Loading...
HomeMy WebLinkAbout20090571 Ver 1_401 Application_20090518City of Lenoir Memorandum of Transmittal C?jn?i F?A2c?y-I f To: From Charles Beck. Director of Public Works nc. u5. q0I c We+?rh s Un ? / images Ckbe?k a?C;. 6-:p-, ?65?0 /Glut Se?°?:c l?eu Phone: 8? 7s 7 0?/?3 F /ICS. x'76W- 16.s-0 Date: 6-- //- 0 9 Re: R - 3 °/ 3 CC: o Urgent For Review o Please Comment rr / o Please Reply o Please Recycle 02 uS,Oh 0ti -, L ? --r-o e- A,-? 40, ob- iwoi,c- oy+:oti. -- ae_ QC?C????IG MAY 1 8 2009 DENR • WATER allAUTY WETLANDS AND STDRMWATER BRANCH 01FW^A7f;9.OG ® 90' ® 5 7 a IryJ{i'?J`_7C Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: I Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NW P) number: or General Permit (GP) number: 198200031 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWO 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Replacement of Bridge No. 68 on Mulberry Street over Lower Creek 2b. County: Caldwell 2c. Nearest municipality / town: City of Lenoir 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: TIP B-3932, WBS 33365.3.1 fi 3. Owner Information MAY 1 8 2009 3a. Name(s) on Recorded Deed: ITY 3b. Deed Book and Page No. yrETIM+MOM TORMN'AIFRBRAN08 3c., Responsible Party (for LLC if applicable): Charles Beck, Public Works Director, City of Lenoir 3d. Street address: P.O. Box 958 3e. City, state, zip: Lenoir, NC 28645 3f. Telephone no.: (828) 757-2183 3g. Fax no.: (828) 757-2112 3h. Email address: ckbeck@ci.lenoir.nc.us Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: Consultant 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. AgenttConsultant Information (if applicable) 5a. Name: Jimmy L. Terry, PE 5b. Business name (if applicable): TGS Engineers 5c. Street address: 141 Walnut Street, Suite 141 5d. City, state, zip: Cary, NC 27511 5e. Telephone no.: (919) 319-8850 Ext. 106 5f. Fax no.: (919) 319-6999 5g. Email address: jterry@tgsengineers.com Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: 35.9059 Longitude: - 81.5329 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Lower Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Developed outdoor recreational and sporting. 3b. List the total estimated acreage of all existing wetlands on the property: No wetlands exist in vicinity of project. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 70 It 3d. Explain the purpose of the proposed project: To replace a deteriorating and structurally deficient bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: Bridge No. 68 is to be replaced with a two-span prestressed concrete cored slab bridge. The existing stream banks will be lined with rip rap for erosion protection. No heavy construction equipment will be needed in the surface water. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Environmental Services, Name (if known): Inc. Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. January 26, 2007 (See attached CE) 5. Project History 5a. Have permits or certifications been requested or obtained for h ? Yes ®No ? Unknown t is project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent(P)or intermittent DWQ-non-404 width (linear Temporary (T) (INT)? , other) (feet) feet) S1 ®P ? T Bank Stabilization Drilled Piers Lower Creek ® PER ? INT ® Corps ® DWQ 30-40 70 S2 ? P ®T Construction Pad Lower Creek ® PER ? INT ® Corps ® DWQ 30 40 60 S3 ? PEI T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 El P [I T ? PER El Corps ? INT ? DWQ 3h. Total stream and tributary impacts 70 3i. Comments: Temporary Impact for the construction pad is within the Permanent Impact area. Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number- (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem ora T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? B1 ?P?T ?Yes ? No B2 ? P ? T ? Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: I Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Due to the proximity of the intersection with NC 18 (Morganton Blvd.) and the hydrologic no-rise FEMA model, the bridge needed to be a two-span cored slab to give sufficient clearance to avoid a rise in the water surface elevations of Lower Creek. Due to the restraints of cored slab span lengths, a pier had to be placed in the vicinity of surface water. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Erosion control measures will be implemented in accordance to NCDENR standards. The bridge demolition activities will strictly follow NCDOT's Best Management Practices for Bridge Demolition and Removal. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ®No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. Comments: ? Yes ? No 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? 0% 2b . Does this project require a Stormwater Management Plan? ? Yes ® No 2c . If this project DOES NOT require a Stormwater Management Plan, explain why: There is no increase in impervious area due to the project construction. 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWO Stormwater Program ? DWO401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Lenoir ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW apply (check all that apply): ? USMP ? Water Supply Watershed ? Other: None 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HOW ? ORW (check all that apply): ? Session Law 2006-246 ® Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ® Yes ? No 5. DWO 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWO Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the f ® Yes ? No use o public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? tc. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ® Yes ? No Comments: 2. Violations (DWO Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H.0500), Isolated Wetland Rules (15A NCAC 2H.1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ®No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWO Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWO Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No impacts? Raleigh ® 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Biological surveys by ESI (See CE). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? hftp://ocean.floridamarine.org/efh_coraLrims/viewer.htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina Department of Cultural Resources (See CE) 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: A floodplain development permit has been approved(See Attached) 8c. What source(s) did you use to make the floodplain determination? FEMA Model Charles Beck Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version pppp? 1\ NORTH CAROLINA , , `) g0 VICINITY t _. \ 77 \ 1 gq \ 1 I I I 1• I' I .r CITY OF LENOIR PROJECT: B-3932 CALDWELL COUNTY REPLACE BRIDGE NO. 68 MAP ON a1fJWER CREEK ON 1 L MULBERRY STREET SHEET ? OF ? ? MAY 209 0 1 2 3 4 5 10 Miles 11 1? . , 1 IMPACTED LOWER CREEK SURFACE WATER B3 PLAN VIEW 9m DENOTES IMPACTS IN SURFACE WATER ? 'i s 4 i5 sA scue: r = so• CITY OF ]LIENOIR CALDWELL COUNTY PROJECT. 33365.3.1 (B-3932) REPLACE BRIDGE NO.68 OVER LOWER CREEK ON MULBERRY STREET 3 OF 7 05/06/ pp? IMPACTED LOWER CREEK SURFACE WATER a3 V I lip ? ,aa PLAN VIEW DENOTES IMPACTS IN SURFACE WATER ;s ;.s q ss sp n?rnn???a SCALE: T = 5p• wr CITY OF ILIENOIR CALDWELL COUNTY PROJECT: 33365.3.1 (B-3932) REPLACE BRIDGE NO.68 OVER LOWER CREEK ON MULBERRY STREET SHEET 4 OF 7 05/06/ E ry N C N - N c c c 5 - - - - - - - - - - - - `N m N C ? U E ? w E 6 OI N N 0 W C C U C m F n E .w n L C Ea 3 W O N m N K E m ? '- E N - N m U , N F b N E y i C W ° a Q C C O U t d G N C C U U y N a°v°c L N U o Q 2 N 3 ? a ? - - - - - - - - - - - - - - ? Q o v j ? U K = x3A K w 111 3 c a ? z W 3 = LL ' Z E CL T F C 3 v a c c c m = m ? €LL3 a n w ? J a ? Q d m 0 N U 2 H N < O a w U -- -- -- -- -- -- -- m -- -- -- W O W O Q W o E % N LL A m } O Q N J d tq Z - -- -- -- -- -- -- -- - W g f W LL' C h o ? r Z R W Z m low ? o? 1IU O= W ?T m 0 w W ?j Q 6 w U W U 6U wK K ; O J A LL w N . . A PROPERTY OWNERS NAMES AND ADDRESSES NAMES ADDRESSES THE LENOIR OPTIMIST CLUB INC. CITY OF LENOIR NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 415 HIGH CIRCLE LENOIR, NC 28645 P.O. BOX 500 LENOIR, NC 28645 P.O. BOX 250 NORTH WILKESBORO,NC 28659 CITY OF LENOIR CALDWELL COUNTY PROJECT: B-3932 REPLACE BRIDGE NO.68 OVER LOWER CREEK ON MULBERRY STREET SHEET 7 OF 7