Loading...
HomeMy WebLinkAbout20041590 Ver 1_Other Agency Comments_20090527:'Iermit Class P°r nL Number TRANSFER RENEWAL S'TAG'E OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission ikrinit for 129-05 U i MAY 2 7 2009 S MID SWATER y ORM WA R BRMCH } 3 X Major Development in an krea of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Cape Fear Public Utility Authority, 235 Government Center, Dr., Wilmington, NC 28403 Authorizing development in New Hanover County at Smith Creek and Cape Fear _ River as requested in the permittee's application dated 6/14/04, including attached workplan drawings (23), dated as referenced in Condition No. 1 of this permit. This permit, issued on May 26, 2009 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. James A. Laughlin WAWTP Upgrades 1) Unless specifically altered herein, all work shall be done in compliance with the following attached workplan drawings: - Sheets 2 and 3 of 24, both dated May 2005 - Sheet 4 of 24, dated 3/15/01 - Sheets 5 and 6 of 24, both dated received 6/23/04 - Sheet 7 of 24 dated 8/31/00 - Sheet 8 of 24 dated 1/4/02 - Sheets 9-17 of 24, all dated received 6/23/04 Sheets 22-24 of 24, all dated May, 2004 Sheets D1, DM5, FM5, FM15 and FM6, all dated modified 4/20/05 (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2010 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. James H. regson, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee ADDITIONAL CONDITIONS Permit,4 129-05 Page 2 of 3 x A 2) Unless specifically altered herein, this permit authorizes the expansion of the James A. Laughlin T o..,- ..s ~m ` Dl t 1 fl.c t.-. -o of .arl;t: 1 + / 19"1 no I: r feet of force f fo.rce sa+Stc w uL2r TreaLiiicn? i iari?, irLCILidin, U1 CvrLsLi d Lien v an ao i.ai T i - 1 rv ..nea. ,.. main, and a new outfall diffuser in the Cape Fear River. 3) The portion of the force main crossing Smith Creek shall be installed by utilizing horizontal directional boring technology. No excavation or filling within Smith Creek is authorized without permit modification. 4) The authorized outfall structure in the Cape Fear River shall be located landward of the US Army Corps of Engineers Cape Fear Harbor Line. 5) No excavated or fill material shall be placed at any time in any vegetated wetlands outside of the alignment of the area(s) indicated on the workplan drawing(s). 6) All backfill material shall be clean and free of any pollutants except in trace quantities. 7) The permittee shall maintain_ the authorized force main at Smith Creek and the authorized force main and outfall structure at. the Cape hear River in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. Easement 8) Prior to initiation of any activities at the Smith Creek and/or Cape Fear River project sites authorized under this permit, the permittee shall apply for and receive and Easement from the Department of Administration's State Property Office as required under N.C.G.S. 146-12(e). Sedimentation and Erosion Control NOTE: An Erosion Sedimentation Control Plan will be required for this project. This plan must be filed at least (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environmental and Natural Resources, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. 9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). Stormwater Manaizement 10) The N.C. Division of Water Quality approved this project under stormwater management rules of the Environmental Management Commission under Stormwater Permit No. SW8040311, which was issued on 3/22/05. Any violation of the permit approved by the DWQ shall be considered a violation of this CAMA permit. City of Wilmington ADDITIONAL CONDITIONS General Permit # 129-05 Pate 3 of 3 f1At?{re operatlVL,s \1 tbP TJrl:ted gtnfAS requires fl- 11) The permrttee understands and agrees that, 11 ;4F b removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 12) The federally endangered West Indian manatee (TYichechus manatus), has been reported in North Carolina waters. In order to protect the manatee, all work should be done between November 1 and May 31. If work must be done outside of this time frame, the permittee shall adhere to enclosed guidelines, entitled "Precautions for General Construction in Areas Which May Be Used by the West Indian Manatee in North Carolina". 13) This renewal shall be attached to the original Permit No. 1.29-05, which was issued on 8/11105, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3490 (DWQ Project No. 041590), which was issued on 7/28/05. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-200500004.