Memorandum of Transmittal
C?jn?i F?A2c?y-I f
To: From Charles Beck. Director of Public Works
nc. u5.
q0I c
We+?rh s Un ? / images Ckbe?k a?C;. 6-:p-,
?65?0 /Glut Se?°?:c l?eu Phone: 8? 7s 7 0?/?3 F
/ICS. x'76W- 16.s-0 Date: 6-- //- 0 9
Re: R - 3 °/ 3 CC:
o Urgent For Review o Please Comment
rr /
o Please Reply o Please Recycle
02
uS,Oh
0ti -, L ? --r-o e- A,-? 40, ob- iwoi,c- oy+:oti. -- ae_
QC?C????IG
MAY 1 8 2009
DENR • WATER allAUTY
WETLANDS AND STDRMWATER BRANCH
01FW^A7f;9.OG ® 90' ® 5 7
a IryJ{i'?J`_7C
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
I
Section 404 Permit El Section 10 Permit
1 b. Specify Nationwide Permit (NW P) number: or General Permit (GP) number: 198200031
1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required? For the record only for DWO 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ® No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below. ? Yes ® No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Replacement of Bridge No. 68 on Mulberry Street over Lower Creek
2b. County: Caldwell
2c. Nearest municipality / town: City of Lenoir
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no: TIP B-3932, WBS 33365.3.1 fi
3. Owner Information MAY 1 8 2009
3a. Name(s) on Recorded Deed: ITY
3b. Deed Book and Page No. yrETIM+MOM TORMN'AIFRBRAN08
3c., Responsible Party (for LLC if
applicable): Charles Beck, Public Works Director, City of Lenoir
3d. Street address: P.O. Box 958
3e. City, state, zip: Lenoir, NC 28645
3f. Telephone no.: (828) 757-2183
3g. Fax no.: (828) 757-2112
3h. Email address: ckbeck@ci.lenoir.nc.us
Page 1 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify: Consultant
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. AgenttConsultant Information (if applicable)
5a. Name: Jimmy L. Terry, PE
5b. Business name
(if applicable): TGS Engineers
5c. Street address: 141 Walnut Street, Suite 141
5d. City, state, zip: Cary, NC 27511
5e. Telephone no.: (919) 319-8850 Ext. 106
5f. Fax no.: (919) 319-6999
5g. Email address: jterry@tgsengineers.com
Page 2 of 10
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1b. Site coordinates (in decimal degrees): Latitude: 35.9059 Longitude: - 81.5329
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Lower Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Catawba
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Developed outdoor recreational and sporting.
3b. List the total estimated acreage of all existing wetlands on the property:
No wetlands exist in vicinity of project.
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
70 It
3d. Explain the purpose of the proposed project:
To replace a deteriorating and structurally deficient bridge.
3e. Describe the overall project in detail, including the type of equipment to be used:
Bridge No. 68 is to be replaced with a two-span prestressed concrete cored slab bridge. The existing stream banks will
be lined with rip rap for erosion protection. No heavy construction equipment will be needed in the surface water.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / ®Yes ? No
? Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type Preliminary ® Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Environmental Services,
Name (if known): Inc.
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
January 26, 2007 (See attached CE)
5. Project History
5a. Have permits or certifications been requested or obtained for
h ? Yes
®No ? Unknown
t
is project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent(P)or intermittent DWQ-non-404 width (linear
Temporary (T) (INT)? ,
other) (feet) feet)
S1 ®P ? T Bank Stabilization
Drilled Piers Lower Creek ® PER
? INT ® Corps
® DWQ 30-40 70
S2 ? P ®T Construction Pad Lower Creek ® PER
? INT ® Corps
® DWQ
30 40
60
S3 ? PEI T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 El P [I T ? PER El Corps
? INT ? DWQ
3h. Total stream and tributary impacts 70
3i. Comments: Temporary Impact for the construction pad is within the Permanent Impact area.
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number- (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWO)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ?Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number- Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary impact required?
B1 ?P?T ?Yes
? No
B2 ? P ? T ? Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts
6i. Comments:
I Page 5 of 10
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Due to the proximity of the intersection with NC 18 (Morganton Blvd.) and the hydrologic no-rise FEMA model, the bridge
needed to be a two-span cored slab to give sufficient clearance to avoid a rise in the water surface elevations of Lower Creek.
Due to the restraints of cored slab span lengths, a pier had to be placed in the vicinity of surface water.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Erosion control measures will be implemented in accordance to NCDENR standards. The bridge demolition activities will
strictly follow NCDOT's Best Management Practices for Bridge Demolition and Removal.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
El Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ®No
within one of the NC Riparian Buffer Protection Rules?
1 b . If yes, then is a diffuse flow plan included? If no, explain why.
Comments: ? Yes ? No
2. Stormwater Management Plan
2a . What is the overall percent imperviousness of this project? 0%
2b . Does this project require a Stormwater Management Plan? ? Yes ® No
2c . If this project DOES NOT require a Stormwater Management Plan, explain why: There is no increase in impervious area
due to the project construction.
2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWO Stormwater Program
? DWO401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? City of Lenoir
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
apply (check all that apply): ? USMP
? Water Supply Watershed
? Other: None
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
4a.
Which of the following state-implemented stormwater management programs apply ? HOW
? ORW
(check all that apply): ? Session Law 2006-246
® Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ® Yes ? No
5. DWO 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWO Requirement)
la. Does the project involve an expenditure of public (federal/state/local) funds or the
f
® Yes
? No
use o
public (federal/state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ® Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
tc. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ® Yes ? No
Comments:
2. Violations (DWO Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H.0500), Isolated
Wetland Rules (15A NCAC 2H.1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B.0200)?
2b. Is this an after-the-fact permit application? ? Yes ®No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWO Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ®No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWO Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No
impacts?
Raleigh
®
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Biological surveys by ESI (See CE).
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
hftp://ocean.floridamarine.org/efh_coraLrims/viewer.htm
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
North Carolina Department of Cultural Resources (See CE)
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No
8b. If yes, explain how project meets FEMA requirements: A floodplain development permit has been approved(See Attached)
8c. What source(s) did you use to make the floodplain determination? FEMA Model
Charles Beck
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 10 of 10
PCN Form - Version 1.3 December 10, 2008 Version
pppp?
1\
NORTH CAROLINA
,
,
`) g0
VICINITY
t _.
\ 77
\
1
gq \ 1
I
I
I
1•
I'
I
.r
CITY OF LENOIR
PROJECT: B-3932
CALDWELL COUNTY
REPLACE BRIDGE NO. 68
MAP ON a1fJWER CREEK ON
1 L MULBERRY STREET
SHEET ? OF ? ?
MAY 209
0 1 2 3 4 5 10 Miles
11
1?
. , 1
IMPACTED LOWER CREEK SURFACE WATER
B3
PLAN VIEW
9m DENOTES IMPACTS IN
SURFACE WATER
? 'i s 4 i5 sA
scue: r = so•
CITY OF ]LIENOIR
CALDWELL COUNTY
PROJECT. 33365.3.1 (B-3932)
REPLACE BRIDGE NO.68
OVER LOWER CREEK ON
MULBERRY STREET
3 OF 7
05/06/
pp?
IMPACTED LOWER CREEK SURFACE WATER
a3
V
I
lip ? ,aa
PLAN VIEW
DENOTES IMPACTS IN
SURFACE WATER
;s ;.s q ss sp
n?rnn???a
SCALE: T = 5p•
wr
CITY OF ILIENOIR
CALDWELL COUNTY
PROJECT: 33365.3.1 (B-3932)
REPLACE BRIDGE NO.68
OVER LOWER CREEK ON
MULBERRY STREET
SHEET 4 OF 7 05/06/
E
ry N C
N -
N
c c c
5 - - - - - - - - - - - -
`N m
N C
?
U E ?
w E
6
OI N N 0
W C C U C
m
F
n
E
.w n
L C
Ea
3
W
O N
m
N
K E
m
? '- E
N
- N m
U
,
N
F b N
E
y
i
C
W
°
a
Q C C O U
t d G N
C
C U U y
N
a°v°c
L N
U o
Q
2
N 3
?
a ?
-
-
- -
- -
- -
-
- - -
- -
? Q
o v
j ? U
K
= x3A
K
w
111
3 c
a ?
z W
3 =
LL
'
Z E CL
T
F
C
3 v a
c
c
c
m = m ?
€LL3
a
n w
?
J
a ? Q
d m
0
N
U
2 H
N < O
a w
U
-- -- -- -- -- -- --
m -- -- --
W
O W
O Q
W o
E
%
N
LL
A
m
}
O
Q
N
J
d
tq Z - -- -- -- -- -- -- -- -
W
g
f
W
LL' C
h
o
? r
Z R
W
Z m
low
?
o?
1IU O=
W
?T m 0
w W
?j
Q 6 w
U W
U 6U
wK
K ;
O
J A
LL
w
N
. . A
PROPERTY OWNERS
NAMES AND ADDRESSES
NAMES
ADDRESSES
THE LENOIR OPTIMIST CLUB INC.
CITY OF LENOIR
NORTH CAROLINA DEPARTMENT
OF TRANSPORTATION
415 HIGH CIRCLE
LENOIR, NC 28645
P.O. BOX 500
LENOIR, NC 28645
P.O. BOX 250
NORTH WILKESBORO,NC 28659
CITY OF LENOIR
CALDWELL COUNTY
PROJECT: B-3932
REPLACE BRIDGE NO.68
OVER LOWER CREEK ON
MULBERRY STREET
SHEET 7 OF 7