HomeMy WebLinkAbout20180705 Ver 1_Full Set May9_20180522MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Cover Sheet, Vicinity Map, & Sheet Index 1.0
SHEET INDEX
SHEET DESCRIPTION
1.0 COVER SHEET, VICINITY MAP, AND SHEET INDEX
EXISTING CONDITIONS
DEMOLITION PLAN
EROSION & SEDIMENT CONTROL PLAN
EROSION & SEDIMENT CONTROL PLAN - DETAILS
PRIMARY RISER & OUTLET REPAIR
1.1 NOTES, ABBREVIATIONS, AND LEGEND
HEADCUT / ERODED CHANNEL REPAIR
EMERGENCY SPILLWAY DESIGN
DAM EMBANKMENT REPAIR
DAM EMBANKMENT - CROSS SECTIONS
2.0-2.4
3.0
4.0
4.1
5.0
7.0
8.0
9.0
9.1-9.2
6.0 EXISTING CONCRETE SPILLWAY REPAIR
DETAILS10.0
1.2 SITE LAYOUT
ROADWAY SIGN
FLOW VALVE
PHONE PED.
LIGHT POLE
TREE LINE
POWER POLE
GW GUY WIRE
FENCE AS NOTED
GUARD RAIL
EXISTING CONTOUR WITH ELEVATION
EDGE OF PAVEMENT
EDGE OF CONCRETE
CONCRETE
GUM TREE
PINE TREE
LP
T
PPCPCONTROL POINT
BUILDING OUTLINE
OAK TREE
CEDAR TREE
MISC. TREE
WOOD FENCE
RIP RAP
BOUNDARY LINE
BOUNDARY CORNER
FOUND AS NOTED
TEMPORARY CONSTRUCTION EASEMENT
TEMPORARY SILT FENCE
LIMITS OF DISTURBANCE
TEMPORARY PROTECTION FENCE
LEGEND
PROPOSED CONTOUR WITH ELEVATION170
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Notes, Abbreviations, & Legend 1.1
STANDARD SITE ABBREVIATIONS
DEFINITION OF TERMS:
CONTACT PHONE NUMBERS:
BEFORE YOU DIG!
CONTACT ONE-CALL CENTER
1-800-632-4949 OR 811
GW
GW
GW
GW
GW
GW
GW
GW
X
T T
TT
LP
LP
LP
LP
LP
LP
PP
PP
PP
PP
PP
PP
PP
PPBOUNDARY LINEAPPARENT BOUNDARY OVERLAPPP
PP
PP
GW
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Site Layout 1.2
PPPP
PP
GW
GW
GW
GW
GW
GW
GW
X
T T
TT
LP
LP
LP
LP
LP
LP
PP
PP
PP
PP
GW
TERRY SANFORD DRIVE
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Demolition Plan 3.0
X
OUTLET STRUCTURE
TOP TRASH RACK GRATE=168.30'
TOP EXISTING WOOD BOARD=165.17'
TOP OF CONCRETE=164.17'
IE=155.55' (4)(60" RCP)
BOTTOM=154.62'
INSIDE DIMENSION
7' x14'
INSIDE DIMENSION
7' x14'
60"
RCP
60"
RCP
60"
RCP
60"
RCP
PRIMARY OUTLET STRUCTURE DETAIL
SLIDE GATE DETAIL
TRASH RACK DETAIL
ANCHOR BOLTS DETAIL
PRIMARY OUTLET ACB REPAIRA
5.0SECTION
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Primary Riser & Outlet Repair 5.0
NOTES:
1.DIVERT FLOW TO ONE SIDE OF THE TWO-CHAMBER RISER STRUCTURE TO REPLACE TWO OF
THE GATES AND TRASH RACKS IN THE DRY. DIVERT FLOW TO OTHER SIDE OF STRUCTURE TO
REPLACE REMAINING TWO GATES AND TRASH RACKS IN THE DRY.
2.BARREL PIPES SHALL BE INSPECTED WHILE FLOW IS DIVERTED FOR GATE REPLACEMENT.
CONTRACTOR SHALL COORDINATE WITH ENGINEER TO ALLOW FOR SUCH INSPECTION.
3.ELEVATIONS OF THE GABIONS AND ARTICULATED CONCRETE BLOCK SHALL BE FIELD LOCATED
TO BLEND THE NEW BLOCK WITH THE EXISTING BLOCK, WHERE ADJACENT TO BLOCK, AND
EXISTING GROUND ELEVATION, WHERE ADJACENT NATURAL GROUND, WITH MINIMAL GRADING
OUTSIDE OF PROPOSED STRUCTURES.
EXISTING CONCRETE SPILLWAYSECTION D
6.0
9' x 1' x 9' MATTRESS 9' x 1' x 12' MATTRESS 9' x 1' x 12' MATTRESS 9' x 1' x 12' MATTRESS
3'x1.5'x3'
3
'
x
3
'
x
6
'
3' x 3'
x
9'
3'x1.5'x6'
GABION (TYP)
SECTION E
6.0
3'x1.5'x3'
CONCRETE SPILLWAY REPAIR
6' x 1.5' x 3'
9' x 1' x 12' RENO MATTRESS
CONCRETE SPILLWAY
MATERIAL
UNKNOWN 3' x 1.5' x 6'
EXPANDED SECTION D/6.0 THROUGH GABION REPAIR
GABION
GABION
1.5'2'SPILLWAY GROUTING REPAIR DETAIL1
6.0
6' x 1.5' x 3'
9' x 1' x 12' RENO MATTRESS
CONCRETE SPILLWAY
3' x 1.5' x 6'
GABION
GABION
1.5'VARIES
ALTERNATIVE GABION REPAIR2
6.0
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Existing Concrete Spillway Repair 6.0
TEMPORARY CONSTRUCTI
ON EASE
MENT
SECTION A
7.0 STATION HC/EC 0+27.85
PROFILE - HEADCUT / ERODED CHANNEL
SECTION B
7.0 STATION HC/EC 0+77.68
SECTION C
7.0 STATION HC/EC 1+08.97
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Headcut / Eroded Channel Repair 7.0
PLAN: EMERGENCY SPILLWAY
EMERGENCY SPILLWAY SECTION A
8.0
EMERGENCY SPILLWAY AND LAKE DRAIN
SECTION B
8.0
EMERGENCY SPILLWAY DOWNSTREAM FACE C
8.0
EMERGENCY SPILLWAY DOWNSTREAM CHANNEL D
8.0
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Emergency Spillway and Lake Drain 8.0
EMERGENCY SPILLWAY LAKE DRAIN DETAIL2
8.1
ACB TYPICAL CHANNEL SCHEMATIC1
8.1
2' MIN2' MIN
125'
3
1
3
1 1' MIN1' MIN
LOW FLOW AREA AT LAKE DRAIN3
8.1
SECTION E
8.1 LAKE DRAIN PIPE
NOT TO SCALE
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Emergency Spillway and Lake Drain 8.1
Pipe Inlet Strainer/Trash Guard Detail
Pipe Outlet Varmint Guard Detail
TYPICAL DAM CROSS SECTION
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Dam Embankment Repair 9.0
NOTES:
1.FINAL CREST ELEVATION SHALL BE 169.5 ACROSS THE ENTIRE LENGTH OF THE EMBANKMENT,
WITH THE EXCEPTION OF THE PROPOSED EMERGENCY SPILLWAY AND AREAS WHERE
EXISTING ELEVATION IS GREATER THAN 169.5.
2.RAISING THE CREST ELEVATION WILL EXTEND THE SLOPED FACE ON THE DOWNSTREAM SIDE
OF THE EMBANKMENT FROM STATION 0+00 TO 36+00 AND ON THE UPSTREAM SIDE OF THE
EMBANKMENT FROM STATION 36+00 TO 60+80. SEE CROSS SECTIONS ON SHEETS 9.1 AND 9.2.
3.EXTENDED SLOPES ON THE DOWNSTREAM FACE SHALL BE CONSTRUCTED AT 3:1 SLOPE.
EXTENDED SLOPES ON THE UPSTREAM FACE SHALL BE CONSTRUCTED AT 3:1 SLOPE ABOVE
THE NORMAL POOL ELEVATION OF 165 AND AT 2:1 SLOPE BELOW ELEVATION 165.
4.FILL MATERIAL FOR THE EMBANKMENT REPAIR WILL BE EXCAVATED FROM BORROW AREAS ON
SITE. BORROW AREAS ARE SHOWN ON THE SITE LAYOUT ON SHEET 1.2.
5.FILL MATERIAL USED TO RAISE THE CREST OF THE DAM SHALL CONTAIN 20% OR MORE FINES
PASSING THE #200 SIEVE WITH SOME PLASTICITY. CLEANER SANDS AS WELL AS CLAYEY
SANDS CAN BE USED ON THE EMBANKMENT FACE. CONTRACTOR SHALL COORDINATE WITH
THE GEOTECHNICAL ENGINEER FOR FILL MATERIAL SELECTION.
6.ALL NEW FILL PLACED ON THE EMBANKMENT SHALL BE COMPACETED TO NOT LESS THAN 95%
OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY AT MOISTURE CONTENTS OF OPTIMUM
MOISTURE TO 3% WET OF OPTIMUM.
GW
PPPPPPPPPPPPMAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Dam Embankment Repair - Cross Sections 9.1
GW
GW
GW
GW
GWT TLPLPLPPPPPPPPPPPGW
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Dam Embankment Repair - Cross Sections 9.2
PUBLIC STREET
EXISTING GROUND
50' MIN.18' MIN.6" MIN.TYPE II FILTER FABRIC
UNDER 2"-3" COURSE AGGREGATE
50' MIN.PUBLIC STREETNOTES:
1.A STABILIZED ENTRANCE PAD OF 2"-3" COURSE AGGREGATE SHALL BE LOCATED WHERE TRAFFIC
WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET OR EXISTING
GRAVEL/PAVED SURFACE.
2.FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE
CONSTRUCTION ENTRANCE.
3.THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING
OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP
DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY
MEASURES USED TO TRAP SEDIMENT.
4.ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE
REMOVED IMMEDIATELY.
5.WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A
PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH
CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. NO. 30.11B.
6.NCDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 10.24 & 10.25) TO ACCESS THE
CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE.
CONSTRUCTION ENTRANCE
FILL
SL
O
P
E
FLOW
TEMPORARY SILT FENCE NOTES:
1.FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING.
2.WOVEN FILTER FABRIC TO BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS.
3.STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF-FASTENER ANGLE STEEL TYPE.
4.TURN SILT FENCE UP SLOPE AT ENDS.
5.DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE.
6.SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
7.DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW.
8.INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FENCE.
9.ATTACH THE FABRIC TO EACH POST WITH THREE TIES WITH THE TOP TIE WITHIN 8” OF THE TOP OF THE FABRIC.
10.WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES.
11.CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY,
SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST.
TEMPORARY SILT FENCE MAINTENANCE NOTES:
1.INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY.
2.SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY.
3.REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE.
TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
4.REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING
DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.
WOVEN
FILTER
FABRIC
STEEL POST
8' MAX
2'-0"STEEL POST
WOVEN FILTER FABRIC
30" MIN24" FILTER FABRICANCHOR SKIRT 8" MINIMUM
TEMPORARY SILT FENCE
4'-10"
FINISHED GRADE
WIRE OR ZIP TIES TO SECURE
SAFETY FENCE TO POST
STAKES: 66" T-POST DRIVEN 18"
BELOW GRADE
48" HIGH DENSITY ORANGE
POLYETHYLENE SAFETY FENCE
STAKE SPACING 12' ON
CENTER
TEMPORARY PROTECTION FENCE
NOTES:
1.HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE WORK BEGINS.
2.CLEARING IN THE WETLAND IS PROHIBITED.
3.INSTALL RAMP ACCESS OUTSIDE OF WETLAND AREA. LINE ACCESS RAMP AREA WITH
NON-WOVEN FILTER FABRIC AND CONSTRUCT RAMP WITH CLASS B RIP RAP.
4.INSTALL MUD MATS IN LOCATIONS SPECIFIED IN THE PLAN VIEW.
5.MAINTAIN CROSSING SO THAT RUNOFF FROM THE CONSTRUCTION ROAD DOES NOT ENTER
WETLAND.
6.THE WOOD MAT SHALL BE OF SUFFICIENT SIZE AND WIDTH TO SUPPORT THE LARGEST VEHICLE
CROSSING THE WETLAND.
7.CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT
UTILIZED, RECOMMENDED MAXIMUM 5:1 SLOPE.
8.AFTER CONSTRUCTION IS COMPLETE, REMOVE MUDMATS, ACCESS RAMPS AND SEED WETLAND
ACCORDING TO THE PLANTING PLAN.
TEMPORARY WETLAND CROSSING - MUDMAT
6" MIN WIDTH FOR
2" TREES OR SMALLER
DEAD TREES AND SCRUB OR UNDER
GROWTH SHALL BE CUT FLUSH WITH
ADJACENT GRADE. NO GRUBBING
ALLOWED UNDER DRIP LINE.
2x4" STANDARDS + 1x4" RAILS OR ORANGE
SAFETY FENCING MAY BE USED.
SEE DETAIL 3/10.0.
PLAN VIEW OF ROOT ZONE
FOR PRUNING SEE
NATIONAL ARBORIST
ASSOCIATION SPECS.
TREE LIMB
REMOVAL
1. REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT.
2. SEE PLANS FOR LOCATION OF ALL TREE PROTECTION FENCES.
NOTES
TREE PRUNING
3'-0"
3'-0"
6" BARK MULCH,
PLACE BARK MULCH
AT AREAS NOT PROTECTED
BY BARRIER
TREE PROTECTION
INSTALLATION
1.LIFTING STRAPS SHALL BE PLACED UNDER
THE FILTER BAG TO FACILITATE REMOVAL
AFTER USE.
2.PLACE FILTER BAG ON A LEVEL STABILIZED
AREA OVER GRAVEL.
3.INSERT DISCHARGE HOSE FROM PUMP
INTO FILTER BAG A MINIMUM OF SIX INCHES
(6") AND TIGHTLY SECURE WITH STRAP TO
PREVENT WATER FROM FLOWING OUT OF
THE BAG WITHOUT BEING FILTERED.
4.REPLACE THE UNIT WHEN ONE HALF (1
2)
FULL OF SEDIMENT OR WHEN SEDIMENT
HAS REDUCED THE FLOW RATE OF THE
PUMP DISCHARGE TO AN IMPRACTICAL
RATE.
5.MATERIAL REMOVED FROM SILT BAGS CAN
BE SPREAD ON SITE AS LANDSCAPE
MATERIAL AS LONG AS IT HAS BEEN
ADEQUATELY DEWATERED SUCH THAT IT
WILL NOT MIGRATE DOWNSLOPE WHEN
PLACED. SILT BAG MATERIAL SHALL NOT
BE USED AS BACKFILL OR PLACED WHERE
STRUCTURAL MATERIAL IS REQUIRED.
DEWATERING WITH FILTER BAG DETAIL
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Details 10.0
ARMORTEC'TQUKQP%QPVTQN5QNWVKQPU
#%106'%*%1/2#0;
%'064'21+06'&457+6'
9'56%*'56'41*+1
2*
Ä(#:
Ä
ARTICULATED BLOCK - OPEN CELL MAT ARTICULATED BLOCK - STANDARD DIMENSIONS ARMORTEC'TQUKQP%QPVTQN5QNWVKQPU
#%106'%*%1/2#0;
%'064'21+06'&457+6'
9'56%*'56'41*+1
2*
Ä(#:
Ä
MAY 3, 2018 Lumbee Tribe of NC - Cultural Center Lake Dam Repairs
PO BOX 2294 LIC # C1842
KERNERSVILLE, NC 27284
OFFICE: (336) 996-9974 jewellengineering.pro
SHEET NO.
17-233-014
PRELIMINARY
DRAWINGS
NOT FOR
CONSTRUCTION
Details 10.1
BEDDING FOR ACB DETAIL