent with the project design. I understand that in accordance with General Statutes 143-215.6A and 143-215.66, any person who Knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal with written signature placed over or adjacent to the seal and dated: 58/0 a SEAL 9r' 04 26 Application for Authorization to Construct Permit (FORM ATC -12-14) Page 12 State of North Carolina Department of Environmental Quality sion of Water Resources Water Resources ENVIRONMENTAL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC4244) SECTION 6: APPLICATION CERTIFICATION BY APPLICANT Applicant's Certification per 15A NCAC 02T a 1, Joseph C. Wilson, P.E., attest that this application package for an Authorization to Construct (Typed Name of Signature Authority and Title) for the Charlotte Water Ashe Plantation Wastewater Treatment Plant Upgrade (Facility and Project Name) has been reviewed by me and is accurate and complete to the best of my knowledge. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that in accordance with 15A NCAC 02T .0120(b), the Applicant or any affiliate has not been convicted of environmental crimes, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been abandoned or exhausted, are compliant with any active compliance schedule, and does not have any overdue annual fees. understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon acceptance of the Licensed Professional Engineer's Certification contained in Section 5, and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I further understand that the application package may be subject to a future audit. understand that in accordance with General Statutes 143-215.6A and 143-215.6B any person who knowingly makes any false SWLemen , representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may includ a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Signature: Date: A 1/4 THE COMPLETED APPLICATION AND SUPPORTING INFORMATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES/NPDES By U.S. Postal Service By Courier/Special Delivery: 1617 MAIL SERVICE CENTER 512 N. SALISBURY STREET, 9TH FLOOR RALEIGH, NORTH CAROLINA 276994617 RALEIGH, NORTH CAROLINA 27604 TELEPHONE NUMBER: (919) 807-6351 Application for Authorization to Construct Permit (FORM ATC -12-14) Page 13