Loading...
HomeMy WebLinkAbout20171374 Ver 1_ External RE Stokes Co- Duggins Rd_20180516Wanucha, Dave From: Sent: To: Cc: Subject: Attachments: Stephanie, Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil> Wednesday, May 16, 2018 3:43 PM Wanucha, Dave; Braquet, Stephanie Guy, Jeremy M [External] RE: Stokes Co- Duggins Rd Outlet_riprapjpg In Corps' Nationwide Permits there is a Regional General Condition for Culvert Placement. The requirements for culvert placement states that "for all NWPs that involve the construction/installation of culverts, measures will be included in the construction/installation that will promote the safe passage of fish and other aquatic organisms. The dimension, pattern, and profile of the stream above and below a pipe or culvert should not be modified by altering the width or depth of the stream profile in connection with the construction activity. The width, height, and gradient of a proposed culvert should be sufficient to pass the average historical low flow and spring flow without adversely altering flow velocity." In addition culverts must be buried, to a certain depth depending on size, to maintain aquatic passage and to maintain passage during drought of low flow conditions. The Corps is in agreement with the state (Dave W.) and believes current installation of the culvert and riprap could restrict aquatic passage within the culvert. Therefore, the Corps along with the state recommend that the riprap be placed at the outlet as the plans show. Please provide written confirmation and pictures once the modifications to the culvert is complete. Let me know if you have any other questions. Thanks, Bryan Roden-Reynolds Regulatory Project Manager U.S. Army Corps of Engineers Charlotte Regulatory Office 8430 University Executive Park Drive Charlotte, NC 28262 Office: (704)510-1440 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 -----Original Message----- From: Wanucha, Dave [mailto:dave.wanucha@ncdenr.gov] Sent: Wednesday, May 16, 2018 3:00 PM To: Braquet, Stephanie <scbraquet@ncdot.gov>; Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil> Cc: Guy, Jeremy M <jmguy@ncdot.gov> Subject: [Non-DoD Source] RE: Stokes Co- Duggins Rd Stephanie, I understand from our phone conversation earlier today that DOT believes that the low flow barrel will backfill with channel sediments overtime forming a new channel bottom at the elevation of the sills inside the culvert. DWR agrees that this may occur. However, the issue we have is with the placement of the riprap above the toe of the outlet. The plans do not show riprap higher than the bottom of the pipe. Therefore, we are requesting that the riprap be placed at the outlet as the plans show. Let us know when the repairs are complete. Thanks. Dave W. Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Braquet, Stephanie Sent: Wednesday, May 16, 2018 2:04 PM To: Bryan.Roden-Reynolds@usace.army.mil Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Guy, Jeremy M<jmguy@ncdot.gov> Subject: RE: Stokes Co- Duggins Rd Hey Brian, Dave thinks this stuff may not be clear to you, if you have any questions you can contact me. Thanks Stephanie Braquet Division 9 Environmental Specialist North Carolina Department of Transportation 336 747 7800 office scbraquet@ncdot.gov <mailto:scbraquet@ncdot.gov> 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Braquet, Stephanie Sent: Wednesday, May 16, 2018 11:17 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov <mailto:dave.wanucha@ncdenr.gov> > Cc: Bryan Roden-Reynolds <Bryan.Roden-Reynolds@usace.army.mil <mailto:Bryan.Roden-Reynolds@usace.army.mil> >; Guy, Jeremy M <jmguy@ncdot.gov <mailto:jmguy@ncdot.gov> > Subject: RE: Stokes Co- Duggins Rd Dave, The original pipe was significantly perched so we stepped down with rock to make-up grade and dissipate energy. Also, the rip- rap is higher than the bottom of the pipe but it is not higher than the sill. Stephanie Braquet Division 9 Environmental Specialist North Carolina Department of Transportation 336 747 7800 office scbraquet@ncdot.gov <mailto:scbraquet@ncdot.gov> 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Wanucha, Dave Sent: Wednesday, May 16, 2018 9:59 AM To: Braquet, Stephanie <scbraquet@ncdot.gov <mailto:scbraquet@ncdot.gov> > Cc: Bryan Roden-Reynolds <Bryan.Roden-Reynolds@usace.army.mil <mailto:Bryan.Roden-Reynolds@usace.army.mil> > Subject: RE: Stokes Co- Duggins Rd Stephanie, The attached picture shows rip rap as installed at the low flow outlet. The plans and narrative explain that riprap will be placed at the toe of outlet to dissipate energy at the existing blow hole. However, it appears that the riprap is actually blocking the bottom portion of the outlet, of which will likely prevent aquatic passage. Was there a particular reason for placing rip rap in this manner? Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov <mailto:Dave.Wanucha@ncdenr.gov> NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Braquet, Stephanie Sent: Tuesday, May 15, 2018 8:30 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov <mailto:dave.wanucha@ncdenr.gov> > Subject: Stokes Co- Duggins Rd Attached please find the completion form for Culvert 107 on SR 1696 Duggins Road. If you have any questions, please contact me. Thanks Stephanie Braquet Division 9 Environmental Specialist North Carolina Department of Transportation 336 747 7800 office scbraquet@ncdot.gov <mailto:scbraquet@ncdot.gov> 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.