Loading...
HomeMy WebLinkAboutNC0066516_Engineer Certification_20180522Town of Fuquay-Varina Terrible Creek WWTP Authorization to Construct No. 066516A03 Issued February 5, 2016 Engineer's Certification as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (eriodicaIl /weekly/full time) the construction of the modifications and improvements to the 'I'errib a reek astewater Treatment Plant, located in Wake County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Demolition of existing influent wet wells, existing clarifiers # 1, #2, #3, existing tertiary filters #1, #2, #3, existing blowers, existing chemical storage facility, existing post aeration basin, existing UV disinfection system, and other surplus components; refurbishment of existing treatment plant #1 and 42 basins to two (2) 0.383 MG EQ basins, piping, and controls; refurbishment of treatment plant #3 basin to one (1) 0.682 MG EQ basin, piping, and controls; installation of new influent pump station with 18 MGD peak hourly mechanical and manual coarse screen system and incline conveyor, consisting of four (4) submersible 1,565 GPM at 58 ft TDH pumps with VFD, two (2) submersible 781 GPM at 58 ft TDH pumps with VFD, influent composite sampler, piping, and controls; Installation of new preliminary treatment facility consisting of two (2) 4.5 MGD peak hourly mechanical step fine screens systems, a manual screen channel, two (2) 4.5 MGFD peak hourly grit removal systems with cyclone/classifier and screening compactor, a manual grit bypass channel, three (3) 300 GPM at 55 ft TDH grit pumps, piping, and controls; installation of new BNR tanks/secondary clarifier splitter box with drop leg air diffusers (both sides) and ALS addition diffusers (clarifier side), piping, and controls; installation of two (2) new five stage (zones) 2.25 MG BNR tanks with fine air bubble diffuser array, zone 1 has one (1) mechanical mixer and influent sump, zone 2 has four (4) mechanical mixers and drain sump, zone 3 has one submersible (1) 6,250 GPM at 1 ft TDH NRYC pump with VFD and drain sump, zone 4 has two (2) mechanical mixers and SCS addition diffusers, zone 5 has drain sump and effluent outlet, piping, and controls; installation of two (2) new 85 ft diameter clarifiers with 200 GPM at 28 TDH scum pumps, piping, and controls; installation of new RAS/WAS pump station consisting of three (3) 1,389 GPM at 28 ft TDH pumps with VFD, piping, and controls; installation of four (4) new blowers with VFD, 2 blowers each 1,410 SUM at 15 psig maximum and 2 blowers each 1,100 SCFM at 15 psig maximum, piping, and controls; installation of two (2) new 309 ft2 tertiary disk filters systems with each filter system peak flow rated at 4.5 MGD and consisting of internal backwash pump system and wash system, multiple disks, piping, and controls; installation of new dual channel UV system with UV intensity and lamp monitoring and automatic lamp sleeve cleaning, system rated for disinfection of 9.0 MGD to meet NPDES fecal coliform limits per North Carolina minimum UV design criterion, 3 banks in series per channel, 8 lamps per bank, with one bank per channel designated as stand by, and other controls; installation of new post aeration weir channels, effluent composite sampler, piping, and controls: installation of new internal UW pump system consisting of sump, 250 gallon hydropneumatic tank, four (4) 130 GPM at 200 ft TDH pumps, piping, and controls; installation of one (1) new 0.4 MG Sludge Terrible Creek WWTP Authorization to Construct No. 066516A03 Issued February 5, 2016 Storage tank with fine air bubble diffuser array, piping, and controls; installation of new sludge dewatering and truck loadout system consisting of two (2) 400 GPM at 70 TDH Dewatering Sludge Feed pumps, two (2) adjustable polymer addition and mixer systems design for maximum 1,500 GPH of 2% polymer solution, two (2) integrated independent gravity belt thickener with sludge hopper and screw conveyor and continuous belt filter press , two (2) 100 GPM at 115 ft TDH TWAS pumps, three (3) in series dewatered sludge screw conveyors designed for maximum 24,000 lbs/hr, contained truck loading area, piping, and controls; installation of new chemical storage area and chemical feed systems with containment for each chemical tank system and for the corresponding truck unloading area, consisting of one (1) 5,000 gallon ALS tank with three (3) 111 GPH at 30 psig adjustable chemical feed pumps and contaimnent sump with pump, one (1) 13,000 gallon caustic storage tank with water dilution meter and two (2) 110 GPM at 20 TDH circulation/mixing pumps and two (2) 111 GPH at 30 psig adjustable chemical feed pumps and containment sump with pump, one (1) 7,300 gallon SCS tank with three (3)111 GPH at 30 psig adjustable chemical feed pumps and containment sump with pump, piping, and controls; installation of one (1) diesel driven 1,000 KW, 480 vac, 3 phase standby generator system with 24 hr capacity fuel tank, and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environmental Quality. Upon completion of construction and submittal of this Engineering Certificate the facility is confirming its expansion to 3.0 MGD and will be subject to NPDES permit requirements for 3.0 MGD. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date 57 z Z / I k Mail this Certification to: Attn: -Ren4gtm, f3 -, y9 Q oA Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 3Z4ia9 t�A1?0�11 ���q •;l'G1NE� •ra0r� ��rrrull�i��� �.•