HomeMy WebLinkAboutIndustrial Distribution Center - DRAINAGE REPORT - CMCSCS-DC18 STORM WATER MANAGEMENT REPORT FOR: BROOKS DISTRIBUTION CENTER ALAMANCE COUNTY, NC 2267 US-70 MEBANE, NORTH CAROLINA 27302 April 25, 2018 LE&D PROFESSIONALS, PC River Run Executive Offices Suite B 110 Exchange Street Danville, VA 24541 Office: (434) 792-3680 Fax: (434) 792-3685 LE&D Project No. CMCSCS-DC18 Table of Contents Discussion……………………………………...……….……………………………………………..3 Calculations: Pre- & Post Hydrology..…………………………………......………………………….……..4 Runoff Summary……….……………………………………………………………….……..5 Underground Detention System……………………………………………….…………….6-8 Storm Pipe System………………………………………………………………………….9-10 Appendix Quad Map A Drainage Area Maps B Rainfall Data C SWM Calculations (HydroCAD) D Soil Map and Report E NC DEQ Storm-EZ Form F BROOKS DISTRIBUTION CENTER 4/25/2018 NEW DISTRIBUTION BUILDING ALAMANCE COUNTY, NC PURPOSE: Analyze the storm water runoff for the proposed distribution center. The project consists of grading, utility installation, building construction, paving, and re- stabilization of all disturbed areas. SITE DATA: The 25.44 acre site (10.97 acre disturbed) is located on the south side of US -70. The site has flat to moderate slopes and drains generally to the south to the existing culvert under the railroad. The railroad culvert eventually drains to Lower Back Creek, which drains to the Haw River. The pre-developed site consists of grassed and forested areas. Properties adjacent to the site are existing industrial buildings to the east, residential lots to the north, and undeveloped, wooded area to the west. PROCEDURE: Stormwater runoff was determined for pre- and post-development conditions for the site by the Curve Number Method (TR-55.) Channel protection will be met per North Carolina Erosion and Sediment Control Planning and Design Manual. The NC DEQ Storm-EZ Form was used to determine required water quality treatment volume for the developed conditions runoff. A Contech Stormfilter Vault will be installed at the downstream side of the site and will provide storm water quality treatment for the proposed development. A series of 96” CMP pipes will utilized for stormwater volume using the rational method with inlet/outlet control hydraulics for pre-development flows. PROPOSED DEVELOPMENT & FINAL SITE CONDITIONS: The proposed development will consist of the construction of a 250,000 square foot new building, utilities, and graveled access. Stormwater management will include installation of a Contech Stormfilter vault to treat the stormwater runoff. The stormwater management facilities will be maintained according to a proposed long-term maintenance agreement which includes operation, maintenance & inspection procedures. Designer:Date: 4/18/2018 Project Title: SITE AREA: 10.97 acres Forest 0 Forest 1.30 Forest 0.24 Forest 1.69 Forest 0 Forest 0 Grass 2.82 Grass 3.70 Grass 0 Grass 0.43 Grass 0.87 Grass 0.96 Impervious 0 Impervious 0.00 Impervious 0.00 Impervious 0 Impervious 0.00 Impervious 0.00 Total 2.82 Total 5.00 Total 0.24 Total 2.12 Total 0.87 Total 0.96 Post‐Developed Pervious 1.53 Pervious 1.99 Pervious 0.00 Pervious 0.74 Pervious 0.67 Pervious 0.94 Impervious 0 Impervious 6.09 Impervious 0.00 Impervious 0 Impervious 0.00 Impervious 0.00 Total 1.53 Total 8.08 Total 0.00 Total 0.74 Total 0.67 Total 0.94 Refer to Appendix "D" for Tc, Runoff Curve Numbers, Hydrographs, and Peak Flows. Brooks Distribution Center Basin 1 Basin 2 Drainage Area [acres] Drainage Area [acres] Pre‐Developed Drainage Area [acres] Basin 1 Basin 2 Drainage Area [acres] Basin 3 Drainage Area [acres] Basin 3 Drainage Area [acres] Basin 4 Basin 5 LE&D Professionals, PC Ryan Gatewood, PE HYDROLOGY CALCULATIONS Project Number: CMCSCS‐DC18 Drainage Area [acres] Drainage Area [acres] Drainage Area [acres] Basin 6 Drainage Area [acres] Drainage Area [acres] Drainage Area [acres] Basin 4 Basin 5 Basin 6 Designer:Date: 4/18/2018 Project Title: Storm 1 YR 0.40 cfs 0.60 cfs 0.02 cfs 0.10 cfs 0.28 cfs 0.36 cfs 2 YR 0.94 cfs 1.62 cfs 0.08 cfs 0.34 cfs 0.65 cfs 0.79 cfs 10 YR 2.89 cfs 5.57 cfs 0.38 cfs 1.45 cfs 1.85 cfs 2.18 cfs Post‐Developed Storm 1 YR 0.34 cfs 0.45 cfs 0.00 cfs 0.19 cfs 0.25 cfs 0.35 cfs 2 YR 0.80 cfs 0.54 cfs 0.00 cfs 0.45 cfs 0.55 cfs 0.77 cfs 10 YR 2.37 cfs 5.50 cfs 0.00 cfs 1.31 cfs 1.53 cfs 2.14 cfs 100 YR 5.45 cfs 23.54 cfs 0.00 cfs 2.97 cfs 3.39 cfs 4.73 cfs Refer to Appendix "D" for peak flow rates, elevations, and ponding stage/storage/discharge. Basin 3 Flowrate Brooks Distribution Center LE&D Professionals, PC Ryan Gatewood, PE RUNOFF SUMMARY CALCULATIONS Project Number: CMCSCS‐DC18 Pre‐Developed Flowrate Basin 1 Basin 2 Flowrate Basin 4 Basin 5 Basin 1 Basin 2 Flowrate Basin 3 Flowrate Flowrate with Detention Flowrate Flowrate Flowrate Basin 6 Flowrate Flowrate Flowrate Basin 4 Basin 5 Basin 6 BROOKS DISTRIBUTION CENTERDATE: 4/18/18STORM DRAINAGE PIPE DESIGN WORKSHEET0.01310 YEAR STORM7.08 IN/HRFROM TOTOTALINLET PIPE PIPE-TIMEPIPE LENGTH UPPER LOWERPOINT POINT PERVIOUSD.A.TIME TIME OF CONC.SLOPE OF PIPE INVERT INVERTAC. AC.AC.(MIN) (MIN) (MIN) (CFS) (CFS)(CFS)(FT/FT) (IN) (IN) (FT/SEC) (FT) (MIN) (FT) (FT)YI-1 MH-2 0.45 0.000.455.0 0.0 5.0 0.98 0.135 0.000 0.135 0.96 0.000.960.0227 6.3 18 4.45 22.00 0.1 606.50 606.00MH-2 YI-3 0.00 0.450.455.0 0.0 5.0 0.98 0.000 0.441 0.441 0.00 3.123.120.0455 8.6 24 7.76 278.00 0.6 605.90 593.25YI-3 YI-4 0.55 0.451.005.0 0.0 5.0 0.98 0.165 0.441 0.606 1.17 3.124.290.0170 11.6 24 5.80 171.00 0.5 593.15 590.25RL 8" YI-4 0.00 0.002.505.0 0.0 5.0 0.98 2.250 0.000 2.250 15.93 0.0015.930.0100 21.0 24 6.61 20.00 0.1 592.00 591.80YI-4 YI-5 0.20 3.503.705.0 0.0 5.0 0.98 0.060 3.430 3.490 0.42 24.2824.710.0100 24.8 30 7.38 102.00 0.2 587.12 586.10YI-5 YI-6 0.20 3.703.905.0 0.0 5.0 0.98 0.060 3.626 3.686 0.42 25.6726.100.0050 28.8 30 5.78 449.00 1.3 586.00 583.74YI-6 MH-7 0.15 3.904.215.0 0.0 5.0 0.98 0.189 3.822 4.011 1.34 27.0628.400.0126 25.0 30 8.32 86.00 0.2 583.64 582.56RL 8" MH-7 0.00 0.002.505.0 0.0 5.0 0.98 2.250 0.000 2.250 15.93 0.0015.930.0095 21.2 24 6.48 471.00 1.2 592.00 587.53MH-7 96" CMP 0.00 6.716.715.0 0.0 5.0 0.98 0.000 6.576 6.576 0.00 46.5646.560.0083 32.5 36 8.07 12.00 0.0 582.56 582.4696" CMP OCS-8 0.00 6.710.005.0 0.0 5.0 0.98 0.000 6.576 6.576 0.00 46.5612.290.0214 16.5 36 8.24 7.00 0.0 582.46 582.31OCS-8STORMFILTER0.000.005.0 0.0 5.0 0.98 0.000 0.000 0.000 0.00 0.004.830.0050 15.3 18 3.78 6.00 0.0 582.21 582.18OCS-8 MH-9 0.000.005.0 0.0 5.0 0.98 0.000 0.000 0.000 0.00 0.0023.540.0050 27.7 36 5.62 12.00 0.0 583.55 583.49MH-9 MH-10 0.00 0.000.005.0 0.0 5.0 0.98 0.000 0.000 0.000 0.00 0.0023.540.0100 24.3 36 7.29 36.00 0.1 581.99 581.63MH-10 MH-11 0.00 0.000.005.0 0.0 5.0 0.98 0.000 0.000 0.000 0.00 0.0023.540.0100 24.3 36 7.29 12.00 0.0 579.87 579.75STORMFILTERMH-11 0.00 0.000.005.0 0.0 5.0 0.98 0.000 0.000 0.000 0.00 0.004.830.0060 14.8 18 4.05 5.00 0.0 579.78 579.75MH-11 EW-12 0.00 0.000.005.0 0.0 5.0 0.98 0.000 0.000 0.000 0.00 0.0028.370.0050 29.7 36 5.89 30.00 0.1 579.65 579.50000.00FROM HYDROCAD000.000.000.162.500.00AC0.000.000.002.50INLET FLOWTOTAL CxAPIPE CxAINLET CxAPIPE/RD RUNOFF COEF.FROM HYDROCADC = 0.45 LANDSCAPEDC = 0.90 IMPERVIOUSINLET D.A.PIPE OR ROOF DRAIN D.A.IMPV PART FULL PIPESEG- MENT TIMEPIPE FLOWMANNINGS n =RAINFALL INTENSITY=TOTAL FLOWACTUAL PIPE DIA.THEO. PIPE DIA. PREPARED BY: LE and D PROFESSIONALS, PCProject: Project No.CMCSCS-DC18Date:4/19/18Design Storm:10 YearsHydraulic Grade Line CalculationsManning n= 0.013JUNCTION LOSSLine #.Outlet Water Elev. Do Qo Lo Sfo (ft/ft) Hf Vo Ho Qi Vi Qi Vi Vi^2/2g Hi H Hl 0.5 Hl Final HInlet Water Surface Elev.Rim Elev.EW‐12 ‐ MH‐11 579.50 36.00 28.37 30.00 0.0050 0.15 5.89 0.13 28.37 5.89 167.10 0.54 0.19 0.38 0.700.35 0.50 580.00 591.00MH‐11 ‐ STORMFILTER580.00 18.00 4.83 5.00 0.0060 0.03 4.05 0.06 4.83 4.05 19.56 0.25 0.09 0.18 0.330.17 0.20 580.20 591.50MH‐11 ‐ MH‐10 580.00 36.00 23.54 12.00 0.0100 0.12 7.29 0.21 23.54 7.29 171.61 0.83 0.29 0.58 1.070.54 0.66 580.66 589.25MH‐10 ‐ MH‐9 580.66 36.00 23.54 36.00 0.0100 0.36 7.29 0.21 23.54 7.29 171.61 0.83 0.29 0.58 1.070.54 0.90 581.55 591.50MH‐9 ‐ OCS‐8 581.55 36.00 23.54 12.00 0.0050 0.06 5.62 0.12 23.54 5.62 132.29 0.49 0.17 0.34 0.640.32 0.38 581.93 591.50STORMFILTER ‐ OCS‐8580.20 18.00 4.83 6.00 0.0050 0.03 3.78 0.06 4.83 3.78 18.26 0.22 0.08 0.16 0.290.14 0.17 580.37 591.50OCS‐8 ‐ 96" CMP 580.37 36.00 12.29 7.00 0.0214 0.15 8.24 0.26 12.29 8.24 101.27 1.05 0.37 0.74 1.370.69 0.84 581.21 592.0096" CMP ‐ MH‐7 581.21 36.00 46.56 12.00 0.0083 0.10 8.07 0.25 46.56 8.07 375.74 1.01 0.35 0.71 1.310.66 0.76 581.96 594.50MH‐7 ‐ RL 8" 581.96 24.00 15.93 471.00 0.0095 4.47 6.48 0.16 15.93 6.48 103.23 0.65 0.23 0.46 0.850.42 4.90 586.86 595.00MH‐7 ‐ YI‐6 581.96 30.00 28.40 86.00 0.0126 1.08 8.32 0.27 28.40 8.32 236.29 1.07 0.38 0.75 1.400.70 1.78 583.74 589.25YI‐6 ‐ YI‐5 583.74 30.00 26.10 449.00 0.0050 2.25 5.78 0.13 26.10 5.78 150.86 0.52 0.18 0.36 0.670.34 2.58 586.33 590.10YI‐5 ‐ YI‐4 586.33 30.00 24.71 102.00 0.0100 1.02 7.38 0.21 24.71 7.38 182.36 0.85 0.30 0.59 1.100.55 1.57 587.90 594.25YI‐4 ‐ RL 8" 587.90 24.00 15.93 20.00 0.0100 0.20 6.61 0.17 15.93 6.61 105.30 0.68 0.24 0.47 0.880.44 0.64 588.54 595.00YI‐4 ‐ YI‐3 587.90 24.00 4.29 171.00 0.0179 3.06 5.80 0.13 4.29 5.80 24.88 0.52 0.18 0.37 0.680.34 3.40 591.30 597.25YI‐3 ‐ MH‐2 591.30 24.00 3.12 278.00 0.0455 12.65 7.76 0.23 3.12 7.76 24.21 0.94 0.33 0.65 1.220.61 13.26 604.55 610.00MH‐2 ‐ YI‐1 604.55 18.00 0.96 22.00 0.0227 0.50 4.45 0.08 0.96 4.45 4.27 0.31 0.11 0.22 0.400.20 0.70 605.25 610.50Brooks Distribution CenterPOST‐DEVELOPED Q10CMCSCS‐DC18 HGL.xlsx Appendix A Quad Map AlamanceCounty Printed April 16, 2018 See Below for Disclaimer Welcome to the Alamance County GIS Site. THIS IS NOT A LEGAL DOCUMENT. Alamance County shall assume no liability for any errors, omissions, or inaccuracies in the information provided regardless of how caused; or any decisions made or actions taken or not taken by user in reliance upon any information or data furnished hereunder. The user knowingly waives any and all claims for damages against any and all of the entities comprising the ALAMANCE COUNTY GIS SYSTEM that may arise from the mapping data. The well & septic layer is a representation of well and septic data collected or plotted by the Alamance County Health Department. It is accurate within the limits of their equipment and training. GPS data collection began in 2013, it is not a complete representation of all parcels within the county that have wells and septic systems. This dataset is updated periodically as new data becomes available. **IMPORTANT NOTE: This web map is intended to provide general information as to the individual school attendance zones. The completeness or accuracy of the mapping is not guaranteed nor should the user assume the results as a guarantee of student placement at any school. Addresses that are on or near an attendance line should be confirmed by the Alamance-Burlington School District Transportation Department 336-570-6541.** Appendix B Drainage Area Maps Appendix C Rainfall Data NOAA Atlas 14, Volume 2, Version 3 Location name: Mebane, North Carolina, USA* Latitude: 36.0947°, Longitude: -79.3151° Elevation: 593.17 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.392 (0.357‑0.429) 0.465 (0.426‑0.510) 0.541 (0.493‑0.592) 0.590 (0.538‑0.645) 0.643 (0.583‑0.702) 0.676 (0.611‑0.738) 0.704 (0.634‑0.769) 0.725 (0.650‑0.794) 0.745 (0.662‑0.816) 0.757 (0.667‑0.828) 10-min 0.626 (0.571‑0.685) 0.744 (0.681‑0.816) 0.866 (0.790‑0.948) 0.944 (0.861‑1.03) 1.02 (0.930‑1.12) 1.08 (0.973‑1.18) 1.12 (1.01‑1.22) 1.15 (1.03‑1.26) 1.18 (1.05‑1.29) 1.19 (1.05‑1.31) 15-min 0.782 (0.714‑0.856) 0.935 (0.856‑1.02) 1.10 (1.00‑1.20) 1.19 (1.09‑1.31) 1.30 (1.18‑1.42) 1.36 (1.23‑1.49) 1.41 (1.27‑1.55) 1.45 (1.30‑1.59) 1.48 (1.32‑1.62) 1.50 (1.32‑1.64) 30-min 1.07 (0.978‑1.17) 1.29 (1.18‑1.42) 1.56 (1.42‑1.70) 1.73 (1.58‑1.89) 1.93 (1.75‑2.10) 2.05 (1.86‑2.24) 2.17 (1.95‑2.37) 2.26 (2.02‑2.47) 2.36 (2.10‑2.58) 2.42 (2.13‑2.65) 60-min 1.34 (1.22‑1.46) 1.62 (1.48‑1.78) 2.00 (1.82‑2.18) 2.25 (2.05‑2.46) 2.56 (2.32‑2.80) 2.78 (2.51‑3.04) 2.98 (2.69‑3.26) 3.17 (2.84‑3.47) 3.39 (3.01‑3.71) 3.54 (3.12‑3.87) 2-hr 1.58 (1.45‑1.72) 1.91 (1.76‑2.09) 2.38 (2.17‑2.59) 2.71 (2.47‑2.95) 3.12 (2.83‑3.40) 3.43 (3.10‑3.73) 3.73 (3.34‑4.05) 4.01 (3.57‑4.35) 4.37 (3.85‑4.74) 4.62 (4.03‑5.03) 3-hr 1.69 (1.56‑1.84) 2.05 (1.89‑2.23) 2.54 (2.34‑2.77) 2.91 (2.67‑3.15) 3.37 (3.07‑3.64) 3.70 (3.36‑4.00) 4.03 (3.63‑4.36) 4.36 (3.89‑4.70) 4.76 (4.20‑5.14) 5.06 (4.42‑5.47) 6-hr 2.05 (1.90‑2.23) 2.48 (2.30‑2.70) 3.08 (2.84‑3.34) 3.53 (3.24‑3.82) 4.12 (3.76‑4.46) 4.58 (4.15‑4.95) 5.04 (4.54‑5.44) 5.50 (4.89‑5.93) 6.11 (5.36‑6.59) 6.58 (5.69‑7.11) 12-hr 2.44 (2.26‑2.66) 2.95 (2.72‑3.22) 3.68 (3.38‑4.01) 4.25 (3.90‑4.62) 5.03 (4.58‑5.44) 5.65 (5.10‑6.10) 6.29 (5.62‑6.77) 6.95 (6.13‑7.46) 7.86 (6.81‑8.45) 8.58 (7.30‑9.22) 24-hr 2.86 (2.67‑3.08) 3.46 (3.23‑3.71) 4.31 (4.01‑4.62) 4.96 (4.62‑5.32) 5.85 (5.42‑6.29) 6.55 (6.06‑7.05) 7.26 (6.69‑7.83) 7.99 (7.33‑8.63) 8.98 (8.20‑9.73) 9.75 (8.86‑10.6) 2-day 3.35 (3.13‑3.59) 4.03 (3.77‑4.32) 4.97 (4.65‑5.33) 5.68 (5.31‑6.10) 6.64 (6.18‑7.13) 7.38 (6.84‑7.94) 8.13 (7.51‑8.76) 8.89 (8.17‑9.60) 9.90 (9.06‑10.7) 10.7 (9.74‑11.6) 3-day 3.53 (3.31‑3.79) 4.24 (3.97‑4.55) 5.22 (4.89‑5.60) 5.97 (5.58‑6.40) 6.98 (6.50‑7.49) 7.77 (7.20‑8.35) 8.56 (7.91‑9.22) 9.37 (8.62‑10.1) 10.5 (9.57‑11.3) 11.3 (10.3‑12.3) 4-day 3.72 (3.49‑3.99) 4.46 (4.18‑4.78) 5.48 (5.13‑5.86) 6.27 (5.85‑6.71) 7.33 (6.82‑7.85) 8.15 (7.56‑8.76) 9.00 (8.31‑9.69) 9.86 (9.07‑10.6) 11.0 (10.1‑11.9) 11.9 (10.9‑13.0) 7-day 4.27 (4.02‑4.56) 5.09 (4.79‑5.43) 6.16 (5.80‑6.58) 7.01 (6.58‑7.48) 8.15 (7.64‑8.71) 9.06 (8.46‑9.70) 9.98 (9.27‑10.7) 10.9 (10.1‑11.7) 12.2 (11.2‑13.1) 13.2 (12.0‑14.3) 10-day 4.84 (4.57‑5.15) 5.75 (5.42‑6.12) 6.89 (6.50‑7.35) 7.79 (7.33‑8.30) 9.00 (8.45‑9.60) 9.95 (9.31‑10.6) 10.9 (10.2‑11.7) 11.9 (11.0‑12.8) 13.2 (12.2‑14.2) 14.2 (13.1‑15.4) 20-day 6.46 (6.11‑6.84) 7.62 (7.20‑8.07) 8.99 (8.50‑9.53) 10.1 (9.53‑10.7) 11.6 (10.9‑12.3) 12.8 (12.0‑13.6) 14.0 (13.1‑14.9) 15.2 (14.1‑16.3) 16.9 (15.6‑18.2) 18.2 (16.7‑19.6) 30-day 8.01 (7.61‑8.46) 9.42 (8.93‑9.93) 10.9 (10.4‑11.5) 12.1 (11.5‑12.8) 13.7 (12.9‑14.4) 14.9 (14.0‑15.7) 16.0 (15.1‑17.0) 17.2 (16.1‑18.3) 18.8 (17.5‑20.0) 20.0 (18.6‑21.4) 45-day 10.2 (9.67‑10.7) 11.9 (11.3‑12.5) 13.6 (12.9‑14.3) 14.9 (14.2‑15.7) 16.7 (15.8‑17.6) 18.1 (17.1‑19.0) 19.4 (18.3‑20.5) 20.7 (19.5‑21.9) 22.5 (21.0‑23.9) 23.8 (22.2‑25.4) 60-day 12.2 (11.6‑12.8) 14.2 (13.6‑14.9) 16.0 (15.3‑16.8) 17.4 (16.6‑18.2) 19.2 (18.3‑20.1) 20.5 (19.5‑21.6) 21.8 (20.7‑22.9) 23.1 (21.8‑24.3) 24.7 (23.2‑26.1) 25.9 (24.3‑27.4) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical NOAA Atlas 14, Volume 2, Version 3 Location name: Mebane, North Carolina, USA* Latitude: 36.0947°, Longitude: -79.3151° Elevation: 593.17 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.70 (4.28‑5.15) 5.58 (5.11‑6.12) 6.49 (5.92‑7.10) 7.08 (6.46‑7.74) 7.72 (7.00‑8.42) 8.11 (7.33‑8.86) 8.45 (7.61‑9.23) 8.70 (7.80‑9.53) 8.94 (7.94‑9.79) 9.08 (8.00‑9.94) 10-min 3.76 (3.43‑4.11) 4.46 (4.09‑4.90) 5.20 (4.74‑5.69) 5.66 (5.17‑6.19) 6.15 (5.58‑6.71) 6.46 (5.84‑7.05) 6.71 (6.05‑7.33) 6.90 (6.18‑7.55) 7.07 (6.28‑7.74) 7.16 (6.30‑7.83) 15-min 3.13 (2.86‑3.42) 3.74 (3.42‑4.10) 4.38 (4.00‑4.80) 4.78 (4.36‑5.22) 5.20 (4.71‑5.68) 5.45 (4.93‑5.95) 5.66 (5.10‑6.18) 5.80 (5.20‑6.35) 5.94 (5.27‑6.50) 5.99 (5.27‑6.55) 30-min 2.14 (1.96‑2.35) 2.58 (2.36‑2.83) 3.11 (2.84‑3.41) 3.46 (3.15‑3.78) 3.85 (3.49‑4.20) 4.10 (3.71‑4.48) 4.33 (3.90‑4.73) 4.52 (4.05‑4.94) 4.72 (4.19‑5.17) 4.85 (4.27‑5.30) 60-min 1.34 (1.22‑1.46) 1.62 (1.48‑1.78) 2.00 (1.82‑2.18) 2.25 (2.05‑2.46) 2.56 (2.32‑2.80) 2.78 (2.51‑3.04) 2.98 (2.69‑3.26) 3.17 (2.84‑3.47) 3.39 (3.01‑3.71) 3.54 (3.12‑3.87) 2-hr 0.790 (0.724‑0.862) 0.957 (0.878‑1.05) 1.19 (1.09‑1.30) 1.35 (1.23‑1.47) 1.56 (1.42‑1.70) 1.72 (1.55‑1.86) 1.86 (1.67‑2.03) 2.00 (1.78‑2.18) 2.18 (1.92‑2.37) 2.31 (2.02‑2.52) 3-hr 0.563 (0.518‑0.611) 0.682 (0.629‑0.742) 0.847 (0.779‑0.921) 0.968 (0.888‑1.05) 1.12 (1.02‑1.21) 1.23 (1.12‑1.33) 1.34 (1.21‑1.45) 1.45 (1.29‑1.57) 1.59 (1.40‑1.71) 1.68 (1.47‑1.82) 6-hr 0.343 (0.317‑0.373) 0.414 (0.383‑0.450) 0.514 (0.474‑0.558) 0.589 (0.542‑0.638) 0.689 (0.629‑0.744) 0.765 (0.693‑0.826) 0.842 (0.757‑0.908) 0.918 (0.817‑0.991) 1.02 (0.894‑1.10) 1.10 (0.950‑1.19) 12-hr 0.203 (0.187‑0.221) 0.245 (0.226‑0.267) 0.305 (0.281‑0.333) 0.353 (0.323‑0.384) 0.418 (0.380‑0.452) 0.469 (0.423‑0.506) 0.522 (0.466‑0.561) 0.577 (0.509‑0.619) 0.653 (0.565‑0.701) 0.712 (0.606‑0.765) 24-hr 0.119 (0.111‑0.128) 0.144 (0.135‑0.155) 0.179 (0.167‑0.193) 0.207 (0.192‑0.222) 0.244 (0.226‑0.262) 0.273 (0.252‑0.294) 0.303 (0.279‑0.326) 0.333 (0.306‑0.360) 0.374 (0.342‑0.405) 0.406 (0.369‑0.441) 2-day 0.070 (0.065‑0.075) 0.084 (0.078‑0.090) 0.103 (0.097‑0.111) 0.118 (0.111‑0.127) 0.138 (0.129‑0.148) 0.154 (0.143‑0.165) 0.169 (0.156‑0.182) 0.185 (0.170‑0.200) 0.206 (0.189‑0.224) 0.223 (0.203‑0.242) 3-day 0.049 (0.046‑0.053) 0.059 (0.055‑0.063) 0.073 (0.068‑0.078) 0.083 (0.077‑0.089) 0.097 (0.090‑0.104) 0.108 (0.100‑0.116) 0.119 (0.110‑0.128) 0.130 (0.120‑0.141) 0.145 (0.133‑0.158) 0.157 (0.143‑0.171) 4-day 0.039 (0.036‑0.042) 0.046 (0.044‑0.050) 0.057 (0.053‑0.061) 0.065 (0.061‑0.070) 0.076 (0.071‑0.082) 0.085 (0.079‑0.091) 0.094 (0.087‑0.101) 0.103 (0.094‑0.111) 0.115 (0.105‑0.124) 0.124 (0.113‑0.135) 7-day 0.025 (0.024‑0.027) 0.030 (0.029‑0.032) 0.037 (0.035‑0.039) 0.042 (0.039‑0.045) 0.049 (0.045‑0.052) 0.054 (0.050‑0.058) 0.059 (0.055‑0.064) 0.065 (0.060‑0.070) 0.072 (0.067‑0.078) 0.078 (0.072‑0.085) 10-day 0.020 (0.019‑0.021) 0.024 (0.023‑0.026) 0.029 (0.027‑0.031) 0.032 (0.031‑0.035) 0.038 (0.035‑0.040) 0.041 (0.039‑0.044) 0.045 (0.042‑0.049) 0.050 (0.046‑0.053) 0.055 (0.051‑0.059) 0.059 (0.054‑0.064) 20-day 0.013 (0.013‑0.014) 0.016 (0.015‑0.017) 0.019 (0.018‑0.020) 0.021 (0.020‑0.022) 0.024 (0.023‑0.026) 0.027 (0.025‑0.028) 0.029 (0.027‑0.031) 0.032 (0.029‑0.034) 0.035 (0.032‑0.038) 0.038 (0.035‑0.041) 30-day 0.011 (0.011‑0.012) 0.013 (0.012‑0.014) 0.015 (0.014‑0.016) 0.017 (0.016‑0.018) 0.019 (0.018‑0.020) 0.021 (0.019‑0.022) 0.022 (0.021‑0.024) 0.024 (0.022‑0.025) 0.026 (0.024‑0.028) 0.028 (0.026‑0.030) 45-day 0.009 (0.009‑0.010) 0.011 (0.010‑0.012) 0.013 (0.012‑0.013) 0.014 (0.013‑0.015) 0.015 (0.015‑0.016) 0.017 (0.016‑0.018) 0.018 (0.017‑0.019) 0.019 (0.018‑0.020) 0.021 (0.019‑0.022) 0.022 (0.021‑0.023) 60-day 0.008 (0.008‑0.009) 0.010 (0.009‑0.010) 0.011 (0.011‑0.012) 0.012 (0.012‑0.013) 0.013 (0.013‑0.014) 0.014 (0.014‑0.015) 0.015 (0.014‑0.016) 0.016 (0.015‑0.017) 0.017 (0.016‑0.018) 0.018 (0.017‑0.019) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Appendix D HydroCAD Calculations 1S PRE 1 Drainage Diagram for PRE 1 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link PRE 1 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 2.820 61 >75% Grass cover, Good, HSG B (1S) 2.820 Type II 24-hr 1 YR Rainfall=2.86"PRE 1 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2.820 ac Runoff Depth=0.31"Subcatchment 1S: PRE 1 Flow Length=1,577' Tc=30.3 min CN=61 Runoff=0.40 cfs 0.074 af Total Runoff Area = 2.820 ac Runoff Volume = 0.074 af Average Runoff Depth = 0.31" 100.00% Pervious Area = 2.820 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"PRE 1 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 1 Runoff = 0.40 cfs @ 12.36 hrs, Volume= 0.074 af, Depth= 0.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 2.820 61 >75% Grass cover, Good, HSG B 2.820 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.7 300 0.0730 0.25 Sheet Flow, 300' - SHEET Grass: Dense n= 0.240 P2= 3.46" 9.7 1,100 0.0730 1.89 Shallow Concentrated Flow, 115' - SHALLOW Short Grass Pasture Kv= 7.0 fps 0.9 177 0.0500 3.35 Shallow Concentrated Flow, 177' - SHALLOW Grassed Waterway Kv= 15.0 fps 30.3 1,577 Total Subcatchment 1S: PRE 1 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.44 0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=2.820 ac Runoff Volume=0.074 af Runoff Depth=0.31" Flow Length=1,577' Tc=30.3 min CN=61 0.40 cfs Type II 24-hr 2 YR Rainfall=3.46"PRE 1 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2.820 ac Runoff Depth=0.55"Subcatchment 1S: PRE 1 Flow Length=1,577' Tc=30.3 min CN=61 Runoff=0.94 cfs 0.130 af Total Runoff Area = 2.820 ac Runoff Volume = 0.130 af Average Runoff Depth = 0.55" 100.00% Pervious Area = 2.820 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"PRE 1 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 1 Runoff = 0.94 cfs @ 12.32 hrs, Volume= 0.130 af, Depth= 0.55" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 2.820 61 >75% Grass cover, Good, HSG B 2.820 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.7 300 0.0730 0.25 Sheet Flow, 300' - SHEET Grass: Dense n= 0.240 P2= 3.46" 9.7 1,100 0.0730 1.89 Shallow Concentrated Flow, 115' - SHALLOW Short Grass Pasture Kv= 7.0 fps 0.9 177 0.0500 3.35 Shallow Concentrated Flow, 177' - SHALLOW Grassed Waterway Kv= 15.0 fps 30.3 1,577 Total Subcatchment 1S: PRE 1 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)1 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=2.820 ac Runoff Volume=0.130 af Runoff Depth=0.55" Flow Length=1,577' Tc=30.3 min CN=61 0.94 cfs Type II 24-hr 10 YR Rainfall=4.96"PRE 1 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2.820 ac Runoff Depth=1.35"Subcatchment 1S: PRE 1 Flow Length=1,577' Tc=30.3 min CN=61 Runoff=2.90 cfs 0.316 af Total Runoff Area = 2.820 ac Runoff Volume = 0.316 af Average Runoff Depth = 1.35" 100.00% Pervious Area = 2.820 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"PRE 1 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 1 Runoff = 2.90 cfs @ 12.29 hrs, Volume= 0.316 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 2.820 61 >75% Grass cover, Good, HSG B 2.820 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.7 300 0.0730 0.25 Sheet Flow, 300' - SHEET Grass: Dense n= 0.240 P2= 3.46" 9.7 1,100 0.0730 1.89 Shallow Concentrated Flow, 115' - SHALLOW Short Grass Pasture Kv= 7.0 fps 0.9 177 0.0500 3.35 Shallow Concentrated Flow, 177' - SHALLOW Grassed Waterway Kv= 15.0 fps 30.3 1,577 Total Subcatchment 1S: PRE 1 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)3 2 1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=2.820 ac Runoff Volume=0.316 af Runoff Depth=1.35" Flow Length=1,577' Tc=30.3 min CN=61 2.90 cfs Type II 24-hr 100 YR Rainfall=7.26"PRE 1 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2.820 ac Runoff Depth=2.89"Subcatchment 1S: PRE 1 Flow Length=1,577' Tc=30.3 min CN=61 Runoff=6.80 cfs 0.679 af Total Runoff Area = 2.820 ac Runoff Volume = 0.679 af Average Runoff Depth = 2.89" 100.00% Pervious Area = 2.820 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"PRE 1 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 1 Runoff = 6.80 cfs @ 12.26 hrs, Volume= 0.679 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 2.820 61 >75% Grass cover, Good, HSG B 2.820 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.7 300 0.0730 0.25 Sheet Flow, 300' - SHEET Grass: Dense n= 0.240 P2= 3.46" 9.7 1,100 0.0730 1.89 Shallow Concentrated Flow, 115' - SHALLOW Short Grass Pasture Kv= 7.0 fps 0.9 177 0.0500 3.35 Shallow Concentrated Flow, 177' - SHALLOW Grassed Waterway Kv= 15.0 fps 30.3 1,577 Total Subcatchment 1S: PRE 1 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)7 6 5 4 3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=2.820 ac Runoff Volume=0.679 af Runoff Depth=2.89" Flow Length=1,577' Tc=30.3 min CN=61 6.80 cfs 1S POST 1 Drainage Diagram for POST 1 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link POST 1 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 1.530 61 >75% Grass cover, Good, HSG B (1S) 1.530 Type II 24-hr 1 YR Rainfall=2.86"POST 1 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=1.530 ac Runoff Depth=0.31"Subcatchment 1S: POST 1 Flow Length=924' Slope=0.0730 '/' Tc=16.1 min CN=61 Runoff=0.34 cfs 0.040 af Total Runoff Area = 1.530 ac Runoff Volume = 0.040 af Average Runoff Depth = 0.31" 100.00% Pervious Area = 1.530 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"POST 1 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 1 Runoff = 0.34 cfs @ 12.14 hrs, Volume= 0.040 af, Depth= 0.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 1.530 61 >75% Grass cover, Good, HSG B 1.530 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 300 0.0730 0.37 Sheet Flow, 300' SHEET Grass: Short n= 0.150 P2= 3.46" 2.6 624 0.0730 4.05 Shallow Concentrated Flow, 369' SHALLOW Grassed Waterway Kv= 15.0 fps 16.1 924 Total Subcatchment 1S: POST 1 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=1.530 ac Runoff Volume=0.040 af Runoff Depth=0.31" Flow Length=924' Slope=0.0730 '/' Tc=16.1 min CN=61 0.34 cfs Type II 24-hr 2 YR Rainfall=3.46"POST 1 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=1.530 ac Runoff Depth=0.55"Subcatchment 1S: POST 1 Flow Length=924' Slope=0.0730 '/' Tc=16.1 min CN=61 Runoff=0.80 cfs 0.071 af Total Runoff Area = 1.530 ac Runoff Volume = 0.071 af Average Runoff Depth = 0.55" 100.00% Pervious Area = 1.530 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"POST 1 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 1 Runoff = 0.80 cfs @ 12.11 hrs, Volume= 0.071 af, Depth= 0.55" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 1.530 61 >75% Grass cover, Good, HSG B 1.530 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 300 0.0730 0.37 Sheet Flow, 300' SHEET Grass: Short n= 0.150 P2= 3.46" 2.6 624 0.0730 4.05 Shallow Concentrated Flow, 369' SHALLOW Grassed Waterway Kv= 15.0 fps 16.1 924 Total Subcatchment 1S: POST 1 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=1.530 ac Runoff Volume=0.071 af Runoff Depth=0.55" Flow Length=924' Slope=0.0730 '/' Tc=16.1 min CN=61 0.80 cfs Type II 24-hr 10 YR Rainfall=4.96"POST 1 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=1.530 ac Runoff Depth=1.35"Subcatchment 1S: POST 1 Flow Length=924' Slope=0.0730 '/' Tc=16.1 min CN=61 Runoff=2.37 cfs 0.172 af Total Runoff Area = 1.530 ac Runoff Volume = 0.172 af Average Runoff Depth = 1.35" 100.00% Pervious Area = 1.530 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"POST 1 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 1 Runoff = 2.37 cfs @ 12.10 hrs, Volume= 0.172 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 1.530 61 >75% Grass cover, Good, HSG B 1.530 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 300 0.0730 0.37 Sheet Flow, 300' SHEET Grass: Short n= 0.150 P2= 3.46" 2.6 624 0.0730 4.05 Shallow Concentrated Flow, 369' SHALLOW Grassed Waterway Kv= 15.0 fps 16.1 924 Total Subcatchment 1S: POST 1 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=1.530 ac Runoff Volume=0.172 af Runoff Depth=1.35" Flow Length=924' Slope=0.0730 '/' Tc=16.1 min CN=61 2.37 cfs Type II 24-hr 100 YR Rainfall=7.26"POST 1 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=1.530 ac Runoff Depth=2.89"Subcatchment 1S: POST 1 Flow Length=924' Slope=0.0730 '/' Tc=16.1 min CN=61 Runoff=5.45 cfs 0.369 af Total Runoff Area = 1.530 ac Runoff Volume = 0.369 af Average Runoff Depth = 2.89" 100.00% Pervious Area = 1.530 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"POST 1 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 1 Runoff = 5.45 cfs @ 12.09 hrs, Volume= 0.369 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 1.530 61 >75% Grass cover, Good, HSG B 1.530 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 300 0.0730 0.37 Sheet Flow, 300' SHEET Grass: Short n= 0.150 P2= 3.46" 2.6 624 0.0730 4.05 Shallow Concentrated Flow, 369' SHALLOW Grassed Waterway Kv= 15.0 fps 16.1 924 Total Subcatchment 1S: POST 1 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)6 5 4 3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=1.530 ac Runoff Volume=0.369 af Runoff Depth=2.89" Flow Length=924' Slope=0.0730 '/' Tc=16.1 min CN=61 5.45 cfs 1S PRE 2 Drainage Diagram for PRE 2 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link PRE 2 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 1.300 55 Woods, Good, HSG B (1S) 3.700 61 >75% Grass cover, Good, HSG B (1S) 5.000 Type II 24-hr 1 YR Rainfall=2.86"PRE 2 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=5.000 ac Runoff Depth=0.26"Subcatchment 1S: PRE 2 Flow Length=830' Slope=0.0730 '/' Tc=21.9 min CN=59 Runoff=0.60 cfs 0.107 af Total Runoff Area = 5.000 ac Runoff Volume = 0.107 af Average Runoff Depth = 0.26" 100.00% Pervious Area = 5.000 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"PRE 2 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 2 Runoff = 0.60 cfs @ 12.24 hrs, Volume= 0.107 af, Depth= 0.26" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 3.700 61 >75% Grass cover, Good, HSG B 1.300 55 Woods, Good, HSG B 5.000 59 Weighted Average 5.000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.7 300 0.0730 0.25 Sheet Flow, 300' - SHEET Grass: Dense n= 0.240 P2= 3.46" 2.2 530 0.0730 4.05 Shallow Concentrated Flow, 530' - SHALLOW Grassed Waterway Kv= 15.0 fps 21.9 830 Total Subcatchment 1S: PRE 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=5.000 ac Runoff Volume=0.107 af Runoff Depth=0.26" Flow Length=830' Slope=0.0730 '/' Tc=21.9 min CN=59 0.60 cfs Type II 24-hr 2 YR Rainfall=3.46"PRE 2 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=5.000 ac Runoff Depth=0.48"Subcatchment 1S: PRE 2 Flow Length=830' Slope=0.0730 '/' Tc=21.9 min CN=59 Runoff=1.62 cfs 0.198 af Total Runoff Area = 5.000 ac Runoff Volume = 0.198 af Average Runoff Depth = 0.48" 100.00% Pervious Area = 5.000 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"PRE 2 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 2 Runoff = 1.62 cfs @ 12.20 hrs, Volume= 0.198 af, Depth= 0.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 3.700 61 >75% Grass cover, Good, HSG B 1.300 55 Woods, Good, HSG B 5.000 59 Weighted Average 5.000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.7 300 0.0730 0.25 Sheet Flow, 300' - SHEET Grass: Dense n= 0.240 P2= 3.46" 2.2 530 0.0730 4.05 Shallow Concentrated Flow, 530' - SHALLOW Grassed Waterway Kv= 15.0 fps 21.9 830 Total Subcatchment 1S: PRE 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)1 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=5.000 ac Runoff Volume=0.198 af Runoff Depth=0.48" Flow Length=830' Slope=0.0730 '/' Tc=21.9 min CN=59 1.62 cfs Type II 24-hr 10 YR Rainfall=4.96"PRE 2 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=5.000 ac Runoff Depth=1.21"Subcatchment 1S: PRE 2 Flow Length=830' Slope=0.0730 '/' Tc=21.9 min CN=59 Runoff=5.59 cfs 0.505 af Total Runoff Area = 5.000 ac Runoff Volume = 0.505 af Average Runoff Depth = 1.21" 100.00% Pervious Area = 5.000 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"PRE 2 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 2 Runoff = 5.59 cfs @ 12.17 hrs, Volume= 0.505 af, Depth= 1.21" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 3.700 61 >75% Grass cover, Good, HSG B 1.300 55 Woods, Good, HSG B 5.000 59 Weighted Average 5.000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.7 300 0.0730 0.25 Sheet Flow, 300' - SHEET Grass: Dense n= 0.240 P2= 3.46" 2.2 530 0.0730 4.05 Shallow Concentrated Flow, 530' - SHALLOW Grassed Waterway Kv= 15.0 fps 21.9 830 Total Subcatchment 1S: PRE 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)6 5 4 3 2 1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=5.000 ac Runoff Volume=0.505 af Runoff Depth=1.21" Flow Length=830' Slope=0.0730 '/' Tc=21.9 min CN=59 5.59 cfs Type II 24-hr 100 YR Rainfall=7.26"PRE 2 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=5.000 ac Runoff Depth=2.69"Subcatchment 1S: PRE 2 Flow Length=830' Slope=0.0730 '/' Tc=21.9 min CN=59 Runoff=13.70 cfs 1.120 af Total Runoff Area = 5.000 ac Runoff Volume = 1.120 af Average Runoff Depth = 2.69" 100.00% Pervious Area = 5.000 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"PRE 2 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 2 Runoff = 13.70 cfs @ 12.16 hrs, Volume= 1.120 af, Depth= 2.69" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 3.700 61 >75% Grass cover, Good, HSG B 1.300 55 Woods, Good, HSG B 5.000 59 Weighted Average 5.000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.7 300 0.0730 0.25 Sheet Flow, 300' - SHEET Grass: Dense n= 0.240 P2= 3.46" 2.2 530 0.0730 4.05 Shallow Concentrated Flow, 530' - SHALLOW Grassed Waterway Kv= 15.0 fps 21.9 830 Total Subcatchment 1S: PRE 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=5.000 ac Runoff Volume=1.120 af Runoff Depth=2.69" Flow Length=830' Slope=0.0730 '/' Tc=21.9 min CN=59 13.70 cfs 1S POST 2 2P Underground Detention Drainage Diagram for POST 2 WITH UNDERGROUND STORAGE_REV-1 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 1.990 61 >75% Grass cover, Good, HSG B (1S) 6.090 98 Paved parking & roofs (1S) 8.080 Type II 24-hr 1 YR Rainfall=2.86"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=8.080 ac Runoff Depth=1.77"Subcatchment 1S: POST 2 Flow Length=1,570' Tc=10.2 min CN=89 Runoff=21.67 cfs 1.194 af Peak Elev=584.85' Storage=0.173 af Inflow=21.67 cfs 1.194 afPond 2P: Underground Detention Discarded=11.69 cfs 1.179 af Primary=0.45 cfs 0.015 af Outflow=12.14 cfs 1.194 af Total Runoff Area = 8.080 ac Runoff Volume = 1.194 af Average Runoff Depth = 1.77" 24.63% Pervious Area = 1.990 ac 75.37% Impervious Area = 6.090 ac Type II 24-hr 1 YR Rainfall=2.86"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff = 21.67 cfs @ 12.02 hrs, Volume= 1.194 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 1.990 61 >75% Grass cover, Good, HSG B 6.090 98 Paved parking & roofs 8.080 89 Weighted Average 1.990 Pervious Area 6.090 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 35 0.0730 0.17 Sheet Flow, 35' SHEET Grass: Dense n= 0.240 P2= 3.46" 5.0 296 0.0200 0.99 Shallow Concentrated Flow, 296' SHALLOW Short Grass Pasture Kv= 7.0 fps 0.3 278 0.0455 15.36 48.26 Circular Channel (pipe), 278' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.3 171 0.0170 9.39 29.50 Circular Channel (pipe), 171' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 102 0.0397 14.35 45.07 Circular Channel (pipe), 102' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.5 449 0.0397 14.35 45.07 Circular Channel (pipe), 449' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.2 86 0.0126 8.08 25.39 Circular Channel (pipe), 86' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 30 0.0050 6.67 335.37 Circular Channel (pipe), 30' PIPE Diam= 96.0" Area= 50.3 sf Perim= 25.1' r= 2.00' n= 0.025 Corrugated metal 0.2 123 0.0100 13.26 260.44 Circular Channel (pipe), 123' PIPE Diam= 60.0" Area= 19.6 sf Perim= 15.7' r= 1.25' n= 0.013 Corrugated PE, smooth interior 10.2 1,570 Total Type II 24-hr 1 YR Rainfall=2.86"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=8.080 ac Runoff Volume=1.194 af Runoff Depth=1.77" Flow Length=1,570' Tc=10.2 min CN=89 21.67 cfs Type II 24-hr 1 YR Rainfall=2.86"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Area = 8.080 ac, Inflow Depth = 1.77" for 1 YR event Inflow = 21.67 cfs @ 12.02 hrs, Volume= 1.194 af Outflow = 12.14 cfs @ 12.12 hrs, Volume= 1.194 af, Atten= 44%, Lag= 6.4 min Discarded = 11.69 cfs @ 12.12 hrs, Volume= 1.179 af Primary = 0.45 cfs @ 12.12 hrs, Volume= 0.015 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Peak Elev= 584.85' @ 12.12 hrs Surf.Area= 0.177 ac Storage= 0.173 af Plug-Flow detention time= 3.4 min calculated for 1.194 af (100% of inflow) Center-of-Mass det. time= 3.4 min ( 819.8 - 816.5 ) Volume Invert Avail.Storage Storage Description #1 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #2 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #3 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #4 587.51' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0100 '/' #5 584.07' 0.008 af 24.0"D x 108.00'L Horizontal Cylinder S= 0.0100 '/' #6 585.25' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0397 '/' #7 586.10' 0.007 af 24.0"D x 102.00'L Horizontal Cylinder S= 0.0397 '/' #8 590.25' 0.012 af 24.0"D x 171.00'L Horizontal Cylinder S= 0.0170 '/' #9 582.56' 0.003 af 4.00'D x 11.96'H Vertical Cone/Cylinder #10 585.15' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder #11 586.00' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder 1.753 af Total Available Storage Device Routing Invert Outlet Devices #1 Primary 581.99'60.0" x 36.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 581.63' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Discarded 582.21'18.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 583.55'4.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 585.60'36.0" Vert. Orifice/Grate C= 0.600 Discarded OutFlow Max=11.70 cfs @ 12.12 hrs HW=584.85' (Free Discharge) 2=Orifice/Grate (Orifice Controls 11.70 cfs @ 6.62 fps) Primary OutFlow Max=0.45 cfs @ 12.12 hrs HW=584.85' (Free Discharge) 1=Culvert (Passes 0.45 cfs of 52.10 cfs potential flow) 3=Orifice/Grate (Orifice Controls 0.45 cfs @ 5.13 fps) 4=Orifice/Grate ( Controls 0.00 cfs) Type II 24-hr 1 YR Rainfall=2.86"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Outflow Discarded Primary Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=8.080 ac Peak Elev=584.85' Storage=0.173 af 21.67 cfs 12.14 cfs 11.69 cfs 0.45 cfs Type II 24-hr 1.24" Rainfall=1.24"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=8.080 ac Runoff Depth=0.44"Subcatchment 1S: POST 2 Flow Length=1,570' Tc=10.2 min CN=89 Runoff=5.40 cfs 0.298 af Peak Elev=583.29' Storage=0.013 af Inflow=5.40 cfs 0.298 afPond 2P: Underground Detention Discarded=4.83 cfs 0.298 af Primary=0.00 cfs 0.000 af Outflow=4.83 cfs 0.298 af Total Runoff Area = 8.080 ac Runoff Volume = 0.298 af Average Runoff Depth = 0.44" 24.63% Pervious Area = 1.990 ac 75.37% Impervious Area = 6.090 ac Type II 24-hr 1.24" Rainfall=1.24"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff = 5.40 cfs @ 12.03 hrs, Volume= 0.298 af, Depth= 0.44" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1.24" Rainfall=1.24" Area (ac) CN Description 1.990 61 >75% Grass cover, Good, HSG B 6.090 98 Paved parking & roofs 8.080 89 Weighted Average 1.990 Pervious Area 6.090 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 35 0.0730 0.17 Sheet Flow, 35' SHEET Grass: Dense n= 0.240 P2= 3.46" 5.0 296 0.0200 0.99 Shallow Concentrated Flow, 296' SHALLOW Short Grass Pasture Kv= 7.0 fps 0.3 278 0.0455 15.36 48.26 Circular Channel (pipe), 278' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.3 171 0.0170 9.39 29.50 Circular Channel (pipe), 171' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 102 0.0397 14.35 45.07 Circular Channel (pipe), 102' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.5 449 0.0397 14.35 45.07 Circular Channel (pipe), 449' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.2 86 0.0126 8.08 25.39 Circular Channel (pipe), 86' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 30 0.0050 6.67 335.37 Circular Channel (pipe), 30' PIPE Diam= 96.0" Area= 50.3 sf Perim= 25.1' r= 2.00' n= 0.025 Corrugated metal 0.2 123 0.0100 13.26 260.44 Circular Channel (pipe), 123' PIPE Diam= 60.0" Area= 19.6 sf Perim= 15.7' r= 1.25' n= 0.013 Corrugated PE, smooth interior 10.2 1,570 Total Type II 24-hr 1.24" Rainfall=1.24"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)6 5 4 3 2 1 0 Type II 24-hr 1.24" Rainfall=1.24" Runoff Area=8.080 ac Runoff Volume=0.298 af Runoff Depth=0.44" Flow Length=1,570' Tc=10.2 min CN=89 5.40 cfs Type II 24-hr 1.24" Rainfall=1.24"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 11Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Area = 8.080 ac, Inflow Depth = 0.44" for 1.24" event Inflow = 5.40 cfs @ 12.03 hrs, Volume= 0.298 af Outflow = 4.83 cfs @ 12.07 hrs, Volume= 0.298 af, Atten= 11%, Lag= 2.6 min Discarded = 4.83 cfs @ 12.07 hrs, Volume= 0.298 af Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Peak Elev= 583.29' @ 12.07 hrs Surf.Area= 0.038 ac Storage= 0.013 af Plug-Flow detention time= 0.6 min calculated for 0.298 af (100% of inflow) Center-of-Mass det. time= 0.6 min ( 857.3 - 856.7 ) Volume Invert Avail.Storage Storage Description #1 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #2 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #3 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #4 587.51' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0100 '/' #5 584.07' 0.008 af 24.0"D x 108.00'L Horizontal Cylinder S= 0.0100 '/' #6 585.25' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0397 '/' #7 586.10' 0.007 af 24.0"D x 102.00'L Horizontal Cylinder S= 0.0397 '/' #8 590.25' 0.012 af 24.0"D x 171.00'L Horizontal Cylinder S= 0.0170 '/' #9 582.56' 0.003 af 4.00'D x 11.96'H Vertical Cone/Cylinder #10 585.15' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder #11 586.00' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder 1.753 af Total Available Storage Device Routing Invert Outlet Devices #1 Primary 581.99'60.0" x 36.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 581.63' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Discarded 582.21'18.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 583.55'4.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 585.60'36.0" Vert. Orifice/Grate C= 0.600 Discarded OutFlow Max=4.83 cfs @ 12.07 hrs HW=583.29' (Free Discharge) 2=Orifice/Grate (Orifice Controls 4.83 cfs @ 3.54 fps) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=582.46' (Free Discharge) 1=Culvert (Passes 0.00 cfs of 2.03 cfs potential flow) 3=Orifice/Grate ( Controls 0.00 cfs) 4=Orifice/Grate ( Controls 0.00 cfs) Type II 24-hr 1.24" Rainfall=1.24"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 12Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Outflow Discarded Primary Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)6 5 4 3 2 1 0 Inflow Area=8.080 ac Peak Elev=583.29' Storage=0.013 af 5.40 cfs 4.83 cfs4.83 cfs 0.00 cfs Type II 24-hr 2 YR Rainfall=3.46"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 13Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=8.080 ac Runoff Depth=2.32"Subcatchment 1S: POST 2 Flow Length=1,570' Tc=10.2 min CN=89 Runoff=28.06 cfs 1.562 af Peak Elev=585.35' Storage=0.270 af Inflow=28.06 cfs 1.562 afPond 2P: Underground Detention Discarded=13.14 cfs 1.538 af Primary=0.54 cfs 0.024 af Outflow=13.68 cfs 1.562 af Total Runoff Area = 8.080 ac Runoff Volume = 1.562 af Average Runoff Depth = 2.32" 24.63% Pervious Area = 1.990 ac 75.37% Impervious Area = 6.090 ac Type II 24-hr 2 YR Rainfall=3.46"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 14Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff = 28.06 cfs @ 12.02 hrs, Volume= 1.562 af, Depth= 2.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 1.990 61 >75% Grass cover, Good, HSG B 6.090 98 Paved parking & roofs 8.080 89 Weighted Average 1.990 Pervious Area 6.090 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 35 0.0730 0.17 Sheet Flow, 35' SHEET Grass: Dense n= 0.240 P2= 3.46" 5.0 296 0.0200 0.99 Shallow Concentrated Flow, 296' SHALLOW Short Grass Pasture Kv= 7.0 fps 0.3 278 0.0455 15.36 48.26 Circular Channel (pipe), 278' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.3 171 0.0170 9.39 29.50 Circular Channel (pipe), 171' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 102 0.0397 14.35 45.07 Circular Channel (pipe), 102' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.5 449 0.0397 14.35 45.07 Circular Channel (pipe), 449' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.2 86 0.0126 8.08 25.39 Circular Channel (pipe), 86' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 30 0.0050 6.67 335.37 Circular Channel (pipe), 30' PIPE Diam= 96.0" Area= 50.3 sf Perim= 25.1' r= 2.00' n= 0.025 Corrugated metal 0.2 123 0.0100 13.26 260.44 Circular Channel (pipe), 123' PIPE Diam= 60.0" Area= 19.6 sf Perim= 15.7' r= 1.25' n= 0.013 Corrugated PE, smooth interior 10.2 1,570 Total Type II 24-hr 2 YR Rainfall=3.46"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 15Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=8.080 ac Runoff Volume=1.562 af Runoff Depth=2.32" Flow Length=1,570' Tc=10.2 min CN=89 28.06 cfs Type II 24-hr 2 YR Rainfall=3.46"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 16Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Area = 8.080 ac, Inflow Depth = 2.32" for 2 YR event Inflow = 28.06 cfs @ 12.02 hrs, Volume= 1.562 af Outflow = 13.68 cfs @ 12.14 hrs, Volume= 1.562 af, Atten= 51%, Lag= 7.3 min Discarded = 13.14 cfs @ 12.14 hrs, Volume= 1.538 af Primary = 0.54 cfs @ 12.14 hrs, Volume= 0.024 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Peak Elev= 585.35' @ 12.14 hrs Surf.Area= 0.212 ac Storage= 0.270 af Plug-Flow detention time= 4.8 min calculated for 1.562 af (100% of inflow) Center-of-Mass det. time= 4.8 min ( 813.6 - 808.8 ) Volume Invert Avail.Storage Storage Description #1 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #2 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #3 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #4 587.51' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0100 '/' #5 584.07' 0.008 af 24.0"D x 108.00'L Horizontal Cylinder S= 0.0100 '/' #6 585.25' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0397 '/' #7 586.10' 0.007 af 24.0"D x 102.00'L Horizontal Cylinder S= 0.0397 '/' #8 590.25' 0.012 af 24.0"D x 171.00'L Horizontal Cylinder S= 0.0170 '/' #9 582.56' 0.003 af 4.00'D x 11.96'H Vertical Cone/Cylinder #10 585.15' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder #11 586.00' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder 1.753 af Total Available Storage Device Routing Invert Outlet Devices #1 Primary 581.99'60.0" x 36.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 581.63' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Discarded 582.21'18.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 583.55'4.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 585.60'36.0" Vert. Orifice/Grate C= 0.600 Discarded OutFlow Max=13.14 cfs @ 12.14 hrs HW=585.35' (Free Discharge) 2=Orifice/Grate (Orifice Controls 13.14 cfs @ 7.44 fps) Primary OutFlow Max=0.54 cfs @ 12.14 hrs HW=585.35' (Free Discharge) 1=Culvert (Passes 0.54 cfs of 68.13 cfs potential flow) 3=Orifice/Grate (Orifice Controls 0.54 cfs @ 6.15 fps) 4=Orifice/Grate ( Controls 0.00 cfs) Type II 24-hr 2 YR Rainfall=3.46"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 17Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Outflow Discarded Primary Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=8.080 ac Peak Elev=585.35' Storage=0.270 af 28.06 cfs 13.68 cfs 13.14 cfs 0.54 cfs Type II 24-hr 10 YR Rainfall=4.96"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 18Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=8.080 ac Runoff Depth=3.73"Subcatchment 1S: POST 2 Flow Length=1,570' Tc=10.2 min CN=89 Runoff=44.05 cfs 2.514 af Peak Elev=586.41' Storage=0.520 af Inflow=44.05 cfs 2.514 afPond 2P: Underground Detention Discarded=15.81 cfs 2.390 af Primary=5.50 cfs 0.124 af Outflow=21.31 cfs 2.514 af Total Runoff Area = 8.080 ac Runoff Volume = 2.514 af Average Runoff Depth = 3.73" 24.63% Pervious Area = 1.990 ac 75.37% Impervious Area = 6.090 ac Type II 24-hr 10 YR Rainfall=4.96"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 19Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff = 44.05 cfs @ 12.01 hrs, Volume= 2.514 af, Depth= 3.73" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 1.990 61 >75% Grass cover, Good, HSG B 6.090 98 Paved parking & roofs 8.080 89 Weighted Average 1.990 Pervious Area 6.090 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 35 0.0730 0.17 Sheet Flow, 35' SHEET Grass: Dense n= 0.240 P2= 3.46" 5.0 296 0.0200 0.99 Shallow Concentrated Flow, 296' SHALLOW Short Grass Pasture Kv= 7.0 fps 0.3 278 0.0455 15.36 48.26 Circular Channel (pipe), 278' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.3 171 0.0170 9.39 29.50 Circular Channel (pipe), 171' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 102 0.0397 14.35 45.07 Circular Channel (pipe), 102' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.5 449 0.0397 14.35 45.07 Circular Channel (pipe), 449' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.2 86 0.0126 8.08 25.39 Circular Channel (pipe), 86' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 30 0.0050 6.67 335.37 Circular Channel (pipe), 30' PIPE Diam= 96.0" Area= 50.3 sf Perim= 25.1' r= 2.00' n= 0.025 Corrugated metal 0.2 123 0.0100 13.26 260.44 Circular Channel (pipe), 123' PIPE Diam= 60.0" Area= 19.6 sf Perim= 15.7' r= 1.25' n= 0.013 Corrugated PE, smooth interior 10.2 1,570 Total Type II 24-hr 10 YR Rainfall=4.96"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 20Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=8.080 ac Runoff Volume=2.514 af Runoff Depth=3.73" Flow Length=1,570' Tc=10.2 min CN=89 44.05 cfs Type II 24-hr 10 YR Rainfall=4.96"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 21Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Area = 8.080 ac, Inflow Depth = 3.73" for 10 YR event Inflow = 44.05 cfs @ 12.01 hrs, Volume= 2.514 af Outflow = 21.31 cfs @ 12.14 hrs, Volume= 2.514 af, Atten= 52%, Lag= 7.3 min Discarded = 15.81 cfs @ 12.14 hrs, Volume= 2.390 af Primary = 5.50 cfs @ 12.14 hrs, Volume= 0.124 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Peak Elev= 586.41' @ 12.14 hrs Surf.Area= 0.250 ac Storage= 0.520 af Plug-Flow detention time= 7.4 min calculated for 2.513 af (100% of inflow) Center-of-Mass det. time= 7.4 min ( 802.7 - 795.4 ) Volume Invert Avail.Storage Storage Description #1 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #2 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #3 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #4 587.51' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0100 '/' #5 584.07' 0.008 af 24.0"D x 108.00'L Horizontal Cylinder S= 0.0100 '/' #6 585.25' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0397 '/' #7 586.10' 0.007 af 24.0"D x 102.00'L Horizontal Cylinder S= 0.0397 '/' #8 590.25' 0.012 af 24.0"D x 171.00'L Horizontal Cylinder S= 0.0170 '/' #9 582.56' 0.003 af 4.00'D x 11.96'H Vertical Cone/Cylinder #10 585.15' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder #11 586.00' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder 1.753 af Total Available Storage Device Routing Invert Outlet Devices #1 Primary 581.99'60.0" x 36.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 581.63' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Discarded 582.21'18.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 583.55'4.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 585.60'36.0" Vert. Orifice/Grate C= 0.600 Discarded OutFlow Max=15.81 cfs @ 12.14 hrs HW=586.41' (Free Discharge) 2=Orifice/Grate (Orifice Controls 15.81 cfs @ 8.95 fps) Primary OutFlow Max=5.42 cfs @ 12.14 hrs HW=586.41' (Free Discharge) 1=Culvert (Passes 5.42 cfs of 105.89 cfs potential flow) 3=Orifice/Grate (Orifice Controls 0.69 cfs @ 7.90 fps) 4=Orifice/Grate (Orifice Controls 4.73 cfs @ 3.07 fps) Type II 24-hr 10 YR Rainfall=4.96"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 22Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Outflow Discarded Primary Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)45 40 35 30 25 20 15 10 5 0 Inflow Area=8.080 ac Peak Elev=586.41' Storage=0.520 af 44.05 cfs 21.31 cfs 15.81 cfs 5.50 cfs Type II 24-hr 100 YR Rainfall=7.26"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 23Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=8.080 ac Runoff Depth=5.96"Subcatchment 1S: POST 2 Flow Length=1,570' Tc=10.2 min CN=89 Runoff=68.39 cfs 4.014 af Peak Elev=587.53' Storage=0.808 af Inflow=68.39 cfs 4.014 afPond 2P: Underground Detention Discarded=18.19 cfs 3.442 af Primary=23.54 cfs 0.572 af Outflow=41.73 cfs 4.014 af Total Runoff Area = 8.080 ac Runoff Volume = 4.014 af Average Runoff Depth = 5.96" 24.63% Pervious Area = 1.990 ac 75.37% Impervious Area = 6.090 ac Type II 24-hr 100 YR Rainfall=7.26"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 24Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff = 68.39 cfs @ 12.01 hrs, Volume= 4.014 af, Depth= 5.96" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 1.990 61 >75% Grass cover, Good, HSG B 6.090 98 Paved parking & roofs 8.080 89 Weighted Average 1.990 Pervious Area 6.090 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 35 0.0730 0.17 Sheet Flow, 35' SHEET Grass: Dense n= 0.240 P2= 3.46" 5.0 296 0.0200 0.99 Shallow Concentrated Flow, 296' SHALLOW Short Grass Pasture Kv= 7.0 fps 0.3 278 0.0455 15.36 48.26 Circular Channel (pipe), 278' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.3 171 0.0170 9.39 29.50 Circular Channel (pipe), 171' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 102 0.0397 14.35 45.07 Circular Channel (pipe), 102' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.5 449 0.0397 14.35 45.07 Circular Channel (pipe), 449' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.2 86 0.0126 8.08 25.39 Circular Channel (pipe), 86' PIPE Diam= 24.0" Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 Corrugated PE, smooth interior 0.1 30 0.0050 6.67 335.37 Circular Channel (pipe), 30' PIPE Diam= 96.0" Area= 50.3 sf Perim= 25.1' r= 2.00' n= 0.025 Corrugated metal 0.2 123 0.0100 13.26 260.44 Circular Channel (pipe), 123' PIPE Diam= 60.0" Area= 19.6 sf Perim= 15.7' r= 1.25' n= 0.013 Corrugated PE, smooth interior 10.2 1,570 Total Type II 24-hr 100 YR Rainfall=7.26"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 25Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 2 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=8.080 ac Runoff Volume=4.014 af Runoff Depth=5.96" Flow Length=1,570' Tc=10.2 min CN=89 68.39 cfs Type II 24-hr 100 YR Rainfall=7.26"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 26Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Area = 8.080 ac, Inflow Depth = 5.96" for 100 YR event Inflow = 68.39 cfs @ 12.01 hrs, Volume= 4.014 af Outflow = 41.73 cfs @ 12.11 hrs, Volume= 4.014 af, Atten= 39%, Lag= 5.9 min Discarded = 18.19 cfs @ 12.11 hrs, Volume= 3.442 af Primary = 23.54 cfs @ 12.11 hrs, Volume= 0.572 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Peak Elev= 587.53' @ 12.11 hrs Surf.Area= 0.263 ac Storage= 0.808 af Plug-Flow detention time= 8.0 min calculated for 4.014 af (100% of inflow) Center-of-Mass det. time= 7.9 min ( 790.5 - 782.6 ) Volume Invert Avail.Storage Storage Description #1 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #2 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #3 582.46' 0.552 af 96.0"D x 478.00'L Horizontal Cylinder S= 0.0050 '/' #4 587.51' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0100 '/' #5 584.07' 0.008 af 24.0"D x 108.00'L Horizontal Cylinder S= 0.0100 '/' #6 585.25' 0.032 af 24.0"D x 449.00'L Horizontal Cylinder S= 0.0397 '/' #7 586.10' 0.007 af 24.0"D x 102.00'L Horizontal Cylinder S= 0.0397 '/' #8 590.25' 0.012 af 24.0"D x 171.00'L Horizontal Cylinder S= 0.0170 '/' #9 582.56' 0.003 af 4.00'D x 11.96'H Vertical Cone/Cylinder #10 585.15' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder #11 586.00' 0.001 af 4.00'D x 4.10'H Vertical Cone/Cylinder 1.753 af Total Available Storage Device Routing Invert Outlet Devices #1 Primary 581.99'60.0" x 36.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 581.63' S= 0.0100 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Discarded 582.21'18.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 583.55'4.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 585.60'36.0" Vert. Orifice/Grate C= 0.600 Discarded OutFlow Max=18.19 cfs @ 12.11 hrs HW=587.53' (Free Discharge) 2=Orifice/Grate (Orifice Controls 18.19 cfs @ 10.29 fps) Primary OutFlow Max=23.52 cfs @ 12.11 hrs HW=587.53' (Free Discharge) 1=Culvert (Passes 23.52 cfs of 146.02 cfs potential flow) 3=Orifice/Grate (Orifice Controls 0.82 cfs @ 9.40 fps) 4=Orifice/Grate (Orifice Controls 22.70 cfs @ 4.73 fps) Type II 24-hr 100 YR Rainfall=7.26"POST 2 WITH UNDERGROUND STORAGE_REV-1 Page 27Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Pond 2P: Underground Detention Inflow Outflow Discarded Primary Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=8.080 ac Peak Elev=587.53' Storage=0.808 af 68.39 cfs 41.73 cfs 18.19 cfs23.54 cfs 1S PRE 3 Drainage Diagram for PRE 3 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link PRE 3 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 0.400 55 Woods, Good, HSG B (1S) 0.400 Type II 24-hr 1 YR Rainfall=2.86"PRE 3 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.400 ac Runoff Depth=0.16"Subcatchment 1S: PRE 3 Flow Length=245' Slope=0.1000 '/' Tc=17.2 min CN=55 Runoff=0.02 cfs 0.005 af Total Runoff Area = 0.400 ac Runoff Volume = 0.005 af Average Runoff Depth = 0.16" 100.00% Pervious Area = 0.400 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"PRE 3 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 3 Runoff = 0.02 cfs @ 12.23 hrs, Volume= 0.005 af, Depth= 0.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 0.400 55 Woods, Good, HSG B 0.400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.0 175 0.1000 0.17 Sheet Flow, 175' SHEET Woods: Light underbrush n= 0.400 P2= 3.46" 0.2 70 0.1000 4.74 Shallow Concentrated Flow, 70' SHALLOW Grassed Waterway Kv= 15.0 fps 17.2 245 Total Subcatchment 1S: PRE 3 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.018 0.017 0.016 0.015 0.014 0.013 0.012 0.011 0.01 0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=0.400 ac Runoff Volume=0.005 af Runoff Depth=0.16" Flow Length=245' Slope=0.1000 '/' Tc=17.2 min CN=55 0.02 cfs Type II 24-hr 2 YR Rainfall=3.46"PRE 3 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.400 ac Runoff Depth=0.33"Subcatchment 1S: PRE 3 Flow Length=245' Slope=0.1000 '/' Tc=17.2 min CN=55 Runoff=0.08 cfs 0.011 af Total Runoff Area = 0.400 ac Runoff Volume = 0.011 af Average Runoff Depth = 0.33" 100.00% Pervious Area = 0.400 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"PRE 3 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 3 Runoff = 0.08 cfs @ 12.17 hrs, Volume= 0.011 af, Depth= 0.33" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 0.400 55 Woods, Good, HSG B 0.400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.0 175 0.1000 0.17 Sheet Flow, 175' SHEET Woods: Light underbrush n= 0.400 P2= 3.46" 0.2 70 0.1000 4.74 Shallow Concentrated Flow, 70' SHALLOW Grassed Waterway Kv= 15.0 fps 17.2 245 Total Subcatchment 1S: PRE 3 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=0.400 ac Runoff Volume=0.011 af Runoff Depth=0.33" Flow Length=245' Slope=0.1000 '/' Tc=17.2 min CN=55 0.08 cfs Type II 24-hr 10 YR Rainfall=4.96"PRE 3 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.400 ac Runoff Depth=0.96"Subcatchment 1S: PRE 3 Flow Length=245' Slope=0.1000 '/' Tc=17.2 min CN=55 Runoff=0.38 cfs 0.032 af Total Runoff Area = 0.400 ac Runoff Volume = 0.032 af Average Runoff Depth = 0.96" 100.00% Pervious Area = 0.400 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"PRE 3 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 3 Runoff = 0.38 cfs @ 12.13 hrs, Volume= 0.032 af, Depth= 0.96" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 0.400 55 Woods, Good, HSG B 0.400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.0 175 0.1000 0.17 Sheet Flow, 175' SHEET Woods: Light underbrush n= 0.400 P2= 3.46" 0.2 70 0.1000 4.74 Shallow Concentrated Flow, 70' SHALLOW Grassed Waterway Kv= 15.0 fps 17.2 245 Total Subcatchment 1S: PRE 3 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=0.400 ac Runoff Volume=0.032 af Runoff Depth=0.96" Flow Length=245' Slope=0.1000 '/' Tc=17.2 min CN=55 0.38 cfs Type II 24-hr 100 YR Rainfall=7.26"PRE 3 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.400 ac Runoff Depth=2.29"Subcatchment 1S: PRE 3 Flow Length=245' Slope=0.1000 '/' Tc=17.2 min CN=55 Runoff=1.05 cfs 0.076 af Total Runoff Area = 0.400 ac Runoff Volume = 0.076 af Average Runoff Depth = 2.29" 100.00% Pervious Area = 0.400 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"PRE 3 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 3 Runoff = 1.05 cfs @ 12.10 hrs, Volume= 0.076 af, Depth= 2.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 0.400 55 Woods, Good, HSG B 0.400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.0 175 0.1000 0.17 Sheet Flow, 175' SHEET Woods: Light underbrush n= 0.400 P2= 3.46" 0.2 70 0.1000 4.74 Shallow Concentrated Flow, 70' SHALLOW Grassed Waterway Kv= 15.0 fps 17.2 245 Total Subcatchment 1S: PRE 3 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=0.400 ac Runoff Volume=0.076 af Runoff Depth=2.29" Flow Length=245' Slope=0.1000 '/' Tc=17.2 min CN=55 1.05 cfs 1S PRE 4 Drainage Diagram for PRE 4 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link PRE 4 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 1.690 55 Woods, Good, HSG B (1S) 0.430 61 >75% Grass cover, Good, HSG B (1S) 2.120 Type II 24-hr 1 YR Rainfall=2.86"PRE 4 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2.120 ac Runoff Depth=0.18"Subcatchment 1S: PRE 4 Flow Length=787' Slope=0.1000 '/' Tc=31.2 min CN=56 Runoff=0.10 cfs 0.032 af Total Runoff Area = 2.120 ac Runoff Volume = 0.032 af Average Runoff Depth = 0.18" 100.00% Pervious Area = 2.120 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"PRE 4 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 4 Runoff = 0.10 cfs @ 12.48 hrs, Volume= 0.032 af, Depth= 0.18" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 1.690 55 Woods, Good, HSG B 0.430 61 >75% Grass cover, Good, HSG B 2.120 56 Weighted Average 2.120 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.1 300 0.1000 0.19 Sheet Flow, 300' - SHEET Woods: Light underbrush n= 0.400 P2= 3.46" 5.1 487 0.1000 1.58 Shallow Concentrated Flow, 487' - SHALLOW Woodland Kv= 5.0 fps 31.2 787 Total Subcatchment 1S: PRE 4 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.11 0.105 0.1 0.095 0.09 0.085 0.08 0.075 0.07 0.065 0.06 0.055 0.05 0.045 0.04 0.035 0.03 0.025 0.02 0.015 0.01 0.005 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=2.120 ac Runoff Volume=0.032 af Runoff Depth=0.18" Flow Length=787' Slope=0.1000 '/' Tc=31.2 min CN=56 0.10 cfs Type II 24-hr 2 YR Rainfall=3.46"PRE 4 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2.120 ac Runoff Depth=0.37"Subcatchment 1S: PRE 4 Flow Length=787' Slope=0.1000 '/' Tc=31.2 min CN=56 Runoff=0.34 cfs 0.065 af Total Runoff Area = 2.120 ac Runoff Volume = 0.065 af Average Runoff Depth = 0.37" 100.00% Pervious Area = 2.120 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"PRE 4 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 4 Runoff = 0.34 cfs @ 12.38 hrs, Volume= 0.065 af, Depth= 0.37" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 1.690 55 Woods, Good, HSG B 0.430 61 >75% Grass cover, Good, HSG B 2.120 56 Weighted Average 2.120 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.1 300 0.1000 0.19 Sheet Flow, 300' - SHEET Woods: Light underbrush n= 0.400 P2= 3.46" 5.1 487 0.1000 1.58 Shallow Concentrated Flow, 487' - SHALLOW Woodland Kv= 5.0 fps 31.2 787 Total Subcatchment 1S: PRE 4 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=2.120 ac Runoff Volume=0.065 af Runoff Depth=0.37" Flow Length=787' Slope=0.1000 '/' Tc=31.2 min CN=56 0.34 cfs Type II 24-hr 10 YR Rainfall=4.96"PRE 4 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2.120 ac Runoff Depth=1.02"Subcatchment 1S: PRE 4 Flow Length=787' Slope=0.1000 '/' Tc=31.2 min CN=56 Runoff=1.46 cfs 0.180 af Total Runoff Area = 2.120 ac Runoff Volume = 0.180 af Average Runoff Depth = 1.02" 100.00% Pervious Area = 2.120 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"PRE 4 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 4 Runoff = 1.46 cfs @ 12.31 hrs, Volume= 0.180 af, Depth= 1.02" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 1.690 55 Woods, Good, HSG B 0.430 61 >75% Grass cover, Good, HSG B 2.120 56 Weighted Average 2.120 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.1 300 0.1000 0.19 Sheet Flow, 300' - SHEET Woods: Light underbrush n= 0.400 P2= 3.46" 5.1 487 0.1000 1.58 Shallow Concentrated Flow, 487' - SHALLOW Woodland Kv= 5.0 fps 31.2 787 Total Subcatchment 1S: PRE 4 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=2.120 ac Runoff Volume=0.180 af Runoff Depth=1.02" Flow Length=787' Slope=0.1000 '/' Tc=31.2 min CN=56 1.46 cfs Type II 24-hr 100 YR Rainfall=7.26"PRE 4 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=2.120 ac Runoff Depth=2.39"Subcatchment 1S: PRE 4 Flow Length=787' Slope=0.1000 '/' Tc=31.2 min CN=56 Runoff=3.99 cfs 0.422 af Total Runoff Area = 2.120 ac Runoff Volume = 0.422 af Average Runoff Depth = 2.39" 100.00% Pervious Area = 2.120 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"PRE 4 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 4 Runoff = 3.99 cfs @ 12.28 hrs, Volume= 0.422 af, Depth= 2.39" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 1.690 55 Woods, Good, HSG B 0.430 61 >75% Grass cover, Good, HSG B 2.120 56 Weighted Average 2.120 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.1 300 0.1000 0.19 Sheet Flow, 300' - SHEET Woods: Light underbrush n= 0.400 P2= 3.46" 5.1 487 0.1000 1.58 Shallow Concentrated Flow, 487' - SHALLOW Woodland Kv= 5.0 fps 31.2 787 Total Subcatchment 1S: PRE 4 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)4 3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=2.120 ac Runoff Volume=0.422 af Runoff Depth=2.39" Flow Length=787' Slope=0.1000 '/' Tc=31.2 min CN=56 3.99 cfs 1S POST 4 Drainage Diagram for POST 4 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link POST 4 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 0.740 61 >75% Grass cover, Good, HSG B (1S) 0.740 Type II 24-hr 1 YR Rainfall=2.86"POST 4 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.740 ac Runoff Depth=0.31"Subcatchment 1S: POST 4 Flow Length=300' Slope=0.0417 '/' Tc=12.7 min CN=61 Runoff=0.19 cfs 0.019 af Total Runoff Area = 0.740 ac Runoff Volume = 0.019 af Average Runoff Depth = 0.31" 100.00% Pervious Area = 0.740 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"POST 4 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 4 Runoff = 0.19 cfs @ 12.09 hrs, Volume= 0.019 af, Depth= 0.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 0.740 61 >75% Grass cover, Good, HSG B 0.740 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0417 0.27 Sheet Flow, 200' SHEET Grass: Short n= 0.150 P2= 3.46" 0.5 100 0.0417 3.29 Shallow Concentrated Flow, 100' SHALLOW Unpaved Kv= 16.1 fps 12.7 300 Total Subcatchment 1S: POST 4 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.21 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=0.740 ac Runoff Volume=0.019 af Runoff Depth=0.31" Flow Length=300' Slope=0.0417 '/' Tc=12.7 min CN=61 0.19 cfs Type II 24-hr 2 YR Rainfall=3.46"POST 4 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.740 ac Runoff Depth=0.55"Subcatchment 1S: POST 4 Flow Length=300' Slope=0.0417 '/' Tc=12.7 min CN=61 Runoff=0.45 cfs 0.034 af Total Runoff Area = 0.740 ac Runoff Volume = 0.034 af Average Runoff Depth = 0.55" 100.00% Pervious Area = 0.740 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"POST 4 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 4 Runoff = 0.45 cfs @ 12.07 hrs, Volume= 0.034 af, Depth= 0.55" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 0.740 61 >75% Grass cover, Good, HSG B 0.740 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0417 0.27 Sheet Flow, 200' SHEET Grass: Short n= 0.150 P2= 3.46" 0.5 100 0.0417 3.29 Shallow Concentrated Flow, 100' SHALLOW Unpaved Kv= 16.1 fps 12.7 300 Total Subcatchment 1S: POST 4 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.48 0.46 0.44 0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=0.740 ac Runoff Volume=0.034 af Runoff Depth=0.55" Flow Length=300' Slope=0.0417 '/' Tc=12.7 min CN=61 0.45 cfs Type II 24-hr 10 YR Rainfall=4.96"POST 4 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.740 ac Runoff Depth=1.35"Subcatchment 1S: POST 4 Flow Length=300' Slope=0.0417 '/' Tc=12.7 min CN=61 Runoff=1.31 cfs 0.083 af Total Runoff Area = 0.740 ac Runoff Volume = 0.083 af Average Runoff Depth = 1.35" 100.00% Pervious Area = 0.740 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"POST 4 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 4 Runoff = 1.31 cfs @ 12.06 hrs, Volume= 0.083 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 0.740 61 >75% Grass cover, Good, HSG B 0.740 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0417 0.27 Sheet Flow, 200' SHEET Grass: Short n= 0.150 P2= 3.46" 0.5 100 0.0417 3.29 Shallow Concentrated Flow, 100' SHALLOW Unpaved Kv= 16.1 fps 12.7 300 Total Subcatchment 1S: POST 4 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=0.740 ac Runoff Volume=0.083 af Runoff Depth=1.35" Flow Length=300' Slope=0.0417 '/' Tc=12.7 min CN=61 1.31 cfs Type II 24-hr 100 YR Rainfall=7.26"POST 4 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.740 ac Runoff Depth=2.89"Subcatchment 1S: POST 4 Flow Length=300' Slope=0.0417 '/' Tc=12.7 min CN=61 Runoff=2.97 cfs 0.178 af Total Runoff Area = 0.740 ac Runoff Volume = 0.178 af Average Runoff Depth = 2.89" 100.00% Pervious Area = 0.740 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"POST 4 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 4 Runoff = 2.97 cfs @ 12.05 hrs, Volume= 0.178 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 0.740 61 >75% Grass cover, Good, HSG B 0.740 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0417 0.27 Sheet Flow, 200' SHEET Grass: Short n= 0.150 P2= 3.46" 0.5 100 0.0417 3.29 Shallow Concentrated Flow, 100' SHALLOW Unpaved Kv= 16.1 fps 12.7 300 Total Subcatchment 1S: POST 4 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=0.740 ac Runoff Volume=0.178 af Runoff Depth=2.89" Flow Length=300' Slope=0.0417 '/' Tc=12.7 min CN=61 2.97 cfs 1S PRE 5 Drainage Diagram for PRE 5 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link PRE 5 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 0.870 61 >75% Grass cover, Good, HSG B (1S) 0.870 Type II 24-hr 1 YR Rainfall=2.86"PRE 5 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.870 ac Runoff Depth=0.31"Subcatchment 1S: PRE 5 Flow Length=691' Tc=7.8 min CN=61 Runoff=0.30 cfs 0.023 af Total Runoff Area = 0.870 ac Runoff Volume = 0.023 af Average Runoff Depth = 0.31" 100.00% Pervious Area = 0.870 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"PRE 5 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 5 Runoff = 0.30 cfs @ 12.03 hrs, Volume= 0.023 af, Depth= 0.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 0.870 61 >75% Grass cover, Good, HSG B 0.870 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.5 188 0.1800 0.48 Sheet Flow, 188' SHEET Grass: Short n= 0.150 P2= 3.46" 1.3 503 0.0200 6.42 5.04 Circular Channel (pipe), 503' PIPE Diam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 Corrugated PE, smooth interior 7.8 691 Total Subcatchment 1S: PRE 5 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=0.870 ac Runoff Volume=0.023 af Runoff Depth=0.31" Flow Length=691' Tc=7.8 min CN=61 0.30 cfs Type II 24-hr 2 YR Rainfall=3.46"PRE 5 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.870 ac Runoff Depth=0.55"Subcatchment 1S: PRE 5 Flow Length=691' Tc=7.8 min CN=61 Runoff=0.67 cfs 0.040 af Total Runoff Area = 0.870 ac Runoff Volume = 0.040 af Average Runoff Depth = 0.55" 100.00% Pervious Area = 0.870 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"PRE 5 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 5 Runoff = 0.67 cfs @ 12.02 hrs, Volume= 0.040 af, Depth= 0.55" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 0.870 61 >75% Grass cover, Good, HSG B 0.870 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.5 188 0.1800 0.48 Sheet Flow, 188' SHEET Grass: Short n= 0.150 P2= 3.46" 1.3 503 0.0200 6.42 5.04 Circular Channel (pipe), 503' PIPE Diam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 Corrugated PE, smooth interior 7.8 691 Total Subcatchment 1S: PRE 5 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=0.870 ac Runoff Volume=0.040 af Runoff Depth=0.55" Flow Length=691' Tc=7.8 min CN=61 0.67 cfs Type II 24-hr 10 YR Rainfall=4.96"PRE 5 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.870 ac Runoff Depth=1.35"Subcatchment 1S: PRE 5 Flow Length=691' Tc=7.8 min CN=61 Runoff=1.89 cfs 0.098 af Total Runoff Area = 0.870 ac Runoff Volume = 0.098 af Average Runoff Depth = 1.35" 100.00% Pervious Area = 0.870 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"PRE 5 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 5 Runoff = 1.89 cfs @ 12.00 hrs, Volume= 0.098 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 0.870 61 >75% Grass cover, Good, HSG B 0.870 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.5 188 0.1800 0.48 Sheet Flow, 188' SHEET Grass: Short n= 0.150 P2= 3.46" 1.3 503 0.0200 6.42 5.04 Circular Channel (pipe), 503' PIPE Diam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 Corrugated PE, smooth interior 7.8 691 Total Subcatchment 1S: PRE 5 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=0.870 ac Runoff Volume=0.098 af Runoff Depth=1.35" Flow Length=691' Tc=7.8 min CN=61 1.89 cfs Type II 24-hr 100 YR Rainfall=7.26"PRE 5 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.870 ac Runoff Depth=2.89"Subcatchment 1S: PRE 5 Flow Length=691' Tc=7.8 min CN=61 Runoff=4.20 cfs 0.210 af Total Runoff Area = 0.870 ac Runoff Volume = 0.210 af Average Runoff Depth = 2.89" 100.00% Pervious Area = 0.870 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"PRE 5 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 5 Runoff = 4.20 cfs @ 12.00 hrs, Volume= 0.210 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 0.870 61 >75% Grass cover, Good, HSG B 0.870 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.5 188 0.1800 0.48 Sheet Flow, 188' SHEET Grass: Short n= 0.150 P2= 3.46" 1.3 503 0.0200 6.42 5.04 Circular Channel (pipe), 503' PIPE Diam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 Corrugated PE, smooth interior 7.8 691 Total Subcatchment 1S: PRE 5 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)4 3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=0.870 ac Runoff Volume=0.210 af Runoff Depth=2.89" Flow Length=691' Tc=7.8 min CN=61 4.20 cfs 1S POST 5 Drainage Diagram for POST 5 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link POST 5 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 0.670 61 >75% Grass cover, Good, HSG B (1S) 0.670 Type II 24-hr 1 YR Rainfall=2.86"POST 5 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.670 ac Runoff Depth=0.31"Subcatchment 1S: POST 5 Flow Length=703' Tc=6.6 min CN=61 Runoff=0.25 cfs 0.018 af Total Runoff Area = 0.670 ac Runoff Volume = 0.018 af Average Runoff Depth = 0.31" 100.00% Pervious Area = 0.670 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"POST 5 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 5 Runoff = 0.25 cfs @ 12.01 hrs, Volume= 0.018 af, Depth= 0.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 0.670 61 >75% Grass cover, Good, HSG B 0.670 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 200 0.3300 0.62 Sheet Flow, 90' SHEET Grass: Short n= 0.150 P2= 3.46" 1.3 503 0.0200 6.42 5.04 Circular Channel (pipe), 503' PIPE Diam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 Corrugated PE, smooth interior 6.6 703 Total Subcatchment 1S: POST 5 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=0.670 ac Runoff Volume=0.018 af Runoff Depth=0.31" Flow Length=703' Tc=6.6 min CN=61 0.25 cfs Type II 24-hr 2 YR Rainfall=3.46"POST 5 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.670 ac Runoff Depth=0.55"Subcatchment 1S: POST 5 Flow Length=703' Tc=6.6 min CN=61 Runoff=0.55 cfs 0.031 af Total Runoff Area = 0.670 ac Runoff Volume = 0.031 af Average Runoff Depth = 0.55" 100.00% Pervious Area = 0.670 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"POST 5 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 5 Runoff = 0.55 cfs @ 12.00 hrs, Volume= 0.031 af, Depth= 0.55" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 0.670 61 >75% Grass cover, Good, HSG B 0.670 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 200 0.3300 0.62 Sheet Flow, 90' SHEET Grass: Short n= 0.150 P2= 3.46" 1.3 503 0.0200 6.42 5.04 Circular Channel (pipe), 503' PIPE Diam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 Corrugated PE, smooth interior 6.6 703 Total Subcatchment 1S: POST 5 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=0.670 ac Runoff Volume=0.031 af Runoff Depth=0.55" Flow Length=703' Tc=6.6 min CN=61 0.55 cfs Type II 24-hr 10 YR Rainfall=4.96"POST 5 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.670 ac Runoff Depth=1.35"Subcatchment 1S: POST 5 Flow Length=703' Tc=6.6 min CN=61 Runoff=1.53 cfs 0.075 af Total Runoff Area = 0.670 ac Runoff Volume = 0.075 af Average Runoff Depth = 1.35" 100.00% Pervious Area = 0.670 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"POST 5 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 5 Runoff = 1.53 cfs @ 11.99 hrs, Volume= 0.075 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 0.670 61 >75% Grass cover, Good, HSG B 0.670 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 200 0.3300 0.62 Sheet Flow, 90' SHEET Grass: Short n= 0.150 P2= 3.46" 1.3 503 0.0200 6.42 5.04 Circular Channel (pipe), 503' PIPE Diam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 Corrugated PE, smooth interior 6.6 703 Total Subcatchment 1S: POST 5 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=0.670 ac Runoff Volume=0.075 af Runoff Depth=1.35" Flow Length=703' Tc=6.6 min CN=61 1.53 cfs Type II 24-hr 100 YR Rainfall=7.26"POST 5 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.670 ac Runoff Depth=2.89"Subcatchment 1S: POST 5 Flow Length=703' Tc=6.6 min CN=61 Runoff=3.39 cfs 0.161 af Total Runoff Area = 0.670 ac Runoff Volume = 0.161 af Average Runoff Depth = 2.89" 100.00% Pervious Area = 0.670 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"POST 5 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 5 Runoff = 3.39 cfs @ 11.98 hrs, Volume= 0.161 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 0.670 61 >75% Grass cover, Good, HSG B 0.670 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.3 200 0.3300 0.62 Sheet Flow, 90' SHEET Grass: Short n= 0.150 P2= 3.46" 1.3 503 0.0200 6.42 5.04 Circular Channel (pipe), 503' PIPE Diam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25' n= 0.013 Corrugated PE, smooth interior 6.6 703 Total Subcatchment 1S: POST 5 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=0.670 ac Runoff Volume=0.161 af Runoff Depth=2.89" Flow Length=703' Tc=6.6 min CN=61 3.39 cfs 1S PRE 6 Drainage Diagram for PRE 6 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link PRE 6 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 0.960 61 >75% Grass cover, Good, HSG B (1S) 0.960 Type II 24-hr 1 YR Rainfall=2.86"PRE 6 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.960 ac Runoff Depth=0.31"Subcatchment 1S: PRE 6 Flow Length=270' Tc=6.0 min CN=61 Runoff=0.37 cfs 0.025 af Total Runoff Area = 0.960 ac Runoff Volume = 0.025 af Average Runoff Depth = 0.31" 100.00% Pervious Area = 0.960 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"PRE 6 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 6 Runoff = 0.37 cfs @ 12.00 hrs, Volume= 0.025 af, Depth= 0.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 0.960 61 >75% Grass cover, Good, HSG B 0.960 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 108 0.1800 0.43 Sheet Flow, 108' SHEET Grass: Short n= 0.150 P2= 3.46" 1.8 162 0.0100 1.50 Shallow Concentrated Flow, 162' SHALLOW Grassed Waterway Kv= 15.0 fps 6.0 270 Total Subcatchment 1S: PRE 6 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=0.960 ac Runoff Volume=0.025 af Runoff Depth=0.31" Flow Length=270' Tc=6.0 min CN=61 0.37 cfs Type II 24-hr 2 YR Rainfall=3.46"PRE 6 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.960 ac Runoff Depth=0.55"Subcatchment 1S: PRE 6 Flow Length=270' Tc=6.0 min CN=61 Runoff=0.81 cfs 0.044 af Total Runoff Area = 0.960 ac Runoff Volume = 0.044 af Average Runoff Depth = 0.55" 100.00% Pervious Area = 0.960 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"PRE 6 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 6 Runoff = 0.81 cfs @ 11.99 hrs, Volume= 0.044 af, Depth= 0.55" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 0.960 61 >75% Grass cover, Good, HSG B 0.960 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 108 0.1800 0.43 Sheet Flow, 108' SHEET Grass: Short n= 0.150 P2= 3.46" 1.8 162 0.0100 1.50 Shallow Concentrated Flow, 162' SHALLOW Grassed Waterway Kv= 15.0 fps 6.0 270 Total Subcatchment 1S: PRE 6 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.9 0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=0.960 ac Runoff Volume=0.044 af Runoff Depth=0.55" Flow Length=270' Tc=6.0 min CN=61 0.81 cfs Type II 24-hr 10 YR Rainfall=4.96"PRE 6 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.960 ac Runoff Depth=1.35"Subcatchment 1S: PRE 6 Flow Length=270' Tc=6.0 min CN=61 Runoff=2.25 cfs 0.108 af Total Runoff Area = 0.960 ac Runoff Volume = 0.108 af Average Runoff Depth = 1.35" 100.00% Pervious Area = 0.960 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"PRE 6 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 6 Runoff = 2.25 cfs @ 11.98 hrs, Volume= 0.108 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 0.960 61 >75% Grass cover, Good, HSG B 0.960 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 108 0.1800 0.43 Sheet Flow, 108' SHEET Grass: Short n= 0.150 P2= 3.46" 1.8 162 0.0100 1.50 Shallow Concentrated Flow, 162' SHALLOW Grassed Waterway Kv= 15.0 fps 6.0 270 Total Subcatchment 1S: PRE 6 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=0.960 ac Runoff Volume=0.108 af Runoff Depth=1.35" Flow Length=270' Tc=6.0 min CN=61 2.25 cfs Type II 24-hr 100 YR Rainfall=7.26"PRE 6 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.960 ac Runoff Depth=2.89"Subcatchment 1S: PRE 6 Flow Length=270' Tc=6.0 min CN=61 Runoff=4.97 cfs 0.231 af Total Runoff Area = 0.960 ac Runoff Volume = 0.231 af Average Runoff Depth = 2.89" 100.00% Pervious Area = 0.960 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"PRE 6 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: PRE 6 Runoff = 4.97 cfs @ 11.98 hrs, Volume= 0.231 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 0.960 61 >75% Grass cover, Good, HSG B 0.960 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 108 0.1800 0.43 Sheet Flow, 108' SHEET Grass: Short n= 0.150 P2= 3.46" 1.8 162 0.0100 1.50 Shallow Concentrated Flow, 162' SHALLOW Grassed Waterway Kv= 15.0 fps 6.0 270 Total Subcatchment 1S: PRE 6 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)5 4 3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=0.960 ac Runoff Volume=0.231 af Runoff Depth=2.89" Flow Length=270' Tc=6.0 min CN=61 4.97 cfs 1S POST 6 Drainage Diagram for POST 6 Prepared by {enter your company name here} 4/18/2018 HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcat Reach Pond Link POST 6 Page 2Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres)CN Description (subcats) 0.940 61 >75% Grass cover, Good, HSG B (1S) 0.940 Type II 24-hr 1 YR Rainfall=2.86"POST 6 Page 3Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.940 ac Runoff Depth=0.31"Subcatchment 1S: POST 6 Flow Length=270' Tc=6.0 min CN=61 Runoff=0.36 cfs 0.025 af Total Runoff Area = 0.940 ac Runoff Volume = 0.025 af Average Runoff Depth = 0.31" 100.00% Pervious Area = 0.940 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 1 YR Rainfall=2.86"POST 6 Page 4Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 6 Runoff = 0.36 cfs @ 12.00 hrs, Volume= 0.025 af, Depth= 0.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 1 YR Rainfall=2.86" Area (ac) CN Description 0.940 61 >75% Grass cover, Good, HSG B 0.940 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 108 0.1800 0.43 Sheet Flow, 108' SHEET Grass: Short n= 0.150 P2= 3.46" 1.8 162 0.0100 1.50 Shallow Concentrated Flow, 162' SHALLOW Grassed Waterway Kv= 15.0 fps 6.0 270 Total Subcatchment 1S: POST 6 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 0 Type II 24-hr 1 YR Rainfall=2.86" Runoff Area=0.940 ac Runoff Volume=0.025 af Runoff Depth=0.31" Flow Length=270' Tc=6.0 min CN=61 0.36 cfs Type II 24-hr 2 YR Rainfall=3.46"POST 6 Page 5Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.940 ac Runoff Depth=0.55"Subcatchment 1S: POST 6 Flow Length=270' Tc=6.0 min CN=61 Runoff=0.79 cfs 0.043 af Total Runoff Area = 0.940 ac Runoff Volume = 0.043 af Average Runoff Depth = 0.55" 100.00% Pervious Area = 0.940 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 2 YR Rainfall=3.46"POST 6 Page 6Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 6 Runoff = 0.79 cfs @ 11.99 hrs, Volume= 0.043 af, Depth= 0.55" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 2 YR Rainfall=3.46" Area (ac) CN Description 0.940 61 >75% Grass cover, Good, HSG B 0.940 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 108 0.1800 0.43 Sheet Flow, 108' SHEET Grass: Short n= 0.150 P2= 3.46" 1.8 162 0.0100 1.50 Shallow Concentrated Flow, 162' SHALLOW Grassed Waterway Kv= 15.0 fps 6.0 270 Total Subcatchment 1S: POST 6 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)0.85 0.8 0.75 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 Type II 24-hr 2 YR Rainfall=3.46" Runoff Area=0.940 ac Runoff Volume=0.043 af Runoff Depth=0.55" Flow Length=270' Tc=6.0 min CN=61 0.79 cfs Type II 24-hr 10 YR Rainfall=4.96"POST 6 Page 7Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.940 ac Runoff Depth=1.35"Subcatchment 1S: POST 6 Flow Length=270' Tc=6.0 min CN=61 Runoff=2.20 cfs 0.105 af Total Runoff Area = 0.940 ac Runoff Volume = 0.105 af Average Runoff Depth = 1.35" 100.00% Pervious Area = 0.940 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 10 YR Rainfall=4.96"POST 6 Page 8Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 6 Runoff = 2.20 cfs @ 11.98 hrs, Volume= 0.105 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 10 YR Rainfall=4.96" Area (ac) CN Description 0.940 61 >75% Grass cover, Good, HSG B 0.940 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 108 0.1800 0.43 Sheet Flow, 108' SHEET Grass: Short n= 0.150 P2= 3.46" 1.8 162 0.0100 1.50 Shallow Concentrated Flow, 162' SHALLOW Grassed Waterway Kv= 15.0 fps 6.0 270 Total Subcatchment 1S: POST 6 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)2 1 0 Type II 24-hr 10 YR Rainfall=4.96" Runoff Area=0.940 ac Runoff Volume=0.105 af Runoff Depth=1.35" Flow Length=270' Tc=6.0 min CN=61 2.20 cfs Type II 24-hr 100 YR Rainfall=7.26"POST 6 Page 9Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.01 hrs, 4801 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=0.940 ac Runoff Depth=2.89"Subcatchment 1S: POST 6 Flow Length=270' Tc=6.0 min CN=61 Runoff=4.87 cfs 0.226 af Total Runoff Area = 0.940 ac Runoff Volume = 0.226 af Average Runoff Depth = 2.89" 100.00% Pervious Area = 0.940 ac 0.00% Impervious Area = 0.000 ac Type II 24-hr 100 YR Rainfall=7.26"POST 6 Page 10Prepared by {enter your company name here} 4/18/2018HydroCAD® 8.00 s/n 004988 © 2006 HydroCAD Software Solutions LLC Subcatchment 1S: POST 6 Runoff = 4.87 cfs @ 11.98 hrs, Volume= 0.226 af, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.01 hrs Type II 24-hr 100 YR Rainfall=7.26" Area (ac) CN Description 0.940 61 >75% Grass cover, Good, HSG B 0.940 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 108 0.1800 0.43 Sheet Flow, 108' SHEET Grass: Short n= 0.150 P2= 3.46" 1.8 162 0.0100 1.50 Shallow Concentrated Flow, 162' SHALLOW Grassed Waterway Kv= 15.0 fps 6.0 270 Total Subcatchment 1S: POST 6 Runoff Hydrograph Time (hours) 484644424038363432302826242220181614121086420Flow (cfs)5 4 3 2 1 0 Type II 24-hr 100 YR Rainfall=7.26" Runoff Area=0.940 ac Runoff Volume=0.226 af Runoff Depth=2.89" Flow Length=270' Tc=6.0 min CN=61 4.87 cfs Appendix E Soil Map Soil Map—Alamance County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/23/2018 Page 1 of 33995640399569039957403995790399584039958903995640399569039957403995790399584039958903995940651450651500651550651600651650651700651750651800651850651900 651450 651500 651550 651600 651650 651700 651750 651800 651850 651900 36° 5' 46'' N 79° 19' 4'' W36° 5' 46'' N79° 18' 44'' W36° 5' 36'' N 79° 19' 4'' W36° 5' 36'' N 79° 18' 44'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 100 200 400 600 Feet 0 30 60 120 180 Meters Map Scale: 1:2,190 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Alamance County, North Carolina Survey Area Data: Version 14, Oct 2, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 4, 2014—Feb 8, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Alamance County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/23/2018 Page 2 of 3 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CnB2 Cullen clay loam, 2 to 6 percent slopes, moderately eroded 9.7 58.5% CnC2 Cullen clay loam, 6 to 10 percent slopes, moderately eroded 2.3 13.8% CnD2 Cullen clay loam, 10 to 15 percent slopes, moderately eroded 0.1 0.4% CuB2 Cullen-Urban land complex, 2 to 6 percent slopes, moderately eroded 2.8 16.7% EnB Enon sandy loam, 2 to 6 percent slopes 0.8 4.8% W Water 0.9 5.7% Totals for Area of Interest 16.5 100.0% Soil Map—Alamance County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/23/2018 Page 3 of 3 Soil Map—Alamance County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/18/2018 Page 1 of 339955603995610399566039957103995760399581039958603995560399561039956603995710399576039958103995860651870651920651970652020652070652120652170652220652270652320652370 651870 651920 651970 652020 652070 652120 652170 652220 652270 652320 652370 36° 5' 44'' N 79° 18' 47'' W36° 5' 44'' N79° 18' 26'' W36° 5' 33'' N 79° 18' 47'' W36° 5' 33'' N 79° 18' 26'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 0 100 200 400 600 Feet 0 35 70 140 210 Meters Map Scale: 1:2,460 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:12,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Alamance County, North Carolina Survey Area Data: Version 14, Oct 2, 2017 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 4, 2014—Feb 8, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Alamance County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/18/2018 Page 2 of 3 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CnD2 Cullen clay loam, 10 to 15 percent slopes, moderately eroded 0.0 0.0% EnB Enon sandy loam, 2 to 6 percent slopes 5.4 89.2% EnC Enon sandy loam, 6 to 10 percent slopes 0.7 10.8% Totals for Area of Interest 6.0 100.0% Soil Map—Alamance County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/18/2018 Page 3 of 3 Appendix F NC DEQ Storm-EZ Form Type of application: Initials 1 2 3 4 Only complete application packages will be accepted and reviewed. A complete package includes all of the items in the checklist below. Add any comments, and indicate the page or plan sheet number where the following information can be found. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Item 5 c. Dimensioned property/project boundary with bearings & distances. Two sets of sealed, signed, & dated full-sized plans of the entire site at a readable scale, including: Part I: Submittal Checklist Application New Permit Notes / Comments Original and one copy of this application form (all worksheets) and the permit application fee. For applications submitted to the DEMLR regular permitting program, the fee is $505 payable to NCDENR. For Express Review, click on the link below for information and fee schedule. Contact the appropriate regional office Express Review Coordinator to schedule the required pre-application meeting. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to and is within 1/2 mile of SA waters, then include the 1/2 mile radius on the map. Brooks Distribution Center Mebane, NC ALAMANCE County A copy of the most current property deed. Two copies of additional calculations (as needed). Sealed, signed and dated. Click here for Express Permitting info d. The boundaries of all surface waters, regulatory flood zones, and protected b. Location map with street names and SR numbers, legend, north arrow, scale. a. Project name, engineer and firm, revision number and dates. 6 i. Drainage area boundaries (included in the main set of plans, not as a separate document). j. Existing and proposed maintenance access routes, utility easements, drainage easements, public rights-of-way etc. f. Site layout showing all built-upon areas, drainage features, stormwater collection systems (inlets, outlets, swales, pipe elevations, slopes and diameters), and SCMs at ultimate build-out. g. Existing contours, proposed contours, spot elevations, and finished floor elevations. h. Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations. c. A table of elevations, incremental volumes and accumulated volumes (if applicable). a. Dimensions, side slopes, length to width ratios and elevations with a benchmark for clean-out if appropriate. b. All applicable conveyance devices, including: bypass structure, pretreatment area, flow distribution device, underdrains, outlet device, outlet dissipater and level spreader. Two sets of sealed, signed, & dated full-sized plan details of each SCM (or typical if appropriate) in both plan view and cross-section at a scale of 1" = 30' or larger, including: k. A construction sequence that shows how the SCMs will be protected from sediment until the entire drainage area is stabilized. d. Specifications for applicable materials, such as planting media, aggregate, sod, underdrains, outlet devices, etc. riparian buffers or a note on the plans that none exist. e. The boundaries of all vegetated or protected riparian buffers. STORM-EZ Version 1.4 Application 4/18/2018 Page 1 of 13 8 9 10 11 12 d. A one-time fertilizer specification to establish plants if necessary. A copy of the proposed deed restrictions protecting the SCMs and limiting the built-upon area so that it does not exceed the capacity of the SCM(s) or the high density threshold (as applicable). Two sealed, signed, & dated planting plans for each SCM (or typical) at a scale of 1" = 20' or larger, as applicable, including: a. The locations of each species and a planting detail. b. A table summarizing the size, spacing and total quantity of each plant species that should be used. A copy of the lease agreement or pending sales agreement if applicable. NC Dept. of the Secretary of State A soils report based on field evaluation indicating the SHWT elevations within the footprints of the proposed SCM(s). Provide a map of the boring locations with the existing elevations and boring logs. For infiltration SCMs, the report shall include the soil type, infiltration rate and method for determining the infiltration rate. Soils information shall be signed and sealed by a licensed soil scientist. A copy of the signed and notarized operation and maintenance (O & M) agreement. 7 For corporations and limited liability corporations (LLC): Documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in the Contact Information section. The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. NCDENR Deed Restriction Forms c. The source nursery for the plants. STORM-EZ Version 1.4 Application 4/18/2018 Page 2 of 13 STORM-EZ Version 1.4 Application 4/18/2018 Page 2 of 13 Date: Lat: Zip:Long: County: Project Applicant: Owner / Signing Offical's Name: Title: Address: City: State: Zip: Phone: Fax: Email: Status of applicant: River Basin: Receiving Stream(s): Stream Class(es): Surface Water Area (ac):Coastal wetland area (ac): Total property area (ac):Total project area (ac): Goals/characteristics:NO Volume Matching (LID) NO Drains to an offsite stormwater system NO Low Density NO Within 575' of Saltwater ORW NO High Density NO Within 5 miles of a public airport Briefly summarize how the stormwater runoff will be treated: Part II: General Project and Applicant Information Mebane Project Street Address: Part III: Permit Information 10.97 -79.315212 Brooks Directions to Project: Brooks Distribution Center 36.094728 25.22 Lower Back Creek - Haw River Brooks NON-COASTAL City: Cape Fear (from nearest intersection) (Identify the corporation, organization, property owner, designated government official, etc. which owns the project .) 27302 Owner Project Name:18-Apr-18 ALAMANCE 2267 US-70 STORM-EZ Version 1.4 Application 4/18/2018 Page 3 of 13 Status of construction: Other permits needed: YES Sedimentation & erosion control 404 Permit / 401 Certification CAMA Major Permit Isolated Wetlands Permit Threatened & Endangered Species NPDES Industrial Stormwater Permit If an application for this project has been previously returned, provide the original project number and previous name of the project: Provide the permit type, number and issue date for any permits that have already been obtained for this project: If claiming vested rights, then identify (and attach) the supporting documents and approval dates: Approval of a site-specific development plan or PUD Approval date: Valid building permit Issue date: Other Date: Not Started Point of Contact:Phone number: Part III: Permit Information Not Started STORM-EZ Version 1.4 Application 4/18/2018 Page 3 of 13 Signing Official & Title: Street address: Signature: _____________________________________________________________ Date: ____________________________________ I N t P bli f th St t f on this permit applicant form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictusion and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable state stormwater rules and requirements. Phone number(s): I, (the Owner & Applicant listed above), Part VI: Property Owner / Applicant Certification , certify that the information included Firm: City, State, Zip: Email: Phone number(s): Consultant: (Note: Person/Organization noted above may be contacted for additional project information if applicant cannot be reached.) City, State, Zip: Email: (Optional) Additional Contact Person / Orginization: Part V: Consultant Information Street address: Complete this section if you wish to designate authority to another individual or firm so that they may provide information on your behalf for this project (such as addressing requests for additional information). Part IV: Additional Contact Information STORM-EZ Version 1.4 Application 4/18/2018 Page 4 of 13 I, ___________________________________________, a Notary Public for the State of ___________________________________ County of ______________________________, do hearby certify that __________________________________________________ personally appeared before me this _____ day of ____________________________, ______________, and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, _____________________________________________. My commission expires ______________________________________________________________ Seal STORM-EZ Version 1.4 Application 4/18/2018 Page 4 of 13 1.00 1.24 1.70 2.85 3.44 4.95 5.85 6.55 7.27 Highlighted Storm is Design Storm 25.22 acres 6.09 acres 0.00 acres 56% 1.04 acres Complete the breakdown of impervious area for the project No NOTE: Please use the Storm-EZ calculation sheets to document the stormwater design and create the O&M Agreement. Discrete SCS Method, Pre - PostCalculation Method Entire Site Stream Class Receiving Stream name Basin Information Lower Back Creek WS-V, NSW Use Worksheet Data? Total Property Area Total Coastal Wetlands Area Total Surface Water Area Depth (inches) P90 First Flush / WQV P90 P95 50-yr, 24-hr Design Storm: Burlington 1-yr, 24-hr Brooks Distribution Center Mebane, NC ALAMANCE County Cape Fear River Basin RAINFALL & CALCULATION DATA Rainfall Source: Project County: Project City: ALAMANCE Mebane Burlington 100-yr, 24-hr PROJECT INFORMATION Total Impervious Area Project % impervious area ALL AREAS ARE IN SQUARE FEET 2-yr, 24-hr Storm Event 10-yr, 24-hr 25-yr, 24-hr(Minimum Design Storm = P90 for non-SA, 1-yr, 24-hr for SA) Loaded Rainfall: Impervious Surface Area Offsite Drainage Area (sf) Stream Index Number Future (sf) Off-site (sf) Existing BUA (sf) 265,360Total Other On-Site (sf) 15,360 0 On-Site Parking (sf) On-Site Sidewalks (sf) On-Site Buildings/Lots (sf) On-Site Streets (sf) 250,000 Proposed Impervious Area (sf) % Impervious Area (total) 0 265,360 56% Total Drainage Area On-Site Drainage Area (sf) 16-18-(6) 478,049 478,049 , Entire Site STORM-EZ Version 1.4 Project Data 4/18/2018 Page 5 of 13 1 of 1 Pre-Development Land Use: HSG CN % B 61 71.50% B 55 28.50% Note: Enter BUA Draining to Permeable Pavement Below HSG 0.00 0.00% 10.97 0.00% Existing Permeable Pavement (Infiltration): Pavement Area Additional BUA Soil Infiltratio n Rate Gravel Void Space Total Gravel Depth Orifice Dia. Orifice Height (sf)(sf) (in/hr) (%) (in) (in) (in) 100 DSD PAW Dgr (in) (%)(in)(sf) (acres) 150 1.24 0.00 10.97 acres 0.00 acres 000 acres D.S. BMP Has Synthetic Liner? Permeable Pavement + Additional BUA: Green Roofs : 0 Existing Green Roofs: HSG SCM # Area DS SCM # 0 Description Land Use Summary: Description Notes 477,853 10.97 % Imp Area (sf.) Area (ac.)Area (sf.) Subtotal: User Defined Drainage Areas:Comp. CNDescription Area 7.84Pasture or Open Space 341,676 136,177 Mebane, NC ALAMANCE County Cape Fear River Basin PRE-DEVELOPMENT LAND USE CALCULATIONS Drainage Area # (sf)Land-use (acres) 3.13Woods Brooks Distribution Center Subtotal: SCM # From Land Use Tables: 477,853 BUA % 477,853 0.00 acres 0.00 acres 0.00 acres 10.97 acres Pre-Development SCMs: Imp. Open (sf) (sf) (cf) HSG 0 477853 200 Rainfall Volume =13.60 cf Natural Infiltration & ET =-13.60 cf Disconnected Impervious Surfaces =0.00 cf SCM Infiltration =0.00 cf Permeable Pavement Infiltration =0.00 cf Green Roof ET =0.00 cf Post Filtration Discharge =0.00 cf Total Runoff Reduction =-13.60 cf Treated SCM Outflow =0.00 cf Untreated Surface Runoff =0.00 cf SCM Type Green Roofs :0 Downstream SCM Total Site Area: Preserved Coastal Wetlands : Drainage Area WQ Volume Provided 477,853 acre-inches = Design Storm Runoff Fate Summary: Runoff Reduction Components: acre-inches = 49,378acre-inches = SCM # Preserved Surface Waters & Non-Coastal Wetlands : acre-inches = acre-inches = acre-inches = acre-inches = acre-inches = acre-inches = SCM Treatment: acre-inches =0 The Pre-Development project area contains 0 sf of built upon area, resulting in an overall density of 0%. 0 0 0 -49,378 -49,378 0 0 0 STORM-EZ Version 1.4 Pre-Development 4/18/2018 Page 6 of 13 1 of 1 Permeable Pavement: Infiltration Rate Void Space Total Gravel Depth Orifice Dia. Orifice Height (sf) (acres) (sf) (acres) (in/hr) (%) (in) (in) (in) 500 0.00 0.00 DSD PAW Dgr (in) (%) (in)(sf)(acres) 600 1.24 0.00 No Residential Lot CN Calculator (Excluding R/W and dedicated open spaces): Max Imp / Lot Woods / Lot (ac.)(sf)(sf) 0.00 Remaining Land Use: HSG CN (sf) (acres) % B 98.0 265,360 6.09 55.53% B 61.0 147,029 3.38 30.77% B 61.0 65,464 1.50 13.70% N/A 0 0.00 0.00% N/A 0 0.00 0.00% 477,853 10.97 100.00% Land Excluded, or Partially Excluded, from Volume Calculations:(sf.) (ac.) 00.00 00.00 477,853 10.97 Rainfall Volume =13.60 cf Natural Infiltration & ET =-7.36 cf Disconnected Impervious Surfaces =0.00 cf SCM Infiltration =0.00 cf Area Open Space / Lot (sf) 49,378 acre-inches = 0 acre-inches = -26,717 acre-inches = Area Runoff Reduction Components: Design Storm Runoff Fate Summary: Brooks Distribution Center Mebane, NC ALAMANCE County Cape Fear River Basin Detention Check Has Synthetic Liner? Infiltration Check POST-DEVELOPMENT LAND USE CALCULATIONS Pvmt Type SCM # 0 acre-inches = Total Site Area: Surface Waters & Non-Coastal Wetlands : Green Roofs : Coastal Wetlands : Open Space (Managed Open Space) Lot Area Impervious Green Roofs: # of Lots Land-Use Open Space (Managed Open Space) Permeable Pavement + BUA: Sub-Total: HSG Avg Lot Size Pavement Area % Imp.(sf.) Down- stream SCM Additional BUA SCM # Downstream SCM # Drainage Area # Retrofit?Comments Permeable Pavement Infiltration =0.00 cf Green Roof ET =0.00 cf Post Filtration Discharge =0.00 cf Total Runoff Reduction =-7.36 cf acre-inches = 0 acre-inches = acre-inches = acre-inches = 0 0 -26,717 STORM-EZ Version 1.4 Post Development 4/18/2018 Page 7 of 13 1 of 1 Brooks Distribution Center Mebane, NC ALAMANCE County Cape Fear River Basin POST-DEVELOPMENT LAND USE CALCULATIONS Drainage Area # Treated SCM Outflow =-6.24 cf Untreated Surface Runoff =0.00 cf Pre-Development Runoff =0.00 cf Difference =0.00 cfacre-inches =0 acre-inches =0 The Post-Development project area contains 265360 sf of built upon area, resulting in an overall density of 55.53%. acre-inches = acre-inches =-22,661 SCM Treatment: 0 STORM-EZ Version 1.4 Post Development 4/18/2018 Page 8 of 13 1 of 1 Impervious (sf) 265,360 (cf) (cf) (cf) (cf) (cf) (cf) 700 CONTECH® Stormfilter B 265,360 100% 26%55000 22661 22661 0 0 22661 41% Rainfall Volume =13.60 acre-inches =cf Natural Infiltration & ET =-7.36 acre-inches =cf Disconnected Impervious Area =0.00 acre-inches =cf SCM Infiltration =0.00 acre-inches =cf Permeable Pavement Infiltration =0.00 acre-inches =cf Green Roof ET =0.00 acre-inches =cf Post Filtration Discharge =0.00 acre-inches =cf Total Runoff Reduction =-7.36 acre-inches =cf SCM Treatment: Treated SCM Outflow =-6.24 acre-inches =cf Untreated Surface Runoff =0.00 acre-inches =cf 0.00 acre-inches =cf 0.00 acre-inches =cf Down- stream SCM # Drainage Area Inflow Volume 0 -26,717 0 0 49,378 Pre-Development Runoff = -22,661 0 100% of total impervious area. 26% of total pervious area. Runoff Reduction Components: -26,717 265360 sf impervious area entered compared to 265360 sf total impervious. 0 Design Storm Runoff Fate Summary: The Post-Development project area contains 265360 sf of built upon area, resulting in an overall density of 55.53%. 0 0 **BASIC TREATMENT MET** Difference = 0 cf of runoff generated by pervious areas. Net untreated runoff = 0 cf. Net 100% of impervious area routed through SCMs. 0 55019 sf open space entered compared to 212493 sf total open space. Pervious (sf) 212,493 Brooks Distribution Center Mebane, NC ALAMANCE County Cape Fear River Basin Enter only runoff volume below that will be infiltrated or drawn down over 2 to 5 days. Additional volume provided in devices should not be entered in this worksheet. Drawdown time requirement applies to all storm events. Drainage Area # PROPOSED SIPs & STRUCTURAL RUNOFF VOLUME CONTROLS Offsite Impervious Area Treated Infiltration & ET 0 sf Total Inflow Volume 55,019 % of Total Impervious Area % of Total Pervious Area Storage Volume Name / Location Contributing Area HSG STORMWATER CONTROL MEASURES % of SCM Volume Utilized Post Filtration Outflow Treated Outflow Type of Device SCM # Warnings: ppj p , g y Note: Large storage devices such as wet/dry detention ponds, constructed wetlands, or infiltration basins may require pond routing calculations. The routing calculations should be provided in addition to this spreadsheet. STORM-EZ Version 1.4 Stormwater Controls 4/18/2018 Page 9 of 13 1 of 1 P90 Storm - Rainfall Depth = 1.24 inches Mebane, NC ALAMANCE County Cape Fear River Basin P90 Brooks Distribution Center Compliance Storm = P90 Storm - Rainfall Depth = 1.24 inches Drainage Area # FATE OF RAINFALL Select Storm: VOLUME MATCHING SCALE Volume Matching Threshold Basic Treatment Threshold BASIC TREATMENT SCALE 30% 40% 50% 60% 70% 80% 90% 100%% of Total Rainfall VolumePost Development Fates 30% 40% 50% 60% 70% 80% 90% 100%% of Total Rainfall VolumePre Development Fates FATE OF RAINFALL GRAPHS The"Fate of Rainfall" charts display the hydrologic processes to which rainfall volumes are subjected based on the combinations of land use, soil type, and stormwater controls entered by the user. The charts are designed to display the stormwater plan in a form which illustrates changes to the hydrologic cycle which result from urbanization and various stormwater management strategies. 0% 10% 20% 30% Infiltration and ET ‐ 26717 cf Treated Outflow from BMPs ‐ 22661 cf Untreated Surface Runoff ‐ 0 cf Post Filtration Outflow ‐ 0 cf Other Infiltration by BMPs ‐ 0 cf Permeable Pavement Infiltration ‐ 0 cf Disconnected Impervious Infiltration ‐ 0 cf Green Roof Evapotranspiration ‐ 0 cf 0% 10% 20% 30% Infiltration and ET ‐ 49378 cf Treated Outflow from BMPs ‐ 0 cf Untreated Surface Runoff ‐ 0 cf Post Filtration Outflow ‐ 0 cf Other Infiltration by BMPs ‐ 0 cf Permeable Pavement Infiltration ‐ 0 cf Disconnected Impervious Infiltration ‐ 0 cf Green Roof Evapotranspiration ‐ 0 cf Infiltration and ET ‐ 49378 cf STORM-EZ Version 1.4 Rainfall Fate Graph 4/18/2018 Page 10 of 13 1 of 1 TIME OF CONCENTRATION CALCULATIONS: Pre-Development Length (ft) Slope (ft/ft)Tt (hrs) Length (ft) Slope (ft/ft) n-value Flow Area (ft2)Tt (hrs) Channel Flow: Channel Flow: Pre-development Tc =5.00 min (Minimum 5 minutes) Post Development Length (ft) Slope (ft/ft)Tt (hrs) Length (ft) Slope (ft/ft) n-value Flow Area (ft2)Tt (hrs) Channel Flow: Channel Flow: Post-development T =500 min (Minimum 5 minutes) Cape Fear River Basin ADDITIONAL CALCULATIONS Brooks Distribution Center Mebane, NC ALAMANCE County Shallow Flow: Drainage Area # Surface Cover Wetted Perimeter (ft) Sheet Flow: Surface Cover Wetted Perimeter (ft) Sheet Flow: Shallow Flow: Sheet Flow: Shallow Flow: Sheet Flow: Shallow Flow: Post-development Tc =5.00 min (Minimum 5 minutes) ADJUSTED CURVE NUMBER CALCULATIONS: Pre-Development F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rainfall (in) = 1.00 1.24 1.70 2.85 3.44 4.95 5.85 6.55 7.27 Q*(in) =0.00 0.00 0.01 0.26 0.48 1.23 1.77 2.23 2.73 CNadj =67 62 59 59 59 59 59 59 59 Post Development F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rainfall (in) = 1.00 1.24 1.70 2.85 3.44 4.95 5.85 6.55 7.27 Q*(in) =0.00 0.00 0.01 0.21 0.64 1.83 2.58 3.18 3.81 CNadj =67 62 58 57 63 68 69 69 70 PEAK FLOW CALCULATIONS: F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Pre-Development Q* (in)0.00 0.00 0.01 0.26 0.48 1.23 1.77 2.23 2.73 qu (csm/in)385.00 385.00 385.00 385.00 666.59 931.69 931.69 931.69 1165.98 Q (cfs) 0.00 0.00 0.10 1.73 5.47 19.57 28.23 35.55 54.47 Post Development Q* (in)0.00 0.00 0.01 0.21 0.64 1.83 2.58 3.18 3.81 qu (csm/in)385.00 385.00 385.00 385.00 809.52 1165.98 1165.98 1165.98 1165.98 Q (cfs) 0.00 0.00 0.06 1.39 8.91 36.61 51.62 63.61 76.18 N/A N/A -40.0% -19.7% 63.0% 87.0% 82.9% 78.9% 39.9% Analysis Area = 10.97 Acres (0.017 sq. miles) **Note: To decrease Post-development peak flows - increase storage volume being drawdown or infiltrated or lengthen post- Analysis Area = 10.97 Acres (0.017 sq. miles) STORM-EZ Version 1.4 Peak Flow Calcs 4/18/2018 Page 11 of 13 development time of concentration. See LID HELP for more information. STORM-EZ Version 1.4 Peak Flow Calcs 4/18/2018 Page 12 of 13 STORM-EZ Version 1.4 Peak Flow Calcs 4/18/2018 Page 12 of 13 The BMP(s) on this project include (check all that apply & corresponding O&M tables will be added automatically): Quantity:Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Quantity: Location(s): Present: No Location(s): Present: No Location(s): Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). Bioretention Cell Dry Detention Basin Cover Page Level Spreader/VFS Grassed Swale Infiltration Basin Infiltration Trench Green Roof Soil Amendments I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Stormwater Wetland Wet Detention Basin Disconnected Impervious Area Permeable Pavement Proprietary System Rainwater Harvesting Sand Filter Operation & Maintenance Agreement Brooks Distribution Center Mebane, NC ALAMANCE County STORM-EZ Version 1.4 O&M Manual 4/18/2018 Page 13 of 13 I,, a Notary Public for the State of County of , do hearby certify that personally appeared before me this day of and acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, _____________________________________________. Seal My commission expires Phone number(s): Email: Signature: Street address: City, state, zip: * Responsible Party: Title & Organization: Date: STORM-EZ Version 1.4 O&M Manual 4/18/2018 Page 13 of 13