Loading...
HomeMy WebLinkAbout20180712 Ver 1_PCN Form Submission_20180523Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 5/23/2018 11:14:18 AM (Start Event) Accept by Carpenter,Kristi 5/23/2018 4:33:03 PM (DOT Initial Review) . The task was assigned to Carpenter,Kristi. The due date is: May 28, 2018 5:00 PM 5/23/2018 11:15 AM i i �� � ����� �ivislan af Water Resour�es Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs.deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf A. Processing Information County (or Counties) where the project is located:* Mecklenburg Is this project a public transportation project?* C Yes l' No lhis is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. Is this a NCDOT Project?* f Yes f• No 1a. Type(s) of approval sought from the Corps:* r% Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E-PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Number Other: List all MN nurrbers you are applying for not on the drop down list. 1c. Type(s) of approval sought from the DWR:* check all that apply �7 401 Water Quality Certification - Regular r 401 Water Quality Certification - E�ress r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: For the record onlyfor Corps Permit: r Yes r No C' Yes r No 1e. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? IF so, attach the acceptance letter from rritigation bank or in-lieu fee program f Yes �' No 1f. Is the project located in anyof NC's twentycoastal counties?* l' Yes C•' No 1h. Is the project located in a designated trout watershed?* f Yes C No Link to trout information: http://wvwv.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the PrimaryContact?* Stephen Tosco 1b. PrimaryContact Email:* stephen.tosco@charlottenc.gov 1c. PrimaryContact Phone:* (xxx)xxx-xxxx (980)293-0992 1d. Who is applying for the permit? rJ Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: City of Charlotte 2b. Deed book and page no.: f�llA 2c. Responsible party: (for Corporations) 2d. Address SYreet Address 600 East 4th Street Address Line 2 aty Charlotte Rutal / Zip Code 28202 2e. Telephone Number: (xxx)xxx-xxxx (980)293-0992 2f. Fax Number: (xxx)xxx-xxxx 2g. Email Address:* stephen.tosco@charlottenc.gov State / Rovince / Region NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Rocky River Road West Streetscape Project 1b. Subdivision name: (if appropriate) wa 1c. Nearest municipality/town:* Charlotte 1d. Driving directions* If it is a new project and can not easily be found in a GPS rrapping system Rease provide directions. From Charlotte, take North Tryon Street north to Rocky River Road West. 2. Project Identification 2a. Propertyldentification Number: (tax RN or parcel ID) wa 2b. Propertysize: (in acres) 24.8 2c. Project Address Street Address Address Line 2 a�y Rzstal / Zip Code State / FYovince / F�gion Country 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on howthe location was determined. (For e�mple, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 35.283433 -80.750045 ex:34208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:'� Toby Creek 3b. Water Resources Classification of nearest receiving water:* C Surface Water Lookup 3c. What river basin(s) is your project located in?* Yadkin-PeeDee RiverBasin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project study area (PSA) consists primarily of developed residential properties adjacent to disturbed/maintained roadways along the Rocky River Road West roadway. Undeveloped, mixed pine/hardwood forested areas are located adjacent to the PSA. Three streams are located in the PSA (See Attached JD Request). 4b. Attach an 8 7/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Figure2_USGS.pdf Fle type rrust be pdF 2.27MB 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) C7ick the upload button or drag and drop files here to attach docurrent Figure3_Soils.pdf Fle type rrust be pdF 4d. List the total estimated acreage of all existing wetlands on the property: 0 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) 2,251 3.14MB 4f. Explain the purpose of the proposed project:* This project is intended to upgrade Rocky River Road West between North Tryon Street and Toby Creek, with the goal of providing a safe, modern, complete street that includes upgraded pedestrian and bicycle facilities. See Supplemental Information for additional details. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:'� Roadway improvements that includes upgraded pedestrian and bicycle facilities and will require a minor stream relocation that will be constructed using natural stream channel design. Track hoes, dump trucks, bulldozers, paving equipment and various hand tools will be used. See Supplemental Information for additional details. 4h. Please upload project drawings for the proposed project. aick the upload button or drag and drop files here to attach docurrem RRRW_PERMIT_2018-05-18.pdf 4.31 MB Fle type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* C•' Yes r No �' Unknown Comme nts: The Jurisdictional Determination for the east portion of the PSA under review. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary C•' Approved C' Unknown C' f�UA Corps AID Number: 6carrple: SAV�2017-99999 SAW-2014-01312 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): David Homans Agency/Consultant Company: S&ME, Inc. Othe r: 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. SAW-2014-01312 issued on September 25, 2014 for west portion of PSA. A Jurisdictional Determination Request for the east portion of the PSA was submitted on June 3, 2016. A field determination was performed by the USACE on March 28, 2017. The Jurisdictional Determination is pending. See Attached JD, JD Request and Figure 4 depicting the west and east JD Request areas. 5d1. Jurisdictional determination upload Qick the upload button or drag and drop files here to attach docurcent saw-2014-01312 JD.pdf RRRW JD request package.pdf Figure4_Waters.pdf Fle type rrust be FDF 6. Project History 380.83KB 3.73MB 4.6MB 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * f Yes C' No �' Unknown 7. Future Project Plans 7a. Is this a phased project? * C' Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�/? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r% Streams-tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Reason for impact*3b.lmpact 3c. Type of impact*3d. Stream name * 3e. Stream 3f. Type of 3g. Stream 3h. Impact sqfe� type * Type * Jurisdiction * width * length * S1 Culvert installation P Culvert RPW Stream C Perennial Both 6 700 6 N�p label (e.g. Fd�ad Qossing F2rrranem (Fj or F2rennial (� or Average (linear feet) 0 1) Terrporary (� irrterrritterd (IfV� (feet) � g2 Culvert installation T Culvert N�p label (e.g. f3�ad Qossing F�rrranent (� or 1) Terrporary (� S3 Stream relocation P Relocation N�p label (e.g. 13�ad Qossing F2rrranent (P� or 1) Terrporary (� RPW Stream C RPW Stream A Perennial Both F2rennial (Fff2) or interrrittent (IIVT) Perennial Both F2rennial (FB�) or irderrrittent (IfVn 6 31 1 Average (linearfeet) $ (feet) 6 12 196 2 Average (linearfeet) , (feet) 3 5 2 S4 Stream relocation T Relocation RPW Stream A Perennial Both 12 37 4 fv�p label (e.g. Finad Qossing F2rrranent (Fj or F2rennial (� or Average (linear feet) 4 �� Terrporary (lj irnermittent (If� �seet� 4 *� All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 296 3i. Total temporary stream impacts: 68 3i. Total stream and tributary impacts: 364 3j. Comments: Please see Attached Supplemental Information for details on impacts. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* The project is on an ebsting roadway location and required the relocation of RPW Stream A to widen the roadway for the proposed improvements while minimiang impacts. See attached Supplemental Information. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* NCDOT Best Management Practices for Construction and Maintenance Activities will be employed. See attached Supplemental Information. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? l' Yes C•' No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Based on the self-mitigating stream relocation and the culvert extension, the USACE determined that mitigation would not be necessary. The profile/cross section measurement of the relocated stream will be performed after construction, and visual monitoring of the relocated portion of RPW Stream A will be performed for two years. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section ."* 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes C•' No For a list of options to meet the diffuse flow requirements, click here. If no, explain why: PSA is located in the Yadkin-Pee Dee basin that is not subject to NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * l" Yes C•' No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* f• Yes C' No To look up low density requirement click here 15A NCAC 02H .1003(2). G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* G Yes �' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?* f Yes r No Comme nts: * This roadway improvements project does not require a NEPA/SEPA document. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (75A NCAC 2B .0200)?* f Yes r No 2b. Is this an after-the-fact permit application?* C' Yes C•' No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonablyanticipated future impacts) result in additional development, which could impact nearby downstream water quality?* l" Yes l•' No 3b. If you answered "no," provide a short narrative description. A roadway improvements project will not open up additional land for development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* l' Yes C' No C•' f�UA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * C Yes C' No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* f• Yes l" No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* f Yes C No 5e. Is this a DOT project located within Division's 1-8?* C' Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? G Yes r No 5g. Does this project involve bridge maintenance or removal? C' Yes C No f Unknown Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?* f Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? C' Yes C•' No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS and NC Natural Heritage Program Request for evaluation (Attached as Supplemental Information), USFWS IPaC website and NC Natural Heritage Program website. See Supplemental Information for listed species and biological conclusions. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NOAA EFH mapper. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* f Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * NC SHPO Concurrence (Attached). 7c. Historic or Prehistoric Information Upload C7ick the upload button or drag and drop files here to attach docurrent ER 15-2499.pdf 103.86KB Fle rrust be F�F 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain?* C Yes C' No 8b. If yes, explain how project meets FEMArequirements: Hydraulics calculations have determined that a no-rise to the floodplain will occur. 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM mapping Miscellaneous Miscellaneous attachments not previously requested. aick the upload button or drag and drop files here to attach docurrem 16-040_Rocky River Road West Street Improvements_Charlotte_Mecklenburg Co.pdf 178.73KB 20151112_MFB_proposed_rocky_river_road_west.pdf 3.04MB T&E Supplemental info for RRRW PCN Form.pdf 125.42KB Fle rrust be FDF or 4WQ Signature �7 By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Stephen Tosco Signature u���°�rc°� �i�k'o Date Submitted: 5/23/2018 Initial Review Is this project a public transportation project?* (?) f• Yes r No Change only rf needed. Has this project met the requirements for acceptance in to the review process? * f• Yes f No BIMS # Assigned * 20180712 Version#* Reviewing Office * Mooresville Regional Office - (704) 663-1699 Select Project Reviewer* Donna Hood:eads\drhood Is a payment required for this project?* C' No payment required C' Fee received C•' Fee needed - send electronic notification What amout is owed?* f $240.00 C $570.00